CN107563674A - 一种考虑管道动态特性的电‑热耦合系统状态估计方法 - Google Patents
一种考虑管道动态特性的电‑热耦合系统状态估计方法 Download PDFInfo
- Publication number
- CN107563674A CN107563674A CN201710927795.4A CN201710927795A CN107563674A CN 107563674 A CN107563674 A CN 107563674A CN 201710927795 A CN201710927795 A CN 201710927795A CN 107563674 A CN107563674 A CN 107563674A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- state estimation
- thermal coupling
- state
- node
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000008878 coupling Effects 0.000 title claims abstract description 79
- 238000010168 coupling process Methods 0.000 title claims abstract description 79
- 238000005859 coupling reaction Methods 0.000 title claims abstract description 79
- 238000000034 method Methods 0.000 title claims abstract description 30
- 239000012530 fluid Substances 0.000 claims description 43
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 22
- 239000011159 matrix material Substances 0.000 claims description 21
- 239000013598 vector Substances 0.000 claims description 18
- 230000005540 biological transmission Effects 0.000 claims description 13
- 238000004519 manufacturing process Methods 0.000 claims description 13
- 238000002347 injection Methods 0.000 claims description 9
- 239000007924 injection Substances 0.000 claims description 9
- 238000012360 testing method Methods 0.000 claims description 9
- 238000002940 Newton-Raphson method Methods 0.000 claims description 6
- 238000002485 combustion reaction Methods 0.000 claims description 6
- 230000000704 physical effect Effects 0.000 claims description 6
- 238000005259 measurement Methods 0.000 claims description 5
- 230000017105 transposition Effects 0.000 claims description 5
- 230000005611 electricity Effects 0.000 claims description 4
- 239000000470 constituent Substances 0.000 claims description 3
- 230000017525 heat dissipation Effects 0.000 claims description 3
- 230000020169 heat generation Effects 0.000 claims description 3
- 238000005457 optimization Methods 0.000 claims description 3
- 238000010248 power generation Methods 0.000 claims description 3
- 238000005070 sampling Methods 0.000 claims description 3
- 239000000126 substance Substances 0.000 claims description 3
- 101150036841 minJ gene Proteins 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract description 4
- 238000012546 transfer Methods 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 238000011217 control strategy Methods 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M99/00—Subject matter not provided for in other groups of this subclass
- G01M99/005—Testing of complete machines, e.g. washing-machines or mobile phones
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
- G06F1/28—Supervision thereof, e.g. detecting power-supply failure by out of limits supervision
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/10—Complex mathematical operations
- G06F17/11—Complex mathematical operations for solving equations, e.g. nonlinear equations, general mathematical optimization problems
- G06F17/13—Differential equations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Entrepreneurship & Innovation (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- General Engineering & Computer Science (AREA)
- Educational Administration (AREA)
- Public Health (AREA)
- Development Economics (AREA)
- Primary Health Care (AREA)
- Water Supply & Treatment (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- General Health & Medical Sciences (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Feedback Control In General (AREA)
Abstract
本发明涉及一种考虑管道动态特性的电‑热耦合系统状态估计方法,属于综合能源系统的运行和控制技术领域。本方法根据热力系统和电力系统在能量传输速度及时间尺度上的差异,融合热力系统的动态特性,对电‑热耦合系统进行状态估计。本方法适应了电‑热耦合网络能量管理系统及调度管理系统中对热力系统可控性、活动性的要求。当热力系统受调度控制而改变运行方式时,本发明能够较为精确地追踪系统温度等状态变量的变化,且有较好的收敛性。在电‑热耦合网络中成功应用本方法后,可以得到动态的状态估计解,为能量管理系统和调度管理系统提供翔实的数据支撑。
Description
技术领域
本发明涉及一种考虑管道动态特性的电-热耦合系统状态估计方法,属于综合能源系统的运行和控制技术领域。
背景技术
为了提高多种能源的利用效率、充分利用各种能源的灵活性,减少碳排放量并提高新能源的渗透率,能源互联网及综合能源系统的概念应运而生。在包括冷、热、电、气等多种能量形式的网络中,电-热耦合网络目前发展最为迅速,应用前景最为广阔。电-热耦合网络的在线调度和控制策略需要可信的描述系统实时运行状态的大量数据作为支撑,虽然目前已有一些考虑热惯性及电-热耦合网络时间尺度特性的经济调度策略研究,但是由于种种原因,全面可信的测量数据并不容易获得。
状态估计可以充分利用系统的量测冗余,更准确地了解网络的运行状态,检测坏数据,是系统运行中的基础部分,也是能量管理系统的基础。状态估计现已成熟运用在电力系统及给水系统中,但对于综合能源系统的状态估计还在起步阶段。当研究电-热耦合网络的实时调度问题时,由于热力系统变为活动可控的,用稳态模型描述热力系统是不准确的,然而已有的关于电-热耦合网络的状态估计方法大多基于热力系统的稳态模型。
发明内容
本发明的目的是提出一种考虑管道动态特性的电-热耦合系统状态估计方法,充分考虑管道的动态特性及其造成的能量传递中的延迟效应,并对电-热耦合系统进行两个阶段状态估计的方法,以适应多能流能量管理系统及实时调度中对数据的实时性和可信性的要求。
本发明提出的考虑管道动态特性的电-热耦合系统状态估计方法,包括以下步骤:
(1)设定电-热耦合系统状态估计的精度δ及预设最大循环次数d,初始化时设循环次数a为0;
(2)实时测量t时刻电-热耦合系统的运行参数,包括电力系统中所有节点i的电压幅值Vi、注入的有功功率Pi及无功功率Qi,节点i和与节点i相连的节点j之间传输线输送的有功功率Pij及无功功率Qij,热力系统中所有节点k的压强hk、注入流量Lk,供水温度Tk,in、回水温度Tk,out、热源或热负荷节点所供给或消耗的热量Фk,节点k和与节点k相连的节点l之间的连接管道中的流量mkl,上述测量值构成列向量z;
电-热耦合系统的所有待估计的状态变量构成列向量x,x=[xexh]T,其中xe=[Viθi]T,即由电力系统中所有节点i的电压幅值Vi及相位θi组成的列向量,xh=[hkTk,inTk,out]T,为热力系统中所有节点k的压强hk和温度Tk,in、Tk,out组成的列向量;
构建一个量测函数f(x)描述电-热耦合系统状态变量与测量值之间的关系,f(x)=[fe(x)fh(x)]T,上标T表示矩阵转置,
fe(x)为电力系统潮流方程:
Pij=-Vi 2Gij+ViVj(Gijcosθij+Bijsinθij)
Qij=Vi 2(Bij-bc)+ViVj(Gijsinθij-Bijcosθij)
其中,θij为节点i和节点j的相位差,即θij=θi-θj,Gij、Bij为电力系统节点导纳矩阵Y第i行、第j列元素的实部和虚部,bc为电网支路的等效对地电纳,上述数据从电力系统调度中心获取;
fh(x)为热力系统潮流方程:
Фk=CpLk(k,in-Tk,out)
其中Kkl为管道阻力系数,取值为10~500帕/(千克/秒)2,Cp为管道中流体(通常为水)的定压比热容,由流体的物性参数表获取;
(3)根据上述步骤(2)的测量值,建立一个电-热耦合系统状态估计的目标函数如下:
minJ(x)=[z-f(x)]TW[z-f(x)]
其中W为测量值的协方差矩阵,上标T表示矩阵转置;
(4)建立电-热耦合系统稳态运行阶段下的约束条件,包括:
(4-1)电力系统的潮流约束:
其中,θij为节点i和节点j的相位差,即θij=θi-θj,Gij、Bij为电力系统节点导纳矩阵Y的第i行、第j列元素的实部和虚部,由电网调度中心获取;
(4-2)热力系统管道的稳态水力约束为:
A·m=mq
B·h=0
其中表示流体流过元件时,该元件提供的压力或流体损失的压力,m表示流体流过该元件的流量,下标表示元件种类,即pu表示循环泵,pi表示管道,va表示阀门,ex表示换热器;a0,a1,a2分别是循环泵参数,由循环泵的产品铭牌或出厂水力试验报告得到,K表示热力系统管道的沿程阻力,Kv是阀门的参数,由阀门铭牌得到,Re是雷诺数,ρ是热力系统管道中流体的密度,b,c,ζ分别是换热器参数,由换热器设备铭牌或出厂水力试验报告得到,A为热力系统的节点-支路关联矩阵,m、mq分别为由热力系统中各支路流量及各节点注入流量组成的列向量,B为热力系统的回路-支路关联矩阵,h为各个节点压力差组成的列向量;
(4-3)热力系统管道的热力稳态约束为:
(Σmout)Tout=Σ(minTin)
其中,m表示流体流过该元件的流量,下标ex表示换热器,表示内能做功功率,T为流体温度,下标out表示流出节点,下标in表示流入节点,下标表示换热器热水侧,下标c表示换热器冷水侧,Cp为热力系统管道中流体的定压比热容,由流体的物性参数表获取;
(4-4)当电-热耦合系统以燃气轮机或往复式活塞内燃机为联产机组时,联产机组的约束条件为:
kCHP=ФCHP/PCHP
其中,kCHP为联产机组产电产热比,由燃气轮机或往复式活塞内燃机的产品说明书中获取,ФCHP为联产机组产出的热量,PCHP为联产机组发出的电功率;
当电-热耦合系统以蒸汽轮机为联产机组时,联产机组的约束条件为:
其中,ZCHP为蒸汽轮机单位产电改变量引起的产热改变量,ZCHP从蒸汽轮机的产品说明书获取,PCon为蒸汽轮机的最大产电功率,PCon从蒸汽轮机的产品说明书获取,ФcHP为电-热联产机组产出的热量,PCHP为电-热联产机组发出的电功率,从蒸汽轮机的产品说明书获取;
(5)利用拉格朗日乘数法,将上述步骤(3)的目标函数和上述步骤(4)的约束条件构成一个拉格朗日函数如下:
L(x,ω)=J(x)+ωTc(x)
对上述拉格朗日函数进行修正,得到管道系统稳态运行时的电-热耦合系统状态估计模型为:
利用最优化理论中的牛顿-拉夫逊法,求解该模型,得到管道系统稳态运行时的电-热耦合系统状态估计结果;
(6)根据电-热耦合网络的动态特性和上述步骤(5)的管道系统稳态运行时的电-热耦合系统状态估计结果,进行管道系统动态运行时的电-热耦合系统状态估计,包括以下步骤:
(6-1)利用下式,计算热力系统中每个管道产生的能量传输时间延迟s:
其中,为上述步骤(5)得到的状态估计值中热力系统管道中的流体流量,ρ为与管道系统稳态运行时电-热耦合系统状态估计结果中的温度相对应的流体密度,下标t-γΔt表示时刻t-γΔt经过两阶段状态估计得到的估计值,下标t-kΔt代表时刻t-kΔt经过两阶段状态估计所得的估计值, 为对集合中所有符合条件的n取最小值,s.t.是subject to的缩写,意为符合…条件,Z为整数集,即找到最小的正整数n,使得成立,并将满足条件的n赋值给γ,Δt为步骤(2)中测量电-热耦合系统运行参数的采样时间间隔,S为管道横截面积,L为管道长度;
(6-2)选择最接近能量传输时间延迟时间s之前的t-s的一个状态估计结果,根据该结果中的流体温度平均值求得该状态估计时刻的流体密度以及定压比热容:
即
其中代表流体在(t-s)到t时间段中的平均温度。
建立热力系统中每个管道的动态约束方程如下:
其中,Tout(t)代表时刻t时的某管道的回水温度,Tk,in(t-s)代表时刻(t-s)时的管道的供水温度,Ta为管道所处的环境温度,由管道周边环境的测温装置获得,λ为管道单位长度散热系数,由管道铭牌获得,S为管道横截面积,L为管道长度,s为(6-1)算得的能量传输时间延迟;
(6-3)将上述步骤(4)的稳态约束条件作为上述步骤(3)目标函数的约束条件,与上述步骤(6-2)的所有管道的动态约束方程一起,构成一个拉格朗日函数如下:
L(x,ω)=J(x)+ωTc(x)
利用牛顿-拉夫逊法求解该拉格朗日函数,求解得到热力系统动态运行时的电-热耦合系统状态估计结果;
(7)对上述步骤(6)的状态估计结果进行收敛性判断:
若循环次数a达到预设循环次数d,即a≥d,则将本次状态估计结果作为t时刻考虑管道动态特性的电-热耦合系统状态估计结果;
若循环次数a未达到预设循环次数s,即a<d,则进一步根据电-热耦合系统状态估计的精度δ对状态估计结果收敛性进行判断:若最近相邻两次状态估计结果中的状态变xa和xa-1的差值小于状态估计精度δ,即max|xa-xa-1|<δ,则将本次状态估计结果作为t时刻考虑管道动态特性的电-热耦合系统状态估计结果,若最近两次状态估计结果中的状态变量估计值xa和xa-1的差值大于或等于状态估计精度δ,即max|xa-xa-1|≥δ,则更新状态变量,并根据本次状态估计所得的温度值更新流体密度和定压比热容,同时使a=a+1,并返回步骤(4),继续本次状态估计过程。
本发明提出的考虑管道动态特性的电-热耦合系统状态估计方法,其特点和效果是:
本发明方法充分考虑了热力系统和电力系统在能量传输速度及时间尺度上的差异,很好地融合了热力系统的动态特性,适应了电-热耦合网络能量管理系统及调度管理系统中对热力系统可控性、活动性的要求。当热力系统受调度控制而改变运行方式时,本发明能够较为精确地追踪系统温度等状态变量的变化,且有较好的收敛性。本方法的应用需要以电-热耦合网络中大规模测量装置为基础,目前电-热耦合网络尚不能完全满足本发明的需求,因此在电-热耦合网络中成功应用本方法后,可以得到动态的状态估计解,为能量管理系统和调度管理系统提供翔实的数据支撑。
附图说明
图1是本发明方法涉及的电-热耦合系统的结构简化示意图。
具体实施方式
本发明提出的考虑管道动态特性的电-热耦合系统状态估计方法,其中涉及的电-热耦合系统的结构简化示意图如图1所示,包括以下步骤:
(1)设定电-热耦合系统状态估计的精度δ及预设最大循环次数d,初始化时设循环次数a为0;
(2)实时测量t时刻电-热耦合系统的运行参数,包括电力系统中所有节点i的电压幅值Vi、注入的有功功率Pi及无功功率Qi,节点i和与节点i相连的节点j之间传输线输送的有功功率Pij及无功功率Qij,热力系统中所有节点k的压强hk、注入流量Lk,供水温度Tk,in、回水温度Tk,out、热源或热负荷节点所供给或消耗的热量Фk,节点k和与节点k相连的节点l之间的连接管道中的流量mkl,上述测量值构成列向量z;
电-热耦合系统的所有待估计的状态变量构成列向量x,x=[xexh]T,其中xe=[Viθi]T,即由电力系统中所有节点i的电压幅值Vi及相位θi组成的列向量,xh=[hkTk,inTk,out]T,为热力系统中所有节点k的压强hk和温度Tk,in、Tk,out组成的列向量;
构建一个量测函数f(x)描述电-热耦合系统状态变量与测量值之间的关系,f(x)=[fe(x)fh(x)]T,上标T表示矩阵转置,
fe(x)为电力系统潮流方程:
Pij=-Vi 2Gij+ViVj(Gijcosθij+Bijsinθij)
Qij=Vi 2(Bij-bc)+ViVj(Gijsinθij-Bijcosθij)
其中,θij为节点i和节点j的相位差,即θij=θi-θj,Gij、Bij为电力系统节点导纳矩阵Y第i行、第j列元素的实部和虚部,bc为电网支路的等效对地电纳,上述数据从电力系统调度中心获取;
fh(x)为热力系统潮流方程:
Фk=CpLk(Tk,in-Tk,out)
其中Kkl为管道阻力系数,Kkl与热力系统中节点k与节点l之间管道kl的管道直径、管道长度和管道摩擦系数相关的系数,取值为10~500帕/(千克/秒)2,Cp为管道中流体(通常为水)的定压比热容,由流体的物性参数表获取;
(3)根据上述步骤(2)的测量值,建立一个电-热耦合系统状态估计的目标函数如下:
min J(x)=[z-f(x)]TW[z-f(x)]
其中W为测量值的协方差矩阵,上标T表示矩阵转置;
(4)建立电-热耦合系统稳态运行阶段下的约束条件,包括:
(4-1)电力系统的潮流约束:
其中,θij为节点i和节点j的相位差,即θij=θi-θj,Gij、Bij为电力系统节点导纳矩阵Y的第i行、第j列元素的实部和虚部,由电网调度中心获取;
(4-2)热力系统管道的稳态水力约束为:
A·m=mq
B·h=0
其中表示流体流过元件时,该元件提供的压力或流体损失的压力,m表示流体流过该元件的流量,下标表示元件种类,即pu表示循环泵,pi表示管道,va表示阀门,ex表示换热器;a0,a1,a2分别是循环泵参数,由循环泵的产品铭牌或出厂水力试验报告得到,K表示热力系统管道的沿程阻力,Kv是阀门的参数,由阀门铭牌得到,Re是雷诺数,ρ是热力系统管道中流体的密度,b,c,ζ分别是换热器参数,由换热器设备铭牌或出厂水力试验报告得到,A为热力系统的节点-支路关联矩阵,m、mq分别为由热力系统中各支路流量及各节点注入流量组成的列向量,B为热力系统的回路-支路关联矩阵,h为各个节点压力差组成的列向量;
上述热力系统管道稳态水力约束的六个公式中,前四式表示流体流过热力系统中的元件(循环泵、管道、阀门和换热器)产生的压力变化,后两式描述热力网络的拓扑约束;
(4-3)热力系统管道的热力稳态约束为:
(Σmout)Tout=Σ(minTin)
其中,m表示流体流过该元件的流量,下标ex表示换热器,表示内能做功功率,T为流体温度,下标out表示流出节点,下标in表示流入节点,下标表示换热器热水侧,下标c表示换热器冷水侧,Cp为热力系统管道中流体的定压比热容,由流体的物性参数表获取;
(4-4)当电-热耦合系统以燃气轮机或往复式活塞内燃机为联产机组时,联产机组的约束条件为:
kCHP=ФCHP/PCHP
其中,kCHP为联产机组产电产热比,由燃气轮机或往复式活塞内燃机的产品说明书中获取,ФCHP为联产机组产出的热量,PCHP为联产机组发出的电功率;
当电-热耦合系统以蒸汽轮机为联产机组时,联产机组的约束条件为:
其中,ZCHP为蒸汽轮机单位产电改变量引起的产热改变量,ZCHP从蒸汽轮机的产品说明书获取,PCon为蒸汽轮机的最大产电功率,PCon从蒸汽轮机的产品说明书获取,ФCHP为电-热联产机组产出的热量,PCHP为电-热联产机组发出的电功率,从蒸汽轮机的产品说明书获取;
(5)利用拉格朗日乘数法,将上述步骤(3)的目标函数和上述步骤(4)的约束条件构成一个拉格朗日函数如下:
L(x,ω)=J(x)+ωTc(x)
对上述拉格朗日函数进行修正,得到管道系统稳态运行时的电-热耦合系统状态估计模型为:
利用最优化理论中的牛顿-拉夫逊法,求解该模型,得到管道系统稳态运行时的电-热耦合系统状态估计结果;
(6)根据电-热耦合网络的动态特性和上述步骤(5)的管道系统稳态运行时的电-热耦合系统状态估计结果,进行管道系统动态运行时的电-热耦合系统状态估计,包括以下步骤:
(6-1)利用下式,计算热力系统中每个管道产生的能量传输时间延迟s:
其中,为上述步骤(5)得到的状态估计值中热力系统管道中的流体流量,ρ为与管道系统稳态运行时电-热耦合系统状态估计结果中的温度相对应的流体密度,下标t-γΔt表示时刻t-γΔt经过两阶段状态估计得到的估计值,下标t-kΔt代表时刻t-kΔt经过两阶段状态估计所得的估计值, 为对集合中所有符合条件的n取最小值,s.t.是subject to的缩写,意为符合…条件,Z为整数集,即找到最小的正整数n,使得成立,并将满足条件的n赋值给γ,Δt为步骤(2)中测量电-热耦合系统运行参数的采样时间间隔,S为管道横截面积,L为管道长度;
(6-2)选择最接近能量传输时间延迟时间s之前的t-s的一个状态估计结果,根据该结果中的流体温度平均值求得该状态估计时刻的流体密度以及定压比热容:
即
其中代表流体在(t-s)到t时间段中的平均温度。
建立热力系统中每个管道的动态约束方程如下:
其中,Tout(t)代表时刻t时的某管道的回水温度,Tk,in(t-s)代表时刻(t-s)时的管道的供水温度,Ta为管道所处的环境温度,由管道周边环境的测温装置获得,λ为管道单位长度散热系数,由管道铭牌获得,S为管道横截面积,L为管道长度,s为(6-1)算得的能量传输时间延迟;
(6-3)将上述步骤(4)的稳态约束条件作为上述步骤(3)目标函数的约束条件,与上述步骤(6-2)的所有管道的动态约束方程一起,构成一个拉格朗日函数如下:
L(x,ω)=J(x)+ωTc(x)
利用牛顿-拉夫逊法求解该拉格朗日函数,求解得到热力系统动态运行时的电-热耦合系统状态估计结果;
(7)对上述步骤(6)的状态估计结果进行收敛性判断:
若循环次数a达到预设循环次数d,即a≥d,则将本次状态估计结果作为t时刻考虑管道动态特性的电-热耦合系统状态估计结果;
若循环次数a未达到预设循环次数d,即a<d,则进一步根据电-热耦合系统状态估计的精度δ对状态估计结果收敛性进行判断:若最近相邻两次状态估计结果中的状态变xa和xa-1的差值小于状态估计精度δ,即max|xa-xa-1|<δ,则将本次状态估计结果作为t时刻考虑管道动态特性的电-热耦合系统状态估计结果,若最近两次状态估计结果中的状态变量估计值xa和xa-1的差值大于或等于状态估计精度δ,即max|xa-xa-1|≥δ,则更新状态变量,并根据本次状态估计所得的温度值更新流体密度和定压比热容,同时使a=a+1,并返回步骤(4),继续本次状态估计过程。
Claims (1)
1.一种考虑管道动态特性的电-热耦合系统状态估计方法,其特征在于该方法包括以下步骤:
(1)设定电-热耦合系统状态估计的精度δ及预设最大循环次数d,初始化时设循环次数a为0;
(2)实时测量t时刻电-热耦合系统的运行参数,包括电力系统中所有节点i的电压幅值Vi、注入的有功功率Pi及无功功率Qi,节点i和与节点i相连的节点j之间传输线输送的有功功率Pij及无功功率Qij,热力系统中所有节点k的压强hk、注入流量Lk,供水温度Tk,in、回水温度Tk,out、热源或热负荷节点所供给或消耗的热量Фk,节点k和与节点k相连的节点l之间的连接管道中的流量mkl,上述测量值构成列向量z;
电-热耦合系统的所有待估计的状态变量构成列向量x,x=[xexh]T,其中xe=[Viθi]T,即由电力系统中所有节点i的电压幅值Vi及相位θi组成的列向量,xh=[hkTk,inTk,out]T,为热力系统中所有节点k的压强hk和温度Tk,in、Tk,out组成的列向量;
构建一个量测函数f(x)描述电-热耦合系统状态变量与测量值之间的关系,
f(x)=[fe(x)fh(x)]T,上标T表示矩阵转置,
fe(x)为电力系统潮流方程:
<mrow>
<msub>
<mi>P</mi>
<mi>i</mi>
</msub>
<mo>=</mo>
<msub>
<mi>V</mi>
<mi>i</mi>
</msub>
<munder>
<mo>&Sigma;</mo>
<mrow>
<mi>j</mi>
<mo>&Element;</mo>
<mi>i</mi>
</mrow>
</munder>
<msub>
<mi>V</mi>
<mi>j</mi>
</msub>
<mrow>
<mo>(</mo>
<msub>
<mi>G</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<msub>
<mi>cos&theta;</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>+</mo>
<msub>
<mi>B</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<msub>
<mi>sin&theta;</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>)</mo>
</mrow>
</mrow>
<mrow>
<msub>
<mi>Q</mi>
<mi>i</mi>
</msub>
<mo>=</mo>
<msub>
<mi>V</mi>
<mi>i</mi>
</msub>
<munder>
<mo>&Sigma;</mo>
<mrow>
<mi>j</mi>
<mo>&Element;</mo>
<mi>i</mi>
</mrow>
</munder>
<msub>
<mi>V</mi>
<mi>j</mi>
</msub>
<mrow>
<mo>(</mo>
<msub>
<mi>G</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>*</mo>
<msub>
<mi>sin&theta;</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>-</mo>
<msub>
<mi>B</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<msub>
<mi>cos&theta;</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>)</mo>
</mrow>
</mrow>
Pij=-Vi 2Gij+ViVj(Gijcosθij+Bijsinθij)
Qij=Vi 2(Bij-bc)+ViVj(Gijsinθij-Bijcosθij)
其中,θij为节点i和节点j的相位差,即θij=θi-θj,Gij、Bij为电力系统节点导纳矩阵Y第i行、第j列元素的实部和虚部,bc为电网支路的等效对地电纳,上述数据从电力系统调度中心获取;
fh(x)为热力系统潮流方程:
<mrow>
<msub>
<mi>L</mi>
<mi>k</mi>
</msub>
<mo>=</mo>
<munder>
<mo>&Sigma;</mo>
<mrow>
<mo><</mo>
<mi>k</mi>
<mo>,</mo>
<mi>l</mi>
<mo>></mo>
<mo>&Element;</mo>
<msub>
<mi>Pipe</mi>
<mi>k</mi>
</msub>
</mrow>
</munder>
<mfrac>
<mn>1</mn>
<msqrt>
<msub>
<mi>K</mi>
<mrow>
<mi>k</mi>
<mi>l</mi>
</mrow>
</msub>
</msqrt>
</mfrac>
<mo>&CenterDot;</mo>
<mfrac>
<mrow>
<msub>
<mi>h</mi>
<mi>l</mi>
</msub>
<mo>-</mo>
<msub>
<mi>h</mi>
<mi>k</mi>
</msub>
</mrow>
<mrow>
<mo>|</mo>
<msub>
<mi>h</mi>
<mi>l</mi>
</msub>
<mo>-</mo>
<msub>
<mi>h</mi>
<mi>k</mi>
</msub>
<mo>|</mo>
</mrow>
</mfrac>
</mrow>
<mrow>
<msub>
<mi>m</mi>
<mrow>
<mi>k</mi>
<mi>l</mi>
</mrow>
</msub>
<mo>=</mo>
<mfrac>
<mn>1</mn>
<msqrt>
<msub>
<mi>K</mi>
<mrow>
<mi>k</mi>
<mi>l</mi>
</mrow>
</msub>
</msqrt>
</mfrac>
<mo>&CenterDot;</mo>
<mfrac>
<mrow>
<msub>
<mi>h</mi>
<mi>k</mi>
</msub>
<mo>-</mo>
<msub>
<mi>h</mi>
<mi>l</mi>
</msub>
</mrow>
<mrow>
<mo>|</mo>
<msub>
<mi>h</mi>
<mi>k</mi>
</msub>
<mo>-</mo>
<msub>
<mi>h</mi>
<mi>l</mi>
</msub>
<mo>|</mo>
</mrow>
</mfrac>
</mrow>
Фk=CpLk(Tk,in-Tk,out)
其中Kkl为管道阻力系数,取值为10~500帕/(千克/秒)2,Cp为管道中流体(通常为水)的定压比热容,由流体的物性参数表获取;
(3)根据上述步骤(2)的测量值,建立一个电-热耦合系统状态估计的目标函数如下:
minJ(x)=[z-f(x)]TW[z-f(x)]
其中W为测量值的协方差矩阵,上标T表示矩阵转置;
(4)建立电-热耦合系统稳态运行阶段下的约束条件,包括:
(4-1)电力系统的潮流约束:
<mrow>
<msub>
<mi>P</mi>
<mi>i</mi>
</msub>
<mo>=</mo>
<msub>
<mi>V</mi>
<mi>i</mi>
</msub>
<munder>
<mo>&Sigma;</mo>
<mrow>
<mi>j</mi>
<mo>&Element;</mo>
<mi>i</mi>
</mrow>
</munder>
<msub>
<mi>V</mi>
<mi>j</mi>
</msub>
<mrow>
<mo>(</mo>
<msub>
<mi>G</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<msub>
<mi>cos&theta;</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>+</mo>
<msub>
<mi>B</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<msub>
<mi>sin&theta;</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>)</mo>
</mrow>
</mrow>
<mrow>
<msub>
<mi>Q</mi>
<mi>i</mi>
</msub>
<mo>=</mo>
<msub>
<mi>V</mi>
<mi>i</mi>
</msub>
<munder>
<mo>&Sigma;</mo>
<mrow>
<mi>j</mi>
<mo>&Element;</mo>
<mi>i</mi>
</mrow>
</munder>
<msub>
<mi>V</mi>
<mi>j</mi>
</msub>
<mrow>
<mo>(</mo>
<msub>
<mi>G</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<msub>
<mi>sin&theta;</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>-</mo>
<msub>
<mi>B</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<msub>
<mi>cos&theta;</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>)</mo>
</mrow>
</mrow>
其中,θij为节点i和节点j的相位差,即θij=θi-θj,Gij、Bij为电力系统节点导纳矩阵Y的第i行、第j列元素的实部和虚部,由电网调度中心获取;
(4-2)热力系统管道的稳态水力约束为:
hpu=a0·m2+a1·m+a2
hpi=K·m·|m|
<mrow>
<msub>
<mi>h</mi>
<mrow>
<mi>v</mi>
<mi>a</mi>
</mrow>
</msub>
<mo>=</mo>
<mfrac>
<mn>100</mn>
<mi>&rho;</mi>
</mfrac>
<mo>&CenterDot;</mo>
<msup>
<mrow>
<mo>(</mo>
<mfrac>
<mi>m</mi>
<mrow>
<mi>K</mi>
<mi>v</mi>
</mrow>
</mfrac>
<mo>)</mo>
</mrow>
<mn>2</mn>
</msup>
</mrow>
<mrow>
<msub>
<mi>h</mi>
<mrow>
<mi>e</mi>
<mi>x</mi>
</mrow>
</msub>
<mo>=</mo>
<mi>c</mi>
<mo>&CenterDot;</mo>
<msup>
<mi>Re</mi>
<mi>b</mi>
</msup>
<mo>&CenterDot;</mo>
<mfrac>
<mi>&zeta;</mi>
<mi>&rho;</mi>
</mfrac>
<mo>&CenterDot;</mo>
<msup>
<mi>m</mi>
<mn>2</mn>
</msup>
</mrow>
A·m=mq
B·h=0
其中h表示流体流过元件时,该元件提供的压力或流体损失的压力,m表示流体流过该元件的流量,下标表示元件种类,即pu表示循环泵,pi表示管道,va表示阀门,ex表示换热器;a0,a1,a2分别是循环泵参数,由循环泵的产品铭牌或出厂水力试验报告得到,K表示热力系统管道的沿程阻力,Kv是阀门的参数,由阀门铭牌得到,Re是雷诺数,ρ是热力系统管道中流体的密度,b,c,ζ分别是换热器参数,由换热器设备铭牌或出厂水力试验报告得到,A为热力系统的节点-支路关联矩阵,m、mq分别为由热力系统中各支路流量及各节点注入流量组成的列向量,B为热力系统的回路-支路关联矩阵,h为各个节点压力差组成的列向量;
(4-3)热力系统管道的热力稳态约束为:
(Σmout)Tout=Σ(minTin)
其中,m表示流体流过该元件的流量,下标ex表示换热器,表示内能做功功率,T为流体温度,下标out表示流出节点,下标in表示流入节点,下标h表示换热器热水侧,下标c表示换热器冷水侧,Cp为热力系统管道中流体的定压比热容,由流体的物性参数表获取;
(4-4)当电-热耦合系统以燃气轮机或往复式活塞内燃机为联产机组时,联产机组的约束条件为:
kCHP=ФCHP/PCHP
其中,kCHP为联产机组产电产热比,由燃气轮机或往复式活塞内燃机的产品说明书中获取,ФCHP为联产机组产出的热量,PCHP为联产机组发出的电功率;
当电-热耦合系统以蒸汽轮机为联产机组时,联产机组的约束条件为:
<mrow>
<msub>
<mi>Z</mi>
<mrow>
<mi>C</mi>
<mi>H</mi>
<mi>P</mi>
</mrow>
</msub>
<mo>=</mo>
<mfrac>
<mrow>
<msup>
<mi>&Phi;</mi>
<mrow>
<mi>C</mi>
<mi>H</mi>
<mi>P</mi>
</mrow>
</msup>
<mo>-</mo>
<mn>0</mn>
</mrow>
<mrow>
<msup>
<mi>P</mi>
<mrow>
<mi>C</mi>
<mi>o</mi>
<mi>n</mi>
</mrow>
</msup>
<mo>-</mo>
<msup>
<mi>P</mi>
<mrow>
<mi>C</mi>
<mi>H</mi>
<mi>P</mi>
</mrow>
</msup>
</mrow>
</mfrac>
</mrow>
其中,ZCHP为蒸汽轮机单位产电改变量引起的产热改变量,ZCHP从蒸汽轮机的产品说明书获取,PCon为蒸汽轮机的最大产电功率,PCon从蒸汽轮机的产品说明书获取,ФCHP为电-热联产机组产出的热量,PCHP为电-热联产机组发出的电功率,从蒸汽轮机的产品说明书获取;
(5)利用拉格朗日乘数法,将上述步骤(3)的目标函数和上述步骤(4)的约束条件构成一个拉格朗日函数如下:
L(x,ω)=J(x)+ωTc(x)
对上述拉格朗日函数进行修正,得到管道系统稳态运行时的电-热耦合系统状态估计模型为:
<mrow>
<mfenced open = "[" close = "]">
<mtable>
<mtr>
<mtd>
<mrow>
<msup>
<mi>F</mi>
<mi>T</mi>
</msup>
<mi>W</mi>
<mi>F</mi>
</mrow>
</mtd>
<mtd>
<msup>
<mi>C</mi>
<mi>T</mi>
</msup>
</mtd>
</mtr>
<mtr>
<mtd>
<mi>C</mi>
</mtd>
<mtd>
<mn>0</mn>
</mtd>
</mtr>
</mtable>
</mfenced>
<mfenced open = "[" close = "]">
<mtable>
<mtr>
<mtd>
<mi>&Delta;</mi>
<mi>x</mi>
</mtd>
</mtr>
<mtr>
<mtd>
<mi>&omega;</mi>
</mtd>
</mtr>
</mtable>
</mfenced>
<mo>=</mo>
<mfenced open = "[" close = "]">
<mtable>
<mtr>
<mtd>
<msup>
<mi>F</mi>
<mi>T</mi>
</msup>
<mi>W</mi>
<mi>&Delta;</mi>
<mi>z</mi>
</mtd>
</mtr>
<mtr>
<mtd>
<mo>-</mo>
<mi>&Delta;</mi>
<mi>c</mi>
</mtd>
</mtr>
</mtable>
</mfenced>
</mrow>
利用最优化理论中的牛顿-拉夫逊法,求解该模型,得到管道系统稳态运行时的电-热耦合系统状态估计结果;
(6)根据电-热耦合网络的动态特性和上述步骤(5)的管道系统稳态运行时的电-热耦合系统状态估计结果,进行管道系统动态运行时的电-热耦合系统状态估计,包括以下步骤:
(6-1)利用下式,计算热力系统中每个管道产生的能量传输时间延迟s:
<mrow>
<mi>s</mi>
<mo>=</mo>
<mi>&gamma;</mi>
<mo>&CenterDot;</mo>
<mi>&Delta;</mi>
<mi>t</mi>
<mo>-</mo>
<mfrac>
<mrow>
<msup>
<mi>V</mi>
<mo>*</mo>
</msup>
<mo>-</mo>
<mi>S</mi>
<mi>L</mi>
</mrow>
<mrow>
<mo>(</mo>
<msub>
<mover>
<mi>m</mi>
<mo>^</mo>
</mover>
<mrow>
<mi>t</mi>
<mo>-</mo>
<mi>&gamma;</mi>
<mi>&Delta;</mi>
<mi>t</mi>
</mrow>
</msub>
<mo>/</mo>
<msub>
<mi>&rho;</mi>
<mrow>
<mi>t</mi>
<mo>-</mo>
<mi>&gamma;</mi>
<mi>&Delta;</mi>
<mi>t</mi>
</mrow>
</msub>
<mo>)</mo>
</mrow>
</mfrac>
</mrow>
其中,为上述步骤(5)得到的状态估计值中热力系统管道中的流体流量,ρ为与管道系统稳态运行时电-热耦合系统状态估计结果中的温度相对应的流体密度,下标t-γΔt表示时刻t-γΔt经过两阶段状态估计得到的估计值,下标t-kΔt代表时刻t-kΔt经过两阶段状态估计所得的估计值, 为对集合中所有符合条件的n取最小值,s.t.是subject to的缩写,意为符合…条件,Z为整数集,即找到最小的正整数n,使得成立,并将满足条件的n赋值给γ,Δt为步骤(2)中测量电-热耦合系统运行参数的采样时间间隔,S为管道横截面积,L为管道长度;
(6-2)选择最接近能量传输时间延迟时间s之前的t-s的一个状态估计结果,根据该结果中的流体温度平均值求得该状态估计时刻的流体密度以及定压比热容:
即
其中代表流体在(t-s)到t时间段中的平均温度。
建立热力系统中每个管道的动态约束方程如下:
<mrow>
<msub>
<mi>T</mi>
<mrow>
<mi>o</mi>
<mi>u</mi>
<mi>t</mi>
</mrow>
</msub>
<mrow>
<mo>(</mo>
<mi>t</mi>
<mo>)</mo>
</mrow>
<mo>=</mo>
<mo>&lsqb;</mo>
<msub>
<mi>T</mi>
<mrow>
<mi>i</mi>
<mi>n</mi>
</mrow>
</msub>
<mrow>
<mo>(</mo>
<mi>t</mi>
<mo>-</mo>
<mi>s</mi>
<mo>)</mo>
</mrow>
<mo>-</mo>
<msub>
<mi>T</mi>
<mi>a</mi>
</msub>
<mo>&rsqb;</mo>
<mo>&CenterDot;</mo>
<msup>
<mi>e</mi>
<mrow>
<mo>-</mo>
<mfrac>
<mi>&lambda;</mi>
<mrow>
<msub>
<mi>C</mi>
<mi>p</mi>
</msub>
<mi>S</mi>
<mi>&rho;</mi>
</mrow>
</mfrac>
<mo>&CenterDot;</mo>
<mi>s</mi>
</mrow>
</msup>
<mo>+</mo>
<msub>
<mi>T</mi>
<mi>a</mi>
</msub>
</mrow>
其中,Tout(t)代表时刻t时的某管道的回水温度,Tk,in(t-s)代表时刻(t-s)时的管道的供水温度,Ta为管道所处的环境温度,由管道周边环境的测温装置获得,λ为管道单位长度散热系数,由管道铭牌获得,S为管道横截面积,L为管道长度,s为(6-1)算得的能量传输时间延迟;
(6-3)将上述步骤(4)的稳态约束条件作为上述步骤(3)目标函数的约束条件,与上述步骤(6-2)的所有管道的动态约束方程一起,构成一个拉格朗日函数如下:
L(x,ω)=J(x)+ωTc(x)
利用牛顿-拉夫逊法求解该拉格朗日函数,求解得到热力系统动态运行时的电-热耦合系统状态估计结果;
(7)对上述步骤(6)的状态估计结果进行收敛性判断:
若循环次数a达到预设循环次数d,即a≥d,则将本次状态估计结果作为t时刻考虑管道动态特性的电-热耦合系统状态估计结果;
若循环次数a未达到预设循环次数d,即a<d,则进一步根据电-热耦合系统状态估计的精度δ对状态估计结果收敛性进行判断:若最近相邻两次状态估计结果中的状态变xa和xa-1的差值小于状态估计精度δ,即max|xa-xa-1|<δ,则将本次状态估计结果作为t时刻考虑管道动态特性的电-热耦合系统状态估计结果,若最近两次状态估计结果中的状态变量估计值xa和xa-1的差值大于或等于状态估计精度δ,即max|xa-xa-1|≥δ,则更新状态变量,并根据本次状态估计所得的温度值更新流体密度和定压比热容,同时使a=a+1,并返回步骤(4),继续本次状态估计过程。
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710927795.4A CN107563674B (zh) | 2017-10-09 | 2017-10-09 | 一种考虑管道动态特性的电-热耦合系统状态估计方法 |
PCT/CN2017/114464 WO2019071763A1 (zh) | 2017-10-09 | 2017-12-04 | 一种考虑管道动态特性的电-热耦合系统状态估计方法 |
US16/841,481 US11435265B2 (en) | 2017-10-09 | 2020-04-06 | Method for estimating state of combined heat and power system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710927795.4A CN107563674B (zh) | 2017-10-09 | 2017-10-09 | 一种考虑管道动态特性的电-热耦合系统状态估计方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107563674A true CN107563674A (zh) | 2018-01-09 |
CN107563674B CN107563674B (zh) | 2020-07-10 |
Family
ID=60984972
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710927795.4A Active CN107563674B (zh) | 2017-10-09 | 2017-10-09 | 一种考虑管道动态特性的电-热耦合系统状态估计方法 |
Country Status (3)
Country | Link |
---|---|
US (1) | US11435265B2 (zh) |
CN (1) | CN107563674B (zh) |
WO (1) | WO2019071763A1 (zh) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108460547A (zh) * | 2018-05-16 | 2018-08-28 | 山东大学 | 热电联供系统热电联合状态估计方法及系统 |
CN109145441A (zh) * | 2018-08-21 | 2019-01-04 | 清华-伯克利深圳学院筹备办公室 | 一种热电供能的计算方法、装置、电子设备及存储介质 |
CN110619487A (zh) * | 2019-10-12 | 2019-12-27 | 东北大学 | 一种基于卡尔曼滤波的电-气-热耦合网络动态状态估计方法 |
WO2020015241A1 (zh) * | 2018-07-20 | 2020-01-23 | 清华大学 | 一种考虑散热系数区间的热网区间潮流计算方法 |
WO2020093296A1 (zh) * | 2018-11-06 | 2020-05-14 | 国电南瑞科技股份有限公司 | 电-热互联综合能源系统的区间潮流计算方法 |
CN111414721A (zh) * | 2020-02-22 | 2020-07-14 | 清华大学 | 一种用于综合能源系统调度的供热网络水路建模方法 |
CN112362096A (zh) * | 2020-10-26 | 2021-02-12 | 南方电网科学研究院有限责任公司 | 多能流运行状态监测方法、装置、终端设备及存储介质 |
CN112883662A (zh) * | 2021-02-01 | 2021-06-01 | 清华大学 | 一种蒸汽供热网络动态运行水力状态估计方法及系统 |
CN112963897A (zh) * | 2021-03-17 | 2021-06-15 | 北京华远意通热力科技股份有限公司 | 分布式变频控制系统 |
CN115036923A (zh) * | 2022-08-12 | 2022-09-09 | 南京邮电大学 | 一种考虑多能流时序的电-气综合能源系统状态估计方法 |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111523210B (zh) * | 2020-04-10 | 2023-05-16 | 浙江英集动力科技有限公司 | 城市集中供热系统升降温过程预测分析方法及其系统 |
CN112134289A (zh) * | 2020-09-02 | 2020-12-25 | 国网江苏省电力有限公司无锡供电分公司 | 一种基于数据驱动的电-热联合系统潮流计算方法 |
CN112084198B (zh) * | 2020-09-16 | 2022-09-16 | 云南电网有限责任公司 | 一种压缩存储形式的节点导纳矩阵直接列写方法及装置 |
CN112330493B (zh) * | 2020-11-24 | 2022-10-28 | 南方电网科学研究院有限责任公司 | 一种能源系统的建模及综合分析的方法、装置及存储介质 |
CN113159985B (zh) * | 2021-03-26 | 2023-10-31 | 东北大学 | 一种电热综合能源系统的两阶段优化调度方法 |
CN113094909B (zh) * | 2021-04-16 | 2022-04-19 | 浙江大学 | 一种综合能源系统设备运行监控优先级评估方法及系统 |
CN113627033A (zh) * | 2021-08-27 | 2021-11-09 | 西安热工研究院有限公司 | 一种采暖热电联产机组保热调电能力提升方法及系统 |
CN113837577B (zh) * | 2021-09-14 | 2024-03-19 | 国网河南省电力公司经济技术研究院 | 一种农村电热联合系统耦合元件规划方法 |
CN115510665A (zh) * | 2022-10-09 | 2022-12-23 | 东南大学 | 一种电热综合能源系统安全域构建方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106022624A (zh) * | 2016-05-27 | 2016-10-12 | 清华大学 | 一种电-热耦合多能流网络状态估计方法 |
CN106056478A (zh) * | 2016-06-12 | 2016-10-26 | 清华大学 | 一种电‑热耦合系统中热网的区间潮流计算方法 |
CN106056251A (zh) * | 2016-06-12 | 2016-10-26 | 清华大学 | 一种电‑热耦合多能流系统的优化调度方法 |
CN106096747A (zh) * | 2016-03-25 | 2016-11-09 | 东南大学 | 一种实时电价环境下计及多种不确定因素的太阳能辅助家庭能量管理方法 |
CN106096269A (zh) * | 2016-06-12 | 2016-11-09 | 清华大学 | 一种电‑气耦合系统中天然气网的区间潮流计算方法 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10378805B2 (en) * | 2014-03-07 | 2019-08-13 | Alliance For Sustainable Energy, Llc | Model predictive control for heat transfer to fluids |
CN105958531B (zh) * | 2016-05-27 | 2018-10-19 | 清华大学 | 一种电-气耦合多能流网络状态估计方法 |
CN106777708B (zh) * | 2016-12-21 | 2021-02-05 | 天津大学 | 一种电力-天然气区域综合能源系统的稳态分析方法 |
-
2017
- 2017-10-09 CN CN201710927795.4A patent/CN107563674B/zh active Active
- 2017-12-04 WO PCT/CN2017/114464 patent/WO2019071763A1/zh active Application Filing
-
2020
- 2020-04-06 US US16/841,481 patent/US11435265B2/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106096747A (zh) * | 2016-03-25 | 2016-11-09 | 东南大学 | 一种实时电价环境下计及多种不确定因素的太阳能辅助家庭能量管理方法 |
CN106022624A (zh) * | 2016-05-27 | 2016-10-12 | 清华大学 | 一种电-热耦合多能流网络状态估计方法 |
CN106056478A (zh) * | 2016-06-12 | 2016-10-26 | 清华大学 | 一种电‑热耦合系统中热网的区间潮流计算方法 |
CN106056251A (zh) * | 2016-06-12 | 2016-10-26 | 清华大学 | 一种电‑热耦合多能流系统的优化调度方法 |
CN106096269A (zh) * | 2016-06-12 | 2016-11-09 | 清华大学 | 一种电‑气耦合系统中天然气网的区间潮流计算方法 |
Non-Patent Citations (3)
Title |
---|
潘昭光等: "面向能源互联网的多能流静态安全分析方法", 《电网技术》 * |
董今妮等: "热电联合网络状态估计", 《电网技术》 * |
邓莉荣: "面向能源互联网的热电联供系统节点能价研究", 《电网技术》 * |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108460547A (zh) * | 2018-05-16 | 2018-08-28 | 山东大学 | 热电联供系统热电联合状态估计方法及系统 |
WO2020015241A1 (zh) * | 2018-07-20 | 2020-01-23 | 清华大学 | 一种考虑散热系数区间的热网区间潮流计算方法 |
CN109145441A (zh) * | 2018-08-21 | 2019-01-04 | 清华-伯克利深圳学院筹备办公室 | 一种热电供能的计算方法、装置、电子设备及存储介质 |
WO2020093296A1 (zh) * | 2018-11-06 | 2020-05-14 | 国电南瑞科技股份有限公司 | 电-热互联综合能源系统的区间潮流计算方法 |
CN110619487B (zh) * | 2019-10-12 | 2023-01-17 | 东北大学 | 一种基于卡尔曼滤波的电-气-热耦合网络动态状态估计方法 |
CN110619487A (zh) * | 2019-10-12 | 2019-12-27 | 东北大学 | 一种基于卡尔曼滤波的电-气-热耦合网络动态状态估计方法 |
CN111414721A (zh) * | 2020-02-22 | 2020-07-14 | 清华大学 | 一种用于综合能源系统调度的供热网络水路建模方法 |
CN112362096A (zh) * | 2020-10-26 | 2021-02-12 | 南方电网科学研究院有限责任公司 | 多能流运行状态监测方法、装置、终端设备及存储介质 |
CN112362096B (zh) * | 2020-10-26 | 2022-04-12 | 南方电网科学研究院有限责任公司 | 多能流运行状态监测方法、装置、终端设备及存储介质 |
CN112883662A (zh) * | 2021-02-01 | 2021-06-01 | 清华大学 | 一种蒸汽供热网络动态运行水力状态估计方法及系统 |
CN112883662B (zh) * | 2021-02-01 | 2024-05-10 | 清华大学 | 一种蒸汽供热网络动态运行水力状态估计方法及系统 |
CN112963897A (zh) * | 2021-03-17 | 2021-06-15 | 北京华远意通热力科技股份有限公司 | 分布式变频控制系统 |
CN112963897B (zh) * | 2021-03-17 | 2022-03-08 | 北京华远意通热力科技股份有限公司 | 分布式变频控制系统 |
CN115036923A (zh) * | 2022-08-12 | 2022-09-09 | 南京邮电大学 | 一种考虑多能流时序的电-气综合能源系统状态估计方法 |
Also Published As
Publication number | Publication date |
---|---|
US11435265B2 (en) | 2022-09-06 |
WO2019071763A1 (zh) | 2019-04-18 |
US20200232886A1 (en) | 2020-07-23 |
CN107563674B (zh) | 2020-07-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107563674B (zh) | 一种考虑管道动态特性的电-热耦合系统状态估计方法 | |
CN111815042B (zh) | 计及精细化热网模型的电热综合能源系统优化调度方法 | |
CN106022624B (zh) | 一种电-热耦合多能流网络状态估计方法 | |
CN109492325B (zh) | 一种基于扩展能源集线器的多能耦合系统潮流分析方法 | |
CN111222213B (zh) | 一种热力网络动态仿真方法及装置 | |
CN111061986B (zh) | 一种多运行模式的热电综合能源系统潮流计算方法 | |
CN108241782B (zh) | 一种混合暂态分析方法及混合暂态分析系统 | |
CN111082417A (zh) | 一种基于综合能源系统电气热联合网络的状态估计方法 | |
CN106056478B (zh) | 一种电-热耦合系统中热网的区间潮流计算方法 | |
Wang et al. | Hydraulic resistance identification and optimal pressure control of district heating network | |
CN106844895B (zh) | 一种冷热电联供微网能量流的解耦计算方法 | |
CN110728032B (zh) | 一种计及环网的电-热互联综合能源系统快速潮流计算方法 | |
Sheng et al. | Two-stage state estimation approach for combined heat and electric networks considering the dynamic property of pipelines | |
CN114491817B (zh) | 一种船舶核动力管网仿真中的母管模拟方法及系统 | |
CN113190999A (zh) | 供热管网流量调节提升风电消纳的电热协调方法及装置 | |
CN110866213A (zh) | 电-气综合能源系统多网络稳态能量流分析方法及装置 | |
CN109636148B (zh) | 基于能量网络方程的多能流系统的工作状态评估方法 | |
CN114781102A (zh) | 一种城市综合能源系统的能量流建模方法及应用 | |
CN115062555A (zh) | 一种基于非平衡节点㶲的综合能源系统㶲流直接计算方法 | |
Man et al. | State estimation for integrated energy system containing electricity, heat and gas | |
CN111310310B (zh) | 一种用于量调节的热力系统静态潮流快速解耦计算方法 | |
CN111291968B (zh) | 一种基于大数据的多能源系统运行稳定性计算方法 | |
CN116611706A (zh) | 基于多能源主体的动态碳排放因子测算方法 | |
CN111783309A (zh) | 基于内部守恒的蒸汽供热网络动态仿真方法 | |
CN115081193A (zh) | 一种电网-热网模型构建方法、融合仿真方法及系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |