CN107591758A - 一种适应锥筒风塔的风电母线安装方法 - Google Patents
一种适应锥筒风塔的风电母线安装方法 Download PDFInfo
- Publication number
- CN107591758A CN107591758A CN201710863110.4A CN201710863110A CN107591758A CN 107591758 A CN107591758 A CN 107591758A CN 201710863110 A CN201710863110 A CN 201710863110A CN 107591758 A CN107591758 A CN 107591758A
- Authority
- CN
- China
- Prior art keywords
- support column
- wind
- power bus
- wind power
- tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Landscapes
- Wind Motors (AREA)
Abstract
本发明适应锥筒风塔的风电母线安装方法,风电母线安装板通过支撑柱安装在风塔内壁支撑板上,自风塔顶部至风塔底部的支撑柱长度依次增加,以适应锥形风塔的锥度,使得风电母线保持中心垂直度,风电母线受力均匀,减了小风电母线运行时的振动,系统运行稳定性好,安全系数高。
Description
技术领域
本发明涉及一种适应锥筒风塔的风电母线安装方法。
背景技术
风能资源蕴含量巨大,风力发电行业技术的迅猛发展及广阔前景对母线槽产品带来了巨大的市场需求,风电母线槽产品为风力发电机组必不可少的供电系统,现有风力发电系统中的母线槽产品一般通过安装结构固定安装于相当于高层建筑的风塔中,而风塔一般具有上小下大的锥体形状,以适应高强风力作用于风扇发电的同时对风塔主体造成的摇摆、剪切、振动等破坏性反作用力,风电母线安装于风塔主体内部时需适应风塔上小下大的锥体形状,同时风电母线也不能倾斜安装,防止风电母线受力不均匀,影响风电母线系统运行稳定性,造成安全隐患。
发明内容
本发明所要解决的技术问题是,提供一种能够适应风塔主体上小下大的锥体形状,保持风电母线垂直度,适应锥筒风塔的风电母线安装方法。
本发明适应锥筒风塔的风电母线安装方法,包括以下步骤:
第一步,测量风塔顶部风扇主轴至底部控制柜顶部垂直距离,根据垂直距离计算分段母线段数N,每段风电母线标称长度为6m,余数分别设置为两端始端母线、终端连接电缆连接距离;
第二步,每段母线均匀设置两个支撑点,支撑点总数为2N,计算各支撑点至风塔锥筒顶部距离;
第三步,塔顶第一支撑点位置安装支撑板,支撑板通过第一支撑柱固定连接在风电母线的第一安装板上;
第四步,塔顶第二支撑点位置安装支撑板,支撑板通过第二支撑柱固定连接在风电母线第二安装板上,第二支撑柱长度大于第一支撑柱,第二支撑柱与第一支撑柱长度差为A;
第五步,安装第三支撑点的支撑板,并通过第三支撑柱固定连接在风电母线第三安装板上,第三支撑柱长度大于第二支撑柱,第三支撑柱与第二支撑柱长度差也为A;
第六步,依次类推,重复安装第四支撑点至第2N支撑点的支撑板,并分别通过第四支撑柱至第2N支撑柱固定连接在风电母线第四安装板至第2N安装板上,第2N支撑柱长度大于第(2N-1)支撑柱,第2N支撑柱与第(2N-1)支撑柱长度差也为A;
所述第四步至第六步中的A值通过经伟仪测量确定;
所述第四步至第六步中的A值根据风塔锥度通过余弦定理计算确定;
所述安装板通过减震器与风电母线连接。
本发明适应锥筒风塔的风电母线安装方法,风电母线安装板通过支撑柱安装在风塔内壁支撑板上,自风塔顶部至风塔底部的支撑柱长度依次增加,以适应锥形风塔的锥度,使得风电母线保持中心垂直度,风电母线受力均匀,减了小风电母线运行时的振动,系统运行稳定性好,安全系数高。
具体实施方式
一种适应锥筒风塔的风电母线安装方法,包括以下步骤:
第一步,测量风塔顶部风扇主轴至底部控制柜顶部垂直距离,根据垂直距离计算分段母线段数N,每段风电母线标称长度为6m,余数分别设置为两端始端母线、终端连接电缆连接距离;
第二步,每段母线均匀设置两个支撑点,支撑点总数为2N,计算各支撑点至风塔锥筒顶部距离;
第三步,塔顶第一支撑点位置安装支撑板,支撑板通过第一支撑柱固定连接在风电母线的第一安装板上;
第四步,塔顶第二支撑点位置安装支撑板,支撑板通过第二支撑柱固定连接在风电母线第二安装板上,第二支撑柱长度大于第一支撑柱,第二支撑柱与第一支撑柱长度差为A;
第五步,安装第三支撑点的支撑板,并通过第三支撑柱固定连接在风电母线第三安装板上,第三支撑柱长度大于第二支撑柱,第三支撑柱与第二支撑柱长度差也为A;
第六步,依次类推,重复安装第四支撑点至第2N支撑点的支撑板,并分别通过第四支撑柱至第2N支撑柱固定连接在风电母线第四安装板至第2N安装板上,第2N支撑柱长度大于第(2N-1)支撑柱,第2N支撑柱与第(2N-1)支撑柱长度差也为A;
所述第四步至第六步中的A值通过经伟仪测量确定;
所述第四步至第六步中的A值根据风塔锥度通过余弦定理计算确定;
所述安装板通过减震器与风电母线连接。
本发明适应锥筒风塔的风电母线安装方法,风电母线安装板通过支撑柱安装在风塔内壁支撑板上,自风塔顶部至风塔底部的支撑柱长度依次增加,以适应锥形风塔的锥度,使得风电母线保持中心垂直度,风电母线受力均匀,减了小风电母线运行时的振动,系统运行稳定性好,安全系数高。
Claims (4)
1.一种适应锥筒风塔的风电母线安装方法,包括以下步骤:
第一步,测量风塔顶部风扇主轴至底部控制柜顶部垂直距离,根据垂直距离计算分段母线段数N,每段风电母线标称长度为6m,余数分别设置为两端始端母线、终端连接电缆连接距离;
第二步,每段母线均匀设置两个支撑点,支撑点总数为2N,计算各支撑点至风塔锥筒顶部距离;
第三步,塔顶第一支撑点位置安装支撑板,支撑板通过第一支撑柱固定连接在风电母线的第一安装板上;
第四步,塔顶第二支撑点位置安装支撑板,支撑板通过第二支撑柱固定连接在风电母线第二安装板上,第二支撑柱长度大于第一支撑柱,第二支撑柱与第一支撑柱长度差为A;
第五步,安装第三支撑点的支撑板,并通过第三支撑柱固定连接在风电母线第三安装板上,第三支撑柱长度大于第二支撑柱,第三支撑柱与第二支撑柱长度差也为A;
第六步,依次类推,重复安装第四支撑点至第2N支撑点的支撑板,并分别通过第四支撑柱至第2N支撑柱固定连接在风电母线第四安装板至第2N安装板上,第2N支撑柱长度大于第(2N-1)支撑柱,第2N支撑柱与第(2N-1)支撑柱长度差也为A。
2.根据权利要求1所述适应锥筒风塔的风电母线安装方法,其特征在于:所述第四步至第六步中的A值通过经伟仪测量确定。
3.根据权利要求1所述适应锥筒风塔的风电母线安装方法,其特征在于:所述第四步至第六步中的A值根据风塔锥度通过余弦定理计算确定。
4.根据权利要求1所述适应锥筒风塔的风电母线安装方法,其特征在于:所述安装板通过减震器与风电母线连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710863110.4A CN107591758B (zh) | 2017-09-22 | 2017-09-22 | 一种适应锥筒风塔的风电母线安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710863110.4A CN107591758B (zh) | 2017-09-22 | 2017-09-22 | 一种适应锥筒风塔的风电母线安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107591758A true CN107591758A (zh) | 2018-01-16 |
CN107591758B CN107591758B (zh) | 2023-07-28 |
Family
ID=61047601
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710863110.4A Active CN107591758B (zh) | 2017-09-22 | 2017-09-22 | 一种适应锥筒风塔的风电母线安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107591758B (zh) |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3647937A (en) * | 1970-10-02 | 1972-03-07 | Square D Co | Weatherproof bus duct joint structure having selectively removable parts |
CN201134653Y (zh) * | 2007-12-19 | 2008-10-15 | 中国电力科学研究院 | 一种试验线段管母线连接金具 |
CN201256250Y (zh) * | 2008-08-21 | 2009-06-10 | 刘仕洪 | 节能电器开关柜 |
CN201813126U (zh) * | 2010-06-22 | 2011-04-27 | 唐伟 | 一种防爆的风能母线槽 |
CN102797643A (zh) * | 2012-07-31 | 2012-11-28 | 同济大学 | 一种风力发电塔装置 |
CN203056495U (zh) * | 2013-01-07 | 2013-07-10 | 沈阳锦宏电力科技有限公司 | 一种风电铝管母线结构 |
CN104009432A (zh) * | 2014-05-13 | 2014-08-27 | 镇江西门子母线有限公司 | 一种风能导电轨安装支架 |
CN105745438A (zh) * | 2013-09-17 | 2016-07-06 | 奥兰多·罗琦 | 垂直轴风力涡轮机风轮 |
CN106089595A (zh) * | 2016-08-05 | 2016-11-09 | 国网山东省电力公司龙口市供电公司 | 一种风塔电力输送装置 |
CN106164563A (zh) * | 2014-04-11 | 2016-11-23 | 保罗·瓦尔有限公司和两合公司 | 用于将集电器接触部竖直地引入到路径的汇流排中的用于路径的定位区域 |
CN205752997U (zh) * | 2015-11-25 | 2016-11-30 | 中国能源建设集团浙江省电力设计院有限公司 | 基于垂直排列导线的变电构架 |
CN205811293U (zh) * | 2016-07-25 | 2016-12-14 | 国网浙江省电力公司经济技术研究院 | 单柱双母线背靠背垂直布置结构 |
CN205882617U (zh) * | 2016-07-15 | 2017-01-11 | 马鞍山纽盟知识产权管理服务有限公司 | 一种母线槽支架 |
CN106374406A (zh) * | 2016-09-29 | 2017-02-01 | 易升伟 | 一种母线槽 |
-
2017
- 2017-09-22 CN CN201710863110.4A patent/CN107591758B/zh active Active
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3647937A (en) * | 1970-10-02 | 1972-03-07 | Square D Co | Weatherproof bus duct joint structure having selectively removable parts |
CN201134653Y (zh) * | 2007-12-19 | 2008-10-15 | 中国电力科学研究院 | 一种试验线段管母线连接金具 |
CN201256250Y (zh) * | 2008-08-21 | 2009-06-10 | 刘仕洪 | 节能电器开关柜 |
CN201813126U (zh) * | 2010-06-22 | 2011-04-27 | 唐伟 | 一种防爆的风能母线槽 |
CN102797643A (zh) * | 2012-07-31 | 2012-11-28 | 同济大学 | 一种风力发电塔装置 |
CN203056495U (zh) * | 2013-01-07 | 2013-07-10 | 沈阳锦宏电力科技有限公司 | 一种风电铝管母线结构 |
CN105745438A (zh) * | 2013-09-17 | 2016-07-06 | 奥兰多·罗琦 | 垂直轴风力涡轮机风轮 |
CN106164563A (zh) * | 2014-04-11 | 2016-11-23 | 保罗·瓦尔有限公司和两合公司 | 用于将集电器接触部竖直地引入到路径的汇流排中的用于路径的定位区域 |
CN104009432A (zh) * | 2014-05-13 | 2014-08-27 | 镇江西门子母线有限公司 | 一种风能导电轨安装支架 |
CN205752997U (zh) * | 2015-11-25 | 2016-11-30 | 中国能源建设集团浙江省电力设计院有限公司 | 基于垂直排列导线的变电构架 |
CN205882617U (zh) * | 2016-07-15 | 2017-01-11 | 马鞍山纽盟知识产权管理服务有限公司 | 一种母线槽支架 |
CN205811293U (zh) * | 2016-07-25 | 2016-12-14 | 国网浙江省电力公司经济技术研究院 | 单柱双母线背靠背垂直布置结构 |
CN106089595A (zh) * | 2016-08-05 | 2016-11-09 | 国网山东省电力公司龙口市供电公司 | 一种风塔电力输送装置 |
CN106374406A (zh) * | 2016-09-29 | 2017-02-01 | 易升伟 | 一种母线槽 |
Non-Patent Citations (2)
Title |
---|
欧阳潮: "600MW机组脱硫装置电气系统设计分析", 《电力科学与工程》 * |
穆国锋;辛晓涛;张韶华;: "石门坎水电站双曲拱坝施工测量", 云南水力发电 * |
Also Published As
Publication number | Publication date |
---|---|
CN107591758B (zh) | 2023-07-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8578676B2 (en) | Tower barrel, wind tower and wind power plant for wind electric power generation | |
KR20110009209A (ko) | 대형 수직축 풍력 발전기 구조 | |
CN102623895A (zh) | 防雷装置及风电机组 | |
CN201260056Y (zh) | 分散式防舞动间隔棒 | |
CN108598998A (zh) | 一种架空地线防震锤复位装置 | |
CN203481707U (zh) | 上桩头引流线固定杆 | |
CN102564715A (zh) | 500kV紧凑型输电线路三相分裂导线微风振动模拟试验平台 | |
CN107591758A (zh) | 一种适应锥筒风塔的风电母线安装方法 | |
CN109449867A (zh) | ±1100kv直流线路耐张塔避雷器装置及拆装方法 | |
CN108963948A (zh) | 一种用于超大型钢结构雷达的防雷装置 | |
CN102751687A (zh) | 一种高压交流线路耐张塔引流金具 | |
KR101066637B1 (ko) | 가공송전선의 처짐 방지 장치 | |
CN205123000U (zh) | 一种驱鸟型避雷器 | |
CN108242791A (zh) | 一种风电母线安装方法 | |
CN205478119U (zh) | 框架结构风力发电平台 | |
CN206976984U (zh) | 一种箱式变压器低压侧用的电缆抱箍组件 | |
CN109449868A (zh) | ±1100kv直流线路直线塔避雷器装置及拆装方法 | |
CN202759154U (zh) | 空气间隙线路型避雷器电极结构 | |
CN204809803U (zh) | 一种可悬挂避雷线的新型耐张杆 | |
CN107453303A (zh) | 一种适应风塔摇摆的风电母线安装方法 | |
CN201671390U (zh) | 一种自立式输电线路铁塔纠偏装置 | |
CN110576288A (zh) | 一种离相封闭母线绝缘子支座定位焊接的工装胎具及其使用方法 | |
CN209233437U (zh) | ±1100kv直流线路直线塔避雷器装置 | |
CN202930879U (zh) | 一种防风偏绝缘支撑装置 | |
CN204793977U (zh) | 一种可悬挂避雷线的耐张杆 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |