CN107590625A - Intelligent management system and method - Google Patents

Intelligent management system and method Download PDF

Info

Publication number
CN107590625A
CN107590625A CN201610537896.6A CN201610537896A CN107590625A CN 107590625 A CN107590625 A CN 107590625A CN 201610537896 A CN201610537896 A CN 201610537896A CN 107590625 A CN107590625 A CN 107590625A
Authority
CN
China
Prior art keywords
module
stock
information
equipment
intelligent management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610537896.6A
Other languages
Chinese (zh)
Inventor
高二雄
王秀林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitac Computer Shunde Ltd
Original Assignee
Mitac Computer Shunde Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitac Computer Shunde Ltd filed Critical Mitac Computer Shunde Ltd
Priority to CN201610537896.6A priority Critical patent/CN107590625A/en
Publication of CN107590625A publication Critical patent/CN107590625A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • General Factory Administration (AREA)

Abstract

The present invention provides a kind of intelligent management system and method, is connected to ERP server, including integrates module, and data syn-chronization is carried out with ERP server;Inventory database, store and update stock;Stock management module, identify and record storage material information, generate receiving note, update stock;Stock module, according to the stock order received, material is searched in stock to take;Equipment on-line module, crawl material casting rate, material surplus etc. online with process equipment;Production management module, receive ERP server in production scheduling, work order, receive the information such as the material casting rate, material surplus, according to the work order material to the stock module send one stock order;Material returned module, the information such as material casting rate, the material surplus of the equipment are received, a work order form is generated after work order terminates, statistics residue doses is returned to stock.The intelligent management system and method for the present invention, incorporates rewinding, material issuing and the material returned, stock is effectively managed.

Description

Intelligent management system and method
Technical field
The present invention relates to a kind of intelligent management system and method, more particularly to a kind of intelligence pipe for integrating each production link Manage system and method.
Background technology
The flow chain of traditional electronics manufacturing enterprise is mostly:Collect supplier's material and enter material depot(Big warehouse), lead to Often using chest as minimum management unit;According to following one week work order demand, material allocation to line side storehouse(Material buffer area), do Material arranges(Devan son, blank, measurement, stock etc.), to accelerate the speed that work order is reached the standard grade;Manufacture and give birth to by work order material loading Produce, there are two people to be responsible for feeding and feed supplement by SMT machines.This work pattern is relatively adapted to the production model of the few sample of volume, is working as Under modern a small amount of various manufacturing mode, traditional work pattern shortcoming clearly, has very in quality management and efficiency management The defects of big, the material for such as overstocking several days more, business inventory is caused to overstock;The centre of the inherently one unnecessary link in line side storehouse Link, consume man power and material;Line side storehouse tears material and sub-material open, i.e., is packaged into inner wrapping easily wrong material from big.Then, typically Enterprise imports different managing and control systems in different links, for example import WMS in warehouse to solve the problems, such as links (WMS), MES is imported at the scene(Manufacture execution system), in SMT(Chip mounter)Import PTS(Process follows up With inspection)System, but system constructing lacks integral layout, lacks between system and effectively integrates, and causes intelligent deficiency, and it is sacrificial Domestic animal efficiency and generation operation redundancy.Therefore especially need the solution of an integration to eliminate these on the whole structural to ask Topic.
The content of the invention
For the above situation, it is an object of the invention to provide a kind of intelligence for being effectively integrated links in flow Can management system.
To reach above-mentioned purpose, the present invention provides a kind of intelligent management system, is connected to ERP server, including:
Module is integrated, is carried out data transmission using DB-link and ERP server, the data code transmitted is defined, generation The different-format of code represents different transmission direction and data type, is believed receiving note, stock, work order, work order form etc. with this Breath is synchronous with the ERP server in the integration module;
Inventory database, the integration module is connected, it stores and constantly updates the material information of material in stock, such as title, type Number, quantity, warehouse compartment, storage date etc., instock material information is updated after the completion of rewinding, stock, the material returned, concurrently Deliver to the integration module;
Stock management module, the integration module and the inventory database are connected, the material letter of material when it identifies and records storage Breath, such as title, model, quantity, warehouse compartment, storage date, receiving note is generated, and send it to the integration module, sent out simultaneously The inventory database is given, to update inventory database;
Stock module, connects the inventory database, according to the stock order received, searches and meet the requirements in inventory database Material stocked up for processing take;
Equipment on-line module, online, the information such as the material casting rate of capture apparatus, material surplus is carried out with process equipment;
Production management module, connects the integration module and the equipment on-line module, receives production scheduling in ERP server, work Single, information, the material according to needed for the work order such as material casting rate that receiving device on-line module grabs, material surplus are standby to this Expect that module sends a stock order;
Material returned module, the production management module, the integration module and the inventory database are connected respectively, receives the material casting of the equipment The information such as rate, material surplus, a work order form is generated after work order terminates, and be sent to integration module, while count remaining Stock is returned to after inventory, to update the inventory database.
Especially, the integration module is entered with the ERP server every a setting time to the data message that other side sends Row is handled and updated.
Especially, the stock management module is according to the material information, such as title, model, quantity, warehouse compartment, storage date, And generate a bar-code label.
Especially, the stock module is stocked up according to the storage date of material according to FIFO principle.
Especially, the equipment on-line module is by directly reading the database of process equipment, and to capture material casting rate, material remains The information such as surplus.
Especially, the process equipment is provided with multiple code readers, and supplies consumption amount and product performance are counted respectively Number, the equipment on-line module is by being calculated the information such as material casting rate, material surplus.
Especially, should after the material surplus of the equipment grabbed when the equipment on-line module is less than a certain setting value Equipment on-line module sends a pre-warning signal to the production management module, and it is backward that the production management module receives the pre-warning signal The stock module sends a stock order.
Especially, the production management module is tested before equipment processing to material, and records thing used in each product Material and the product processed per batch materials.
The present invention also provides a kind of intelligent management, comprises the following steps:
(A) carried out data transmission using DB-link and ERP server, the data code transmitted to needs is defined, code Different-format represents different transmission direction and data type, to distinguish information such as receiving note, stock, work orders, makes the integration Module keeps synchronizing information with the ERP server;
(B) identify and record the material information of storage material, such as title, model, quantity, warehouse compartment, storage date, generation is received It is single, inventory information is updated, and be synchronized to ERP server;
(C) according to the production scheduling and work order information in ERP server, satisfactory material is found from inventory information, In case processing;
(E) it is online with process equipment, capture the information such as material casting rate and the residue doses of its processing;
(F) according to information such as the material casting rate and residue doses after work order terminates, work order form is produced, returns leftover materials, more New inventory information, and it is synchronized to ERP server.
Especially, between step (C) and step (E), in addition to:
(D) material is tested before processing, and records material used in each product and the product processed per batch materials.
Especially, in step (A), in addition to:It is synchronous that primary information is carried out every a setting time.
Especially, in step (B), in addition to:Bar-code label is generated using the material information of the material.
Especially, in step (C), in addition to:The material found is ranked up according to the storage date.
Especially, in step (E), in addition to:When residue doses deficiency, find and conform to from inventory information The material asked, material is supplemented according to FIFO principle.
Compared to prior art, intelligent management system of the invention and method, incorporate from rewinding operation, material issuing operation and Material returned operation, stock is effectively managed.Above-mentioned system and method can eliminate line side storehouse directly from warehouse feeding, Reduce manpower;Low water level early warning is set, improved efficiency of stocking up;In strict accordance with FIFO principle control, error proofing capability improving.
【Brief description of the drawings】
Fig. 1 is the structure chart of the intelligent management system of the present invention;
Fig. 2 is the flow chart of the intelligent management of the present invention.
【Embodiment】
Refer to shown in Fig. 1, the intelligent management system 1 is connected to ERP server 2, including integrates module 11, inventory database 12nd, stock management module 13, stock module 14, equipment on-line module 15 and material returned module 17.
The integration module 11 is carried out data transmission using DB-link and ERP server 2, and the data code transmitted is entered Row definition, the different-format of code represent different transmission direction and data type, are believed receiving note, stock, work order etc. with this Breath is synchronous with the ERP server 2 in the integration module 11, such as:Represented respectively from the integration with the code of 856,862 beginnings Module 11 is sent to the ERP server 2, the information of the integration module 11 is sent to from the ERP server 2 for example, definition 856S represent from the ERP server 2 to the integration module 11 send an order form information, 862S represent from the integration module 11 to The ERP server 2 sends a receiving note confirmation;862W is represented from the ERP server 2 to module 11 is integrated and is sent a work Single information, 856W, which represents, sends a work order confirmation from the integration module 11 to the ERP server 2.In the present embodiment, should ERP server 2 is analyzed to update the data with the integration module 11 every the data message that a setting time is sent to other side.
The inventory database 12 connects the integration module 11, and it stores the material information of interior material in stock, such as title, type Number, quantity, warehouse compartment, storage date etc., instock material information is updated after the completion of rewinding, stock, the material returned, concurrently The integration module 11 is delivered to, to be updated to the ERP server 2.
The stock management module 13 connects the integration module 11 and the inventory database 12 respectively, identifies and records storage thing The material information of material, such as title, model, quantity, warehouse compartment, storage date, in the present embodiment, bar code is generated according to those information Label, such as one-dimension code or Quick Response Code, in case stock or can quickly be identified by scanning when arranging.
The stock module 14 connects the inventory database 12, when the stock order for receiving the equipment on-line module 15 and sending Afterwards, satisfactory material is searched in the inventory database 12, in the present embodiment, in satisfactory more batches found In secondary material, it is ranked up according to the storage date, according to FIFO principle, takes the earliest material of entry time, in case plus Work is taken.
The equipment on-line module 15 carries out online, the material casting rate of capture apparatus, material residue in processing with process equipment The information such as amount, it is noted herein that, often can be directly by reading its database number carried for novel device According to, to grab the information such as material casting rate, material surplus, and some old equipment are directed to, can be using after being counted one by one to product It is calculated, multiple code readers is such as installed on process equipment, material actual consumption amount, product performance is counted respectively Number, can calculate material minimal consumption amount, then subtract material minimal consumption with actual consumption amount and measure by product performance Material casting quantity, material casting rate is further obtained with this, and material surplus can subtract material actual consumption by quantity of stocking up and measure Arrive.In the present embodiment, the equipment on-line module 15 can set a material threshold value, when what the equipment on-line module 15 grabbed is somebody's turn to do After the material surplus of equipment is less than the threshold value, a pre-warning signal is sent to the production management module 16.
The production management module 16 connects the integration module 11 and the equipment on-line module, to receive in the ERP server 2 Production scheduling and work order, according to the work order to the stock module 14 send one stock order, take corresponding to material be used for plus Work, while the production management module 16 receives material casting rate, material surplus and the material pre-warning signal of the equipment on-line module, When receiving material pre-warning signal, to the stock module 14 send a pair should material stock order, to supplement material, prevent Only material deficiency causes to stop to produce.The production management module 16 is tested before equipment processing to material simultaneously, prevents mistake Material, in addition, the production management module 16 also records material used in each product and the product processed per batch materials, with after an action of the bowels Which mainboard phase can have been got on these materials according to Tracing Material, and can also trace which has been used according to product serial number A little materials.
The material returned module 17 connects the equipment on-line module 15, the integration module 11 and the inventory database 12 respectively, connects The information such as the material casting rate of equipment that receiving unit on-line module provides, material surplus, generate work order form, hair after work order terminates The integration module 11 is delivered to, to be updated to the ERP server 2, while material surplus is counted, is returned to the inventory data In storehouse 12.
Refer to shown in Fig. 2, a specific embodiment of intelligent management of the invention comprises the following steps:
S01:Intelligent management system 1 is carried out data transmission using DB-link and ERP server 2, the data code transmitted to needs It is defined, the different-format of code represents different transmission direction and data type, is sent out with distinguishing from the intelligent management system 1 Deliver to the ERP server 2, or sent from the ERP server 2 to the intelligent management system 1, and distinguish receiving note, stock, The information such as work order, the information received is analyzed every a setting time, with the synchronous intelligent management system 1 and the ERP The information of server 2;
S02:Identify and record the material information of storage material, such as title, model, quantity, warehouse compartment, storage date, and according to Those material informations simultaneously generate a bar-code label, quick identification during for stocking up or arrange, while generate receiving note, update storehouse Information is deposited, receiving note and inventory information are then synchronized to ERP server 2;
S03:The production scheduling and work order information in ERP server 2 are received, satisfactory thing is found from inventory information Material, according to the sequencing on storage date, stocked up according to the principle of FIFO, so that processing is taken;
S04:It is online with process equipment, it is processed according to work order, while capture material casting rate and residue doses of its processing etc. Information;
S05:Equipment processing before material is tested, prevent wrong material, also record in addition material used in each product and often The product that batch materials are processed, so which product the later stage can have been got on these materials according to Tracing Material, and according to Product serial number can also trace has used for which material.
S06:Judge whether the residue doses on process equipment is insufficient;
S07:When residue doses deficiency, satisfactory material is found from inventory information again, according to FIFO Principle supplement material;
S08:Work order terminates, and according to information such as the material casting rate and residue doses, generates work order form, returns leftover materials, more New inventory information, and it is synchronized to ERP server 2.
Above in conjunction with accompanying drawing to the present invention embodiment and embodiment elaborate, but can not with restriction The scope of the present invention, the impartial modification and transformation made in scope of the present invention patent, should all belong to patent of the present invention In the range of.

Claims (14)

1. a kind of intelligent management system, is connected to ERP server, it is characterised in that:Including:
Module is integrated, is carried out data transmission using DB-link and ERP server, the data code transmitted is defined, generation The different-format of code represents different transmission direction and data type, is believed receiving note, stock, work order, work order form etc. with this Breath is synchronous with the ERP server in the integration module;
Inventory database, the integration module is connected, it stores and constantly updates the material information of material in stock, such as title, type Number, quantity, warehouse compartment, storage date etc., instock material information is updated after the completion of rewinding, stock, the material returned, concurrently Deliver to the integration module;
Stock management module, the integration module and the inventory database are connected, the material letter of material when it identifies and records storage Breath, such as title, model, quantity, warehouse compartment, storage date, receiving note is generated, and send it to the integration module, sent out simultaneously The inventory database is given, to update inventory database;
Stock module, connects the inventory database, according to the stock order received, searches and meet the requirements in inventory database Material stocked up for processing take;
Equipment on-line module, online, the information such as the material casting rate of capture apparatus, material surplus is carried out with process equipment;
Production management module, connects the integration module and the equipment on-line module, receives production scheduling in ERP server, work Single, information, the material according to needed for the work order such as material casting rate that receiving device on-line module grabs, material surplus are standby to this Expect that module sends a stock order;
Material returned module, the production management module, the integration module and the inventory database are connected respectively, receives the material casting of the equipment The information such as rate, material surplus, a work order form is generated after work order terminates, and be sent to integration module, while count remaining Stock is returned to after inventory, to update the inventory database.
2. intelligent management system according to claim 1, it is characterised in that:The integration module and the ERP server every One setting time is handled and updated to the data message that other side sends.
3. intelligent management system according to claim 1, it is characterised in that:The stock management module is believed according to the material Breath, such as title, model, quantity, warehouse compartment, storage date, and generate a bar-code label.
4. intelligent management system according to claim 1, it is characterised in that:The stock module is according to storage day of material Phase, stocked up according to FIFO principle.
5. intelligent management system according to claim 1, it is characterised in that:The equipment on-line module is added by directly reading The database of construction equipment, to capture the information such as material casting rate, material surplus.
6. intelligent management system according to claim 1, it is characterised in that:The process equipment is provided with multiple code readers, Supplies consumption amount and product performance are counted respectively, the equipment on-line module is by being calculated material casting rate, material remains The information such as surplus.
7. according to the intelligent management system any one of claim 1,5 or 6, it is characterised in that:When the online mould of the equipment After the material surplus for the equipment that block grabs is less than a certain setting value, the equipment on-line module is sent out to the production management module A pre-warning signal is sent, the production management module is ordered after receiving the pre-warning signal to the stock of stock module transmission one.
8. intelligent management system according to claim 1, it is characterised in that:The production management module is right before equipment processing Material is tested, and records material used in each product and the product processed per batch materials.
A kind of 9. intelligent management, it is characterised in that:Comprise the following steps:
(A) carried out data transmission using DB-link and ERP server, the data code transmitted to needs is defined, code Different-format represents different transmission direction and data type, to distinguish information such as receiving note, stock, work orders, makes the integration Module keeps synchronizing information with the ERP server;
(B) identify and record the material information of storage material, such as title, model, quantity, warehouse compartment, storage date, generation is received It is single, inventory information is updated, and be synchronized to ERP server;
(C) according to the production scheduling and work order information in ERP server, satisfactory material is found from inventory information, In case processing;
(E) it is online with process equipment, capture the information such as material casting rate and the residue doses of its processing;
(F) according to information such as the material casting rate and residue doses after work order terminates, work order form is produced, returns leftover materials, more New inventory information, and it is synchronized to ERP server.
10. intelligent management according to claim 9, it is characterised in that:Between step (C) and step (E), also wrap Include:
(D) material is tested before processing, and records material used in each product and the product processed per batch materials.
11. intelligent management according to claim 9, it is characterised in that:In step (A), in addition to:Set every one Fixing time, it is synchronous to carry out primary information.
12. intelligent management according to claim 9, it is characterised in that:In step (B), in addition to:Utilize the thing The material information generation bar-code label of material.
13. intelligent management according to claim 9, it is characterised in that:In step (C), in addition to:To finding Material according to storage the date be ranked up.
14. intelligent management according to claim 9, it is characterised in that:In step (E), in addition to:Work as residue During doses deficiency, satisfactory material is found from inventory information, material is supplemented according to FIFO principle.
CN201610537896.6A 2016-07-08 2016-07-08 Intelligent management system and method Pending CN107590625A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610537896.6A CN107590625A (en) 2016-07-08 2016-07-08 Intelligent management system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610537896.6A CN107590625A (en) 2016-07-08 2016-07-08 Intelligent management system and method

Publications (1)

Publication Number Publication Date
CN107590625A true CN107590625A (en) 2018-01-16

Family

ID=61046564

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610537896.6A Pending CN107590625A (en) 2016-07-08 2016-07-08 Intelligent management system and method

Country Status (1)

Country Link
CN (1) CN107590625A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108830480A (en) * 2018-06-12 2018-11-16 恩龙实业(嘉兴)有限公司 A kind of ERP buying calculation method and its system
CN108846559A (en) * 2018-05-29 2018-11-20 上海文什数据科技有限公司 A kind of production management method with production link tracing function
CN109033379A (en) * 2018-07-27 2018-12-18 四川爱创科技有限公司 Material Information Management System method and system suitable for coffee machine
CN109377028A (en) * 2018-10-08 2019-02-22 联宝(合肥)电子科技有限公司 A kind of quality of materials management method and system
CN109685320A (en) * 2018-11-28 2019-04-26 长春北方化工灌装设备股份有限公司 MES system deposits the integrated management method of information and automation equipment to three-dimensional Kuku
CN110334911A (en) * 2019-06-10 2019-10-15 广州南沙珠江啤酒有限公司 A kind of method of management of production line and system
CN110472905A (en) * 2019-07-02 2019-11-19 湖北北辰时代信息技术有限公司 It is a kind of based on the material quality detecting method for automatically generating two dimensional code intelligent terminal barcode scanning
CN110837986A (en) * 2018-08-16 2020-02-25 张志陆 Warehouse management system and method thereof
CN110910061A (en) * 2019-11-06 2020-03-24 长沙格力暖通制冷设备有限公司 Material management method, material management system, storage medium and electronic equipment
CN110949935A (en) * 2019-11-15 2020-04-03 合肥百音智能科技有限公司 Workshop warehouse logistics management system
CN111123868A (en) * 2019-12-21 2020-05-08 唐山钢铁集团微尔自动化有限公司 System and method for realizing intelligent scheduling of unmanned overhead travelling crane of hot-rolled slab warehouse
CN113537792A (en) * 2021-07-21 2021-10-22 深圳登科云软件有限公司 Optical communication product collaborative manufacturing platform
CN114169838A (en) * 2022-01-19 2022-03-11 深圳市今天国际物流技术股份有限公司 Warehouse logistics management method and system
CN115034340A (en) * 2022-05-18 2022-09-09 青岛奥利普自动化控制系统有限公司 Digital material management system, method, electronic equipment and storage medium
CN115063057A (en) * 2022-08-18 2022-09-16 中材节能股份有限公司 Method and system for reducing cost of calcium silicate board based on inventory management

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1510563A (en) * 2002-12-26 2004-07-07 鸿富锦精密工业(深圳)有限公司 System and method for stock control
KR20080009882A (en) * 2006-07-25 2008-01-30 대덕대학산학협력단 Medical erp system
CN102930410A (en) * 2011-08-09 2013-02-13 鸿富锦精密工业(深圳)有限公司 Warehouse inventory management system and management method
CN103208054A (en) * 2013-03-15 2013-07-17 重庆大学 Fine monitoring method and system for discrete workshop production process work-in-process inventory

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1510563A (en) * 2002-12-26 2004-07-07 鸿富锦精密工业(深圳)有限公司 System and method for stock control
KR20080009882A (en) * 2006-07-25 2008-01-30 대덕대학산학협력단 Medical erp system
CN102930410A (en) * 2011-08-09 2013-02-13 鸿富锦精密工业(深圳)有限公司 Warehouse inventory management system and management method
CN103208054A (en) * 2013-03-15 2013-07-17 重庆大学 Fine monitoring method and system for discrete workshop production process work-in-process inventory

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108846559A (en) * 2018-05-29 2018-11-20 上海文什数据科技有限公司 A kind of production management method with production link tracing function
CN108830480B (en) * 2018-06-12 2020-10-09 恩龙实业(嘉兴)有限公司 ERP purchasing calculation method and system
CN108830480A (en) * 2018-06-12 2018-11-16 恩龙实业(嘉兴)有限公司 A kind of ERP buying calculation method and its system
CN109033379A (en) * 2018-07-27 2018-12-18 四川爱创科技有限公司 Material Information Management System method and system suitable for coffee machine
CN109033379B (en) * 2018-07-27 2022-05-31 四川爱创科技有限公司 Raw material information management method and system suitable for coffee machine
CN110837986A (en) * 2018-08-16 2020-02-25 张志陆 Warehouse management system and method thereof
CN109377028A (en) * 2018-10-08 2019-02-22 联宝(合肥)电子科技有限公司 A kind of quality of materials management method and system
CN109685320A (en) * 2018-11-28 2019-04-26 长春北方化工灌装设备股份有限公司 MES system deposits the integrated management method of information and automation equipment to three-dimensional Kuku
CN110334911A (en) * 2019-06-10 2019-10-15 广州南沙珠江啤酒有限公司 A kind of method of management of production line and system
CN110472905A (en) * 2019-07-02 2019-11-19 湖北北辰时代信息技术有限公司 It is a kind of based on the material quality detecting method for automatically generating two dimensional code intelligent terminal barcode scanning
CN110910061A (en) * 2019-11-06 2020-03-24 长沙格力暖通制冷设备有限公司 Material management method, material management system, storage medium and electronic equipment
CN110949935A (en) * 2019-11-15 2020-04-03 合肥百音智能科技有限公司 Workshop warehouse logistics management system
CN111123868A (en) * 2019-12-21 2020-05-08 唐山钢铁集团微尔自动化有限公司 System and method for realizing intelligent scheduling of unmanned overhead travelling crane of hot-rolled slab warehouse
CN111123868B (en) * 2019-12-21 2022-12-27 唐山钢铁集团微尔自动化有限公司 System and method for realizing intelligent scheduling of unmanned overhead travelling crane of hot-rolled slab warehouse
CN113537792A (en) * 2021-07-21 2021-10-22 深圳登科云软件有限公司 Optical communication product collaborative manufacturing platform
CN114169838A (en) * 2022-01-19 2022-03-11 深圳市今天国际物流技术股份有限公司 Warehouse logistics management method and system
CN114169838B (en) * 2022-01-19 2024-06-14 深圳市今天国际物流技术股份有限公司 Warehouse logistics management method and system
CN115034340A (en) * 2022-05-18 2022-09-09 青岛奥利普自动化控制系统有限公司 Digital material management system, method, electronic equipment and storage medium
CN115063057A (en) * 2022-08-18 2022-09-16 中材节能股份有限公司 Method and system for reducing cost of calcium silicate board based on inventory management

Similar Documents

Publication Publication Date Title
CN107590625A (en) Intelligent management system and method
CN108089557B (en) AGV shelf storage control system and control method
CN106600197A (en) Workshop material distribution device and method
CN102622684B (en) Production and supply chain cooperation system based on wireless Internet of things
CN105931002A (en) JIT (Just In Time) production supply system and control method thereof
CN201828527U (en) Online mmoke box automatic identification and elimination system
CN111930088A (en) Edge management system
CN105760555B (en) A kind of filter stick formation analysis of processing quality and traceability system and its method
CN112200523A (en) E-commerce commodity logistics storage center intelligent management platform based on big data analysis
CN116704429B (en) Intelligent processing method based on big data analysis
CN110236221A (en) A kind of cigar mill is for throwing volume packet joint error protection system and method
CN112381187B (en) Automatic smart card issuing system, automatic smart card issuing method and automatic smart card issuing equipment
CN114677078A (en) Visual material storage management method, device and system
CN112766857A (en) Intelligent warehouse management platform, system and method
CN111695789A (en) Intelligent factory logistics scheduling system
CN110525858A (en) A kind of cigarette supplementary matches disk storage method and system
CN110956428B (en) Electric power material management system
CN108082808A (en) Fabric storage area system and fabric running method thereof
CN111401814A (en) Data processing method and device, electronic equipment and computer readable medium
CN115587771A (en) Intelligent warehouse management method and system based on PDA (personal digital Assistant) identification
CN111381570A (en) Automatic cigarette auxiliary material matching system
CN115687523A (en) MES system broken network data processing method, device and system
CN112508390B (en) Collaborative manufacturing support system and method
CN112150099A (en) Interface for connecting ERP and MES in enterprise production scheduling
Niemann et al. Kanban

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180116