CN101519881A - Basement post-cast strip construction process - Google Patents
Basement post-cast strip construction process Download PDFInfo
- Publication number
- CN101519881A CN101519881A CN200910096921A CN200910096921A CN101519881A CN 101519881 A CN101519881 A CN 101519881A CN 200910096921 A CN200910096921 A CN 200910096921A CN 200910096921 A CN200910096921 A CN 200910096921A CN 101519881 A CN101519881 A CN 101519881A
- Authority
- CN
- China
- Prior art keywords
- ater
- casting
- making
- concrete
- resistance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 15
- 238000000034 method Methods 0.000 title claims abstract description 12
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 18
- 238000005266 casting Methods 0.000 claims description 36
- 230000006835 compression Effects 0.000 claims description 19
- 238000007906 compression Methods 0.000 claims description 19
- 230000002787 reinforcement Effects 0.000 claims description 9
- 229910000831 Steel Inorganic materials 0.000 claims description 7
- 230000003014 reinforcing effect Effects 0.000 claims description 7
- 239000010959 steel Substances 0.000 claims description 7
- 241000208202 Linaceae Species 0.000 claims description 6
- 235000004431 Linum usitatissimum Nutrition 0.000 claims description 6
- 239000004568 cement Substances 0.000 claims description 4
- 239000003795 chemical substances by application Substances 0.000 claims description 4
- 239000000463 material Substances 0.000 claims description 4
- 239000010426 asphalt Substances 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 claims description 3
- 238000003825 pressing Methods 0.000 claims description 3
- 230000000717 retained effect Effects 0.000 claims description 3
- 238000007789 sealing Methods 0.000 claims description 3
- 239000002689 soil Substances 0.000 claims description 3
- 238000004078 waterproofing Methods 0.000 claims description 3
- 239000003643 water by type Substances 0.000 claims description 2
- 230000008485 antagonism Effects 0.000 claims 1
- 238000004519 manufacturing process Methods 0.000 abstract 3
- 230000000694 effects Effects 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 239000011449 brick Substances 0.000 description 2
- 230000007797 corrosion Effects 0.000 description 2
- 238000005260 corrosion Methods 0.000 description 2
- 230000009429 distress Effects 0.000 description 2
- 230000035882 stress Effects 0.000 description 2
- 239000011398 Portland cement Substances 0.000 description 1
- 230000033228 biological regulation Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 238000001035 drying Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000036571 hydration Effects 0.000 description 1
- 238000006703 hydration reaction Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The invention discloses a basement post-cast strip construction process which comprises the steps of manufacturing a bottom plate post-cast strip pressure-resistant plate, manufacturing a bottom plate post-cast strip and manufacturing a side wall post-cast strip. The invention solves the problem that the house is too long and the plane shape changes to generate concrete cracks, so that the basement does not seep water, the engineering quality is ensured, and the daily use requirement is met.
Description
Technical field
The present invention relates to a kind of basement post-pouring zone construction process.
Background technology
At present, bulky building is more and more in the city, and the length in house surpasses the construction in building construction of code requirement, especially basement has become universal phenomenon.Because factors such as the contraction of cast-in-situ concrete, drying shrinkage, distortion, temperature make concrete structure produce internal stress, cause structure crack easily.
Summary of the invention
The object of the present invention is to provide a kind of basement post-pouring zone construction process, adopted to stay and establish that the long and plane change of shape in house is solved in the ater-casting and the problem that produces distress in concrete does not seep water basement, guaranteed workmanship, satisfied daily instructions for use.
In order to achieve the above object, technical scheme of the present invention is:
A kind of basement post-pouring zone construction process comprises the making of bottom plate rear pouring tape resistance to compression plate, the making of bottom plate rear pouring tape, the making of side wall ater-casting.
The making of described bottom plate rear pouring tape resistance to compression plate is meant that the thickness of making the resistance to compression plate is 1/2-1/3 of ater-casting width, and be no more than base plate thickness, the width of resistance to compression plate is 2m, and make 45 degree hypotenuses, and configuration is two-way concrete slab up and down, and reinforcing bar inserts in the basement bottom board with 45 degree, wherein resistance to compression plate middle part is provided with rubber fastening band, the rubber fastening band upper and lower surface is filled up a kind of in pitch flax silk or the cystosepiment, is not destroyed with the protection rubber fastening band, plays the permanent water-resistant effect; The resistance to compression plate re-lays the thick SBS modified asphalt waterproof coiled material of one deck 4mm at its external surface after watering and smashing maintenance; The two-way concrete slab up and down that resists then on the pressing plate carries out colligation.
Described rubber fastening band adopts the rubber fastening band of Ω type, and will add the pitch flax silk in the top and bottom of rubber fastening band.
The making of described bottom plate rear pouring tape is meant that employing builds than the expansive concrete that former concrete grade improves one-level, wherein mixes the UEA-H concrete expansion waterproof agent of 10% place of cement; The grade beam main reinforcement at position, ater-casting does not block hoop and encrypts, the base plate reinforcing bar does not also block and sets up the additional bar that is no less than former arrangement of reinforcement 15% and stretches into each 1000mm of both sides, ater-casting, the retained flat in ater-casting, the thick steel plate for sealing water waterproof of 3mm is adopted at the base plate middle part, and the both sides, ater-casting adopt the dense mesh that easily closes up to isolate the interception concrete.
The making of described side wall ater-casting is identical with the way of bottom plate rear pouring tape; but be provided with in the outside 300mm thick water the steel concrete protection side plate of smashing simultaneously with other position side walls; the same side wall of arrangement of reinforcement; width is 2m; with side wall with high, so just formed tight waterproof system, the ater-casting do not water smash before; can carry out the side wall waterproofing work, return soil.
Beneficial effect of the present invention is: the present invention adopts to stay and establishes the ater-casting and solve the problem that the long and plane change of shape in house produces distress in concrete, and basement is not seeped water, and guarantees workmanship, satisfies daily instructions for use.
The specific embodiment
Embodiment 1
A kind of basement post-pouring zone construction process of present embodiment indication comprises the making of bottom plate rear pouring tape resistance to compression plate, the making of bottom plate rear pouring tape, the making of side wall ater-casting.The making of bottom plate rear pouring tape resistance to compression plate is meant that the thickness of making the resistance to compression plate is 1/2-1/3 of ater-casting width, and be no more than base plate thickness, the width of resistance to compression plate is 2m, and makes 45 degree hypotenuses, configuration is two-way concrete slab up and down, and rubber fastening band adopts the rubber fastening band of Ω type; The rubber fastening band non-deformability of Ω type is strong, can not adopt yi word pattern waterstop or reclaimed rubber waterstop, and will add the pitch flax silk thereon, plays the effect of permanent waterproof.Reinforcing bar inserts in the basement bottom boards with 45 degree, and wherein resistance to compression plate middle part is provided with rubber fastening band, and the rubber fastening band upper and lower surface is filled up a kind of in pitch flax silk or the cystosepiment, is not destroyed with the protection rubber fastening band, plays the permanent water-resistant effect; The resistance to compression plate re-lays the thick SBS modified asphalt waterproof coiled material of one deck 4mm at its external surface after watering and smashing maintenance; The two-way concrete slab up and down that resists then on the pressing plate carries out colligation.The bottom plate rear pouring tape resistance to compression plate that present embodiment is made has the impermeable ability in crack that do not produce.
The making of bottom plate rear pouring tape is meant that employing builds than the expansive concrete that former concrete grade improves one-level, wherein mixes the UEA-H concrete expansion waterproof agent of 10% place of cement; Before concreting, remove the foreign material in the ater-casting, the corrosion reinforcing bar should remove and embroider, and the concrete loose stone that both sides are watered earlier cuts, and cleans up, and can increase the adhesion stress between the new-old concrete like this.The grade beam main reinforcement at position, ater-casting does not block hoop and encrypts, the base plate reinforcing bar does not also block and sets up the additional bar that is no less than former arrangement of reinforcement 15% and stretches into each 1000mm of both sides, ater-casting, the retained flat in ater-casting, the thick steel plate for sealing water waterproof of 3mm is adopted at the base plate middle part, and the both sides, ater-casting adopt the dense mesh that easily closes up to isolate the interception concrete.Will in time clear up if having slurries and concrete to flow into the ater-casting, best two sections alter-pouring strips mould plates will stay 500mm long-term job plate, are beneficial to concrete and flow out.Construction period, the both sides, ater-casting should properly be supported, to guarantee member and structure thereof supporting capacity and the stability in the construction stage.Base plate is built two skin bricks along place, both sides, ater-casting, covers with nine clamping plate, crashes in the ater-casting to prevent other objects, keeps the cleaning of ater-casting, prevents other objects, is brought into the ater-casting as wood chip by water, has water in time to discharge as the ater-casting, to prevent corrosion of steel bar.The bottom plate rear pouring tape that present embodiment is made has been strengthened the function of waterproof.
The making of side wall ater-casting is identical with the way of bottom plate rear pouring tape; but be provided with in the outside 300mm thick water the steel concrete protection side plate of smashing simultaneously with other position side walls; the same side wall of arrangement of reinforcement; width is 2m; with side wall with high, so just formed tight waterproof system, the ater-casting do not water smash before; can carry out the side wall waterproofing work, return soil.
The ater-casting retention time is no less than two months, or waters behind the agent structure knot top again and smash, and the quality of strict control concrete raw material, and the aggregate mud content is below 1%, and cement is selected the lower Portland cement of the heat of hydration for use, should keep somewhere test block in accordance with regulations when building.Build 2 skin brick water storing conservations in both sides after the concreting of ater-casting, side wall will often manually water, and curing time was 2 weeks.
Claims (5)
1, a kind of basement post-pouring zone construction process is characterized in that: comprise the making of bottom plate rear pouring tape resistance to compression plate, the making of bottom plate rear pouring tape, the making of side wall ater-casting.
2, basement post-pouring zone construction process as claimed in claim 1, it is characterized in that: the making of described bottom plate rear pouring tape resistance to compression plate is meant that the thickness of making the resistance to compression plate is 1/2-1/3 of ater-casting width, and be no more than base plate thickness, the width of resistance to compression plate is 2m, and make 45 degree hypotenuses, and configuration is two-way concrete slab up and down, and reinforcing bar inserts in the basement bottom board with 45 degree, wherein resistance to compression plate middle part is provided with rubber fastening band, and the rubber fastening band upper and lower surface is filled up a kind of in pitch flax silk or the cystosepiment; Re-lay the thick SBS modified asphalt waterproof coiled material of one deck 4mm at its external surface then; The resistance to compression plate waters smashes that the two-way concrete slab up and down on the antagonism pressing plate carries out colligation after the maintenance.
3, basement post-pouring zone construction process as claimed in claim 2 is characterized in that: described rubber fastening band adopts the rubber fastening band of Ω type, and will add the pitch flax silk in the top and bottom of rubber fastening band.
4, basement post-pouring zone construction process as claimed in claim 1, it is characterized in that: the making of described bottom plate rear pouring tape is meant that employing builds than the expansive concrete that former concrete grade improves one-level, wherein mixes the UEA-H concrete expansion waterproof agent of 10% place of cement; The grade beam main reinforcement at position, ater-casting does not block hoop and encrypts, the base plate reinforcing bar does not also block and sets up the additional bar that is no less than former arrangement of reinforcement 15% and stretches into each 1000mm of both sides, ater-casting, the retained flat in ater-casting, the thick steel plate for sealing water waterproof of 3mm is adopted at the base plate middle part, and the both sides, ater-casting adopt the dense mesh that easily closes up to isolate the interception concrete.
5, basement post-pouring zone construction process as claimed in claim 1; it is characterized in that: the making of described side wall ater-casting is identical with the way of bottom plate rear pouring tape; but be provided with in the outside 300mm thick water the steel concrete protection side plate of smashing simultaneously with other position side walls; the same side wall of arrangement of reinforcement, width are 2m, and be high together with side wall; so just formed tight waterproof system; the ater-casting do not water smash before, can carry out the side wall waterproofing work, return soil.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910096921A CN101519881A (en) | 2009-03-23 | 2009-03-23 | Basement post-cast strip construction process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910096921A CN101519881A (en) | 2009-03-23 | 2009-03-23 | Basement post-cast strip construction process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101519881A true CN101519881A (en) | 2009-09-02 |
Family
ID=41080667
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200910096921A Pending CN101519881A (en) | 2009-03-23 | 2009-03-23 | Basement post-cast strip construction process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101519881A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102373715A (en) * | 2011-07-29 | 2012-03-14 | 中国二十二冶集团有限公司 | Advance water stop construction method of post poured band of fundamental plane part and external wall of underground part |
CN102433865A (en) * | 2012-01-10 | 2012-05-02 | 黄河勘测规划设计有限公司 | Construction method for upstream-side wall body of semi-underground power station plant |
CN102900230A (en) * | 2012-10-31 | 2013-01-30 | 浙江巨星建设集团有限公司 | Liftable reinforced concrete post-casting strip construction method |
CN106759517A (en) * | 2016-12-07 | 2017-05-31 | 北京首钢建设集团有限公司 | Post-cast strip advanced water-stopping method |
CN107190781A (en) * | 2017-05-22 | 2017-09-22 | 歌山建设集团有限公司 | Horizontal joint waterproofing construction method is set up in large space basement roof post-cast strip |
-
2009
- 2009-03-23 CN CN200910096921A patent/CN101519881A/en active Pending
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102373715A (en) * | 2011-07-29 | 2012-03-14 | 中国二十二冶集团有限公司 | Advance water stop construction method of post poured band of fundamental plane part and external wall of underground part |
CN102433865A (en) * | 2012-01-10 | 2012-05-02 | 黄河勘测规划设计有限公司 | Construction method for upstream-side wall body of semi-underground power station plant |
CN102900230A (en) * | 2012-10-31 | 2013-01-30 | 浙江巨星建设集团有限公司 | Liftable reinforced concrete post-casting strip construction method |
CN102900230B (en) * | 2012-10-31 | 2015-04-01 | 浙江巨星建设集团有限公司 | Liftable reinforced concrete post-casting strip construction method |
CN106759517A (en) * | 2016-12-07 | 2017-05-31 | 北京首钢建设集团有限公司 | Post-cast strip advanced water-stopping method |
CN107190781A (en) * | 2017-05-22 | 2017-09-22 | 歌山建设集团有限公司 | Horizontal joint waterproofing construction method is set up in large space basement roof post-cast strip |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103469825B (en) | The prefabricated water resistant template in ater-casting and mounting method | |
CN105064543A (en) | Formwork-free constructional column and construction method | |
CN101519881A (en) | Basement post-cast strip construction process | |
CN107574842A (en) | Basement post-pouring zone advance water stop construction method | |
CN101498136A (en) | After-pouring strips structure with high underground water level | |
CN104806017A (en) | Construction method of assembly type reinforced concrete waterproof roof | |
CN108442704A (en) | The outer insulation integrated non-dismantling formwork construction method of cast-in-place concrete structure | |
CN205134717U (en) | Take frame mould integration light antidetonation partition plate of architectural surface | |
CN102619329B (en) | Expansion restraint construction method for post-pouring belt | |
CN107806250B (en) | Dry-hanging type external wall repairing and reinforcing method | |
CN103669746B (en) | The construction method of inverted roof heat-insulation system | |
CN206987075U (en) | A kind of basement bottom board of alternative post-cast strip strengthens band structure | |
CN105863088B (en) | Ultralong floor concrete last-cost joint design and construction technique | |
CN207685984U (en) | A kind of overlength underground garage external wall structure | |
CN208396171U (en) | A kind of parapet seepage-proof structure | |
CN207775940U (en) | Attractive joint for outer wall of basement | |
JP2020138384A (en) | Precast residual form panel that suppresses salt damage and frost damage of the precast residual form panel, and manufacturing method of the precast residual form panel | |
CN109778916A (en) | A kind of poured band of outer wall of basement Antiseep method based on water resistant plate | |
KR200409176Y1 (en) | A fabricated Block for Retaining Wall and laying Structure using the Block | |
CN108589793A (en) | A kind of poured band of outer wall of basement postposition assembled advance water stop construction method | |
MX2019013767A (en) | Environmentally responsible insulating construction blocks and structures. | |
CN204898942U (en) | Exempt from formwork constructional column | |
CN107060156A (en) | A kind of cast-in-situs gypsum exempts from form removal heat-preserving load-bearing wall and its construction method | |
CN208918089U (en) | A kind of wall body structure with insulation construction integration supporting element | |
CN204982972U (en) | Post -pouring tape |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Open date: 20090902 |