CN105387276A - Cable bridge hoisting frame - Google Patents
Cable bridge hoisting frame Download PDFInfo
- Publication number
- CN105387276A CN105387276A CN201510928791.9A CN201510928791A CN105387276A CN 105387276 A CN105387276 A CN 105387276A CN 201510928791 A CN201510928791 A CN 201510928791A CN 105387276 A CN105387276 A CN 105387276A
- Authority
- CN
- China
- Prior art keywords
- framework
- hoisting frame
- mounting plate
- chute
- cable testing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
- H02G3/02—Details
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
- H02G3/30—Installations of cables or lines on walls, floors or ceilings
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
The invention provides a cable bridge hoisting frame. The cable bridge hoisting frame comprises a mounting plate and a frame body, wherein a movable frame body is arranged on the left side of the frame body and is inverted-'L'-shaped; a rubber pad is mounted on the left side of the movable frame body; a convex opening is formed in the end surface of the right side of the upper part of the movable frame body; a connecting column is arranged on the end surface of the left side of the upper part of the frame body; a hasp is arranged above the concave opening of the movable frame body; a chute is formed in the bottom of the frame body; a sliding block is arranged at the bottom of the chute; a fixing column is mounted on the upper end surface of the sliding block; and a sucker is mounted on the top of the mounting plate. By the rubber pad, vibration caused by the reason that the cable bridge hoisting frame is impacted to a wall in a hoisting process can be reduced; by the sucker, the mounting plate is easy and convenient to mount, and attractiveness of the wall cannot be affected; by the movable frame body, a bridge can be placed in the hoisting frame more easily; and by the chute and the fixing column, the bridge can be fixed, and a bridge which is smaller than the hoisting frame can further be hoisted.
Description
Technical field
The present invention is a kind of cable testing bridge hoisting frame, belongs to crane span structure handling appliance field.
Background technique
In prior art, cable testing bridge is used for placing cable aloft, and its structure is divided into slot type, pellet type and ladder-type, gridding type etc., and its mounting type has trailing arm mounting type and lift-on/lift-off type.Lift-on/lift-off type crane span structure is connected on ceiling board by hoisting frame, existing hoisting frame comprises crane span structure frame, mounting plate and the stay cord be connected in the middle of them, be provided with setscrew on a mounting board, setscrew is used for being connected with ceiling board, but use setscrew inconvenient, needing holes on the wall have impact on the attractive in appearance of body of wall, existing hoisting frame is when carrying out handling simultaneously, the crane span structure meeting hoisting frame size can only be selected to carry out handling, if the size being less than hoisting frame can make crane span structure rock in hoisting frame, hoisting frame is tilted, cause lifting unsuccessfully, present hoisting frame is all fixing, it is very inconvenient when crane span structure is put in hoisting frame, efficiency is very low, so need cable testing bridge hoisting frame always to solve the problems referred to above.
Summary of the invention
For the deficiency that prior art exists, the object of the invention is to provide a kind of cable testing bridge hoisting frame, by adding chute, sucker and activity framework to solve the problem proposed in above-mentioned background technology, the present invention is easy to use, convenient operation, good stability, reliability is high.
To achieve these goals, the present invention realizes by the following technical solutions: a kind of cable testing bridge hoisting frame, comprise mounting plate and framework, activity framework is provided with on the left of described framework, described activity box shape is set to inverted "L" shaped, described activity framework and framework are connected through the hinge, on the left of described activity framework, rubber pad is installed, described rubber pad is provided with two, two described rubber pads one are arranged on the left of activity framework that another is arranged on framework right positions, described activity framework upper right end face is provided with spill mouth, described framework upper left end face is provided with attachment post, hasp is provided with above described spill mouth, chute is provided with bottom described framework, slide block is provided with bottom described chute, described upper end of slide block face is provided with fixing column, described chute front-end face offers spacing hole, described mounting plate top is provided with sucker, described sucker is fixed by bolt and mounting plate, bottom described mounting plate, position, the left and right sides is provided with lifting rope, described lifting rope is provided with two, two described lifting rope one end are connected the other end and are connected with activity framework and framework respectively with mounting plate.
Further, the degree of depth of described chute is less than framework thickness.
Further, one deck anti-slip veins is provided with bottom described framework.
Further, what described hasp adopted is a kind of insurance hasp.
Further, described lifting rope is maximum bears 30 times that pulling force is framework weight.
Further, anti-slip veins is carved with on described fixing column surface.
Beneficial effect of the present invention: a kind of cable testing bridge hoisting frame of the present invention, being arranged in handling process of rubber pad can reduce the vibrations produced because clashing into wall, sucker makes the installation of mounting plate become simple and convenient, the attractive in appearance of wall can not be affected again, the setting of activity framework makes crane span structure more easily put in hoisting frame, the setting of chute and fixing column can not only fix crane span structure, the crane span structure less than hoisting frame can also be lifted, two lifting ropes more easily make hoisting frame keep balance, the present invention is easy to use, convenient operation, good stability, reliability is high.
Accompanying drawing explanation
By reading the detailed description done non-limiting example with reference to the following drawings, other features, objects and advantages of the present invention will become more obvious.
Fig. 1 is the structural representation of a kind of cable testing bridge hoisting frame of the present invention.
Fig. 2 is that the activity framework of a kind of cable testing bridge hoisting frame of the present invention opens schematic diagram.
Fig. 3 is the framework bottom schematic view of a kind of cable testing bridge hoisting frame of the present invention.
Fig. 4 is the activity framework spill mouth schematic diagram of a kind of cable testing bridge hoisting frame of the present invention.
In figure: 1-framework, 2-lifting rope, 3-mounting plate, 4-sucker, 5-hasp, 6-rubber pad, 7-fixing column, 8-activity framework, 9-hinge, 10-attachment post, 11-spill mouth, 12-chute, 13-slide block, 14-spacing hole.
Embodiment
The technological means realized for making the present invention, creation characteristic, reaching object and effect is easy to understand, below in conjunction with embodiment, setting forth the present invention further.
Refer to Fig. 1, Fig. 2, Fig. 3 and Fig. 4, the invention provides a kind of technological scheme: a kind of cable testing bridge hoisting frame, comprise mounting plate 3 and framework 1, activity framework 8 is provided with on the left of framework 1, the setting of activity framework 8 makes crane span structure more easily put in hoisting frame, activity framework 8 shape is set to inverted "L" shaped, activity framework 8 is connected by hinge 9 with framework 1, rubber pad 6 is installed on the left of activity framework 8, rubber pad 6 is provided with two, two rubber pads 6 one are arranged on activity framework 8 leftward position, and another is arranged on framework 1 right positions, activity framework 8 upper right end face is provided with spill mouth 11, framework 1 upper left end face is provided with attachment post 10, hasp 5 is provided with above spill mouth 11, chute 12 is provided with bottom framework 1, slide block 13 is provided with bottom chute 12, slide block 13 upper-end surface is provided with fixing column 7, chute 12 front-end face offers spacing hole 14, mounting plate 3 top is provided with sucker 4, sucker 4 makes the installation of mounting plate 3 become simple and convenient, the attractive in appearance of wall can not be affected again, sucker 4 is fixed by bolt and mounting plate 3, bottom mounting plate 3, position, the left and right sides is provided with lifting rope 2, lifting rope 2 is provided with two, two lifting rope 2 one end are connected the other end with mounting plate 3 and are connected with activity framework 8 and framework 1 respectively.
The degree of depth of chute 12 is less than framework 1 thickness, is provided with one deck anti-slip veins bottom framework 1, and what hasp 5 adopted is a kind of insurance hasp, and lifting rope 2 is maximum bears 30 times that pulling force is framework 1 weight, and anti-slip veins is carved with on fixing column 7 surface.
Embodiment: need before use to check sucker 4, whether lifting rope 2 and hasp 5 can normally use, if checking has fault just cannot employ, if check that all normally just can employ, opening hasp 5 in use utilizes hinge 9 that activity framework 8 is opened, crane span structure is placed on bottom framework 1 after activity framework is opened, utilize slide block 13 and chute 12 that fixing column 7 is adjusted to suitable position, bolt is injected spacing hole 14 and complete fixing crane span structure, even if crane span structure less than hoisting frame so also can carry out handling, closedown activity framework 8 after crane span structure fixes, spill mouth 11 in activity framework 8 to be engaged on attachment post 10 and hasp 5 is locked, sucker 4 is utilized by mounting plate 3 to be fixed on ceiling board or body of wall, lifting rope 2 is utilized to carry out handling, if bump against wall in handling process, rubber pad 6 can reduce because clashing into the vibrations produced, ensure steady in handling process of crane span structure.
More than show and describe basic principle of the present invention and major character and advantage of the present invention, to those skilled in the art, obviously the invention is not restricted to the details of above-mentioned one exemplary embodiment, and when not deviating from spirit of the present invention or essential characteristic, the present invention can be realized in other specific forms.Therefore, no matter from which point, all should embodiment be regarded as exemplary, and be nonrestrictive, scope of the present invention is limited by claims instead of above-mentioned explanation, and all changes be therefore intended in the implication of the equivalency by dropping on claim and scope are included in the present invention.Any reference character in claim should be considered as the claim involved by limiting.
In addition, be to be understood that, although this specification is described according to mode of execution, but not each mode of execution only comprises an independently technological scheme, this narrating mode of specification is only for clarity sake, those skilled in the art should by specification integrally, and the technological scheme in each embodiment also through appropriately combined, can form other mode of executions that it will be appreciated by those skilled in the art that.
Claims (6)
1. a cable testing bridge hoisting frame, comprise mounting plate (3) and framework (1), it is characterized in that: described framework (1) left side is provided with activity framework (8), described activity framework (8) shape is set to inverted "L" shaped, described activity framework (8) is connected by hinge (9) with framework (1), described activity framework (8) left side is provided with rubber pad (6), described rubber pad (6) is provided with two, two described rubber pads (6) are arranged on activity framework (8) left side, and another is arranged on framework (1) right positions, described activity framework (8) upper right end face is provided with spill mouth (11), described framework (1) upper left end face is provided with attachment post (10), described spill mouth (11) top is provided with hasp (5), described framework (1) bottom is provided with chute (12), described chute (12) bottom is provided with slide block (13), described slide block (13) upper-end surface is provided with fixing column (7), described chute (12) front-end face offers spacing hole (14), described mounting plate (3) top is provided with sucker (4), described sucker (4) is fixed by bolt and mounting plate (3), position, the left and right sides, described mounting plate (3) bottom is provided with lifting rope (2), described lifting rope (2) is provided with two, two described lifting rope (2) one end are connected the other end with mounting plate (3) and are connected with activity framework (8) and framework (1) respectively.
2. a kind of cable testing bridge hoisting frame according to claim 1, is characterized in that: the degree of depth of described chute (12) is less than framework (1) thickness.
3. a kind of cable testing bridge hoisting frame according to claim 1, is characterized in that: described framework (1) bottom is provided with one deck anti-slip veins.
4. a kind of cable testing bridge hoisting frame according to claim 1, is characterized in that: what described hasp (5) adopted is a kind of insurance hasp.
5. a kind of cable testing bridge hoisting frame according to claim 1, is characterized in that: described lifting rope (2) is maximum bears 30 times that pulling force is framework (1) weight.
6. a kind of cable testing bridge hoisting frame according to claim 1, is characterized in that: anti-slip veins is carved with on described fixing column (7) surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510928791.9A CN105387276A (en) | 2015-12-15 | 2015-12-15 | Cable bridge hoisting frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510928791.9A CN105387276A (en) | 2015-12-15 | 2015-12-15 | Cable bridge hoisting frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105387276A true CN105387276A (en) | 2016-03-09 |
Family
ID=55419863
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510928791.9A Pending CN105387276A (en) | 2015-12-15 | 2015-12-15 | Cable bridge hoisting frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105387276A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106329432A (en) * | 2016-10-13 | 2017-01-11 | 成都尚智恒达科技有限公司 | Cable distribution fixing device for cables |
CN106786235A (en) * | 2016-12-14 | 2017-05-31 | 浙江亚厦装饰股份有限公司 | A kind of spool or wire casing fastener and installation method |
CN107579486A (en) * | 2017-09-04 | 2018-01-12 | 安徽智瑞电气有限公司 | A kind of cable large span crane span structure |
CN113099634A (en) * | 2021-03-23 | 2021-07-09 | 井冈山市秀狐智造电子有限公司 | LED screen mounting structure |
-
2015
- 2015-12-15 CN CN201510928791.9A patent/CN105387276A/en active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106329432A (en) * | 2016-10-13 | 2017-01-11 | 成都尚智恒达科技有限公司 | Cable distribution fixing device for cables |
CN106786235A (en) * | 2016-12-14 | 2017-05-31 | 浙江亚厦装饰股份有限公司 | A kind of spool or wire casing fastener and installation method |
CN106786235B (en) * | 2016-12-14 | 2018-05-29 | 浙江亚厦装饰股份有限公司 | A kind of spool or wire casing fastener and installation method |
CN107579486A (en) * | 2017-09-04 | 2018-01-12 | 安徽智瑞电气有限公司 | A kind of cable large span crane span structure |
CN113099634A (en) * | 2021-03-23 | 2021-07-09 | 井冈山市秀狐智造电子有限公司 | LED screen mounting structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105387276A (en) | Cable bridge hoisting frame | |
CN203743298U (en) | Damping device for elevator traction machine | |
CN103935882A (en) | Holding-lifting method for large thin-wall dryer | |
CN103010954A (en) | Multi-point hoisting method for heterogeneous prefabricated part | |
CN205226627U (en) | Cable testing bridge hoist and mount frame | |
CN202466561U (en) | Guy rope device for preventing arm support from tipping back based on crawler-type dynamic compactor | |
CN110905520A (en) | Seabed ore collection operation car with adjustable hoisting position | |
CN201050568Y (en) | Steel wire shock reducing device | |
CN208337082U (en) | A kind of round double sheath ecology cable shock brackets | |
CN205709338U (en) | Console model over-speed governor tensioning apparatus | |
CN205605655U (en) | Multi -purpose engineering axle bed | |
CN208022580U (en) | The anticreep hook mechanism of crampon | |
CN209193420U (en) | A kind of cantilever support structure | |
CN208561467U (en) | A kind of vibration damping stable type pedestal of small-sized hoisting device | |
CN208267343U (en) | The lifting structure of attachment type raise scaffold | |
CN108266492B (en) | A kind of winning equipment damping load carrier | |
CN206635823U (en) | Weight for engineering foundation pile strain detecting lifts percussion mechanism | |
CN208617165U (en) | A kind of building hoist sustaining wall lever fixing apparatus | |
CN207142605U (en) | A kind of strong magnetic padlock locking structure of novel elevator layer door machine | |
CN206980822U (en) | A kind of damping type pile cover for disintegrating machine | |
CN206384681U (en) | A kind of cushioning device for elevator | |
CN207944348U (en) | A kind of micro- damping device of main cable saddle of suspension bridge | |
CN203319452U (en) | Damping connecting frame | |
CN203513032U (en) | Counterweight guiding device for construction hoist | |
CN204477125U (en) | A kind of oil-pump braking device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160309 |
|
WD01 | Invention patent application deemed withdrawn after publication |