CN107557529A - A kind of U-shaped scrap heating system - Google Patents

A kind of U-shaped scrap heating system Download PDF

Info

Publication number
CN107557529A
CN107557529A CN201710860162.6A CN201710860162A CN107557529A CN 107557529 A CN107557529 A CN 107557529A CN 201710860162 A CN201710860162 A CN 201710860162A CN 107557529 A CN107557529 A CN 107557529A
Authority
CN
China
Prior art keywords
shaped
air
heating furnace
gas
burner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710860162.6A
Other languages
Chinese (zh)
Other versions
CN107557529B (en
Inventor
张会强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luoyang Woyouda Technology Co ltd
Original Assignee
Luoyang Voda Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luoyang Voda Energy Technology Co Ltd filed Critical Luoyang Voda Energy Technology Co Ltd
Priority to CN201710860162.6A priority Critical patent/CN107557529B/en
Publication of CN107557529A publication Critical patent/CN107557529A/en
Application granted granted Critical
Publication of CN107557529B publication Critical patent/CN107557529B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Furnace Details (AREA)

Abstract

The present invention relates to a kind of U-shaped scrap heating system, including U-shaped heating furnace, and the bell of the U-shaped heating furnace top surface and body of heater two sides are equipped with burner, for being preheated to steel scrap in stove;U-shaped stove side is provided with the second frame, and pulley and steel wire rope mechanism are provided with by the second frame, for by bell opening overhead traveling crane toward U-shaped furnace charge;U-shaped stove is connected with the first rack pivot, and bottom of furnace body is connected with 2 hydraulic cylinders below tail end, and 2 hydraulic cylinder other ends are fixed on ground;U-shaped burner end is provided with fire door, for blowing;Track is provided with below body of heater on ground, blowing dolly slides into along the track from U-shaped stokehold side and blowing is carried out below fire door.The present invention uses 1 U-shaped heating furnace for carrying burner, you can completes charging, baking and the blowing operation to steel scrap.It is sealing baking during baking, thermal loss can be reduced, improve fuel availability, the preheating situation when place that is particularly suitable for use in is little to steel scrap.

Description

A kind of U-shaped scrap heating system
Technical field
The invention belongs to heating device technology area, preheated online more particularly, to a kind of steel scrap for electric furnace steel making and be System, specifically a kind of U-shaped scrap heating system.
Background technology
In being produced using intermediate frequency furnace as the steel of smelting furnace, in order to energy-saving, it usually needs steel scrap is preheated, mesh Preceding scrap steel preheating is usually offline design, i.e.,:Scrap steel preheating is subsequently poured into storage tank to 800 DEG C or so in a place In, then next group steel scrap is preheated, storage tank is transported to electric furnace position, pours into electric furnace and carries out melting, this mode typically at least needs 3 dollies are wanted, are charging dolly respectively, toast dolly and blowing dolly, three dolly circulation work operations.On the one hand this shape The scrap steel preheating efficiency of formula is low, and inconvenience is brought to production;On the other hand, it is necessary to corresponding personnel's real-time operation, increase Cost investment, and dolly longtime running, add its fault rate, and later period maintenance and maintenance cost are higher, and are turning Amount of heat can be lost during fortune, causes the waste of mass energy.
The content of the invention
A kind of U-shaped scrap heating system is provided the invention aims to overcome the deficiencies in the prior art, using carrying The U-shaped heating furnace of burner, only with a heating furnace, whole system is fixed, only needs blowing dolly to move, you can completion pair Charging, baking and the blowing operation of steel scrap.It is very easy to use, it is sealing baking during baking, thermal loss can be reduced, carried High fuel availability, realize that depth energy saving lowers consumption, the preheating situation when place that is particularly suitable for use in is little to steel scrap.
The object of the invention to solve the technical problems is realized using following technical scheme.Itd is proposed according to the present invention A kind of U-shaped scrap heating system, including U-shaped heating furnace 1, on bell 2 of the U-shaped heating furnace top surface and the U-shaped heating furnace Two sides be equipped with least one burner 3;The side of U-shaped heating furnace is provided with the second frame 10, and the side of the second frame 10 is set There are pulley and steel wire rope mechanism 12, bell 2 can be opened by the pulley and steel wire rope mechanism, then with overhead traveling crane toward U-shaped heating Furnace charge;
The U-shaped heating furnace top surface and the burner 3 of two sides are used to the steel scrap in U-shaped heating furnace toast pre- Heat;
Two sides of the U-shaped heating furnace are pivotally connected by bearing block 4 and the first frame 5, U-shaped heating furnace bottom 2 hydraulic cylinders 6 are connected with below tail end, the other end of 2 hydraulic cylinders is fixed on ground;With U-shaped heating furnace tail end Corresponding head end is provided with fire door 7, and the fire door 7 passes through the open or close of fluid power push rod 11;Set on ground below U-shaped heating furnace Track 8 is equipped with, blowing dolly 9 slides into along the track 8 from U-shaped heating furnace front and blowing is carried out below fire door;
The charging, baking, blowing that U-shaped scrap heating stove is completed by above procedure operate.
The object of the invention to solve the technical problems can be also applied to the following technical measures to achieve further.
Foregoing U-shaped scrap heating system, wherein, two sides of the U-shaped heating furnace are equipped with the first air and are in charge of 1-1, the first gas manifold 1-2, the first air circuit 1-3, the first coal gas circuit 1-4, the burner of two sides are empty by first Qi leel pipe 1-1 and the first gas manifold 1-2 connects with the first air circuit 1-3 and the first coal gas circuit 1-4 respectively;
The tail end of U-shaped heating furnace 1 is provided with the first air header 1-5 and the first gas main 1-6, first air header 1-5 and the first gas main 1-6 connects with the first air circuit 1-3 and the first coal gas circuit 1-4 respectively.
Foregoing U-shaped scrap heating system, wherein, air passes through the first air header 1-5, the first air circuit 1- successively 3 are in charge of 1-1 into the first air, and coal gas enters the first coal gas by the first gas main 1-6, the first coal gas circuit 1-4 successively It is in charge of 1-2, coal gas and air burn in burner after entering respective subtube, the steel scrap in U-shaped heating furnace carried out Baking preheating;I.e.:First air header 1-5 and the first gas main 1-6 provide total gas for the burner of U-shaped heating furnace both sides Source.
Foregoing U-shaped scrap heating system, wherein, bell 2 is in charge of 2-1, the second gas manifold 2- provided with the second air 2nd, the second air circuit 2-3, the second coal gas circuit 2-4, the burner on bell are in charge of 2-1 and the second coal gas by the second air It is in charge of 2-2 to connect with the second air circuit 2-3 and the second coal gas circuit 2-4 respectively;
The both sides of second frame 10 are respectively equipped with the second air header 2-5 and the second gas main 2-6, the second frame Top surface is provided with 2 bearing blocks, and the second air header 2-5 and the second gas main 2-6 of frame top surface are reached for being respectively fixed to, The second air header 2-5 and the second gas main 2-6 connects with the second air circuit 2-3 and the second coal gas circuit 2-4 respectively.
Foregoing U-shaped scrap heating system, wherein, air passes through the second air header 2-5, the second air circuit 2- successively 3 are in charge of 2-1 into the second air, and coal gas enters the second coal gas by the second gas main 2-6, the second coal gas circuit 2-4 successively It is in charge of 2-2, coal gas and air burn in burner after entering respective subtube, the steel scrap in U-shaped heating furnace carried out Baking preheating;I.e.:Second air header 2-5 and the second gas main 2-6 provides total gas for the burner of U-shaped heating furnace top surface Source.
Foregoing U-shaped scrap heating system, wherein, the first air header 1-5, the first gas main 1-6, the second sky Gas house steward 2-5, the second gas main 2-6 connect with external air source, the first gas main 1-6 and the second gas main 2- 6 are connected by being flexible coupling with coal gas external air source, are moved easily;Described is flexible coupling using metal hose.
Foregoing U-shaped scrap heating system, wherein, during blowing, hydraulic cylinder 6 jacks up U-shaped heating furnace afterbody, U-shaped heating Furnace head is fallen, and fire door 7 is opened by fluid power push rod 11, carries out blowing;Material is discharged, fluid power push rod 11 closes fire door 7, hydraulic pressure Cylinder is withdrawn, and U-shaped heating furnace afterbody is fallen, and its head and afterbody is in poised state, meanwhile, blowing dolly 9 will be pre- through loop wheel machine Steel scrap after heat moves next program processing to.
Foregoing U-shaped scrap heating system, wherein, the burner number on bell is 8, the combustion of U-shaped heating furnace side Burner number is per side 8.
By above-mentioned technical proposal, advantages of the present invention and effect are:
The present invention only carries baking system with a U-shaped heating furnace, the U-shaped heating furnace, and whole system is fixed, only needs Blowing dolly moves, you can completes charging, baking and the blowing operation to steel scrap.It is very easy to use, the U-shaped heating furnace Length and the quantity of burner can be determined according to actual conditions.It is sealing baking during baking, thermal loss can be reduced, improve fuel Utilization rate, realize that depth energy saving lowers consumption.Present invention is particularly suitable for preheating situation of place when little to steel scrap.
Described above is only the general introduction of technical solution of the present invention, in order to better understand the technological means of the present invention, And can be practiced according to the content of specification, and in order to allow the present invention above-mentioned advantage and other purposes, feature and advantage It can become apparent, below especially exemplified by preferred embodiment, describe in detail as follows.
Brief description of the drawings
Fig. 1 is the front view of the present invention;
Fig. 2 is Fig. 1 left view;
Fig. 3 is the top view of the present invention;
Fig. 4 is present invention charging view;
Fig. 5 is blowing view of the present invention, and for clear expression, the figure omits the second frame and pulley and steel wire rope machine Structure.
【Component symbol explanation】
1:U-shaped heating furnace 2:Bell 3:Burner 4:Bearing block
5:First frame 6:Hydraulic cylinder 7:Fire door 8:Track
9:Blowing dolly 10:Second frame 11:Fluid power push rod
12:Pulley and steel wire rope mechanism
1-1:First air is in charge of 1-2:First gas manifold 1-3:First air circuit
1-4:First coal gas circuit 1-5:First air header 1-6:First gas main
2-1:Second air is in charge of 2-2:Second gas manifold 2-3:Second air circuit
2-4:Second coal gas circuit 2-5:Second air header 2-6:Second gas main
Embodiment
Further to illustrate the present invention to reach the technological means and effect that predetermined goal of the invention is taken, below in conjunction with Accompanying drawing and preferred embodiment, to according to a kind of U-shaped scrap heating system proposed by the present invention, its embodiment, structure, spy Sign and its effect, describe in detail as after.
The present invention is a kind of U-shaped scrap heating system, including U-shaped heating furnace 1, on the bell 2 of U-shaped heating furnace top surface and The two sides of the U-shaped heating furnace are respectively provided with least one burner 3, and U-shaped heating furnace two sides are equipped with the first air and are in charge of 1- 1st, the first gas manifold 1-2, the first air circuit 1-3, the first coal gas circuit 1-4, the burner of two sides pass through the first air It is in charge of 1-1 and the first gas manifold 1-2 to connect with the first air circuit 1-3 and the first coal gas circuit 1-4 respectively;Set on bell 2 There is the second air to be in charge of 2-1, the second gas manifold 2-2, the second air circuit 2-3, the second coal gas circuit 2-4, the combustion on bell Burner by the second air be in charge of 2-1 and the second gas manifold 2-2 respectively with the second air circuit 2-3 and the second coal gas circuit 2- 4 connections.
The both sides of the U-shaped heating furnace are pivotally connected by bearing block 4 and the first frame 5, and U-shaped heating furnace bottom is close to tail 2 hydraulic cylinders 6 are connected with below end, the other end of 2 hydraulic cylinders is fixed on ground.Head end corresponding with tail end is provided with Fire door 7.Track 8 is provided with below U-shaped heating furnace, blowing dolly 9 slides into head along the track 8 from U-shaped heating furnace head end front End lower section carries out blowing, and during blowing, hydraulic cylinder 6 jacks up U-shaped heating furnace afterbody, and under U-shaped heating burner clan, fire door 7 passes through Fluid power push rod 11 is opened, and carries out blowing, as shown in Figure 5;Material is discharged, fluid power push rod 11 closes fire door 7, and hydraulic cylinder is withdrawn, U-shaped Heating furnace afterbody is fallen, and its head and afterbody is in poised state.
The tail end of U-shaped heating furnace 1 is additionally provided with the first air header 1-5 and the first gas main 1-6, and first air is total Pipe 1-5 and the first gas main 1-6 connects with the first air circuit 1-3 and the first coal gas circuit 1-4 respectively.I.e.:First air House steward 1-5 and the first gas main 1-6 provide total source of the gas for the burner of U-shaped heating furnace both sides.
The side of U-shaped heating furnace is provided with the second frame 10, and the both sides of second frame are respectively equipped with the second air header 2-5 and the second gas main 2-6, the top surface of the second frame 10 are provided with 2 bearing blocks, reach the of frame top surface for being respectively fixed to Two air header 2-5 and the second gas main 2-6, the second air header 2-5 and the second gas main 2-6 respectively with the second air Circuit 2-3 and the second coal gas circuit 2-4 connections.Air enters by the second air header 2-5, the second air circuit 2-3 successively Second air is in charge of 2-1, and coal gas enters the second gas manifold 2- by the second gas main 2-6, the second coal gas circuit 2-4 successively 2, coal gas and air burn after entering respective subtube in burner, the steel scrap in U-shaped heating furnace toast pre- Heat.I.e.:Second air header 2-5 and the second gas main 2-6 provides total source of the gas for the burner of U-shaped heating furnace top surface.
Further, the first air header 1-5, the first gas main 1-6, the second air header 2-5, the second coal gas are total Pipe 2-6 connects with external air source, the first gas main 1-6 and the second gas main 2-6 by be flexible coupling with outside coal gas Portion's source of the gas is connected, and is moved easily.Described being flexible coupling can use metal hose.
Further, the side of the second frame 10 is additionally provided with pulley and steel wire rope mechanism 12, passes through the pulley and steel wire rope Mechanism can open bell 2, then with overhead traveling crane toward U-shaped heating furnace charge, as shown in Figure 4.
The above described is only a preferred embodiment of the present invention, any formal limitation not is done to the present invention, though So the present invention is disclosed above with preferred embodiment, but is not limited to the present invention, any to be familiar with this professional technology people Member, without departing from the scope of the present invention, when the technology contents using the disclosure above make a little change or modification For the equivalent embodiment of equivalent variations, as long as being the content without departing from technical solution of the present invention, the technical spirit according to the present invention To any simple modification, equivalent change and modification made for any of the above embodiments, in the range of still falling within technical solution of the present invention.

Claims (8)

1. a kind of U-shaped scrap heating system, it is characterised in that including U-shaped heating furnace (1), the bell (2) of the U-shaped heating furnace top surface Upper and the U-shaped heating furnace two sides are equipped with least one burner (3);The side of U-shaped heating furnace is provided with the second frame (10) pulley and steel wire rope mechanism (12), are provided with beside the second frame (10), can be by bell by the pulley and steel wire rope mechanism (2) open, then with overhead traveling crane toward U-shaped heating furnace charge;
The U-shaped heating furnace top surface and the burner (3) of two sides are used to the steel scrap in U-shaped heating furnace toast pre- Heat;
Two sides of the U-shaped heating furnace are pivotally connected by bearing block (4) and the first frame (5), U-shaped heating furnace bottom 2 hydraulic cylinders (6) are connected with below tail end, the other end of 2 hydraulic cylinders is fixed on ground;With U-shaped heating furnace tail Head end corresponding to end is provided with fire door (7), and the fire door (7) passes through fluid power push rod (11) open or close;Below U-shaped heating furnace Track (8) is provided with ground, blowing dolly (9) slides into below fire door along the track (8) from U-shaped heating furnace front and put Material;
The charging, baking, blowing that U-shaped scrap heating stove is completed by above procedure operate.
2. U-shaped scrap heating system as claimed in claim 1, it is characterised in that two sides of the U-shaped heating furnace are all provided with There is the first air to be in charge of (1-1), the first gas manifold (1-2), the first air circuit (1-3), the first coal gas circuit (1-4), two The burner of side by the first air be in charge of (1-1) and the first gas manifold (1-2) respectively with the first air circuit (1-3) and First coal gas circuit (1-4) connects;
The tail end of U-shaped heating furnace (1) is provided with the first air header (1-5) and the first gas main (1-6), and first air is total Pipe (1-5) and the first gas main (1-6) connect with the first air circuit (1-3) and the first coal gas circuit (1-4) respectively.
3. U-shaped scrap heating system as claimed in claim 2, it is characterised in that air passes through the first air header (1- successively 5), the first air circuit (1-3) is in charge of (1-1) into the first air, and coal gas is successively by the first gas main (1-6), first Coal gas circuit (1-4) enters the first gas manifold (1-2), and coal gas and air enter after respective subtube in burner internal combustion Burn, baking preheating is carried out to the steel scrap in U-shaped heating furnace;I.e.:First air header (1-5) and the first gas main (1-6) are U The burner of type heating furnace both sides provides total source of the gas.
4. U-shaped scrap heating system as claimed in claim 1, it is characterised in that bell (2) is in charge of (2- provided with the second air 1), the second gas manifold (2-2), the second air circuit (2-3), the second coal gas circuit (2-4), the burner on bell pass through Two air be in charge of (2-1) and the second gas manifold (2-2) respectively with the second air circuit (2-3) and the second coal gas circuit (2-4) Connection;
The both sides of second frame (10) are respectively equipped with the second air header (2-5) and the second gas main (2-6), the second machine Top of support is provided with 2 bearing blocks, and the second air header (2-5) and the second gas main of frame top surface are reached for being respectively fixed to (2-6), second air header (2-5) and the second gas main (2-6) respectively with the second air circuit (2-3) and the second coal gas Circuit (2-4) connects.
5. U-shaped scrap heating system as claimed in claim 4, it is characterised in that air passes through the second air header (2- successively 5), the second air circuit (2-3) is in charge of (2-1) into the second air, and coal gas is successively by the second gas main (2-6), second Coal gas circuit (2-4) enters the second gas manifold (2-2), and coal gas and air enter after respective subtube in burner internal combustion Burn, baking preheating is carried out to the steel scrap in U-shaped heating furnace;I.e.:Second air header 2-5 and the second gas main 2-6 adds to be U-shaped The burner of hot stove top surface provides total source of the gas.
6. the U-shaped scrap heating system as described in claim 2 or 4, it is characterised in that first air header (1-5), One gas main (1-6), the second air header (2-5), the second gas main (2-6) are connected with external air source, and described first Gas main (1-6) and the second gas main (2-6) are connected by being flexible coupling with coal gas external air source, are moved easily;It is described Be flexible coupling using metal hose.
7. U-shaped scrap heating system as claimed in claim 1, it is characterised in that during blowing, hydraulic cylinder (6) is by U-shaped heating furnace Afterbody is jacked up, and under U-shaped heating burner clan, fire door (7) is opened by fluid power push rod (11), carries out blowing;Material is discharged, fluid power pushes away Bar (11) closes fire door (7), and hydraulic cylinder is withdrawn, and U-shaped heating furnace afterbody is fallen, and its head and afterbody is in poised state, Meanwhile blowing dolly (9) is moved the steel scrap after preheating to next program through loop wheel machine and handled.
8. U-shaped scrap heating system as claimed in claim 1, it is characterised in that the burner number on bell is 8, U-shaped The burner number of heating furnace side is per side 8.
CN201710860162.6A 2017-09-21 2017-09-21 A kind of U-shaped scrap heating system Active CN107557529B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710860162.6A CN107557529B (en) 2017-09-21 2017-09-21 A kind of U-shaped scrap heating system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710860162.6A CN107557529B (en) 2017-09-21 2017-09-21 A kind of U-shaped scrap heating system

Publications (2)

Publication Number Publication Date
CN107557529A true CN107557529A (en) 2018-01-09
CN107557529B CN107557529B (en) 2019-03-29

Family

ID=60981631

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710860162.6A Active CN107557529B (en) 2017-09-21 2017-09-21 A kind of U-shaped scrap heating system

Country Status (1)

Country Link
CN (1) CN107557529B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108548426A (en) * 2018-07-12 2018-09-18 张会强 A kind of scrap heating stove

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6327635B2 (en) * 1985-08-06 1988-06-03 Yamaguchi Kyoei Kogyo Kk
CN1033529A (en) * 1987-12-17 1989-06-28 沃斯特-阿尔派因多纳维茨钢铁股份有限公司 The method of continuous smelting iron and steel scrap and equipment thereof
RU2401404C2 (en) * 2008-06-16 2010-10-10 Александр Петрович Лежнев Steel furnace electric-arc flue gas scrap heater
CN103822489A (en) * 2014-03-21 2014-05-28 张昌剑 Waste-steel continuous preheating method and waste-steel continuous preheating device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6327635B2 (en) * 1985-08-06 1988-06-03 Yamaguchi Kyoei Kogyo Kk
CN1033529A (en) * 1987-12-17 1989-06-28 沃斯特-阿尔派因多纳维茨钢铁股份有限公司 The method of continuous smelting iron and steel scrap and equipment thereof
RU2401404C2 (en) * 2008-06-16 2010-10-10 Александр Петрович Лежнев Steel furnace electric-arc flue gas scrap heater
CN103822489A (en) * 2014-03-21 2014-05-28 张昌剑 Waste-steel continuous preheating method and waste-steel continuous preheating device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108548426A (en) * 2018-07-12 2018-09-18 张会强 A kind of scrap heating stove
CN108548426B (en) * 2018-07-12 2023-11-10 张会强 Scrap steel heating furnace

Also Published As

Publication number Publication date
CN107557529B (en) 2019-03-29

Similar Documents

Publication Publication Date Title
CN107475483B (en) Mobile online heating system for scrap steel
CN208313028U (en) Energy-saving gas crucible furnace
CN204730682U (en) A kind of sintering circular-cooler waste heat recovery cigarette wind apparatus
CN202835358U (en) Novel regenerative burner
CN107557529A (en) A kind of U-shaped scrap heating system
CN205228148U (en) Natural gas castiron melting rotary furnace and heat preservation stove pair equipment
CN102538493B (en) Device for using waste heat of high-temperature smoke of bath smelting furnace directly
CN203582903U (en) Malleable cast iron heat accumulating type tunnel annealing furnace production line
CN206882775U (en) It is a kind of from heat accumulating type Ladle Furnace Heating And Drying Equipments
CN108746576A (en) Molten iron bassinet structure
CN204724842U (en) A kind of online ladle accumulation of heat roaster
CN204138717U (en) The overall step heating-furnace of a kind of pole
CN206875967U (en) A kind of hardware smelts melting furnace
CN207193326U (en) A kind of portable steel scrap on-line heating system
CN206089763U (en) Liquid lead's device is added to bottom blowing stove
CN208929204U (en) A kind of molten iron bassinet structure
CN208187138U (en) A kind of thermal energy recycling heating installation pouring waste heat using molten iron
CN202709733U (en) Secondary metal preheating process improvement mode
CN206089421U (en) Dog -house water drum device during heating -up furnace
CN206160721U (en) A closed copper melting furnace for continuous casting copper -aluminum composite material
CN105258473B (en) A kind of drying plant of line
CN209407406U (en) A kind of roasting packet equipment of steel ladle
CN205933936U (en) Car -type fuel gas preheating stove
CN204227903U (en) A kind of car type furnace heat accumulating burner capable
CN204535438U (en) Mobile top cap type high temperature smelting furnace slag runner regenerative heat exchanger

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 471399 No.1 Gaoxin Road, Hebin Street Office, Yichuan County, Luoyang City, Henan Province

Patentee after: Luoyang Woyouda Technology Co.,Ltd.

Country or region after: China

Address before: No. 8 Qingcheng Road, High-tech Development Zone, Luoyang City, Henan Province, 471000

Patentee before: LUOYANG WODA ENERGY SAVING TECHNOLOGY CO.,LTD.

Country or region before: China