CN1075857C - Water-proof roof construction technology - Google Patents

Water-proof roof construction technology Download PDF

Info

Publication number
CN1075857C
CN1075857C CN 92111956 CN92111956A CN1075857C CN 1075857 C CN1075857 C CN 1075857C CN 92111956 CN92111956 CN 92111956 CN 92111956 A CN92111956 A CN 92111956A CN 1075857 C CN1075857 C CN 1075857C
Authority
CN
China
Prior art keywords
cement mortar
layer
water
technology
covered
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 92111956
Other languages
Chinese (zh)
Other versions
CN1071480A (en
Inventor
韩克勣
韩渝明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 92111956 priority Critical patent/CN1075857C/en
Publication of CN1071480A publication Critical patent/CN1071480A/en
Application granted granted Critical
Publication of CN1075857C publication Critical patent/CN1075857C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Press-Shaping Or Shaping Using Conveyers (AREA)

Abstract

The present invention provides a novel waterproof roof construction technique which relates to a building construction technique. First of all, a thin layer of cement mortar is covered on the combined positions of the prefabricated slabs of a roof, repeated compact treatment is subsequently carried out, and then plastic films are used for covering the cement mortar; a second layer, a third layer, a fourth layer until a seventh layer are orderly covered by the plastic films as the former technique after initial set; subsequently, a plurality of layers of cement mortar are covered on the rest parts of the precast slabs of the roof until the layers are on the same level as the whole roof according to the former technique, and the technique of forming a thin shell structure with a plurality of layers of the mortar is completed. The present invention has the advantages of favorable waterproof effect, long service life, simple operation, low cost, etc.

Description

Water-proof roof construction technology
The present invention is a kind of water-proof roof construction technology, and it adopts the cement mortar moulding process, relates to building construction technology.
In existing water-proof roofing process, the conventional form of construction work of the cement mortar of employing is arranged, the employing waterproof material is also arranged, as waterproofing unction etc., to scheme to reach the purpose that prevents roof leakage, but, easily produce the crack and leak owing to existing the former roofing in these methods, problem such as latter's price height, application life are short.
The objective of the invention is to provide a kind of good water-proof effect, long service life, processing ease, cheap water-proof roof construction technology for fear of above-mentioned the deficiencies in the prior art part.
Purpose of the present invention can reach by the following technical programs, and its process is:
At first, foreign material in the slit between plate will be reached on the roofing concrete precast plate face, floating dust cleans up, tamp with cement mortar and to fill and lead up slit between plate, after treating 4-8 days, make along plate seam parallel direction with cement mortar again, be covered in the width 100-150 millimeter that plate is sewed on, thick 8-15 millimeter, the top is thicker than the banded cement mortar covering layer of first floor of both sides approximately, then want trickle limit, limit to press repeatedly and smear closely knit processing with instrument, cover with plastic sheeting again, after treating initial set, technology is made the second layer with cement mortar more as described above, the 3rd layer, until the 4-7 layer and the banded cement mortar covering layer that covers successively, from the second layer, every layer thickness is the 4-7 millimeter, width is successively wide a little, again the concrete prefabricated board face employing of all the other roofings is made the first floor that parallels with the plate face as aforementioned process water silt particle slurry, the second layer, until the multilayer cement mortar covering layer that flushes with whole roofing, from first floor, every layer thickness still is controlled at the 4-7 millimeter, also to carry out repeatedly closely knit processing, cover with plastic sheeting, after treating initial set, just can do time one deck, more than just finished multilayer cement mortar thin shell structures technology.And then maintenance 7-10 days of sprinkling water, allow cement sand bed solidify fully, make surface course and grinding stone layer at last; Surface course can be inserted the material of wire lath and make with the 25-40 of gravel fine aggregate concrete below 10 millimeters millimeter, also will carry out closely knit processing and make slope.
Water will be built the pond wall.Should look the roofing size, proportional spacing building pond wall.The general high 180-200 millimeter of wall is near leaving the water outlet breach, high 100-120 millimeter in the gutter.What roofing was little also can be in order to avoid build division wall, and the pond wall should be built on the indoor partition wall, and its technology is: shop one deck cement mortar 3-6 millimeters thick, after closely knit processing repeatedly, press one deck brick again, and brickwork joint also will tamp cement mortar.Then, again the pond wall is all smeared one deck cement mortar 3-6 millimeters thick,, maintained after 7-10 days, do the diversion test again,, should in time adopt remedial measures and be filled up as finding seepage through closely knit processing.Roofing is little, builds one deck gravel fine aggregate concrete below 10 millimeters 20-30 millimeters thick within the walls in the pond, through closely knit processing, makes surface course, after maintenance 15-28 days, does the diversion test again, as non-leakage water, even if completion.Roofing is big, should build one deck fine aggregate concrete 25-40 millimeters thick in the pond within the walls, and wire lath is inserted in the concrete, through closely knit processing, makes surface course, maintenance 15-28 days, finishes even if carry out diversion test back.
For the building in gutter, should adopt as aforesaid multilayer cement mortar thin shell structures technology and finish, just the number of plies of cement mortar can be controlled in layer 2-4.
Other water proof building technology, as the waterproof technology in lavatory, washroom, kitchen, lavatory, at first adopt as aforesaid multilayer cement mortar thin shell structures technology and build up cement sand bed, build one deck gravel fine aggregate concrete 20-30 millimeters thick again, through closely knit processing, build the grinding stone floor at last.
The various material rates of preparation cement mortar are: cement: dry sand: water=1: 1.5: 0.3 (volume ratio).Mud content in the sand is less than 10% (volume ratio).With medium sand is good.
Below in conjunction with embodiment, water-proof roof construction technology is described in further detail: embodiment one, is not water technological operation:
Foreign material on the Prefabricated slab of roof face, floating dust are cleaned up (1); By cement: dry sand: water=1: 1.5: 0.3 (volume ratio) is mixed with cement mortar, and cement is with the portland cement of 425 common labels, medium sand, and mud content adopts tap water (2) less than 10% (volume ratio) in the sand; Tamp with cement mortar and to fill and lead up slit between plate (3); After treating 4 days, stitch parallel direction and be covered in the banded cement mortar covering layer of first floor that plate is sewed on along plate with cement mortar, layer is wide 120 millimeters, and thick 10 millimeters, the top is thicker than both sides (4) approximately; Then want trickle limit, limit to press repeatedly and smear, carry out closely knit processing (5) with ware bricklayer instrument; Cover (6) with plastic sheeting again; After treating initial set, adopt as (4-6) operating procedure as described in ditto make the second layer, the 3rd layer, until 7 layers, and the banded cement mortar covering layer that covers successively, from the second layer, every layer thickness is 5 millimeters, and width is successively wide a little, top successively thick a little (7); Cover one deck cement mortar 5 millimeters thick to adopting on remaining precast concrete plank face again, carry out closely knit processing, cover with plastic sheeting, after treating initial set, cover second layer cement mortar again, as aforementioned operation technology,, finish multilayer cement mortar thin shell structures technology (8) until the multilayer cement mortar covering layer that flushes with whole roofing; 10 days (9) of watering maintenance; Make with 40 millimeters thick of gravel fine aggregate concrete below 10 millimeters, and insert wire lath material and surface course and grinding stone layer (10) with plane, 2% slope.Embodiment two, are the water operating procedure:
The operating procedure of it and embodiment one is basic identical, and institute's difference is: the number of plies of multilayer cement mortar thin shell structures is 5 layers, does not do the grinding stone layer, and will build pond wall and gutter:
The pond wall will be built on the indoor partition wall position, and its technological operation is: the cement mortar of shop one deck 6 millimeters thick; Carry out closely knit processing repeatedly; Press one deck brick again, brickwork joint will tamp with cement mortar; Wall is all smeared the cement sand bed of one deck 6 millimeters thick, carry out closely knit processing repeatedly; Maintained 10 days; Do the diversion test.
The gutter will be built on the eaves of roofing front and back, and its technological operation is: the cement mortar that covers one deck 6 millimeters thick; Carry out repeatedly closely knit processing; Cover with plastic sheeting; After treating initial set, cover the second layer again, until 5 layers, every layer all should be adopted as aforesaid technological operation, does the diversion test at last.
The present invention mainly has the following advantages compared with prior art:
1, good water-proof effect. It adopts multilayer water cement mortar shell structure technology, can be effectively Prevent from or reduce roofing producing crack, every layer of effect of all playing water proof, thereby good water-proof effect.
2, long service life. With the water-proof roofing that this kind new technology is built up, warp is tried out 7 years extremely The present, still find no the percolating water situation.
3, simple to operate. Work progress does not need large-scale special installation, and general skilled worker personnel all can The operation construction.
4, cheap. According to measuring and calculating, process the water-proof roofing of onesize area, use this 2% of the new materials such as the not enough waterproofing unction of the cost of invention, and long service life.

Claims (3)

1, a kind of water-proof roof construction technology, it adopts the cement mortar moulding process, it is characterized in that: a, build water-proof roofing technology: at first, the foreign material in the slit, floating dust on the Prefabricated slab of roof and between plate are cleaned up, tamp with cement mortar and fill and lead up slit between plate; After treating 4-8 days, make along plate seam parallel direction with cement mortar again, being covered in plate sews on, wide 100-150 millimeter, thick 8-15 millimeter, the top is thicker than the banded cement mortar covering layer of first floor of both sides approximately, then want trickle limit, limit to press repeatedly and smear closely knit processing with instrument, cover with plastic sheeting again, after treating initial set, stitch parallel direction with cement mortar along plate again, be covered on the first floor and make the second layer with cement mortar again, the 3rd layer, until the 4-7 layer, the cement mortar covering layer of Fu Gaiing successively, from the thickness of every layer of the second layer is the 4-7 millimeter, width is successively wide a little, again to adopting cement mortar to make on all the other precast plate faces along plate face parallel direction, be covered in the cement mortar first floor that parallels on the plate face, the second layer, the 3rd layer, until the multilayer cement mortar covering layer that flushes with whole roofing, finish multilayer cement mortar thin shell structures technology; Then, watering was maintained 7-10 days again; Make surface course and grinding stone layer at last;
B, build pond wall technology: on indoor partition wall, the cement mortar of shop one deck 3-6 millimeters thick, after carrying out repeatedly closely knit processing, press one deck brick again, brickwork joint also will tamp with cement mortar, with cement mortar the pond wall is all smeared one deck then, and thickness is the 3-6 millimeter, carry out repeatedly closely knit processing, maintained 7-10 days;
C, build gutter technology: use cement mortar to adopt as current aforementioned multilayer cement mortar thin shell structures technology is built up.
2, water-proof roof construction technology as claimed in claim 1, it is characterized in that preparing the various raw materials of cement mortar: the volume ratio of cement, dry sand, water is: 1: 1.5: 0.3.
3, water-proof roof construction technology as claimed in claim 1 or 2 is characterized in that mud content in the sand is less than below 10%.
CN 92111956 1992-10-26 1992-10-26 Water-proof roof construction technology Expired - Fee Related CN1075857C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 92111956 CN1075857C (en) 1992-10-26 1992-10-26 Water-proof roof construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 92111956 CN1075857C (en) 1992-10-26 1992-10-26 Water-proof roof construction technology

Publications (2)

Publication Number Publication Date
CN1071480A CN1071480A (en) 1993-04-28
CN1075857C true CN1075857C (en) 2001-12-05

Family

ID=4945650

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 92111956 Expired - Fee Related CN1075857C (en) 1992-10-26 1992-10-26 Water-proof roof construction technology

Country Status (1)

Country Link
CN (1) CN1075857C (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100395419C (en) * 2004-05-20 2008-06-18 上海市第四建筑有限公司 Precast slab bleaches water-proof treating method
CN115075479B (en) * 2022-08-01 2024-04-19 河北久申防水建筑材料有限公司 Assembled roof system

Also Published As

Publication number Publication date
CN1071480A (en) 1993-04-28

Similar Documents

Publication Publication Date Title
Walker Bond characteristics of earth block masonry
CN109574585A (en) A kind of water-tight concrete and its construction method
CN102776897B (en) Wash apron anti-settling anti-cracking construction method and structure
CN110093989A (en) A kind of interior waterproof construction and its construction method
CN109608147A (en) A kind of water-proof concrete and ground waterproof construction method
CN201224933Y (en) Frame beam preventing water seepage and crack and wall stuffing structure
CN111350268A (en) Construction method of concrete structure self-waterproof system in sewage treatment engineering
CN106284998A (en) Plastering on inner walls completely spreads fiberglass gridding cloth construction method
CN101105070A (en) Polyphenyl board exterior wall outer thermal insulation construction method
CN1075857C (en) Water-proof roof construction technology
CN206545251U (en) A kind of floor drain waterproof construction
CN114606823A (en) Cement-based pervious concrete pavement structure and laying method thereof
CN101519881A (en) Basement post-cast strip construction process
CN112609778A (en) Construction method for tertiary drainage
JPH10110454A (en) Rainwater storage device using water permeable material in upper part thereof and using method of stored water
CN112709456A (en) Construction method for building with geogrid reinforced masonry structure
CN104775454A (en) Construction method of underground engineering cement-based permeable crystallization type waterproof material
CN210263441U (en) Swimming pool waterproof construction
CN110439014A (en) A kind of underground stratiform discharge structure and its construction method
CN212316820U (en) Seepage prevention structure behind view block stone revetment
Sharma Use of Ferro cement for waterproofing
CN109750691A (en) A kind of basement post-pouring zone underdrain method for constructing terrace
CN111962568A (en) Underground seepage-proofing construction method
CN212865796U (en) Combined vegetation block ecological river bank protection
CN111749373B (en) Cast-in-place wall body with microorganisms and rapid pouring method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee