CN107590579A - 一种利用热网储能特性的热‑电系统联合经济调度方法 - Google Patents
一种利用热网储能特性的热‑电系统联合经济调度方法 Download PDFInfo
- Publication number
- CN107590579A CN107590579A CN201710583813.1A CN201710583813A CN107590579A CN 107590579 A CN107590579 A CN 107590579A CN 201710583813 A CN201710583813 A CN 201710583813A CN 107590579 A CN107590579 A CN 107590579A
- Authority
- CN
- China
- Prior art keywords
- mrow
- msub
- wind
- heat supply
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Wind Motors (AREA)
Abstract
一种利用热网储能特性的热‑电系统联合经济调度方法,分析热网储能对热电机组的影响;确定热网在热电机组改变供热抽汽量后保持安全稳定运行的约束;根据含高比例热电机组电力系统产生弃风的具体原因制定考虑热网储能的热‑电系统两阶段调度策略;计算风电不确定性引起的系统安全风险成本;建立以最小弃风量为目标的考虑热网储热计及风电不确定性成本的热‑电系统联合经济调度模型;采用快速粒子群算法求解模型。本发明方法能提高热电机组调峰能力,根据供热阶段系统具体的弃风原因采取两阶段热电机组调度策略,以减少系统弃风;在热电机组的调度过程中,将风电的不确定性量化为风险成本,加入到调度目标函数中,以协调系统的运行成本和风险。
Description
技术领域
本发明涉及热-电系统联合调度技术领域,尤其是一种利用热网储热功能计及风电不确定性成本的热-电系统联合经济调度方法。
背景技术
供热系统主要由热电厂、热网加热单元、热网热量传输单元和热用户四个部分组成。其中热网热量传输单元包含大量管道和换热设备,具有大容量储能功能。利用热网的储能特性,在供热高峰期可以使热电机组在满足供热需求的前提下短时间内调整供热抽汽量,提高机组调峰能力。
抽汽式热电机组供热出力和电出力的耦合关系称为机组的“电热特性”,其电热特性可按下式表示,在满足运行要求的条件下可以通过调节抽汽量来调整热电比。
CminHCHP≤PCHP≤Pmax-CmaxHCHP
式中,PCHP为热电机组电出力,HCHP为热电机组热出力,Cmin和Cmax为机组电功率的下限和上限,Pmax为电功率最大值。
热电机组供热抽汽量增加,机组调峰裕度减小,调峰能力下降,当机组工作在纯凝工况时,热电机组至少有50%的调峰裕度,而当机组供热抽汽量达到最大时,热电机组几乎没有调峰能力。
目前含高比例热电机组的电力系统提高风电消纳能力的主要方式有增设调峰电源、跨区外送、电力供暖或加装储能设备等,这些方法都需要增加大量投资进行建设,同时也很少考虑风电自身不确定性对调度结果产生的影响。
综上所述,有必要发明一种充分利用现有设备和资源又能够计及风电接入对电力系统影响的热-电系统调度方法,以解决现有方法的诸多问题。
发明内容
本发明目的在于提供一种能够有效减少弃风、量化风电接入对调度过程影响的考虑热网储能功能的热-电系统联合经济调度方法。
为实现上述目的,采用了以下技术方案:本发明所述调度方法利用热网自身的储能功能,通过对热网蓄放热进行有序调控,短时间内调整热电机组供热量改变机组发电水平,降低供热和发电的耦合程度,保证热需求的同时提高机组的调峰能力;同时通过监测风电接入引起的系统母线电压波动和计算系统预留备用容量的精确程度,构建风电接入风险成本模型,考量风电接入后系统的运行风险;根据系统弃风的具体原因,制定热-电系统两阶段联合调度策略,更多地消纳风电;最后采用快速粒子群算法对模型进行求解。
进一步的,所述方法的具体步骤如下:
步骤1,分析不同容量热网储能对热电机组的影响,利用热网的储能功能提高热电机组的调峰能力;
步骤2,分析热网运行状态,确定热网在热电机组改变供热抽汽量后保持安全稳定运行的约束条件;
步骤3,分析热-电系统产生弃风的具体原因,根据具体的弃风原因制定考虑热网储能的热-电系统两阶段联合调度策略;
步骤4,计算风电接入系统后由风电不确定性产生的系统安全风险成本;
步骤5,建立以最小弃风量为目标的考虑热网储热计及风电不确定性成本的热-电系统联合经济调度模型;
步骤6,采用快速粒子群算法求解模型,验证所提模型和调度方法的正确性和有效性。
进一步的,所述步骤1的具体过程如下:
(1-1)供热系统分析
供热系统主要由热电厂、热网加热单元、热网热量传输单元和热用户四个部分组成;其中热网热量传输单元包含大量管道和换热设备,具有大容量储能功能;利用热网的储能功能,在供热高峰期可以使热电机组在满足供热需求的前提下短时间内调整供热抽汽量;
(1-2)热电机组特性分析
抽汽式热电机组供热出力和电出力的耦合关系称为机组的“电热特性”,其电热特性可按下式表示,在满足运行要求的条件下可以通过调节抽汽量来调整机组的热电比;
CminHCHP≤PCHP≤Pmax-CmaxHCHP
式中,PCHP为热电机组电出力,HCHP为热电机组热出力,Cmin和Cmax为机组电功率的下限和上限,Pmax为电功率最大值;
在热负荷较高时,热电机组受“以热定电”运行模式的限制,随着供热抽汽量的增加,电功率的调节范围不断缩小,随着热电机组供热抽汽量的增加,机组调峰裕度减小,调峰能力下降;当机组工作在纯凝工况时,热电机组至少有50%的调峰裕度,而当机组供热抽汽量达到最大时,热电机组几乎没有调峰能力。
进一步的,所述步骤2的具体过程如下:
利用热网的储能功能,调整热电机组供热抽汽量提高机组调峰能力,需要保证热网安全稳定工作,遵循以下约束关系:
(2-1)厂内热网汽源压力约束
Px≥Pmin
短时间内减少供热抽汽量,提高热电机组调峰能力时,需要保障厂内热网气源压力维持在一个安全范围,根据等焓膨胀原理,Px作如下计算:
式中,Px为热网汽源压强,vx为待求解热网气源压强下的蒸汽比容,为同一蒸汽焓商下压强和蒸汽比容的关系,M1为热网蒸汽量,v1为设计值下的蒸汽比容,τ为供热流量输入输出偏差,T为热网蓄放热持续时间,为热网容积;
(2-2)热网容量约束
Smin≤St≤Smax
式中,St是热网阶段性储热量,Smin和Smax为热网最小和最大储热量;
(2-3)热平衡约束
Δt(Hin,t-Hout,t-klossSt)=St+1-St
式中,Hin,t为热网输入热量,Hout,t为热网输出热量,kloss为热损耗系数。
进一步的,所述步骤3的具体过程如下:
(3-1)含高比例热电机组的电力系统弃风原因分析
1)用电负荷处在低谷期,风电出力和热负荷处在高位,热电机组受供热制约调峰能力有限,该时段受制于系统本身风电接入能力有限产生弃风;
2)用电负荷逐渐增加,风电出力和热负荷处在低谷期,但风电出力变化剧烈,此时多由于风电出力的反调峰性和不确定性导致旋转备用无法满足风电接入条件产生弃风;
(3-2)制定热-电系统两阶段联合调度策略
第一阶段调度是通过判断是否由于系统本身风电接入能力有限导致弃风的产生,进而调度热电机组供热抽汽参数改变,采取热电机组连续调节,减少供热抽汽量,提高机组调峰能力,热网蓄放热补充热源缺失部分的方式提高系统风电消纳能力;
第二阶段调度加入弃风预判机制,根据弃风可能性判断是否采取利用热网储能功能提前调节热电机组抽汽参数的方式,对热网蓄放热进行控制,优化热电机组出力,提高系统调峰能力;
弃风可能性Pk通过风电实际出力和预测出力的偏差概率进行计算,如下式:
式中,和为风电实际出力小于或大于计划出力的概率;
式中,Φp(O)和Φp(pw)为风电在出力为0和pw时的积分,为风电t时段实际出力,pw,t为风电t时段计划出力,为风电计划出力在t时段的概率密度。
进一步的,所述步骤4的具体过程如下:
(4-1)确定风电不确定性成本的影响因子
1)风电并网引起的系统母线电压波动越剧烈,风险成本越高;
2)风电出力不足和盈余情况发生概率越高,风险成本越高;
3)风电实际出力和计划出力之间的差值越大,风险成本越高;
(4-2)测量风电接入对系统的扰动程度
定义系统内不同母线电压观测值的标准差为母线电压分布指数,表征风电出力波动性对系统的扰动程度;
式中,uk为第k次母线电压观测值,为观测电压平均值,m为观测样本容量;
(4-3)构建风电不确定性成本函数
定义系统正负备用风险调度费用为风电不确定性成本;
fRCS=fR,u+fR,d
式中,fR,u为风电场出力盈余成本,fR,d为风电场出力不足成本;
正旋转备用风险调度费用计算如下:
式中,ξu为出力不足成本系数,μ′u,t为μu,t的归一化值,ψu,t为t时刻风电出力不足概率,Pw,t为t时刻系统的风电实际接入量,Eu,t为风电实际出力的条件期望;
负旋转备用风险调度费用计算如下:
式中,ξd为出力盈余成本系数,μ′d,t为μd,t的归一化值,ψd,t为t时刻风电出力盈余概率,Ed,t为风电实际出力的条件期望;
风电出力的条件期望计算如下:
式中,为风电场实际出力wt的概率密度函数;
(4-4)分析风电不确定性成本对风电接入的影响
根据风电接入风险成本将风电出力不确定性引起的系统风险分为安全、较安全、危险和严重危险四个安全等级,每个安全等级对应着相应的风电接入操作;当风电接入后系统处在危险安全等级情况时,通过采取弃风的方式调节风电接入,保障系统安全运行,相应操作如表1所示。
表 系统安全等级
Tab. System security level
表中,C1、C2和C3分别为系统风险成本的分界值,由于风险成本受风电波动性和风电预测水平的影响,则分界值通过评估系统稳定状况和历史风险成本共同确定。在较安全的等级下系统有两种风电的接入操作,操作1表示当前系统更加重视风电接入带来的环境效益和经济效益,操作2表示系统当前操作较为保守,更加重视系统安全。
进一步的,所述步骤5的具体过程如下:
(5-1)建立调度目标函数
含风电的热电联合经济调度以满足供热需求为前提,最小弃风为主要目标,同时兼顾风电接入风险成本,构建目标函数如下:
式中,F为最小弃风量,Ng1,Ng2分别为热电机组和纯凝机组数,ε为罚因子,T为调度周期,fc1为热电机组运行费用,fc2为纯凝机组运行费用;
式中,ai,1-ai,6为第i台热电机组的耗量特性系数,Pi和Di分别为第i台热电机组的电出力和供热抽汽量;
式中,bj,1-bj,3为第j台纯凝机组的耗量特性系数,Pj为第j台纯凝机组的电出力;
(5-2)设置目标函数约束条件
系统约束条件:
1)系统功率平衡约束
式中,PW,t为t时段风电出力,为t时段弃风量,PL,t为t时段电负荷;
2)系统热负荷平衡约束
式中,为t时段第i台热电机组的供热量,ΔHt,i为热电机组抽汽的焓降,QL,t为t时段热负荷;
热电机组约束条件:
1)热电比约束
Pi,t=Hi,t/khp
式中,Pi,t为热电机组的电出力,Hi,t为热电机组的供热量,khp为机组热电比;
2)热电机组出力约束
Pi,min≤Pi,t≤Pi,max
Di,min≤Di,t≤Di,max
式中,Pi,t为热电机组i在t时段的电出力,Pi,min和Pi,max为机组的最小电出力和最大电出力;Di,t为热电机组i在t时段的热出力,Di,min和Di,max为机组的最小热出力和最大热出力;
3)机组爬坡约束
Pi,t-Pi,t-1≤Ru,iΔT
Pi,t-1-Pi,t≤Rd,iΔT
式中,Ru,i和Rd,i为热电机组i的上下爬坡速率;
常规机组约束条件:
1)常规机组出力约束
Pj,min≤Pj,t≤Pj,max
式中,Pj,t为常规机组j在t时段的出力,Pj,min为机组j最小出力,Pj,max为机组j最大出力;
2)机组爬坡约束
Pj,t-Pj,t-1≤Ru,jΔT
Pj,t-1-Pj,t≤Rd,jΔT
式中,Ru,j和Rd,j为火电机组j的上下爬坡速率;
3)系统正负旋转备用容量约束
式中,pu,s和pd,s为系统提供的正负备用,pL和pw为负荷预测值和风电接入值,L+%和L+%为负荷对备用容量的需求比例,wu%和wd%为风电出力对备用容量需求比例,pu,i和pd,i为机组提供的正旋转备用和最小旋转出力;
热网状态约束:
热网安全稳定运行需要满足步骤2中的约束。
进一步的,所述步骤6的具体过程如下:
(6-1)确定算例以及其必要特征;
(6-2)采用快速粒子群算法对算例进行仿真分析。
与现有技术相比,本发明方法具有如下优点:
1、利用已有资源就地消纳风电,充分发挥热网自身的储热功能,降低热电机组热电耦合程度,提高机组调峰能力,由热网补充热电机组损失的供热,保证用热需求;
2、量化了风电接入风险,考量了风电不确定性对经济调度过程的影响;
3、根据供暖期间系统产生弃风的原因制定了热电系统两阶段调度策略,能够有效减少弃风。
附图说明
图1是本发明方法的供热系统示意图。
图2是本发明方法的热-电系统两阶段调度策略示意图。
图3是本发明方法的热-电系统联合经济调度流程图。
图4是本发明方法的第二阶段调度过程弃风可能性计算值的分布示意图。
图5是本发明方法的用电负荷和风电出力示意图。
图6是本发明方法的热负荷示意图。
具体实施方式
下面结合附图对本发明做进一步说明:
结合图2和图3,本发明所提热电系统联合调度策略的具体步骤如下:
(1)分析热网储能对热电机组的影响
(1-1)供热系统结构
如图1所示,供热系统主要由热电厂、热网加热单元、热网热量传输单元和热用户四个部分组成。其中热网热量传输单元包含大量管道和换热设备,具有大容量储能功能。利用热网的储能功能,在供热高峰期可以使热电机组在满足供热需求的前提下短时间内调整供热抽汽量。
(1-2)热电机组特性分析
抽汽式热电机组供热出力和电出力的耦合关系称为机组的“电热特性”,其电热特性可按下式表示,在满足运行要求的条件下可以通过调节抽汽量来调整机组的热电比。
CminHCHP≤PCHP≤Pmax-CmaxHCHP
式中,PCHP为热电机组电出力,HCHP为热电机组热出力,Cmin和Cmax为机组电功率的下限和上限,Pmax为电功率最大值。
在热负荷较高时,热电机组受“以热定电”运行模式的限制,随着供热抽汽量的增加,电功率的调节范围不断缩小,随着热电机组供热抽汽量的增加,机组调峰裕度减小,调峰能力下降,当机组工作在纯凝工况时,热电机组至少有50%的调峰裕度,而当机组供热抽汽量达到最大时,热电机组几乎没有调峰能力。
(2)确定热网在热电机组改变供热抽汽量后保持安全稳定运行的约束
利用热网的储能功能,调整热电机组供热抽汽量提高机组调峰能力,需要保证热网安全稳定工作,遵循以下约束关系。
(2-1)厂内热网汽源压力约束
Px≥Pmin
短时间内减少供热抽汽量,提高热电机组调峰能力时,需要保障厂内热网气源压力维持在一个安全范围,根据等焓膨胀原理,Px作如下计算:
式中,Px为热网汽源压强,vx为待求解热网气源压强下的蒸汽比容,为同一蒸汽焓商下压强和蒸汽比容的关系,M1为热网蒸汽量,v1为设计值下的蒸汽比容,τ为供热流量输入输出偏差,T为热网蓄放热持续时间,为热网容积。
(2-2)热网容量约束
Smin≤St≤Smax
式中,St是热网阶段性储热量,Smin和Smax为热网最小和最大储热量。
(2-3)热平衡约束
Δt(Hin,t-Hout,t-klossSt)=St+1-St
式中,kloss为热损耗系数。
(3)分析含高比例热电机组电力系统产生弃风的原因,制定考虑热网储能的热-电系统两阶段调度策略
(3-1)含高比例热电机组的电力系统弃风原因分析
1)用电负荷处在低谷期,风电出力和热负荷处在高位,热电机组受供热制约调峰能力有限,这个时段受制于系统本身风电接入能力有限产生弃风。
2)用电负荷逐渐增加,风电出力和热负荷处在低谷期,但风电出力变化剧烈,此时多由于风电出力的反调峰性和不确定性导致旋转备用无法满足风电接入条件产生弃风。
(3-2)制定热-电系统两阶段联合调度策略
两阶段调度策略示意图如图2所示,热-电系统联合经济调度流程如图3所示。第一阶段调度是通过判断是否由于系统本身风电接入能力有限导致弃风的产生,进而调度热电机组供热抽汽参数改变,采取热电机组连续调节,减少供热抽汽量,提高机组调峰能力,热网蓄放热补充热源缺失部分的方式提高系统风电消纳能力;第二阶段调度加入弃风预判机制,根据弃风可能性判断是否采取利用热网储能功能提前调节热电机组抽汽参数的方式,对热网蓄放热进行控制,优化热电机组出力,提高系统调峰能力。
第二阶段调度过程中,弃风可能性Pk通过风电实际出力和预测出力的偏差概率进行计算,如下式:
式中,和为风电实际出力小于或大于计划出力的概率;
式中,Φp(O)和Φp(pw)为风电在出力为0和pw时的积分,为风电t时段实际出力,pw,t为风电t时段计划出力,为风电计划出力在t时段的概率密度。
算例中第二阶段弃风可能性的计算如图4所示。
(4)计算风电不确定性引起的系统安全风险成本
(4-1)确定风电不确定性成本的影响因子
1)风电并网引起的系统母线电压波动越剧烈,风险成本越高;
2)风电出力不足和盈余情况发生概率越高,风险成本越高;
3)风电实际出力和计划出力之间的差值越大,风险成本越高。
(4-2)测量风电接入对系统的扰动程度
定义系统内不同母线电压观测值的标准差为母线电压分布指数,表征风电出力波动性对系统的扰动程度。
式中,uk为第k次母线电压观测值,为观测电压平均值,m为观测样本容量。
计算风电不确定性成本时,按下式对uk进行归一化处理。
(4-3)构建风电不确定性成本函数
定义系统正负备用风险调度费用为风电不确定性成本。
fRCS=fR,u+fR,d
式中,fR,u为风电场出力盈余成本,fR,d为风电场出力不足成本。
正旋转备用风险调度费用计算如下:
式中,ξu为出力不足成本系数,μ′u,t为μu,t的归一化值,ψu,t为t时刻风电出力不足概率,Pw,t为t时刻系统的风电实际接入量,Eu,t为风电实际出力的条件期望。
负旋转备用风险调度费用计算如下:
式中,ξd为出力盈余成本系数,μ′d,t为μd,t的归一化值,ψd,t为t时刻风电出力盈余概率,Ed,t为风电实际出力的条件期望。
风电出力的条件期望计算如下:
式中,为风电场实际出力wt的概率密度函数。
(4-4)分析风电不确定性成本对风电接入的影响
根据风电接入风险成本将风电出力不确定性引起的系统风险分为安全、较安全、危险和严重危险四个安全等级,每个安全等级对应着相应的风电接入操作。当风电接入后系统处在危险安全等级情况时,通过采取弃风的方式调节风电接入,保障系统安全运行,相应操作如表所示。
表 系统安全等级
Tab. System security level
表中,C1、C2和C3分别为系统风险成本的分界值,由于风险成本受风电波动性和风电预测水平的影响,则分界值通过评估系统稳定状况和历史风险成本共同确定。在较安全的等级下系统有两种风电的接入操作,操作1表示当前系统更加重视风电接入带来的环境效益和经济效益,操作2表示系统当前操作较为保守,更加重视系统安全。
(5)建立以最小弃风量为目标的考虑热网储热计及风电不确定性成本的热-电系统联合经济调度模型
(5-1)建立调度目标函数
含风电的热电联合经济调度以满足供热需求为前提,最小弃风为主要目标,同时兼顾风电接入风险成本,构建目标函数如下:
式中,F为最小弃风量,Ng1,Ng2分别为热电机组和纯凝机组数,ε为罚因子,T为调度周期,fc1为热电机组运行费用,fc2为纯凝机组运行费用。
式中,ai,1-ai,6为第i台热电机组的耗量特性系数,Pi和Di分别为第i台热电机组的电出力和供热抽汽量。
式中,bj,1-bj,3为第j台纯凝机组的耗量特性系数,Pj为第j台纯凝机组的电出力。
(5-2)设置目标函数约束条件
系统约束条件:
1)系统功率平衡约束
式中,PW,t为t时段风电出力,为t时段弃风量,PL,t为t时段电负荷。
2)系统热负荷平衡约束
式中,为t时段第i台热电机组的供热量,ΔHt,i为热电机组抽汽的焓降,QL,t为t时段热负荷。
热电机组约束条件:
1)热电比约束
Pi,t=Hi,t/khp
式中,Pi,t为热电机组的电出力,Hi,t为热电机组的供热量,khp为机组热电比。
2)热电机组出力约束
Pi,min≤Pi,t≤Pi,max
Di,min≤Di,t≤Di,max
式中,Pi,t为热电机组i在t时段的电出力,Pi,min和Pi,max为机组的最小电出力和最大电出力;Di,t为热电机组i在t时段的热出力,Di,min和Di,max为机组的最小热出力和最大热出力;
3)机组爬坡约束
Pi,t-Pi,t-1≤Ru,iΔT
Pi,t-1-Pi,t≤Rd,iΔT
式中,Ru,i和Rd,i为热电机组i的上下爬坡速率。
常规机组约束条件:
1)常规机组出力约束
Pj,min≤Pj,t≤Pj,max
式中,Pj,t为常规机组j在t时段的出力,Pj,min为机组j最小出力,Pj,max为机组j最大出力;
2)机组爬坡约束
Pj,t-Pj,t-1≤Ru,jΔT
Pj,t-1-Pj,t≤Rd,jΔT
式中,Ru,j和Rd,j为火电机组j的上下爬坡速率。
3)系统正负旋转备用容量约束
式中,pu,s和pd,s为系统提供的正负备用,pL和pw为负荷预测值和风电接入值,L+%和L+%为负荷对备用容量的需求比例,wu%和wd%为风电出力对备用容量需求比例,pu,i和pd,i为机组提供的正旋转备用和最小旋转出力。
热网状态约束:
热网安全稳定运行需要满足步骤(2)中的约束。
(6)采用快速粒子群算法求解模型,验证所提模型和调度方法的正确性和有效性。
(6-1)确定算例以及其必要特征,用电负荷和风电出力如图5所示,热负荷如图6所示;
(6-2)采用快速粒子群算法对算例进行仿真分析。
以上所述的实施例仅仅是对本发明的优选实施方式进行描述,并非对本发明的范围进行限定,在不脱离本发明设计精神的前提下,本领域普通技术人员对本发明的技术方案做出的各种变形和改进,均应落入本发明权利要求书确定的保护范围内。
Claims (8)
1.一种利用热网储能对含风电热-电系统进行联合经济调度的方法,其特征在于:所述调度方法充分利用热网自身的储能功能,通过对热网蓄放热进行有序调控,短时间内对热电机组供热量进行调整,以降低供热和发电的耦合程度,保证热需求的同时提高机组的调峰能力;同时通过监测风电接入引起的系统母线电压波动和计算系统预留备用容量的精确程度,构建风电接入风险成本模型,考量风电接入后电力系统的运行风险;然后根据系统产生弃风的具体原因,制定热-电系统两阶段联合调度策略,更多地消纳风电;最后采用快速粒子群算法对调度模型进行求解。
2.根据权利要求1所述的一种利用热网储能含风电的热-电系统联合经济调度方法,其特征在于,所述方法的具体步骤如下:
步骤1,分析不同容量热网储能对热电机组的影响,利用热网的储能功能提高热电机组的调峰能力;
步骤2,分析热网运行状态,确定热网在热电机组改变供热抽汽量后保持安全稳定运行的约束条件;
步骤3,分析热-电系统产生弃风的具体原因,根据具体的弃风原因制定考虑热网储能的热-电系统两阶段联合调度策略;
步骤4,计算风电接入系统后由风电不确定性产生的系统安全风险成本;
步骤5,建立以最小弃风量为目标的考虑热网储热计及风电不确定性成本的热-电系统联合经济调度模型;
步骤6,采用快速粒子群算法求解模型,验证所提模型和调度方法的正确性和有效性。
3.根据权利要求2所述的一种利用热网储能含风电的热-电系统联合经济调度方法,其特征在于,所述步骤1的具体过程如下:
(1-1)供热系统分析
供热系统主要由热电厂、热网加热单元、热网热量传输单元和热用户四个部分组成;其中热网热量传输单元包含大量管道和换热设备,具有大容量储能功能;利用热网的储能功能,在供热高峰期可以使热电机组在满足供热需求的前提下短时间内调整供热抽汽量;
(1-2)热电机组特性分析
抽汽式热电机组供热出力和电出力的耦合关系称为机组的“电热特性”,其电热特性可按下式表示,在满足运行要求的条件下可以通过调节抽汽量来调整机组的出力。
CminHCHP≤PCHP≤Pmax-CmaxHCHP
式中,PCHP为热电机组电出力,HCHP为热电机组热出力,Cmin和Cmax为机组电功率的下限和上限,Pmax为电功率最大值;
在热负荷较高时,热电机组受“以热定电”运行模式的限制,随着热电机组供热抽汽量的增加,机组电功率的调节范围不断缩小,机组调峰裕度减小,调峰能力下降。当机组工作在纯凝工况时,热电机组至少有50%的调峰裕度,而当机组供热抽汽量达到最大时,热电机组几乎没有调峰能力。
4.根据权利要求2所述的一种利用热网储能含风电的热-电系统联合经济调度方法,其特征在于,所述步骤2的具体过程如下:
利用热网的储能功能,调整热电机组供热抽汽量提高机组调峰能力,需要保证热网安全稳定工作,遵循以下约束关系:
(2-1)厂内热网汽源压力约束
Px≥Pmin
短时间内减少供热抽汽量,提高热电机组调峰能力时,需要保障厂内热网气源压力维持在一个安全范围,根据等焓膨胀原理,Px作如下计算:
<mrow>
<msub>
<mi>M</mi>
<mn>1</mn>
</msub>
<mo>=</mo>
<mfrac>
<mover>
<mi>V</mi>
<mo>&OverBar;</mo>
</mover>
<msub>
<mi>v</mi>
<mn>1</mn>
</msub>
</mfrac>
</mrow>
式中,Px为热网汽源压强,vx为待求解热网气源压强下的蒸汽比容,为同一蒸汽焓商下压强和蒸汽比容的关系,M1为热网蒸汽量,v1为设计值下的蒸汽比容,τ为供热流量输入输出偏差,T为热网蓄放热持续时间,为热网容积;
(2-2)热网容量约束
Smin≤St≤Smax
式中,St是热网阶段性储热量,Smin和Smax为热网最小和最大储热量;
(2-3)热平衡约束
Δt(Hin,t-Hout,t-klossSt)=St+1-St
式中,Hin,t为热网输入热量,Hout,t为热网输出热量,kloss为热损耗系数。
5.根据权利要求2所述的一种利用热网储能含风电的热-电系统联合经济调度方法,其特征在于,所述步骤3的具体过程如下:
(3-1)含高比例热电机组的电力系统弃风原因分析
1)用电负荷处在低谷期,风电出力和热负荷处在高位,热电机组受供热制约调峰能力有限,该时段受制于系统本身风电接入能力有限产生弃风;
2)用电负荷逐渐增加,风电出力和热负荷处在低谷期,但风电出力变化剧烈,此时多由于风电出力的反调峰性和不确定性导致旋转备用无法满足风电接入条件产生弃风;
(3-2)制定热-电系统两阶段联合调度策略
第一阶段调度是通过判断是否由于系统本身风电接入能力有限导致弃风的产生,进而调度热电机组供热抽汽参数改变,采取热电机组连续调节,减少供热抽汽量,提高机组调峰能力,热网蓄放热补充热源缺失部分的方式提高系统风电消纳能力;
第二阶段调度加入弃风预判机制,根据弃风可能性判断是否采取利用热网储能功能提前调节热电机组抽汽参数的方式,对热网蓄放热进行控制,优化热电机组出力,提高系统调峰能力;
弃风可能性Pk通过风电实际出力和预测出力的偏差概率进行计算,如下式:
<mrow>
<msub>
<mi>P</mi>
<mi>k</mi>
</msub>
<mo>=</mo>
<mi>m</mi>
<mi>a</mi>
<mi>x</mi>
<mrow>
<mo>(</mo>
<msub>
<mi>&Phi;</mi>
<mi>p</mi>
</msub>
<mo>&lsqb;</mo>
<msub>
<mover>
<mi>p</mi>
<mo>~</mo>
</mover>
<mrow>
<mi>w</mi>
<mo>,</mo>
<mi>t</mi>
</mrow>
</msub>
<mo><</mo>
<msub>
<mi>p</mi>
<mrow>
<mi>w</mi>
<mo>,</mo>
<mi>t</mi>
</mrow>
</msub>
<mo>&rsqb;</mo>
<mo>|</mo>
<msub>
<mi>&Phi;</mi>
<mi>p</mi>
</msub>
<mo>&lsqb;</mo>
<msub>
<mover>
<mi>p</mi>
<mo>~</mo>
</mover>
<mrow>
<mi>w</mi>
<mo>,</mo>
<mi>t</mi>
</mrow>
</msub>
<mo>></mo>
<msub>
<mi>p</mi>
<mrow>
<mi>w</mi>
<mo>,</mo>
<mi>t</mi>
</mrow>
</msub>
<mo>&rsqb;</mo>
<mo>)</mo>
</mrow>
</mrow>
式中,和为风电实际出力小于或大于计划出力的概率;
式中,Φp(O)和Φp(pw)为风电在出力为0和pw时的积分,为风电t时段实际出力,pw,t为风电t时段计划出力,为风电计划出力在t时段的概率密度;
6.根据权利要求2所述的一种利用热网储能含风电的热-电系统联合经济调度方法,其特征在于,所述步骤4的具体过程如下:
(4-1)确定风电不确定性成本的影响因子
1)风电并网引起的系统母线电压波动越剧烈,风险成本越高;
2)风电出力不足和盈余情况发生概率越高,风险成本越高;
3)风电实际出力和计划出力之间的差值越大,风险成本越高;
(4-2)测量风电接入对系统的扰动程度
定义系统内不同母线电压观测值的标准差为母线电压分布指数,表征风电出力波动性对系统的扰动程度;
<mrow>
<msub>
<mi>&mu;</mi>
<mi>t</mi>
</msub>
<mo>=</mo>
<msqrt>
<mrow>
<mfrac>
<mn>1</mn>
<mrow>
<mi>m</mi>
<mo>-</mo>
<mn>1</mn>
</mrow>
</mfrac>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>k</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mi>m</mi>
</munderover>
<msup>
<mrow>
<mo>(</mo>
<msub>
<mi>u</mi>
<mi>k</mi>
</msub>
<mo>-</mo>
<mover>
<mi>u</mi>
<mo>&OverBar;</mo>
</mover>
<mo>)</mo>
</mrow>
<mn>2</mn>
</msup>
</mrow>
</msqrt>
</mrow>
式中,uk为第k次母线电压观测值,为观测电压平均值,m为观测样本容量;
(4-3)构建风电不确定性成本函数
定义系统正负备用风险调度费用为风电不确定性成本;
fRCS=fR,u+fR,d
式中,fR,u为风电场出力盈余成本,fR,d为风电场出力不足成本;
正旋转备用风险调度费用计算如下:
<mrow>
<msub>
<mi>f</mi>
<mrow>
<mi>R</mi>
<mo>,</mo>
<mi>u</mi>
</mrow>
</msub>
<mo>=</mo>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>t</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mi>T</mi>
</munderover>
<msub>
<mi>&xi;</mi>
<mi>u</mi>
</msub>
<msubsup>
<mi>&mu;</mi>
<mrow>
<mi>u</mi>
<mo>,</mo>
<mi>t</mi>
</mrow>
<mo>&prime;</mo>
</msubsup>
<msub>
<mi>&psi;</mi>
<mrow>
<mi>u</mi>
<mo>,</mo>
<mi>t</mi>
</mrow>
</msub>
<mo>&lsqb;</mo>
<msub>
<mi>E</mi>
<mrow>
<mi>u</mi>
<mo>,</mo>
<mi>t</mi>
</mrow>
</msub>
<mo>-</mo>
<msub>
<mi>P</mi>
<mrow>
<mi>w</mi>
<mo>,</mo>
<mi>t</mi>
</mrow>
</msub>
<mo>&rsqb;</mo>
<mi>&Delta;</mi>
<mi>T</mi>
</mrow>
式中,ξu为出力不足成本系数,μ′u,t为μu,t的归一化值,ψu,t为t时刻风电出力不足概率,Pw,t为t时刻系统的风电实际接入量,Eu,t为风电实际出力的条件期望;
负旋转备用风险调度费用计算如下:
<mrow>
<msub>
<mi>f</mi>
<mrow>
<mi>R</mi>
<mo>,</mo>
<mi>d</mi>
</mrow>
</msub>
<mo>=</mo>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>t</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mi>T</mi>
</munderover>
<msub>
<mi>&xi;</mi>
<mi>d</mi>
</msub>
<msubsup>
<mi>&mu;</mi>
<mrow>
<mi>d</mi>
<mo>,</mo>
<mi>t</mi>
</mrow>
<mo>&prime;</mo>
</msubsup>
<msub>
<mi>&psi;</mi>
<mrow>
<mi>d</mi>
<mo>,</mo>
<mi>t</mi>
</mrow>
</msub>
<mo>&lsqb;</mo>
<msub>
<mi>P</mi>
<mrow>
<mi>w</mi>
<mo>,</mo>
<mi>t</mi>
</mrow>
</msub>
<mo>-</mo>
<msub>
<mi>E</mi>
<mrow>
<mi>d</mi>
<mo>,</mo>
<mi>t</mi>
</mrow>
</msub>
<mo>&rsqb;</mo>
<mi>&Delta;</mi>
<mi>T</mi>
</mrow>
式中,ξd为出力盈余成本系数,μ′d,t为μd,t的归一化值,ψd,t为t时刻风电出力盈余概率,Ed,t为风电实际出力的条件期望;
风电出力的条件期望计算如下:
<mrow>
<msub>
<mi>E</mi>
<mrow>
<mi>d</mi>
<mo>,</mo>
<mi>t</mi>
</mrow>
</msub>
<mo>=</mo>
<mfrac>
<mrow>
<msubsup>
<mo>&Integral;</mo>
<mn>0</mn>
<mrow>
<mi>P</mi>
<mrow>
<mo>(</mo>
<mi>w</mi>
<mo>,</mo>
<mi>t</mi>
<mo>)</mo>
</mrow>
</mrow>
</msubsup>
<msub>
<mi>w</mi>
<mi>t</mi>
</msub>
<msub>
<mi>f</mi>
<msub>
<mi>w</mi>
<mi>t</mi>
</msub>
</msub>
<msub>
<mi>d</mi>
<msub>
<mi>w</mi>
<mi>t</mi>
</msub>
</msub>
</mrow>
<mrow>
<msubsup>
<mo>&Integral;</mo>
<mn>0</mn>
<mrow>
<mi>P</mi>
<mrow>
<mo>(</mo>
<mi>w</mi>
<mo>,</mo>
<mi>t</mi>
<mo>)</mo>
</mrow>
</mrow>
</msubsup>
<msub>
<mi>w</mi>
<mi>t</mi>
</msub>
<msub>
<mi>d</mi>
<msub>
<mi>w</mi>
<mi>t</mi>
</msub>
</msub>
</mrow>
</mfrac>
</mrow>
<mrow>
<msub>
<mi>E</mi>
<mrow>
<mi>u</mi>
<mo>,</mo>
<mi>t</mi>
</mrow>
</msub>
<mo>=</mo>
<mfrac>
<mrow>
<msubsup>
<mo>&Integral;</mo>
<mrow>
<mi>P</mi>
<mrow>
<mo>(</mo>
<mi>w</mi>
<mo>,</mo>
<mi>t</mi>
<mo>)</mo>
</mrow>
</mrow>
<msub>
<mi>W</mi>
<mi>max</mi>
</msub>
</msubsup>
<msub>
<mi>w</mi>
<mi>t</mi>
</msub>
<msub>
<mi>f</mi>
<msub>
<mi>w</mi>
<mi>t</mi>
</msub>
</msub>
<msub>
<mi>d</mi>
<msub>
<mi>w</mi>
<mi>t</mi>
</msub>
</msub>
</mrow>
<mrow>
<msubsup>
<mo>&Integral;</mo>
<mrow>
<mi>P</mi>
<mrow>
<mo>(</mo>
<mi>w</mi>
<mo>,</mo>
<mi>t</mi>
<mo>)</mo>
</mrow>
</mrow>
<msub>
<mi>W</mi>
<mi>max</mi>
</msub>
</msubsup>
<msub>
<mi>f</mi>
<msub>
<mi>w</mi>
<mi>t</mi>
</msub>
</msub>
<msub>
<mi>d</mi>
<msub>
<mi>w</mi>
<mi>t</mi>
</msub>
</msub>
</mrow>
</mfrac>
</mrow>
式中,为风电场实际出力wt的概率密度函数,p(w,t)为t时段风电出力,Wmax为风电最大出力;
(4-4)分析风电不确定性成本对风电接入的影响
根据风电接入风险成本将风电出力不确定性引起的系统风险分为安全、较安全、危险和严重危险四个安全等级,每个安全等级对应着相应的风电接入操作;当风电接入后系统处在危险安全等级情况时,通过采取弃风的方式调节风电接入,保障系统安全运行。
7.根据权利要求2所述的一种利用热网储能含风电的热-电系统联合经济调度方法,其特征在于,所述步骤5的具体过程如下:
(5-1)建立调度目标函数
含风电的热电联合经济调度以满足供热需求为前提,最小弃风为主要目标,同时兼顾风电接入风险成本,构建目标函数如下:
<mrow>
<mi>M</mi>
<mi>i</mi>
<mi>n</mi>
<mi> </mi>
<mi>F</mi>
<mo>=</mo>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>t</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mi>T</mi>
</munderover>
<mrow>
<mo>(</mo>
<msubsup>
<mi>P</mi>
<mrow>
<mi>W</mi>
<mo>,</mo>
<mi>t</mi>
</mrow>
<mrow>
<mi>c</mi>
<mi>u</mi>
<mi>r</mi>
<mi>t</mi>
</mrow>
</msubsup>
<mo>+</mo>
<mi>&epsiv;</mi>
<mo>(</mo>
<mrow>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>i</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<msub>
<mi>N</mi>
<mrow>
<mi>g</mi>
<mn>1</mn>
</mrow>
</msub>
</munderover>
<msub>
<mi>f</mi>
<mrow>
<mi>c</mi>
<mn>1</mn>
</mrow>
</msub>
<mo>+</mo>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>j</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<msub>
<mi>N</mi>
<mrow>
<mi>g</mi>
<mn>2</mn>
</mrow>
</msub>
</munderover>
<msub>
<mi>f</mi>
<mrow>
<mi>c</mi>
<mn>2</mn>
</mrow>
</msub>
<mo>+</mo>
<msub>
<mi>f</mi>
<mrow>
<mi>R</mi>
<mi>C</mi>
<mi>S</mi>
</mrow>
</msub>
</mrow>
<mo>)</mo>
<mo>)</mo>
</mrow>
</mrow>
式中,F为最小弃风量,为系统弃风量,Ng1,Ng2分别为热电机组和纯凝机组数,ε为权重系数,T为调度周期,fc1为热电机组运行费用,fc2为纯凝机组运行费用;
<mrow>
<msub>
<mi>f</mi>
<mrow>
<mi>c</mi>
<mn>1</mn>
</mrow>
</msub>
<mo>=</mo>
<msub>
<mi>a</mi>
<mrow>
<mi>i</mi>
<mo>,</mo>
<mn>1</mn>
</mrow>
</msub>
<mo>+</mo>
<msub>
<mi>a</mi>
<mrow>
<mi>i</mi>
<mo>,</mo>
<mn>2</mn>
</mrow>
</msub>
<msub>
<mi>P</mi>
<mi>i</mi>
</msub>
<mo>+</mo>
<msub>
<mi>a</mi>
<mrow>
<mi>i</mi>
<mo>,</mo>
<mn>3</mn>
</mrow>
</msub>
<msub>
<mi>D</mi>
<mi>i</mi>
</msub>
<mo>+</mo>
<msub>
<mi>a</mi>
<mrow>
<mi>i</mi>
<mo>,</mo>
<mn>4</mn>
</mrow>
</msub>
<msubsup>
<mi>p</mi>
<mi>i</mi>
<mn>2</mn>
</msubsup>
<mo>+</mo>
<msub>
<mi>a</mi>
<mrow>
<mi>i</mi>
<mo>,</mo>
<mn>5</mn>
</mrow>
</msub>
<msub>
<mi>P</mi>
<mi>i</mi>
</msub>
<msub>
<mi>D</mi>
<mi>i</mi>
</msub>
<mo>+</mo>
<msub>
<mi>a</mi>
<mrow>
<mi>i</mi>
<mo>,</mo>
<mn>6</mn>
</mrow>
</msub>
<msubsup>
<mi>D</mi>
<mi>i</mi>
<mn>2</mn>
</msubsup>
</mrow>
式中,ai,1-ai,6为第i台热电机组的耗量特性系数,Pi和Di分别为第i台热电机组的电出力和供热抽汽量;
<mrow>
<msub>
<mi>f</mi>
<mrow>
<mi>c</mi>
<mn>2</mn>
</mrow>
</msub>
<mo>=</mo>
<msub>
<mi>b</mi>
<mrow>
<mi>j</mi>
<mo>,</mo>
<mn>1</mn>
</mrow>
</msub>
<mo>+</mo>
<msub>
<mi>b</mi>
<mrow>
<mi>j</mi>
<mo>,</mo>
<mn>2</mn>
</mrow>
</msub>
<msub>
<mi>P</mi>
<mi>j</mi>
</msub>
<mo>+</mo>
<msub>
<mi>b</mi>
<mrow>
<mi>j</mi>
<mo>,</mo>
<mn>3</mn>
</mrow>
</msub>
<msubsup>
<mi>P</mi>
<mi>j</mi>
<mn>2</mn>
</msubsup>
</mrow>
式中,bj,1-bj,3为第j台纯凝机组的耗量特性系数,Pj为第j台纯凝机组的电出力。
(5-2)设置目标函数约束条件
系统约束条件:
1)系统功率平衡约束
<mrow>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>i</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<msub>
<mi>N</mi>
<mrow>
<mi>g</mi>
<mn>1</mn>
</mrow>
</msub>
</munderover>
<msub>
<mi>P</mi>
<mrow>
<mi>i</mi>
<mo>,</mo>
<mi>t</mi>
</mrow>
</msub>
<mo>+</mo>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>j</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<msub>
<mi>N</mi>
<mrow>
<mi>g</mi>
<mn>2</mn>
</mrow>
</msub>
</munderover>
<msub>
<mi>P</mi>
<mrow>
<mi>j</mi>
<mo>,</mo>
<mi>t</mi>
</mrow>
</msub>
<mo>+</mo>
<mrow>
<mo>(</mo>
<msub>
<mi>P</mi>
<mrow>
<mi>W</mi>
<mo>,</mo>
<mi>t</mi>
</mrow>
</msub>
<mo>-</mo>
<msubsup>
<mi>P</mi>
<mrow>
<mi>W</mi>
<mo>,</mo>
<mi>t</mi>
</mrow>
<mrow>
<mi>c</mi>
<mi>u</mi>
<mi>r</mi>
<mi>t</mi>
</mrow>
</msubsup>
<mo>)</mo>
</mrow>
<mo>=</mo>
<msub>
<mi>P</mi>
<mrow>
<mi>L</mi>
<mo>,</mo>
<mi>t</mi>
</mrow>
</msub>
</mrow>
式中,PW,t为t时段风电出力,为t时段弃风量,PL,t为t时段电负荷;
2)系统热负荷平衡约束
<mrow>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>i</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<msub>
<mi>N</mi>
<mrow>
<mi>g</mi>
<mn>1</mn>
</mrow>
</msub>
</munderover>
<msubsup>
<mi>Q</mi>
<mrow>
<mi>C</mi>
<mi>H</mi>
<mi>P</mi>
</mrow>
<mrow>
<mi>t</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
</msubsup>
<mo>=</mo>
<msup>
<mi>Q</mi>
<mrow>
<mi>L</mi>
<mo>,</mo>
<mi>t</mi>
</mrow>
</msup>
</mrow>
式中,为t时段第i台热电机组的供热量,ΔHt,i为热电机组抽汽的焓降,QL,t为t时段热负荷;
热电机组约束条件:
1)热电比约束
Pi,t=Hi,t/khp
式中,Pi,t为热电机组的电出力,Hi,t为热电机组的供热量,khp为机组热电比;
2)热电机组出力约束
Pi,min≤Pi,t≤Pi,max
Di,min≤Di,t≤Di,max
式中,Pi,t为热电机组i在t时段的电出力,Pi,min和Pi,max为机组的最小电出力和最大电出力;Di,t为热电机组i在t时段的热出力,Di,min和Di,max为机组的最小热出力和最大热出力;
3)机组爬坡约束
Pi,t-Pi,t-1≤Ru,iΔT
Pi,t-1-Pi,t≤Rd,iΔT
式中,Ru,i和Rd,i为热电机组i的上下爬坡速率;
常规机组约束条件:
1)常规机组出力约束
Pj,min≤Pj,t≤Pj,max
式中,Pj,t为常规机组j在t时段的出力,Pj,min为机组j最小出力,Pj,max为机组j最大出力;
2)机组爬坡约束
Pj,t-Pj,t-1≤Ru,jΔT
Pj,t-1-Pj,t≤Rd,jΔT
式中,Ru,j和Rd,j为火电机组j的上下爬坡速率;
3)系统正负旋转备用容量约束
<mrow>
<msub>
<mi>p</mi>
<mrow>
<mi>u</mi>
<mo>,</mo>
<mi>s</mi>
</mrow>
</msub>
<mo>=</mo>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>i</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<msub>
<mi>N</mi>
<mi>g</mi>
</msub>
</munderover>
<msub>
<mi>p</mi>
<mrow>
<mi>u</mi>
<mo>,</mo>
<mi>i</mi>
</mrow>
</msub>
<mo>&GreaterEqual;</mo>
<msub>
<mi>p</mi>
<mi>L</mi>
</msub>
<mo>&times;</mo>
<msup>
<mi>L</mi>
<mo>+</mo>
</msup>
<mi>%</mi>
<mo>+</mo>
<msub>
<mi>p</mi>
<mi>w</mi>
</msub>
<mo>&times;</mo>
<msub>
<mi>w</mi>
<mi>u</mi>
</msub>
<mi>%</mi>
</mrow>
式中,pu,s和pd,s为系统提供的正负备用,pL和pw为负荷预测值和风电接入值,L+%和L+%为负荷对备用容量的需求比例,wu%和wd%为风电出力对备用容量需求比例,pu,i和pd,i为机组提供的正旋转备用和最小旋转出力;
热网状态约束:
热网安全稳定运行需要满足步骤2中的约束。
8.根据权利要求2所述的一种利用热网储能含风电的热-电系统联合经济调度方法,其特征在于,所述步骤6的具体过程如下:
(6-1)确定算例以及其必要特征;
(6-2)采用快速粒子群算法对算例进行仿真分析。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710583813.1A CN107590579A (zh) | 2017-07-18 | 2017-07-18 | 一种利用热网储能特性的热‑电系统联合经济调度方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710583813.1A CN107590579A (zh) | 2017-07-18 | 2017-07-18 | 一种利用热网储能特性的热‑电系统联合经济调度方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107590579A true CN107590579A (zh) | 2018-01-16 |
Family
ID=61041818
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710583813.1A Pending CN107590579A (zh) | 2017-07-18 | 2017-07-18 | 一种利用热网储能特性的热‑电系统联合经济调度方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107590579A (zh) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108009683A (zh) * | 2018-01-30 | 2018-05-08 | 国网辽宁省电力有限公司 | 一种大容量直控负荷提高风电接纳能力的调度方法 |
CN108258730A (zh) * | 2018-02-01 | 2018-07-06 | 国网辽宁省电力有限公司 | 一种电网协调调度下的弃风供暖系统及方法 |
CN108446865A (zh) * | 2018-04-17 | 2018-08-24 | 北京清大高科系统控制有限公司 | 基于区间方法的热-电耦合多能流系统功率风险评估方法 |
CN108808713A (zh) * | 2018-05-04 | 2018-11-13 | 国网内蒙古东部电力有限公司电力科学研究院 | 提升新能源发电消纳能力的工业热负荷控制系统及方法 |
CN108921441A (zh) * | 2018-07-11 | 2018-11-30 | 南方电网科学研究院有限责任公司 | 一种综合能源供能系统的控制方法、装置、设备及介质 |
CN109325621A (zh) * | 2018-08-29 | 2019-02-12 | 华南理工大学 | 一种园区能源互联网两阶段优化调度控制方法 |
CN109755949A (zh) * | 2019-01-07 | 2019-05-14 | 中国电力科学研究院有限公司 | 一种热电联合储能电站功率的优化分配方法及装置 |
CN111047069A (zh) * | 2019-10-23 | 2020-04-21 | 浙江大学 | 一种考虑热网储能特性的热电联合调度灵活性评估方法 |
CN111291942A (zh) * | 2020-03-05 | 2020-06-16 | 燕山大学 | 一种考虑需求响应的综合能源系统两阶段调度方法及系统 |
CN113363973A (zh) * | 2021-06-16 | 2021-09-07 | 国网冀北电力有限公司检修分公司 | 一种热电联合调度方法及装置 |
CN113587208A (zh) * | 2021-08-03 | 2021-11-02 | 中国华能集团清洁能源技术研究院有限公司 | 一种蒸汽管网储能在线定量计算方法和系统 |
CN113806898A (zh) * | 2021-09-01 | 2021-12-17 | 港华能源投资有限公司 | 用于确定供热管网储能能力的方法及相关装置 |
CN117422282A (zh) * | 2023-12-19 | 2024-01-19 | 国网山东省电力公司电力科学研究院 | 利用电网盈余电力耦合热力系统的机组调峰方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20160180474A1 (en) * | 2013-05-06 | 2016-06-23 | Viridity Energy, Inc. | Facilitating revenue generation from wholesale electricity markets using an engineering-based energy asset model |
CN106327014A (zh) * | 2016-08-24 | 2017-01-11 | 上海电机学院 | 一种含风电场的电力系统调度优化方法 |
-
2017
- 2017-07-18 CN CN201710583813.1A patent/CN107590579A/zh active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20160180474A1 (en) * | 2013-05-06 | 2016-06-23 | Viridity Energy, Inc. | Facilitating revenue generation from wholesale electricity markets using an engineering-based energy asset model |
CN106327014A (zh) * | 2016-08-24 | 2017-01-11 | 上海电机学院 | 一种含风电场的电力系统调度优化方法 |
Non-Patent Citations (2)
Title |
---|
翁振星: "计及风电成本的电力系统动态经济调度", 《中国电机工程学报》 * |
陈磊: "储热提升风电消纳能力的实施方式及效果分析", 《中国电机工程学报》 * |
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108009683A (zh) * | 2018-01-30 | 2018-05-08 | 国网辽宁省电力有限公司 | 一种大容量直控负荷提高风电接纳能力的调度方法 |
CN108258730A (zh) * | 2018-02-01 | 2018-07-06 | 国网辽宁省电力有限公司 | 一种电网协调调度下的弃风供暖系统及方法 |
CN108446865A (zh) * | 2018-04-17 | 2018-08-24 | 北京清大高科系统控制有限公司 | 基于区间方法的热-电耦合多能流系统功率风险评估方法 |
CN108446865B (zh) * | 2018-04-17 | 2019-08-16 | 北京清大高科系统控制有限公司 | 基于区间方法的热-电耦合多能流系统功率风险评估方法 |
CN108808713A (zh) * | 2018-05-04 | 2018-11-13 | 国网内蒙古东部电力有限公司电力科学研究院 | 提升新能源发电消纳能力的工业热负荷控制系统及方法 |
CN108921441A (zh) * | 2018-07-11 | 2018-11-30 | 南方电网科学研究院有限责任公司 | 一种综合能源供能系统的控制方法、装置、设备及介质 |
CN109325621A (zh) * | 2018-08-29 | 2019-02-12 | 华南理工大学 | 一种园区能源互联网两阶段优化调度控制方法 |
CN109325621B (zh) * | 2018-08-29 | 2022-04-22 | 华南理工大学 | 一种园区能源互联网两阶段优化调度控制方法 |
CN109755949B (zh) * | 2019-01-07 | 2021-12-17 | 中国电力科学研究院有限公司 | 一种热电联合储能电站功率的优化分配方法及装置 |
CN109755949A (zh) * | 2019-01-07 | 2019-05-14 | 中国电力科学研究院有限公司 | 一种热电联合储能电站功率的优化分配方法及装置 |
CN111047069B (zh) * | 2019-10-23 | 2022-08-09 | 浙江大学 | 一种考虑热网储能特性的热电联合调度灵活性评估方法 |
CN111047069A (zh) * | 2019-10-23 | 2020-04-21 | 浙江大学 | 一种考虑热网储能特性的热电联合调度灵活性评估方法 |
CN111291942A (zh) * | 2020-03-05 | 2020-06-16 | 燕山大学 | 一种考虑需求响应的综合能源系统两阶段调度方法及系统 |
CN111291942B (zh) * | 2020-03-05 | 2023-09-26 | 燕山大学 | 一种考虑需求响应的综合能源系统两阶段调度方法及系统 |
CN113363973A (zh) * | 2021-06-16 | 2021-09-07 | 国网冀北电力有限公司检修分公司 | 一种热电联合调度方法及装置 |
CN113587208A (zh) * | 2021-08-03 | 2021-11-02 | 中国华能集团清洁能源技术研究院有限公司 | 一种蒸汽管网储能在线定量计算方法和系统 |
CN113806898A (zh) * | 2021-09-01 | 2021-12-17 | 港华能源投资有限公司 | 用于确定供热管网储能能力的方法及相关装置 |
CN113806898B (zh) * | 2021-09-01 | 2022-09-13 | 港华能源投资有限公司 | 用于确定供热管网储能能力的方法及相关装置 |
CN117422282A (zh) * | 2023-12-19 | 2024-01-19 | 国网山东省电力公司电力科学研究院 | 利用电网盈余电力耦合热力系统的机组调峰方法 |
CN117422282B (zh) * | 2023-12-19 | 2024-03-22 | 国网山东省电力公司电力科学研究院 | 利用电网盈余电力耦合热力系统的机组调峰方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107590579A (zh) | 一种利用热网储能特性的热‑电系统联合经济调度方法 | |
Li et al. | A hybrid optimization-based scheduling strategy for combined cooling, heating, and power system with thermal energy storage | |
CN106960282B (zh) | 一种气电综合能源配网系统的协调运行方法 | |
WO2019233134A1 (zh) | 数据驱动下基于风电不确定性的电热气网三阶段调度方法 | |
CN105337303B (zh) | 一种含热泵的热电联产型微电网容量优化配置方法 | |
Arnold et al. | Model-based predictive control applied to multi-carrier energy systems | |
CN104463378B (zh) | 用于水电资源丰富地区省级电网风力发电消纳能力的算法 | |
CN104467029B (zh) | 一种区域小水电、风电日内联合优化调度的方法 | |
CN107104462B (zh) | 一种用于风电场储能调度的方法 | |
Mladenov et al. | Characterisation and evaluation of flexibility of electrical power system | |
CN111724045B (zh) | 基于数据驱动的综合能源系统能效评价与提升方法 | |
CN116341881B (zh) | 计及热网灵活性的电-热系统鲁棒超前调度方法及系统 | |
CN106410845A (zh) | 特高压大功率直流馈入后受端电网的调峰方法 | |
CN109818347A (zh) | 一种电力系统风电消纳能力的评估方法 | |
Nazari et al. | A novel optimization methodology for multi-constraint unit commitment of thermal generating units with considerations for hydro pumped energy Storage | |
CN115099007B (zh) | 基于综合成本-能耗曲线的综合能源系统优化运行方法 | |
CN115842376A (zh) | 电力系统等效惯量趋势与安全状态评估方法、设备和介质 | |
CN113013930B (zh) | 一种虚拟电厂经柔性直流外送的二次调频控制方法及系统 | |
Bruno et al. | Managing networked hybrid-energy systems: A predictive dispatch approach | |
CN115549118A (zh) | 配电网无功补偿设备出力平滑指数预测方法 | |
Li et al. | Proportion optimization of wind and solar power capacity for regional power network | |
Cai et al. | Cross-provincial Day-ahead to Intra-day Scheduling Method Considering Forecasting Uncertainty of New Energy | |
Tie-yan et al. | Analysis on peak-regulation operation strategy of hydro-wind power binding system | |
CN110429662A (zh) | 一种热电联产机组启停机计划制定方法及系统 | |
ZHAO et al. | Dynamic Coordination Optimization Model of Regional and Provincial AGC Unit Control for Ultra-high Voltage Line Interconnected Power System |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180116 |
|
WD01 | Invention patent application deemed withdrawn after publication |