CN107579486A - A kind of cable large span crane span structure - Google Patents

A kind of cable large span crane span structure Download PDF

Info

Publication number
CN107579486A
CN107579486A CN201710784077.6A CN201710784077A CN107579486A CN 107579486 A CN107579486 A CN 107579486A CN 201710784077 A CN201710784077 A CN 201710784077A CN 107579486 A CN107579486 A CN 107579486A
Authority
CN
China
Prior art keywords
bar
crane span
span structure
support bar
buckle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710784077.6A
Other languages
Chinese (zh)
Other versions
CN107579486B (en
Inventor
刘明虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Zhi Rui Electric Applicance Co Ltd
Original Assignee
Anhui Zhi Rui Electric Applicance Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Zhi Rui Electric Applicance Co Ltd filed Critical Anhui Zhi Rui Electric Applicance Co Ltd
Priority to CN201710784077.6A priority Critical patent/CN107579486B/en
Publication of CN107579486A publication Critical patent/CN107579486A/en
Application granted granted Critical
Publication of CN107579486B publication Critical patent/CN107579486B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of cable large span crane span structure, including hoisting mechanism, crane span structure, support frame, the hoisting mechanism is located at the side-lower of crane span structure one, and crane span structure is located at the lower section of support frame, and the bottom of support frame is located at the side of hoisting mechanism, and hoisting mechanism includes:First support bar, second support bar and rotating cylinder, there is ground below rotating cylinder, first support bar, the bottom of second support bar are fixed with ground, the top of first support bar with and drum rotation be connected, one end of second support bar and the other end of rotating cylinder are rotatablely connected, and rotating cylinder is further fixed on gear and crank close to one end of first support bar, and the top of first support bar is fixed with the 3rd support bar, one end of 3rd support bar is fixed with retainer shell, and the inwall of retainer shell has spring.Design structure of the present invention is reasonable, simple to operate, can effectively realize the fastening of crane span structure, the cable of crane span structure can be checked by lowering or hoisting gear, freely adjusts crane span structure height.

Description

A kind of cable large span crane span structure
Technical field
The present invention relates to cable testing bridge technical field, more particularly to a kind of cable large span crane span structure.
Background technology
Cable testing bridge is divided into the structures such as slot type, pellet type and ladder-type, grid type, by support, trailing arm and installation annex etc. Composition.Crane span structure can independently be set up in building, can also be attached on various buildings or structures and piping lane supports, should be embodied It is simple in construction, it is handsome in appearance, configuration is flexible and easy to maintenance the features such as, whole parts are both needed to carry out zinc-plated processing, installed in building The outdoor crane span structure of beyond the region of objective existence is built, herein using trough type bridge frame, traditional crane span structure, activity is would become hard to after fixed, it is impossible to carry out very Cable in good detection crane span structure, and it is inadequate for suspension type crane span structure, the fastening of crane span structure, crane span structure deformation is easily caused, is fallen, New structure is devised herein according to existing crane span structure, the fastening of crane span structure is effectively solved the problems, such as and can not freely detect circuit.
The content of the invention
The invention aims to solve shortcoming present in prior art, and a kind of cable long-span bridge proposed Frame.
To achieve these goals, present invention employs following technical scheme:
A kind of cable large span crane span structure, including hoisting mechanism, crane span structure, support frame, the hoisting mechanism are located under crane span structure side Side, crane span structure are located at the lower section of support frame, and the bottom of support frame is located at the side of hoisting mechanism;
Hoisting mechanism includes:First support bar, second support bar and rotating cylinder, there are ground, first support bar, second below rotating cylinder The bottom of support bar is fixed with ground, the top of first support bar with and drum rotation be connected, one end of second support bar with The other end rotation connection of rotating cylinder, rotating cylinder are further fixed on gear and crank close to one end of first support bar, first support bar Top is fixed with the 3rd support bar, and one end of the 3rd support bar is fixed with retainer shell, and the inwall of retainer shell has spring, The bottom of spring is fixed with fixture block, and the top of fixture block is fixed with pull bar, and for spring housing on pull bar, the top of pull bar passes through stop The top of device shell, fixture block are meshed with gear;
Crane span structure includes:Under casing, top cover and iron chains, the bottom of under casing offer multiple heat emission holes, and the bottom both sides of under casing are welded with Iron hoop, iron hoop connection is connected with iron chains, wherein the other end of an iron chains is connected with buckle, buckle is cavity structure, buckle position In top cover top, top cover is located at the top of under casing, and iron chains is locked by buckle and under casing and top cover, the top outer wall welding of buckle There is draw ring, the top inwall of buckle is connected with snap ring, latch is provided with buckle, and one end of latch is connected with coupling bar, even The one end for connecing bolt is connected with movable bolt through the inwall of buckle, and the inside of another iron chains through buckle is extended to outside buckle, and Iron chains and latch clamping;
Support frame includes:Two pulleys, drawstring and fix bar, a pulley are located at the top of draw ring, and another pulley is positioned at solid The top of fixed pole, one end of drawstring are connected with draw ring, and the other end and the rotating cylinder of drawstring are intertwined and connected, the bottom and ground of fix bar It is fixed.
Preferably, the bottom of the fixture block is inclined-plane, and the bottom of fixture block extends to the between cog of gear.
Preferably, the side inwall of one end of the coupling bar and buckle is rotatablely connected, and coupling bar is fixedly connected with latch, The other end of coupling bar is fixedly connected with movable bolt, and one end of snap ring is fixedly connected with latch, and snap ring and latch are respectively positioned on card The inside of button.
Preferably, the fix bar is inverted L-shaped structure, and fix bar is divided into horizon bar and vertical bar, one end of horizon bar It is fixedly connected with pulley, the junction of horizon bar and vertical bar is fixed with pulley, and it is inverted L that drawstring, which is wound on the fix bar on pulley, Character form structure, fix bar are divided into horizon bar and vertical bar, and one end of horizon bar is fixedly connected with pulley, the friendship of horizon bar and vertical bar The place of connecing is fixed with pulley, and drawstring is wound on pulley.
Preferably, the both sides of the under casing have also offered multiple heat emission holes.
Preferably, the bottom of the latch sticks into the chain link of iron chains.
The beneficial effects of the invention are as follows:By retaining mechanism, in the presence of latch and snap ring, realize to iron chains Locking, so as to be fastened to crane span structure, prevent unbalance stress from deforming;Realized by the effect of drawstring and pulley and rotating cylinder to crane span structure Lift and fall, so as to inspect periodically the circuit question in crane span structure;By stop mechanism, fixture block is realized to being fixed on rotating cylinder Gear carries out one-way stop, during crank shake rotating cylinder causes crane span structure to rise, ensures that rotating cylinder will not turn round, so as to ensure Crane span structure, which rises, not to be fallen out.
Brief description of the drawings
Fig. 1 is a kind of structure of the main view of cable large span crane span structure proposed by the present invention;
Fig. 2 is structure for amplifying schematic front view at a kind of A of cable large span crane span structure proposed by the present invention;
Fig. 3 is structure for amplifying schematic side view at a kind of A of cable large span crane span structure proposed by the present invention;
Fig. 4 is structure for amplifying schematic front view at a kind of B of cable large span crane span structure proposed by the present invention;
Fig. 5 is a kind of under casing structure of the main view of cable large span crane span structure proposed by the present invention;
Fig. 6 is a kind of under casing structure schematic top plan view of cable large span crane span structure proposed by the present invention.
In figure:1 first support bar, 2 cranks, 3 fix bars, 4 pulleys, 5 drawstrings, 6 top covers, 7 iron chains, 8 iron hoops, 9 under casings, 10 Rotating cylinder, 11 second support bars, 12 pull bars, 13 retainer shells, 14 fixture blocks, 15 gears, 16 draw rings, 17 movable bolts, 18 latches, 19 Buckle, 20 snap rings.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.
Reference picture 1-6, a kind of cable large span crane span structure, including hoisting mechanism, crane span structure, support frame, hoisting mechanism are located at The side-lower of crane span structure one, crane span structure are located at the lower section of support frame, and the bottom of support frame is located at the side of hoisting mechanism;
Hoisting mechanism includes:There are ground, the first support in first support bar 1, second support bar 11 and rotating cylinder 10, the lower section of rotating cylinder 10 Bar 1, the bottom of second support bar 11 are fixed with ground, the top of first support bar 1 with and rotating cylinder 10 be rotatablely connected, second One end of strut 11 is rotatablely connected with the other end of rotating cylinder 10, and rotating cylinder 10 is further fixed on gear close to one end of first support bar 1 15 and crank 2, the top of first support bar 1 be fixed with the 3rd support bar, one end of the 3rd support bar is fixed with retainer shell 13, the inwall of retainer shell 13 has spring, and the bottom of spring is fixed with fixture block 14, and the top of fixture block 14 is fixed with pull bar 12, For spring housing on pull bar 12, the top of pull bar 12 passes through the top of retainer shell 13, and fixture block 14 is meshed with gear;
Crane span structure includes:Under casing 9, top cover 6 and iron chains 7, the bottom of under casing 9 offer multiple heat emission holes, the bottom both sides weldering of under casing 9 Iron hoop 8 is connected to, the connection of iron hoop 8 is connected with iron chains 7, wherein the other end of an iron chains 7 is connected with buckle 19, buckle 19 is cavity Structure, buckle 19 are located at the top of top cover 6, and top cover 6 is located at the top of under casing 9, and iron chains 7 is locked by buckle 19 and under casing 9 and top cover 6 Tightly, the top outer wall of buckle 19 is welded with draw ring 16, and the top inwall of buckle 19 is connected with snap ring 20, is provided with buckle 19 Latch 18, one end of latch 18 are connected with coupling bar, and one end of coupling bar is connected with movable bolt 17 through the inwall of buckle 19, separately The inside of one iron chains 7 through buckle 19 is extended to outside buckle 19, and iron chains 7 and the clamping of latch 18;
Support frame includes:Two pulleys 4, drawstring 5 and fix bar 3, a pulley 4 are located at the top of draw ring 16, another pulley 4 Positioned at the top of fix bar 3, one end of drawstring 5 is connected with draw ring 16, and the other end and the rotating cylinder 10 of drawstring 5 are intertwined and connected, fixed The bottom of bar 3 is fixed with ground.
In the present embodiment, iron chains 7 by with the clamping of latch 18 in buckle 19, so as to locking under casing 9, ensure crane span structure Firmly, one end of drawstring 5 is connected on draw ring 16, shakes crank 2, realized in the presence of rotating cylinder 10, drawstring 5 and pulley 4 Lifting to crane span structure, the fixture block 14 of stop mechanism can prevent rotating cylinder 10 from turning round, avoid crane span structure from dropping, fixture block when lifting crane span structure The tooth of 14 meeting clamping gears 15, is played a part of stop, so as to solve open locking, can be made with pull-up pull bar 12 when falling crane span structure Obtain crane span structure to fall, latch 18 can be with the chain link clamping of iron chains 7, and the design is rational in infrastructure, simple to operate, can effectively realize bridge The fastening of frame, the cable of crane span structure can be checked by lowering or hoisting gear, freely adjust crane span structure height.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its Inventive concept is subject to equivalent substitution or change, should all be included within the scope of the present invention.

Claims (6)

1. a kind of cable large span crane span structure, including hoisting mechanism, crane span structure, support frame, it is characterised in that the hoisting mechanism position In the side-lower of crane span structure one, crane span structure is located at the lower section of support frame, and the bottom of support frame is located at the side of hoisting mechanism;
Hoisting mechanism includes:First support bar (1), second support bar (11) and rotating cylinder (10), rotating cylinder have ground below (10), First support bar (1), the bottom of second support bar (11) are fixed with ground, the top of first support bar (1) and and rotating cylinder (10) it is rotatablely connected, one end of second support bar (11) is rotatablely connected with the other end of rotating cylinder (10), and rotating cylinder (10) is close to first One end of support bar (1) is further fixed on gear (15) and crank (2), and the top of first support bar (1) is fixed with the 3rd support bar, One end of 3rd support bar is fixed with retainer shell (13), and the inwall of retainer shell (13) has spring, and the bottom of spring is consolidated Surely there is fixture block (14), the top of fixture block (14) is fixed with pull bar (12), and spring housing is on pull bar (12), the top of pull bar (12) Through the top of retainer shell (13), fixture block (14) is meshed with gear;
Crane span structure includes:Under casing (9), top cover (6) and iron chains (7), the bottom of under casing (9) offer multiple heat emission holes, under casing (9) Bottom both sides are welded with iron hoop (8), and iron hoop (8) connection is connected with iron chains (7), wherein the other end of an iron chains (7) is connected with Buckle (19), buckle (19) are cavity structure, and buckle (19) is located at top cover (6) top, and top cover (6) is located at the top of under casing (9), Iron chains (7) is locked by buckle (19) and under casing (9) and top cover (6), and the top outer wall of buckle (19) is welded with draw ring (16), is blocked The top inwall of button (19) is connected with snap ring (20), and latch (18), one end connection of latch (18) are provided with buckle (19) There is coupling bar, one end of coupling bar is connected with movable bolt (17) through the inwall of buckle (19), and another iron chains (7) passes through buckle (19) inside extends to buckle (19) outside, and iron chains (7) and latch (18) clamping;
Support frame includes:Two pulleys (4), drawstring (5) and fix bar (3), a pulley (4) are located at the top of draw ring (16), Another pulley (4) is located at the top of fix bar (3), and one end of drawstring (5) is connected with draw ring (16), the other end of drawstring (5) It is intertwined and connected with rotating cylinder (10), the bottom of fix bar (3) is fixed with ground.
2. a kind of cable large span crane span structure according to claim 1, it is characterised in that the bottom of the fixture block (14) is Inclined-plane, the bottom of fixture block (14) extend to the between cog of gear (15).
3. a kind of cable large span crane span structure according to claim 1, it is characterised in that one end of the coupling bar and card The side inwall rotation connection of (19) is detained, coupling bar is fixedly connected with latch (18), the other end of coupling bar and movable bolt (17) It is fixedly connected, one end of snap ring (20) is fixedly connected with latch (18), and snap ring (20) and latch (18) are respectively positioned on buckle (19) Inside.
4. a kind of cable large span crane span structure according to claim 1, it is characterised in that the fix bar (3) is inverted L word Shape structure, fix bar (3) are divided into horizon bar and vertical bar, and one end of horizon bar is fixedly connected with pulley (4), horizon bar and vertical bar Junction be fixed with pulley (4), and drawstring (5) is wound on pulley (4).
A kind of 5. cable large span crane span structure according to claim 1, it is characterised in that the both sides of the under casing (9) Multiple heat emission holes are offered.
A kind of 6. cable large span crane span structure according to claim 1, it is characterised in that the bottom card of the latch (18) Enter the chain link of iron chains (7).
CN201710784077.6A 2017-09-04 2017-09-04 Large-span bridge for cable Active CN107579486B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710784077.6A CN107579486B (en) 2017-09-04 2017-09-04 Large-span bridge for cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710784077.6A CN107579486B (en) 2017-09-04 2017-09-04 Large-span bridge for cable

Publications (2)

Publication Number Publication Date
CN107579486A true CN107579486A (en) 2018-01-12
CN107579486B CN107579486B (en) 2019-12-10

Family

ID=61031170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710784077.6A Active CN107579486B (en) 2017-09-04 2017-09-04 Large-span bridge for cable

Country Status (1)

Country Link
CN (1) CN107579486B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108249336A (en) * 2018-01-25 2018-07-06 何杨波 A kind of high-altitude hanging object device of stabilization
CN108340365A (en) * 2018-01-24 2018-07-31 王伟珍 A kind of manipulator of stable regulation height
CN108483291A (en) * 2018-05-31 2018-09-04 丰润建筑安装股份有限公司 A kind of construction site small freight lifting gear and elevating method
CN110359757A (en) * 2019-08-19 2019-10-22 江苏宏航机械有限公司 A kind of mechanical upender of cement electric power bar
CN112234513A (en) * 2020-10-22 2021-01-15 谢晓佳 Simple cable tensioner
CN112531567A (en) * 2020-12-15 2021-03-19 郭阿海 Stringing device for high-altitude high-voltage transmission line
CN112978633A (en) * 2019-12-12 2021-06-18 台山市东扩钢构有限公司 Self-service lifting device for entering and exiting high-rise water tank
CN117605895A (en) * 2024-01-24 2024-02-27 山东职业学院 Pipeline connection protection device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5992711A (en) * 1982-11-17 1984-05-29 攝陽工業株式会社 Plug socket box elevator
CN101793000A (en) * 2010-01-28 2010-08-04 中国海洋石油总公司 Hydraulic multifunctional delivery trestle of multifunctional self-elevating supporting platform for ocean oil field
CN201944417U (en) * 2010-12-02 2011-08-24 中国神华能源股份有限公司 Pulley-type cable bridge
CN201946912U (en) * 2010-12-23 2011-08-24 保定供电公司 Universal clamp apparatus for cross arm of electric transmission line tangent tower
CN203932886U (en) * 2014-06-30 2014-11-05 温州海蓝工业设计有限公司 A kind of adjustable cable crane span structure
CN104901230A (en) * 2015-07-02 2015-09-09 国家电网公司 Live wire insulated lifter
CN105387276A (en) * 2015-12-15 2016-03-09 重庆吉能变压器有限公司 Cable bridge hoisting frame
CN206225928U (en) * 2016-08-18 2017-06-06 孙向进 A kind of novel power cable crane span structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5992711A (en) * 1982-11-17 1984-05-29 攝陽工業株式会社 Plug socket box elevator
CN101793000A (en) * 2010-01-28 2010-08-04 中国海洋石油总公司 Hydraulic multifunctional delivery trestle of multifunctional self-elevating supporting platform for ocean oil field
CN201944417U (en) * 2010-12-02 2011-08-24 中国神华能源股份有限公司 Pulley-type cable bridge
CN201946912U (en) * 2010-12-23 2011-08-24 保定供电公司 Universal clamp apparatus for cross arm of electric transmission line tangent tower
CN203932886U (en) * 2014-06-30 2014-11-05 温州海蓝工业设计有限公司 A kind of adjustable cable crane span structure
CN104901230A (en) * 2015-07-02 2015-09-09 国家电网公司 Live wire insulated lifter
CN105387276A (en) * 2015-12-15 2016-03-09 重庆吉能变压器有限公司 Cable bridge hoisting frame
CN206225928U (en) * 2016-08-18 2017-06-06 孙向进 A kind of novel power cable crane span structure

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108340365A (en) * 2018-01-24 2018-07-31 王伟珍 A kind of manipulator of stable regulation height
CN108249336A (en) * 2018-01-25 2018-07-06 何杨波 A kind of high-altitude hanging object device of stabilization
CN108249336B (en) * 2018-01-25 2019-02-12 重庆信海科技有限公司 A kind of stable high-altitude hanging object device
CN108483291A (en) * 2018-05-31 2018-09-04 丰润建筑安装股份有限公司 A kind of construction site small freight lifting gear and elevating method
CN108483291B (en) * 2018-05-31 2023-09-26 丰润建筑安装股份有限公司 Lifting device and lifting method for small goods on construction site
CN110359757A (en) * 2019-08-19 2019-10-22 江苏宏航机械有限公司 A kind of mechanical upender of cement electric power bar
CN112978633A (en) * 2019-12-12 2021-06-18 台山市东扩钢构有限公司 Self-service lifting device for entering and exiting high-rise water tank
CN112234513A (en) * 2020-10-22 2021-01-15 谢晓佳 Simple cable tensioner
CN112531567A (en) * 2020-12-15 2021-03-19 郭阿海 Stringing device for high-altitude high-voltage transmission line
CN117605895A (en) * 2024-01-24 2024-02-27 山东职业学院 Pipeline connection protection device

Also Published As

Publication number Publication date
CN107579486B (en) 2019-12-10

Similar Documents

Publication Publication Date Title
CN107579486A (en) A kind of cable large span crane span structure
CN205063308U (en) Outer hanging protection frame and outer hanging protective structure
CN205151516U (en) Simple and easy hoist and mount of prefabricated wallboard
CN108951651A (en) A kind of pattern foundation pit supporting structure that stablizing effect is good
US10335706B2 (en) Combined lifting barn fencing equipment
CN112408229A (en) Dust screen lifting mechanism suitable for building foundation pit
CN206784887U (en) A kind of building machinery engineering Hanging Basket
CN205367526U (en) A crane for roof hoist and mount article
CN104675432B (en) Rigid-flexible-guiding buffering explosion-proof device of vertical air shaft
CN206397430U (en) A kind of grain drying machine climbing ladder apparatus
CN211513611U (en) Filter vat for filtering and drying granular rinsing materials and automatically discharging materials
CN209637358U (en) A kind of building engineering construction enclosing frame
CN208402893U (en) The purse seine of off-lying sea tubular pole seining cultivation system
CN207727578U (en) One kind can have enough to meet the need drilled pile construction protective platform
CN206784867U (en) A kind of civil construction support frame
CN206873184U (en) A kind of steel wire rope tightening device
CN109382809A (en) What a kind of scene used has the reinforcing bar storage rack for blocking function
CN205483473U (en) Inspection shaft safety net testing arrangement
CN203383320U (en) Falling prevention device of municipal inspection well
CN213527424U (en) Human body slingshot
CN201507147U (en) Flag raising device
CN105042563B (en) Double-drum boiler facilitating mounting and maintenance of blowdown pipe of lower drum
CN104806278A (en) Automatic networking machine for anchor network
CN205911635U (en) Open air ground box that falls
CN204591318U (en) A kind of automatic networking machine for anchor net

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A large-span cable tray for cables

Granted publication date: 20191210

Pledgee: China Construction Bank Corporation Tangshan Branch

Pledgor: ANHUI ZHIRUI ELECTRIC Co.,Ltd.

Registration number: Y2024980010327

PE01 Entry into force of the registration of the contract for pledge of patent right