CN107574833A - A kind of roofing tower crane shaped steel foundation beam and construction method - Google Patents
A kind of roofing tower crane shaped steel foundation beam and construction method Download PDFInfo
- Publication number
- CN107574833A CN107574833A CN201710632364.5A CN201710632364A CN107574833A CN 107574833 A CN107574833 A CN 107574833A CN 201710632364 A CN201710632364 A CN 201710632364A CN 107574833 A CN107574833 A CN 107574833A
- Authority
- CN
- China
- Prior art keywords
- steel
- tower crane
- shaped steel
- horizontal section
- roofing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 96
- 239000010959 steel Substances 0.000 title claims abstract description 92
- 238000010276 construction Methods 0.000 title claims abstract description 26
- 238000011282 treatment Methods 0.000 claims description 4
- 238000003466 welding Methods 0.000 claims description 4
- 239000000725 suspension Substances 0.000 claims description 3
- 238000005516 engineering process Methods 0.000 description 7
- 241001282153 Scopelogadus mizolepis Species 0.000 description 4
- 238000009434 installation Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 239000011150 reinforced concrete Substances 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 239000011248 coating agent Substances 0.000 description 2
- 238000000576 coating method Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000007306 turnover Effects 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- GOLXNESZZPUPJE-UHFFFAOYSA-N spiromesifen Chemical compound CC1=CC(C)=CC(C)=C1C(C(O1)=O)=C(OC(=O)CC(C)(C)C)C11CCCC1 GOLXNESZZPUPJE-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention provides a kind of roofing tower crane shaped steel foundation beam.The present invention includes vertical shaped steel and is respectively perpendicular the horizontal section steel being welded at left and right sides of vertical shaped steel, and the left side horizontal section steel and right side horizontal section steel form cross girder steel on same straight line, and the cross girder steel is connected by connecting plate with roof structure beam;Base plate is provided with the vertical shaped steel and horizontal section steel equidistant with cross girder steel center, standard section of tower crane is fixed with the base plate.The present invention also provides a kind of construction method of roofing tower crane shaped steel foundation beam.The present invention is simple in construction, easy to operate, it is not necessary to reserved tower crane hole, avoids envelope hole operation, does not influence the construction of secondary structure, electromechanical unit and decorator, reduce labour cost, save the duration;Reduce attached wall and standard knot, construction more simple and effective.
Description
Technical field
The present invention relates to a kind of roofing tower crane shaped steel foundation beam and construction method.
Background technology
With developing rapidly for city size, big scale of construction Commercial Complex is more and more in city, and the long cycle also leads
Cause intersection continuous productive process more and more frequent.Early stage is the transhipment for meeting material, and tower crane is located inside configuration, main structure construction more
During, it can all reserve substantial amounts of structural openings.In order to meet that the intersection of secondary structure, electromechanical unit and decorator is applied
Work, how to increase the subject matter that derrick crane also needs to solve into each project on the basis of closing tower crane hole.
The content of the invention
It is an object of the invention to provide a kind of roofing tower crane shaped steel foundation beam, in closing tower crane structure reserved opening and roofing
In the case of the limitation of bearing capacity, while to meet the execution conditions of secondary structure, electromechanical unit and decorator, no
Influence the turnover of material.
To achieve the above object, the present invention provides a kind of roofing tower crane shaped steel foundation beam, including vertical shaped steel and hangs down respectively
The horizontal section steel being directly welded at left and right sides of vertical shaped steel, the left side horizontal section steel and right side horizontal section steel are in same straight line
On, cross girder steel is formed, the cross girder steel is connected by connecting plate with roof structure beam;With cross girder steel center etc.
Away from vertical shaped steel and horizontal section steel be provided with base plate, be fixed with standard section of tower crane on the base plate.
Vertical shaped steel, left side horizontal section steel and the right side horizontal type are two and be arranged in parallel.
The present invention also provides a kind of construction method of roofing tower crane shaped steel foundation beam, including:
Step 1, structural beams roofing is cleaned out, polished flat at out-of-flatness;
Step 2, by the use of two of roofing tower crane position in decussate texture beam as the basis of tower crane, in structure
Horizontal section steel and 6 meters long vertical shaped steel are laid in beam top, and vertical shaped steel and horizontal section steel Two bors d's oeuveres is installed in cross, and use is high-strength
Bolt and angle steel perforation connecting plate, the shaped steel foundation beam is tied up on structural beams top;
Step 3, according to the size of standard section of tower crane, determine that standard knot is placed in the position on section steel beam top, in standard knot
The girder steel upper weld base plate of suspension column position, then by standard knot welding on the base mounting plate;
Step 4, lightning protection;
Step 5, whole steel member antirust treatments and tower crane set corresponding drainage measure.
The beneficial effects of the invention are as follows:1st, it is simple in construction, because this technology Shaped Steel foundation beam is located at roofing, it is not necessary under
The reserved tower crane hole in side, avoids envelope hole operation, does not influence the construction of secondary structure, electromechanical unit and decorator, operate
Simplicity, labour cost is reduced, save the duration;
2nd, the tower crane installed using this technology compares more common tower crane, has lacked bottom plate to the height of roofing, therefore reduce
Attached wall and standard knot, construction more simple and effective;
3rd, tower crane is substituted for steel construction from reinforced concrete structure, both having reduced tower crane will to foundation bearing capacity
Ask, saved cost again, shortened the duration, and tower crane remove after repeat and utilize, therefore for big scale of construction Commercial Complex and
Native condition condition is unfavorable for for the engineering of tower crane construction, the new direction that this technology will develop as future architecture.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention.
In figure:The vertical shaped steel of 1-, 2- horizontal section steels, 3- connecting plates, 4- base plates, 5- standard section of tower crane.
Embodiment
The present invention and its embodiment are described in further detail below in conjunction with the accompanying drawings.
Referring to Fig. 1, the present invention includes vertical shaped steel 1 and is respectively perpendicular the horizontal type for being welded on the vertical left and right sides of shaped steel 1
Steel 2, left side horizontal section steel and right side horizontal section steel form cross girder steel on same straight line, vertical shaped steel 1, the left side
Horizontal section steel and right side horizontal type are two and be arranged in parallel, and the cross girder steel is connected by connecting plate 3 and roof structure beam
Connect.Base plate 4 is provided with the vertical shaped steel 1 and horizontal section steel 2 equidistant with cross girder steel center, is fixed on the base plate 4
There is standard section of tower crane 5.
To meet the execution conditions of secondary structure, electromechanical unit and decorator, while the turnover of material is not influenceed,
, it is necessary to set up derrick crane in roofing in the case of closing tower crane structure reserved opening.Due to by roofing bearing capacity
Limitation, therefore use shaped steel basis to substitute reinforced concrete foundation.The present invention is applied to big scale of construction Commercial Complex, and native condition condition is not
Constructed beneficial to tower crane, tower crane can only be placed on the project on roofing.
The concrete operations of the present invention are as follows:
1st, roofing is cleared up:, need to be clean by structural beams removing surface before tower crane construction is carried out, need to polish at out-of-flatness
It is smooth, it is ensured that together with tower crane is brought into close contact with structural beams.
2nd, basis arrangement:By the use of two of roofing tower crane position in decussate texture beam as the basis of tower crane,
Structural beams top lay Q345B H300*200*8*12 horizontal section steels and with 6 meters long Two bors d's oeuveres Q345B H300*200*8*12 types
Steel, Two bors d's oeuveres section steel beam are installed in cross, using the high-strength bolt+L20*200 angle steel perforation connecting plate of diameter 32, by the type
Steel foundation beam is tied up on structural beams top.
3rd, welding for steel structure:According to the size of standard section of tower crane, determine that standard knot is placed in the position on section steel beam top,
The mm of thickness steel plate of girder steel upper weld 20 of standard knot suspension column position, then by standard knot welding on the base mounting plate;Ensure Two bors d's oeuveres
Section steel beam connection integrity, it is ensured that section steel beam, steel plate, standard knot lattice column foundation location accurately weld afterwards.
4th, high-strength bolt is installed:Connected between shaped steel foundation beam and structural beams using high-strength bolt, the installation of high-strength bolt
An important factor for quality is control stability of foundation.High-strength bolt should since buying start strict control of quality, it is necessary to concentrate adopt
Qualified products are purchased, forbid to process privately.Safeguard measure should be taken during installation, nut uses torque spanner when installing, it is ensured that installation
It is required that.
5th, lightning protection:Lightning protection provides specification construction according to producer.And make following provisions:
1) tower crown end should fill lightning rod, and connection place should remove coating.
2) cable of Protection grounding can with the bolt connection of any main chord, and remove bolt and nut and
Coating on sleeve pipe.
3) chassis being connected with ground rivet clasp must not be used as the earthing pole of lightning protection device, it is necessary to separately be set outside foundation for tower crane
One grounding-for-lightning device.
4) earthing or grounding means should be installed by special messenger, because the difference between grounding resistance rate apparent time with local condition has very big change
High-accuracy instrument is wanted when changing, and determining resistance.
5) resistance of Protection grounding is no more than 4 ohm.
6) lightning protection is connected to the lightning arrester top on parapet of roofing top.
6th, foundation drainage and antirust treatment:Tower crane sets corresponding drainage measure, it is ensured that roofing is complete without ponding, steel member
Portion passes through antirust treatment.
The present invention is simple in construction, easy to operate, because this technology Shaped Steel foundation beam is located at roofing, it is not necessary to reserved in lower section
Tower crane hole, envelope hole operation is avoided, does not influence the construction of secondary structure, electromechanical unit and decorator, reduces labour cost,
Save the duration;The tower crane installed using this technology compares more common tower crane, has lacked bottom plate to the height of roofing, therefore reduce attached
Wall and standard knot, construction more simple and effective;Tower crane is substituted for steel construction from reinforced concrete structure, both reduces tower
Hang to ground requirement for bearing capacity, saved cost again, shortened the duration, and repeat and utilize after tower crane dismounting, therefore for big
Scale of construction Commercial Complex and native condition condition are unfavorable for for the engineering of tower crane construction, and this technology will turn into future architecture and develop
New direction.
Embodiments of the invention are the foregoing is only, are not intended to limit the scope of the invention, it is every to utilize this hair
The equivalent structure or equivalent flow conversion that bright specification and accompanying drawing content are made, or directly or indirectly it is used in other related skills
Art field, is included within the scope of the present invention.
Claims (3)
1. a kind of roofing tower crane shaped steel foundation beam, it is characterised in that including vertical shaped steel and be respectively perpendicular and be welded on vertical shaped steel
The horizontal section steel of the left and right sides, the left side horizontal section steel and right side horizontal section steel form cross-shaped steel on same straight line
Beam, the cross girder steel are connected by connecting plate with roof structure beam;In the vertical shaped steel equidistant with cross girder steel center and
Horizontal section steel is provided with base plate, and standard section of tower crane is fixed with the base plate.
2. roofing tower crane shaped steel foundation beam according to claim 1, it is characterised in that the vertical shaped steel, left side are horizontal
Shaped steel and right side horizontal type are two and be arranged in parallel.
A kind of 3. construction method of roofing tower crane shaped steel foundation beam as described in any one of claim 1~2, it is characterised in that
Including:
Step 1, structural beams roofing is cleaned out, polished flat at out-of-flatness;
Step 2, by the use of two of roofing tower crane position in decussate texture beam as the basis of tower crane, in structural beams
Horizontal section steel and 6 meters long vertical shaped steel are laid by portion, and vertical shaped steel and horizontal section steel Two bors d's oeuveres is installed in cross, using high-strength bolt
With angle steel perforation connecting plate, the shaped steel foundation beam is tied up on structural beams top;
Step 3, according to the size of standard section of tower crane, determine that standard knot is placed in the position on section steel beam top, in standard knot suspension column
The girder steel upper weld base plate of position, then by standard knot welding on the base mounting plate;
Step 4, lightning protection;
Step 5, whole steel member antirust treatments and tower crane set corresponding drainage measure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710632364.5A CN107574833A (en) | 2017-07-28 | 2017-07-28 | A kind of roofing tower crane shaped steel foundation beam and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710632364.5A CN107574833A (en) | 2017-07-28 | 2017-07-28 | A kind of roofing tower crane shaped steel foundation beam and construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107574833A true CN107574833A (en) | 2018-01-12 |
Family
ID=61035152
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710632364.5A Pending CN107574833A (en) | 2017-07-28 | 2017-07-28 | A kind of roofing tower crane shaped steel foundation beam and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107574833A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115198786A (en) * | 2022-07-05 | 2022-10-18 | 广州建筑工程监理有限公司 | H-shaped reinforced concrete tower crane beam foundation borne by main body structure and reinforcing method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201534978U (en) * | 2009-08-31 | 2010-07-28 | 中建三局第三建设工程有限责任公司 | Steel platform foundation of tower crane |
CN203174621U (en) * | 2013-04-11 | 2013-09-04 | 中建城市建设发展有限公司 | Tower crane foundation |
CN204040058U (en) * | 2014-09-01 | 2014-12-24 | 中国建筑第二工程局有限公司 | Combined tower crane foundation structure |
CN106149571A (en) * | 2015-04-27 | 2016-11-23 | 吴江市明港道桥工程有限公司 | A kind of molding bridge end face installs the method for tower crane |
CN205954660U (en) * | 2016-06-01 | 2017-02-15 | 中建二局第三建筑工程有限公司 | Steel tower crane foundation structure |
CN207331732U (en) * | 2017-07-28 | 2018-05-08 | 中国建筑第二工程局有限公司 | A kind of roofing tower crane shaped steel foundation beam |
-
2017
- 2017-07-28 CN CN201710632364.5A patent/CN107574833A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201534978U (en) * | 2009-08-31 | 2010-07-28 | 中建三局第三建设工程有限责任公司 | Steel platform foundation of tower crane |
CN203174621U (en) * | 2013-04-11 | 2013-09-04 | 中建城市建设发展有限公司 | Tower crane foundation |
CN204040058U (en) * | 2014-09-01 | 2014-12-24 | 中国建筑第二工程局有限公司 | Combined tower crane foundation structure |
CN106149571A (en) * | 2015-04-27 | 2016-11-23 | 吴江市明港道桥工程有限公司 | A kind of molding bridge end face installs the method for tower crane |
CN205954660U (en) * | 2016-06-01 | 2017-02-15 | 中建二局第三建筑工程有限公司 | Steel tower crane foundation structure |
CN207331732U (en) * | 2017-07-28 | 2018-05-08 | 中国建筑第二工程局有限公司 | A kind of roofing tower crane shaped steel foundation beam |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115198786A (en) * | 2022-07-05 | 2022-10-18 | 广州建筑工程监理有限公司 | H-shaped reinforced concrete tower crane beam foundation borne by main body structure and reinforcing method |
CN115198786B (en) * | 2022-07-05 | 2024-05-07 | 广州建筑工程监理有限公司 | H-shaped reinforced concrete tower crane beam foundation borne by main body structure and reinforcing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103924520B (en) | Construction method and device of suspension bridge main cable anchorage prestressed pipes | |
CN107100358A (en) | Without the special bracket of encorbelmenting of off-load industrialization security protection, support body and its construction method | |
CN206942109U (en) | One kind is without special bracket and the protection support body of encorbelmenting of off-load industrialization security protection | |
CN102888991B (en) | Large-scale profile steel beam and concrete combined house roof constructing method | |
CN103993735A (en) | Support system of roof inclined beam and slab cantilever structure and construction method of support system | |
CN206127746U (en) | Isolation bearing handles accurate location structure of pre -buried steel sheet in back | |
CN106120872A (en) | A kind of tower crane foundation is combined the construction method of antiseep with basement bottom board | |
CN106848938A (en) | Cable testing bridge hanging installation method under a kind of High Altitude Platform | |
CN207159828U (en) | A kind of attachment structure being connected applied to I-steel with beret truss | |
CN110055895A (en) | A kind of economical and practical steel trestle construction method | |
CN101818575A (en) | Construction technology of cross-shaped profile steel column | |
CN105756380B (en) | A kind of multilayer large-span assembled integral space steel lattice box structure construction of hydropower method | |
CN107574833A (en) | A kind of roofing tower crane shaped steel foundation beam and construction method | |
CN207331732U (en) | A kind of roofing tower crane shaped steel foundation beam | |
CN107404103A (en) | The lighting proof strip device and its distribution method of the anti-sideflash of roofing skeleton layer curtain wall | |
CN103495793A (en) | Improved construction method for hoisting and welding large-tonnage cast steel component complex joints | |
CN104499706A (en) | Elevator well template platform and construction method thereof | |
CN202299572U (en) | Plus or minus 800kV extra-high voltage direct current large-crossing steel tubular tower joint | |
CN203066491U (en) | Locator for installing round tube type connection member | |
CN205791421U (en) | The lighting proof strip device of the anti-sideflash of roofing skeleton layer curtain wall | |
CN207362894U (en) | Steel plate water-stopping device | |
CN105731271A (en) | Combined tower crane for roof construction and construction method thereof | |
CN112942777A (en) | Ultrahigh-layer periphery protection cyclic telescopic detachable cantilever structure and mounting method | |
CN113756554A (en) | Construction platform and construction method for cast-in-place reinforced concrete support cantilever scaffold | |
CN203755781U (en) | Subsection central upright pillar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180112 |