CN107555272A - Elevator device and part replacement period prediction meanss - Google Patents
Elevator device and part replacement period prediction meanss Download PDFInfo
- Publication number
- CN107555272A CN107555272A CN201710436142.6A CN201710436142A CN107555272A CN 107555272 A CN107555272 A CN 107555272A CN 201710436142 A CN201710436142 A CN 201710436142A CN 107555272 A CN107555272 A CN 107555272A
- Authority
- CN
- China
- Prior art keywords
- purpose stratum
- calling mechanism
- stratum
- place
- input unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
Replacing period of the problem of the present invention in the part used in prediction in place purpose stratum calling mechanism is taken.The mode of the present invention possesses:Place purpose stratum calling mechanism (10) is taken, is arranged on and takes place, and with the purpose stratum input unit (11) on the purpose stratum for being used to input car;And control unit (70).Control unit (70) obtains purpose formation data corresponding with the input operation of the purpose stratum input unit (11) to taking place purpose stratum calling mechanism (10), statistical disposition is carried out to the purpose formation data to calculate the access times of the part of purpose stratum input unit (11) corresponding to composition, and the guarantee value of the access times based on the part and the guaranteed access times of quality as the part, to predict the replacing period for the part for forming purpose stratum input unit (11).
Description
Technical field
The present invention relates to the elevator device for taking place purpose stratum calling mechanism for possessing input purpose stratum and take
Multiply the part replacement period prediction meanss of place purpose stratum calling mechanism.
Background technology
In recent years, building each floor elevator lobby nearby or in elevator lobby, be provided with reservation (registration) mesh
Stratum operation panel (hereinafter also referred to as " taking place purpose stratum calling mechanism ").User can take car it
It is preceding to specify purpose stratum by taking place purpose stratum calling mechanism, but there is also take after car in car not
The situation on purpose stratum can be specified.The information related on the operation used to this takes place purpose stratum calling mechanism
The invention of the operation conditions output device of elevator, there is disclosure in patent document 1.
Patent document 1 discloses based on the service data as the information related to the car position of elevator, to export
Represent the operation conditions output device of the elevator of the route map of the information related to car position.Service data is by including sedan-chair
Railway carriage or compartment status data, call state data and the data composition for waiting number data.In route map, include and pass through
Be arranged on the operation for taking the operation panel at place of each floor of building purpose stratum reservation and operation generation when
The information of the wait number taken at place of each floor in being engraved in.
Citation
Patent document
Patent document 1:Japanese Unexamined Patent Publication 2011-132017 publications
In addition, take place purpose stratum calling mechanism and take place purpose stratum calling mechanism taking place setting
Former mode (for example, entrance hall button for calling car) compare, convenience improves, and usage frequency is high.If someone
Entrance hall button is pressed, then other people will not go by but for taking place purpose stratum calling mechanism, everyone can be again
Reservation purpose stratum and operated.Therefore, the replacement cycle of part in entrance hall button and takes the registration of place purpose stratum
It is different in the case of device.But in the operation conditions output device for the elevator that patent document 1 is recorded, (taken for operation panel
Multiply place purpose stratum calling mechanism) used in the prediction in replacing period of part do not make to consider.
The content of the invention
The invention problem to be solved
The present invention is to consider above-mentioned situation and complete, its object is to, enabling place mesh is being taken in prediction
Stratum calling mechanism in replacing period of part for using.
For solving the technical scheme of problem
The elevator device that the mode of the present invention is related to possesses:Place purpose stratum calling mechanism is taken, it is arranged on
Place is taken, and with the purpose stratum input unit on the purpose stratum for being used to input car;And control unit.Control unit obtains
Purpose formation data corresponding with the input operation of the purpose stratum input unit to taking place purpose stratum calling mechanism, it is right
The purpose formation data carries out statistical disposition, to calculate the destination that place purpose stratum calling mechanism is taken corresponding to composition
The access times of the part of layer input unit.Moreover, access times of the control unit based on the part and the quality as the part
The guarantee value of guaranteed access times, to predict that composition takes the purpose stratum input dress of place purpose stratum calling mechanism
The replacing period for the part put.
In addition, the elevator device that another mode of the present invention is related to takes place purpose stratum calling mechanism based on composition
Purpose stratum input unit part working time and quality guaranteed working time as the part guarantee
Value, to predict that composition takes the replacing period of the part of the purpose stratum input unit of place purpose stratum calling mechanism.
Invention effect
According to the present invention at least one mode, when can predict the part replacement for taking place purpose stratum calling mechanism
Phase easily sets the replacement cycle.
By the explanation of following embodiment, problem, structure and effect other than the above can become more fully apparent.
Brief description of the drawings
Fig. 1 is the block diagram for the schematic configuration for showing the elevator device that the first embodiment of the present invention is related to.
Fig. 2 is the block diagram for the hardware configuration for showing computer.
Fig. 3 is an example for showing the purpose formation data that purpose stratum collection processing unit as shown in Figure 1 is collected
Schematic diagram.
Fig. 4 is the schematic diagram of an example of the analysis result for showing the group management export analytical equipment shown in Fig. 1.
Fig. 5 is the schematic diagram of an example of the other analysis results for showing the group management export analytical equipment shown in Fig. 1.
Fig. 6 is the portion of the digital key apparatus for another analysis result for showing the group management export analytical equipment shown in Fig. 1
Part changes an example of period prognostic chart.
Fig. 7 is to show that what the group management export analytical equipment that is related to of first embodiment of the present invention carried out takes place
The flow chart of the part replacement period prediction processing of purpose stratum calling mechanism.
Fig. 8 is the schematic configuration block diagram for showing the elevator device that second embodiment of the present invention is related to.
Symbol description
1、1A:Elevator device, 10:Take place purpose stratum calling mechanism, 11:Digital key apparatus, 30:Group management control
Device, 50:Elevator control gear, 51:Car, 60:Outlet terminal device, 70:Group management export analytical equipment is (during part replacement
Phase prediction meanss), 71:Statistical disposition portion, 72:Usage frequency extraction unit, 73:Part replacement period prediction section, 74:Informing portion,
80:Computer, 81:CPU, 90:Purpose formation data storehouse, 100:First statistical disposition result, 110:Second statistical disposition result,
120:Usage frequency proximal line.
Embodiment
Hereinafter, the example of the mode for implementing the present invention is illustrated referring to the drawings.In addition, for having in each figure
Simultaneously the repetitive description thereof will be omitted for substantially the same function or the inscape mark same symbol of structure.
<1. first embodiment>
Fig. 1 is the mount structure figure of the schematic configuration for the elevator device for showing the first embodiment based on the present invention.
[schematic configuration of elevator device]
Elevator device 1 shown in Fig. 1 possess more take place purpose stratum calling mechanism 10, via communication line with it is each
Take the input-output control unit 20 and group management control device 30 of the connection of place purpose stratum calling mechanism 10.In addition,
Elevator device 1 possesses the elevator control gear 50,1~N that the lifting to the car 51 of each machine of 1~N machines is controlled
Car 51, outlet terminal device 60 and the group management export analytical equipment 70 of the elevator of machine.Wherein, place destination is taken
As long as layer calling mechanism 10 is provided with least more than one in whole building thing.
Input-output control unit 20 is controlled to the input signal and output signal in each portion.More are taken place purpose
Stratum calling mechanism 10 is for example arranged on each elevator lobby (floor) for the building for being provided with elevator, and user can be to taking
Multiply place purpose stratum calling mechanism 10 to be operable to preengage (registration) desired object stratum.Group management control device 30
Unified pipe is carried out by operation of the elevator control gear 50 of each machines of 1~N machines to the elevator (car 51) of 1~N machines
Reason and control.
[structure for taking place purpose stratum calling mechanism]
Place purpose stratum calling mechanism 10 is respectively taken to possess as purpose stratum of the user for inputting purpose stratum
Digital key apparatus 11, input information reading part 12 and the informing portion 13 of input unit.
Digital key apparatus 11 is digital input unit, has a key group, the key assemble be equipped be assigned comprising numeral to
The key of marking.Each key is the part by the switching for mechanically entering horizontal electrical signal from outside power.That is, can be according to utilization
The operation of person carrys out the mutual contact or non-contact of two-way contact.
Input information reading part 12 read the IC-card drawn from digital key apparatus 11 or user input information or
Input information obtained from organism etc., and it is sent to group management control device 30.
When receiving Distribution Unit information from group management control device 30, informing portion 13 can inform Distribution Unit information,
So that user knows.As the method informed, be shown in display panel or by sound guidance to inform the methods of.
Take place purpose stratum calling mechanism 10 in addition, above-mentioned and can use various structures.For example, in this embodiment party
Digital key apparatus 11 is employed in formula as purpose stratum input unit, but can also use and show such as with liquid crystal display panel
Show the touch panel that panel is integrally constituted.
[structure of group management control device]
Group management control device 30 possesses operational management control system 40, it is contemplated that the stand-by period and make multiple elevator (sedan-chair
Railway carriage or compartment 51) balancedly operate.The operational management control system 40 possesses purpose stratum input reception processing unit 41, the registration of purpose stratum
Processing unit 43 and data output processing part 44 are collected in processing unit 42, purpose stratum.
Purpose stratum input reception processing unit 41 is based on from the digital key apparatus for taking place purpose stratum calling mechanism 10
11st, the purpose formation information of the input such as car purpose stratum button in car 51 (diagram is omited), is received treatment.
Purpose stratum registration process portion 42 based on the purpose formation information accepted by purpose stratum input reception processing unit 41,
Carry out the registration process on purpose stratum.Register information of the operational management control system 40 based on purpose stratum, is being set to distribute
Elevator (the sedan-chair that the floor for taking place purpose stratum calling mechanism 10 for having the reservation operation for having carried out purpose stratum is stopped
Railway carriage or compartment 51).Then, it is Distribution Unit information notice by the information of the elevator (car 51) of distribution via input-output control unit 20
To taking place purpose stratum calling mechanism 10.
Collect processing unit 43 and be handled as follows in purpose stratum, i.e. take place purpose stratum calling mechanism 10 by each
To collect and accumulate the input datas such as the purpose stratum based on digital key apparatus 11.Processing unit 43 is collected based on defeated in purpose stratum
Enter the data (purpose formation data) related to purpose stratum in data, in non-volatile internal holder 87 (reference picture 2)
In construct the purpose formation data storehouse 90 shown in Fig. 3.
Data output processing part 44 is handled as follows, i.e. the purpose that will be collected in purpose stratum collection processing unit 43
One of the daily record data of formation data as elevator device 1 and be output to outlet terminal device 60.In addition, the data output processing
Portion 44 will also make service data needed for visual information (for example, route map) of operation conditions etc. etc. as daily record number
Exported according to outlet terminal device 60.
Outlet terminal device 60 is connected to group management control device 30 via communication line, slot, bus etc..Outlet terminal
Device 60 is received comprising purpose formation data, fortune from the data output processing part 44 of group management control device 30 every preset time
The daily record data of row data etc., and store the non-volatile internal holder 87 for the Fig. 2 being explained below.Outlet terminal device 60
It can be attached/dismantle from group management control device 30, institute can be read in by the group management export analytical equipment 70 of outside
The daily record data preserved in the outlet terminal device 60 pulled down.
Group management export analytical equipment 70 exports operation conditions based on the daily record data exported from outlet terminal device 60
Visual information, each digital key apparatus 11 for taking place purpose stratum calling mechanism 10 each key life-span or change period
Prediction result.
[structure of group management export analytical equipment]
Group management export analytical equipment 70 (examples of part replacement period prediction meanss) possess statistical disposition portion 71,
Usage frequency extraction unit 72, part replacement period prediction section 73 and informing portion 74.
It was found from following description, statistical disposition portion 71 is carried out to the purpose formation data received from outlet terminal device 60
Statistical disposition, press and each take place purpose stratum calling mechanism 10 to calculate the use of each key of digital key apparatus 11 time
Number.Then, the access times of each key calculated are output to usage frequency extraction unit 72 by statistical disposition portion 71.
The access times of each key of the usage frequency extraction unit 72 based on the digital key apparatus 11 inputted from statistical disposition portion 71,
The high key of usage frequency is extracted from the key of digital key apparatus 11 that place purpose stratum calling mechanism 10 is taken corresponding to composition.
Then, usage frequency extraction unit 72 is output to part replacement period prediction section 73 by result is extracted.Because the high key of usage frequency
Compared with the low key of usage frequency, the deterioration caused by abrasion of contact etc. is easier to be in progress, it is possible to thinks replacing period
Earlier.Therefore, can by the way that the high key of the usage frequency in digital key apparatus 11 to be set to the object of part replacement period prediction
Preferential management is presumed to the key of replacing period earlier.
Part replacement period prediction section 73 is directed to the high key of the usage frequency extracted by usage frequency extraction unit 72, prediction
The replacing period of part.In the prediction in the replacing period of the part, the statistical disposition based on statistical disposition portion 71 can be used
As a result usage frequency proximal line and guarantee number (with reference to the Fig. 6 being discussed below).The usage frequency proximal line of key can be by portion
Part is changed period prediction section 73 and calculated using least square method.
The replacing period that informing portion 74 enters the object Part for being about to be predicted by part replacement period prediction section 73 informs management
The processing of member.As the method informed, in addition to being shown in display part 85, the methods of also exporting sound.
Like this, management export analytical equipment 70 is organized to obtain and logarithm by each place purpose stratum calling mechanism 10 of taking
Purpose formation data corresponding to the purpose stratum input operation of word key device 11.Then, the purpose formation data is counted
Processing, to calculate the access times for the part that place purpose stratum calling mechanism 10 is taken corresponding to composition.Then, based on pair
Take the access times of the part that the digital key apparatus 11 of place purpose stratum calling mechanism 10 is formed and set in advance
Threshold value, by each replacing period taken place purpose stratum calling mechanism 10 and carry out the part of predicted figure key apparatus 11.
[hardware structure of computer example]
Fig. 2 shows hardware structure of computer example.
Here, manage forming above-mentioned take place purpose stratum calling mechanism 10, input-output control unit 20, group
Control device 30, elevator control gear 50, the computer 80 of outlet terminal device 60 and group management export analytical equipment 70
Hardware configuration illustrates.Wherein, each several part of computer 80 can coordinate the function of each device, application target and carry out selection and take
House.
Computer 80 is the hardware used as so-called computer.Computer 80 possesses the CPU being connected respectively with bus 84
(Central Processing Unit:CPU) 81, ROM (Read Only Memory:Read-only storage) 82,
RAM(Random Access Memory:Random access memory) 83.Computer 80 is also equipped with display part 85, operating portion 86, non-
Volatibility interior magazine 87, network interface 88.
CPU81 (example of control unit), which reads and performed from ROM82, realizes each function of the present embodiment
The program code of software.In addition, computer 80 can also replace CPU81 and possess MPU (Micro-Processing Unit:It is micro-
Processing unit) etc. processing unit.
RAM83 is written in variable, parameter etc. caused by the midway of calculation process temporarily.Display part 85 is, for example, liquid crystal prison
Visual organ, show result of the processing carried out by computer 80 etc..For operating portion 86 such as using keyboard, mouse, surveillant can
Carry out given operation input, instruction.In the case where computer 80 is applied to take place purpose stratum calling mechanism 10,
Operating portion 86 is equivalent to digital key apparatus 11.
As non-volatile internal holder 87, such as use HDD (Hard Disk Drive:Hard disk drive), SSD
(Solid State Drive:Solid state hard disc), floppy disk, CD, photomagneto disk, CD-ROM, CD-R, tape, non-volatile storage
Device card etc..In the non-volatile internal holder 87, except record has OS (Operating System:Operating system), it is each
Beyond kind parameter, also record has the program for making computer 80 play function.
Network interface 88 is for example using NIC (Network Interface Card:NIC) etc., can be via
LAN etc. receives and dispatches various data between network or communication line and external device (ED).
[collecting the Data Collection in processing unit in purpose stratum]
Fig. 3 shows the data (purpose formation data) on purpose stratum being collected into by purpose stratum collection processing unit 43
An example.
Purpose formation data storehouse 90 shown in Fig. 3 is the database that have accumulated purpose formation data, is carved characters when having operation
Section 91, starting layer field 92, purpose stratum field 93 and used take place purpose stratum calling mechanism id field
94.In figure 3, will take place purpose stratum calling mechanism ID (Identification) token for " calling mechanism ID ",
Sometimes " calling mechanism ID " is also denoted as in later explanation.Here, place purpose stratum calling mechanism 10 is taken by each floor
Set, and whole building thing is provided with more.Therefore, registration is assigned respectively to respectively taking place purpose stratum calling mechanism 10
Device ID, as identifying it is information that several layers of which takes that place purpose stratum calling mechanism 10 is operated.For example,
First record in purpose formation data storehouse 90 shows following situation, i.e. at the operation moment " 08:00:00:32 " (00 divides when 8
00 second 32), have input " 1 layer " from the place purpose stratum calling mechanism 10 of taking that calling mechanism ID is " 001 " and are used as starting layer
And it have input " 12 layers " and be used as purpose stratum.
[statistical disposition in group management export analytical equipment]
Fig. 4 shows an example of the analysis result in the statistical disposition portion 71 based on group management export analytical equipment 70.
First statistical disposition result 100 is to use purpose formation data storehouse 90 as shown in Figure 3, by each calling mechanism ID
The statistical disposition result collected to the accumulative total on the purpose stratum of given period set in advance.Group management export analysis dress
The application target formation data storehouse 90 of statistical disposition portion 71 for putting 70 carries out statistical disposition, so as to obtain the first statistical disposition result
100.The first statistical disposition result 100 have take place purpose stratum calling mechanism id field 101, set layer field 102,
And purpose stratum field 103.In purpose stratum field 103, show to enter according to each destination layer in addition to layer is set
The number (number of operations) of row reservation adds up.
A few houres that both can be in units of one day or in one day during carrying out such count.In addition,
Some movable dates can be simply held between floors, without movable date, the operation conditions of the electric car at nearest station
Deng the particular day for reflecting any situation.
Fig. 4 example shows following situation, i.e. the calling mechanism ID " 001 " for being arranged on 1 layer, for the purpose of 2 layers
The digital key operation on stratum is operated, and " 2 " are secondary, and 3 layers of digital key operations are operated with " 5 " are secondary, and 4 layers of numerical keys are grasped
Work is operated, and " 5 " are secondary, and it is secondary to be operated " 4 " to 5 layers of digital key operations.It also show, 6 layers and 7 layers of numerical keys are grasped
Work is operated that " 1 " is secondary respectively, and 8 layers of digital key operations are operated with " 7 " are secondary, and 9 layers of digital key operation is operated
" 1 " is secondary, and 10 layers of digital key operations are operated with " 2 " are secondary, 11 layers of digital key operations are operated " 6 " it is secondary, and to 12
It is secondary that the digital key operation of layer is operated " 8 ".
Fig. 5 shows an example of other analysis results in the statistical disposition portion 71 based on group management export analytical equipment 70
Son.
Second statistical disposition result 110 is going through for the purpose stratum in the first statistical disposition result 100 according to Fig. 4
The Records of the Historian is recorded, and is pressed each calling mechanism ID and which key to be used the statistical disposition result collected several times to.Second statistics
Result 110, which has, takes place purpose stratum calling mechanism id field 111 and button field 112.In button field 112
Show to distribute to the numeral of button (key for forming digital key apparatus 11).
The digital key apparatus 11 for taking place purpose stratum calling mechanism 10 is set in general numerical key mode.Such as Fig. 5 institutes
Show, for example, it is envisioned that imparted as the key (button) of digital key apparatus 11 " 0 ", " 1 ", " 2 ", " 3 ", " 4 ", " 5 ", " 6 ",
" 7 ", " 8 ", " 9 ", the situation of asterisk mark " ★ ".For example, in the case of using 2 layers of digital key operation as purpose stratum,
The button of " 2 " is used, in the case of the digital key operation to 12 layers, uses the button of " 1 " and " 2 ".Therefore, by by each
Calling mechanism ID collects the data of the input number on purpose stratum, so as to obtain the statistics of the number of operations of each button.
Like this, can utilize the button of as numerical key mode " 0 "~" 9 " combination or " B " (not shown),
The purpose of combination of the button of " M " and the button of numeral is to specify " 12 " layer, " B1 " layer, " M2 " layer stratum." B " is subterranean layer,
" M " represents Mezzanine (interlayer).Mezzanine represents to be arranged on certain layer (for example, 1 layer) and the centre of another layer (2 layers)
Sandwich structure, " M2 " refer to, the interlayer positioned at 1 layer with 2 layers of centre.In the situation of the designation method on such purpose stratum
Under, the behaviour in service of each button can be estimated using Fig. 4 and Fig. 5 statistical disposition result.
In addition to numerical key mode, occasionally there are the special buttons such as " ★ " button, " 12 " button.Also in the presence of as representing to go
" ★ " button toward lobby floor is such, is not come by way of specifying purpose stratum, but by pressing this several combinatorics on words
Button carrys out mode of the assignment of allocation to the purpose stratum of button.In this case or following manner:In Fig. 3 purpose
Special button operation flag is set in the record in formation data storehouse 90, sentenced by " the opening (ON) " of mark, " closing (OFF) "
Whether special button is not operated, to being that the operation of number key button or the operation of special button make a distinction.
For example, in the case where lobby floor is 1 layer, as the operation of specified lobby floor, exist digital key operation to " 1 "
The operation of button or operation to " ★ " button both.In this case, if the record in Fig. 3 purpose formation data storehouse 90
Special button operation flag be " unlatching ", then be set to use " ★ " button, if " closing ", then be set to use " 1 "
Button.
In this case, in Figure 5, in addition to the access times of " 1 " button, it is additionally provided with " ★ " and presses
The field of the access times of button.It is " unlatching " in the special button operation flag of the record in Fig. 3 purpose formation data storehouse 90
In the case of, statistical disposition portion 71 is judged as having used " ★ " button, and in the case of for " closing ", statistical disposition portion 71 is judged as
" 1 " button has been used, and the numerical value in the field of corresponding button has been counted.
[the part replacement period prediction in group management export analytical equipment]
Fig. 6 show by the part replacement period prediction section 73 of group management export analytical equipment 70 it is calculating, form numeral
One example of the part replacement period prognostic chart of the key of key apparatus 11.In figure 6, the longitudinal axis represents the access times [ten thousand of key
It is secondary], transverse axis represents the elapsed time [year] from being set digital key apparatus 11.Fig. 6 is shown on the specific of digital key apparatus 11
Key analysis result example.The digital key apparatus 11 that specific key is e.g. extracted by usage frequency extraction unit 72 makes
With the high key of frequency.
As described above, the statistical disposition portion 71 of group management export analytical equipment 70 carries out Statistics Division to purpose formation data
Reason, and press each each key taken place purpose stratum calling mechanism 10 and calculate digital key apparatus 11 using calling mechanism ID
Access times.In figure 6, to the use of each button of the second statistical disposition result 110 shown in Fig. 5 such as in units of half a year
Number is added up, and as 3.5 years corresponding accumulated results from being set digital key apparatus 11 till now, uses column
Illustrate.In addition, though block diagram has been used in figure 6, but be not restricted to that block diagram.
Part replacement period prediction section 73 half-yearly is tired out for suitable with the height of each post of the block diagram shown in Fig. 6
Access times are counted, using least square method, so as to calculate usage frequency proximal line 120.Then, part replacement period prediction section
73 predict the replacing period of object key using the usage frequency proximal line 120 based on block diagram.In the example of fig. 6, according to
It is the guaranteed access times of quality, approximate with usage frequency as the guarantee number (guarantee value) shown in dotted line as part
The intersection point of line 120, be predicted as the specific key of digital key apparatus 11 access times reach ensure number year be 5.5 years
Afterwards.
Therefore, if the part replacement period prognostic chart of the digital key apparatus 11 using Fig. 6, can reach in specific key
Before actual guarantee number, determine replacing period and establish replacement operation plan.Such analysis can be by digital key apparatus
11 each key is carried out, but can also by usage frequency extraction unit 72 from it is corresponding take place purpose stratum calling mechanism 10 it
It is middle to take at least one of place purpose stratum 10 usage frequencies of calling mechanism high numerical keys using each and carry out as object.
In addition, part replacement period prediction section 73 can not also lead to by using the method for usage frequency proximal line 120
Cross other methods and carry out prediction unit replacing period.For example, part replacement period prediction section 73 can also calculate it is half-yearly tired
The average value of access times is counted, carrys out prediction unit and changes period.It is tired at 3.5 year points if being illustrated by taking Fig. 6 as an example
Counting the average value of access times turns into following value:Accumulative access times from 0.5 year to 3.5 years are added up to, and this is closed
Value obtained from meter divided by 6.If so calculating, every half a year, the average value of accumulative access times can increase.Then, according to
The straight line obtained to the average value application least square method of accumulative access times half-yearly and guarantee number set in advance
Intersection point, prediction unit change period.
[part replacement period prediction processing]
Fig. 7 is to show that what group management export analytical equipment 70 carried out takes (the numeral of place purpose stratum calling mechanism 10
Key apparatus 11) part replacement period prediction processing flow chart.CPU81 is recorded in ROM82 program by performing, so as to real
Processing shown in existing Fig. 7.
In the figure 7, the statistical disposition portion 71 of management export analytical equipment 70 is organized to taking place purpose stratum calling mechanism
10 purpose formation data carries out statistical disposition, so as to obtain the part of the digital key apparatus 11 as purpose stratum input unit
The access times (reference picture 5) (step S1) of (each key).The information of the access times of each key of the digital key apparatus 11 is from statistics
Processing unit 71 is sent to usage frequency extraction unit 72.
Then, usage frequency extraction unit 72 is extracted among each key of the digital key apparatus 11 provided from statistical disposition portion 71
More than access times, i.e. the high key (step S2) of usage frequency.The information of the high key of the usage frequency is from usage frequency extraction unit
72 are sent to part replacement period prediction section 73.
Then, the replacing period of the high key of the usage frequency of the logarithm word key device 11 of part replacement period prediction section 73 is carried out
Predict (step S3).For example, the prediction in part replacement period uses above-mentioned usage frequency proximal line 120 or each given period
The average value of accumulative usage frequency carry out.
It then informs the numerical key predicted by part replacement period prediction section 73 is informed using display part 85 etc. by portion 74
Replacing period (step S4) of the high key of the usage frequency of device 11.
Group management export analytical equipment 70 is real to the digital key apparatus 11 for all taking place purpose stratum calling mechanism 10
Step S1~S4 processing is applied, if completing place to the digital key apparatus 11 for all taking place purpose stratum calling mechanism 10
Reason, then terminate Fig. 7 processing.
The registration of place purpose stratum is respectively taken in the first above-mentioned group management control device 30 of the present embodiment, importing
The operation input for the digital key apparatus 11 with taking place purpose stratum calling mechanism 10 to this that device 10 is exported is corresponding
Operation signal, to carry out a group management control.Thus, group management control device 30 can be accumulated easily takes place mesh by each
The input data (purpose formation data) on purpose stratum that is operated of the logarithm word key device 11 of stratum calling mechanism 10.So
Afterwards, management export analytical equipment 70 is organized to receive by taking place from group management control device 30 via outlet terminal device 60
The purpose formation data of the differentiation of purpose stratum calling mechanism 10 simultaneously carries out statistical disposition, and carrys out predicted figure using the statistical result
The replacing period of each key of key apparatus 11.And then the prediction result in the replacing period of each key by accumulating digital key apparatus 11,
So as to easily press each key (numeral for representing purpose stratum) setting replacement cycle.
Like this, in the first present embodiment, it can predict to be arranged on and take place purpose stratum calling mechanism 10
The replacing period of each key of digital key apparatus 11, or easily carry out the setting of replacement cycle.Moreover, by using display part
85 etc. inform replacing period, replacement cycle, so as to make future digital key apparatus 11 each key it is visual using tendency
Change, can realize that the replacing period of each key of digital key apparatus 11 is made clear.So, it is possible to increase take place purpose stratum
The maintainability of calling mechanism 10.
In addition, it is illustrated in the present embodiment as purpose stratum input unit logarithm word key device 11, still
It can also use by touch operation to carry out the input of purpose stratum and display panel (for example, liquid crystal display panel) integral structure
Into touch panel as purpose stratum input unit.By taking place purpose to each by group management export analytical equipment 70
The usage frequency of stratum calling mechanism 10 carries out statistical disposition, so as to speculate that the brightness of display panel exports situation.So
The replacing period of touch panel (and display panel) can be predicted, or easily sets the replacement cycle.
In addition, the prediction object in the period of replacing is not limited to digital key apparatus 11 and touch panel.It is defeated to form purpose stratum
Enter the display panel that the part of device also includes for example being laminated in touch panel.Usage frequency extraction unit 72 takes ground from by each
The input data (purpose formation data) on the purpose stratum that the logarithm word key device 11 of point purpose stratum calling mechanism 10 is operated
It is middle to obtain the Startup time for respectively taking place purpose stratum calling mechanism 10, and it is calculated as the LCD of display panel
The lighting time (working time) of plate.Then, part replacement period prediction section 73 is to lighting time and the back of the body of liquid crystal display panel
The guarantee lighting time (guarantee value) of light lamp is compared, so as to predict the replacing period of liquid crystal display panel.
For example, it is envisioned that take the situation that place purpose stratum calling mechanism 10 possesses following function:Passed through without the operating time
When having spent more than 1 minute, extinguish the backlight of liquid crystal display panel.Usage frequency extraction unit 72 takes place purpose to operating
Be compared at the time of operation at the time of stratum calling mechanism 10 and next time, without the operating time have passed through 1 minute with
In the case of upper, the working time may be calculated before time for being operated to taking place purpose stratum calling mechanism 10
Afterwards 1 minute.
These are added up to, can also according to guarantee lighting time (guarantee value) of the backlight of liquid crystal display panel,
The actual Startup time and prediction work time estimates the replacing of liquid crystal display panel derived from the Startup time of reality
Period.
And then although illustrated as the input on purpose stratum to taking (the numeral of place purpose stratum calling mechanism 10
Key apparatus 11) operation, still, even other inputs, also can similarly be applied.For example, taking place purpose
Stratum calling mechanism 10 possess wheelchair user with and ordinary people button in the case of or to wheelchair user use
Button input operation.In addition, on a group management export analytical equipment 70, although the visualization as operation conditions is with carrying out
Explanation, but can also be used to predicting and (make part replacement period prognostic chart) to take place purpose stratum calling mechanism 10
Part replacement period special purpose device.
<2. second embodiment>
Second embodiment is that group management export analytical equipment 70 is imported and accumulated from group management control device 30 via network
The structure of tired daily record data.Hereinafter, second embodiment is illustrated centered on the part different from first embodiment.
Fig. 8 is the block diagram for the schematic configuration for showing the elevator device that second embodiment is related to.Elevator device shown in Fig. 8
1A is the structure that output server 130 has been added to elevator device 1.The data output processing part 44 of group management control device 30
The daily record data for including purpose formation data is exported to input-output control unit 20.
Output server 130 is received and accumulated day every preset time from input-output control unit 20 via network N 1
Will data.Analyzed in addition, received daily record data is output to group management export by output with server 130 via network N 2
Device 70.As output server 130, the structure of computer 80 that can be shown in application drawing 2.
The purpose that group management export analytical equipment 70 is included based on the daily record data received from output server 130
Formation data, when life-span or the replacing of each key of the digital key apparatus 11 of place purpose stratum calling mechanism 10 are each taken in output
Phase prediction result.Or group management export analytical equipment 70 can also be set to following structure:Using from output server 130
And the various data that the daily record data of the importing of outlet terminal device 60 is included, the longevity of each key of each digital key apparatus 11 of progress
Life changes the output of period prediction result, visualization of operation conditions etc..
In second embodiment as constructed as above, it can also obtain and first embodiment identical effect.That is, group management
Analytical equipment 70 is exported in addition to the output of the visual information of operation conditions etc., additionally it is possible to take place using based on each
Statistical disposition result (reference picture 4, Fig. 5) and the analysis result (ginseng of the purpose stratum input operation of purpose stratum calling mechanism 10
According to Fig. 6), carry out the replacing period of each key of predicted figure key apparatus 11 or easily set the replacement cycle.
<It is 3. other>
Although management export analytical equipment 70 is organized in the first and second above-mentioned embodiments possesses usage frequency extraction
Portion 72, but structure not necessarily.Part replacement period prediction section 73 can also be not limited to the high key of usage frequency and to structure
All keys into digital key apparatus 11 carry out the prediction in replacing period.
In the first and second above-mentioned embodiments, the daily record data that group management control device 30 exports can also be remembered
Record is in external recording mediums such as USB storages.Group management export analytical equipment 70 can also be to being recorded in external recording medium
Daily record data (purpose stratum input data) carries out statistical disposition, so as to stratum input unit the purpose of predicted figure key apparatus 11
Part replacement period.
And then certainly, the invention is not restricted to above-mentioned each embodiment example, the sheet recorded without departing from claims
The main idea of invention, additionally it is possible to using other various application examples, variation.
For example, above-mentioned embodiment example is in order that the present invention is readily appreciated that and the structure of device and system has been carried out in detail
Thin and specific description, not necessarily it is defined in the embodiment example for possessing illustrated entire infrastructure.Furthermore it is possible to by some
A part for the structure of embodiment example is replaced into the structure of other embodiment example.It is further possible to some embodiment
The structure of the structure addition other embodiment example of example.Additionally it is possible to a part for the structure of each embodiment example is carried out
Addition, deletion, the displacement of other structures.
In addition, on above-mentioned each structure, function, processing unit, processing unit etc., such as can also be by their part
Or be all designed with integrated circuit, so as to be realized with hardware.In addition, on above-mentioned each structure, function etc., also may be used
To be explained by processor and be performed the program for realizing respective function, so as to be realized with software.Realize each function program,
The information of table, file etc. can also be placed in memory, hard disk, SSD (Solid State Drive:Solid state hard disc) etc. record dress
Put or the recording medium such as IC-card, SD card, DVD.
In addition, on control line, information wire, show and think to illustrate required control line, information wire, may not one
Surely control line whole on product, information wire are shown.Indeed, it is possible to think that most structure is all connected with each other.
In addition, in this manual, describing the processing step of the processing of time series, not only include according to described
The processing that order is carried out in temporal sequence, in addition to not necessarily handled but concurrently or independently performed in temporal sequence
Processing (for example, parallel processing or object-based processing).
In addition, each inscape for the image processing apparatus that an embodiment on the above-mentioned disclosure is related to, such as
The each hardware of fruit can be received and sent messages each other via network, then may be mounted at any hardware.In addition, implemented by some processing unit
Processing can be realized by hardware, can also be realized by the decentralized processing based on multiple hardware.
Claims (6)
1. a kind of elevator device, possesses:
Place purpose stratum calling mechanism is taken, it, which is arranged on, takes place, and with the purpose stratum for being used to input car
Purpose stratum input unit;And
Control unit, it is obtained and the input to the purpose stratum input unit for taking place purpose stratum calling mechanism
Purpose formation data corresponding to operation, statistical disposition is carried out to the purpose formation data to calculate described corresponding to composition take
The access times of the part of the purpose stratum input unit of place purpose stratum calling mechanism, and made based on the part
The guarantee value of the guaranteed access times of quality by the use of number and as the part, place mesh is taken described in composition to predict
Stratum calling mechanism purpose stratum input unit the part replacing period.
2. elevator device according to claim 1, wherein,
The place purpose stratum calling mechanism of taking has the key for being configured with and the key to marking comprising numeral being assigned
Group, as purpose stratum input unit,
The control unit, which obtains, to be represented to the purpose stratum input unit for taking place purpose stratum calling mechanism
The purpose formation data of the operation of each key, and the purpose stratum input of place purpose stratum calling mechanism is taken described in prediction
The replacing period of each key of device.
3. elevator device according to claim 2, wherein,
The control unit possesses:
Statistical disposition portion, it carries out statistical disposition to the purpose formation data, calculates and described take place purpose stratum and step on
Remember the access times of each key of the purpose stratum input unit of device;And
Part replacement period prediction section, its institute based on the purpose stratum input unit calculated by the statistical disposition portion
The access times of each key and the relation of time are stated, to predict the replacing period of each key.
4. elevator device according to claim 3, wherein,
The control unit is also equipped with:Usage frequency extraction unit, it is from the corresponding place purpose stratum calling mechanism taken
The high key of usage frequency is extracted in each key of purpose stratum input unit,
The part replacement period prediction section institute high to the usage frequency that is extracted by the usage frequency extraction unit
The replacing period for stating the corresponding key of purpose stratum input unit is predicted.
5. a kind of elevator device, possesses:
Place purpose stratum calling mechanism is taken, it, which is arranged on, takes place, and with the purpose stratum for being used to input car
Purpose stratum input unit;And
Control unit, it is obtained and the input to the purpose stratum input unit for taking place purpose stratum calling mechanism
Purpose formation data corresponding to operation, statistical disposition is carried out to the purpose formation data to calculate described corresponding to composition take
The working time of the part of the purpose stratum input unit of place purpose stratum calling mechanism, and based on the work of the part
Make the guarantee value of time and the quality guaranteed working time as the part, place mesh is taken described in composition to predict
Stratum calling mechanism purpose stratum input unit the part replacing period.
6. a kind of part replacement period prediction meanss, possess:
Control unit, it is obtained with being grasped to the input for being arranged at the purpose stratum input unit for taking place purpose stratum calling mechanism
Purpose formation data corresponding to work, statistical disposition is carried out to the purpose formation data come calculate form corresponding to described take ground
The access times of the part of the purpose stratum input unit of point purpose stratum calling mechanism, and based on the use of the part
The guarantee value of number and guaranteed access times of quality as the part, come predict form described in take place purpose
The replacing period of the part of the purpose stratum input unit of stratum calling mechanism, wherein described take place destination
Layer calling mechanism, which is arranged on, takes place, for inputting the purpose stratum of car.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2016-131418 | 2016-07-01 | ||
JP2016131418A JP2018002390A (en) | 2016-07-01 | 2016-07-01 | Elevator system and component replacement period predictor |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107555272A true CN107555272A (en) | 2018-01-09 |
CN107555272B CN107555272B (en) | 2019-03-19 |
Family
ID=60948356
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710436142.6A Active CN107555272B (en) | 2016-07-01 | 2017-06-09 | Elevator device and part replacement period prediction meanss |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP2018002390A (en) |
CN (1) | CN107555272B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112158696A (en) * | 2020-09-29 | 2021-01-01 | 中国人民解放军国防科技大学 | Method for judging elevator strain degree |
CN112607548A (en) * | 2020-12-15 | 2021-04-06 | 南京中诚签信息科技有限公司 | Elevator running quality monitoring system and method based on big data |
CN113844969A (en) * | 2020-06-25 | 2021-12-28 | 三菱电机株式会社 | Elevator remote monitoring system |
CN115159282A (en) * | 2022-07-01 | 2022-10-11 | 日立楼宇技术(广州)有限公司 | Production method of elevator control box button, elevator control box and upper computer |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7026511B2 (en) | 2018-01-11 | 2022-02-28 | 株式会社アルファ | Door switchgear |
CN110759187A (en) * | 2018-07-27 | 2020-02-07 | 奥的斯电梯公司 | Call request device and display control method thereof |
WO2020049712A1 (en) * | 2018-09-07 | 2020-03-12 | 三菱電機株式会社 | Platform operation panel |
JP6947197B2 (en) * | 2019-03-13 | 2021-10-13 | フジテック株式会社 | Information processing device |
CN110890210B (en) | 2019-11-28 | 2021-04-20 | 烟台首钢磁性材料股份有限公司 | Method for improving coercive force of arc-shaped neodymium iron boron magnet |
CN117377630A (en) * | 2021-05-27 | 2024-01-09 | 通力股份公司 | Elevator control |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01231778A (en) * | 1988-03-09 | 1989-09-18 | Hitachi Ltd | Device and method for controlling elevator and device and method for inputting sensibility of control device |
JPH0543143A (en) * | 1991-08-21 | 1993-02-23 | Toshiba Corp | Elevator control unit |
JPH05201636A (en) * | 1992-01-27 | 1993-08-10 | Hitachi Building Syst Eng & Service Co Ltd | Operation state informing device for equipment for elevator |
CN1161304A (en) * | 1995-09-23 | 1997-10-08 | Lg产电株式会社 | Durability evaluating apparatus for elevator and method thereof |
CN201153077Y (en) * | 2007-09-30 | 2008-11-19 | 南通圣泰机电制造有限公司 | Electronic membrane press-button switch |
JP2012101916A (en) * | 2010-11-11 | 2012-05-31 | Mitsubishi Electric Building Techno Service Co Ltd | Maintenance result display device of passenger transport apparatus |
JP2013124147A (en) * | 2011-12-13 | 2013-06-24 | Mitsubishi Electric Building Techno Service Co Ltd | Elevator gate button replacing device and elevator gate button replacing method |
CN203798558U (en) * | 2014-04-24 | 2014-08-27 | 巨人通力电梯有限公司 | Elevator button service life testing device |
CN205302199U (en) * | 2015-12-30 | 2016-06-08 | 杜洁 | Multifunctional keyboard |
-
2016
- 2016-07-01 JP JP2016131418A patent/JP2018002390A/en active Pending
-
2017
- 2017-06-09 CN CN201710436142.6A patent/CN107555272B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01231778A (en) * | 1988-03-09 | 1989-09-18 | Hitachi Ltd | Device and method for controlling elevator and device and method for inputting sensibility of control device |
JPH0543143A (en) * | 1991-08-21 | 1993-02-23 | Toshiba Corp | Elevator control unit |
JPH05201636A (en) * | 1992-01-27 | 1993-08-10 | Hitachi Building Syst Eng & Service Co Ltd | Operation state informing device for equipment for elevator |
CN1161304A (en) * | 1995-09-23 | 1997-10-08 | Lg产电株式会社 | Durability evaluating apparatus for elevator and method thereof |
CN201153077Y (en) * | 2007-09-30 | 2008-11-19 | 南通圣泰机电制造有限公司 | Electronic membrane press-button switch |
JP2012101916A (en) * | 2010-11-11 | 2012-05-31 | Mitsubishi Electric Building Techno Service Co Ltd | Maintenance result display device of passenger transport apparatus |
JP2013124147A (en) * | 2011-12-13 | 2013-06-24 | Mitsubishi Electric Building Techno Service Co Ltd | Elevator gate button replacing device and elevator gate button replacing method |
CN203798558U (en) * | 2014-04-24 | 2014-08-27 | 巨人通力电梯有限公司 | Elevator button service life testing device |
CN205302199U (en) * | 2015-12-30 | 2016-06-08 | 杜洁 | Multifunctional keyboard |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113844969A (en) * | 2020-06-25 | 2021-12-28 | 三菱电机株式会社 | Elevator remote monitoring system |
CN113844969B (en) * | 2020-06-25 | 2022-12-02 | 三菱电机株式会社 | Elevator remote monitoring system |
CN112158696A (en) * | 2020-09-29 | 2021-01-01 | 中国人民解放军国防科技大学 | Method for judging elevator strain degree |
CN112607548A (en) * | 2020-12-15 | 2021-04-06 | 南京中诚签信息科技有限公司 | Elevator running quality monitoring system and method based on big data |
CN115159282A (en) * | 2022-07-01 | 2022-10-11 | 日立楼宇技术(广州)有限公司 | Production method of elevator control box button, elevator control box and upper computer |
Also Published As
Publication number | Publication date |
---|---|
JP2018002390A (en) | 2018-01-11 |
CN107555272B (en) | 2019-03-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107555272B (en) | Elevator device and part replacement period prediction meanss | |
US8149104B2 (en) | Room management system | |
US11203266B2 (en) | Battery station management system including server for generating monitoring screen showing state information of battery exchange devices and battery devices in each battery station and battery station management method | |
JP5192476B2 (en) | Work support system, work support method, and work support program | |
CN111626533B (en) | Office space data processing method, device and system and electronic equipment | |
CN114093482A (en) | Mobile diagnosis and treatment oriented medical care patient matching method and system | |
DE112016004137T5 (en) | lift system | |
CN102745558B (en) | Elevator cluster management system and control method thereof | |
JP2010225017A (en) | Process planning device and process planning method | |
CN115564257A (en) | Digital production process scheduling management system | |
US20180032549A1 (en) | Experimental data recording device, experimental data recording method and experimental data display device | |
CN108369411A (en) | Display methods, display program and display control unit | |
CN107155323B (en) | Elevator runs display device | |
CN112734188B (en) | Household medical care dispatching optimization method based on two-stage mixed element heuristic algorithm | |
CN116739317B (en) | Mining winch automatic management and dispatching platform, method, equipment and medium | |
CN110872034A (en) | Building information visualization device | |
CN113835346A (en) | Intelligent building energy consumption control system and method based on Internet of things | |
CN106676683A (en) | Operating device and method for spinning preparation machine | |
CN113131476B (en) | Power load prediction method | |
JPWO2017098618A1 (en) | Display method, display program, and display control apparatus | |
JP7470608B2 (en) | Work improvement support device, work improvement support system | |
JP2003256761A (en) | Energy use status managing method | |
JP4488515B2 (en) | Sejo management system | |
JP7360995B2 (en) | Elevator congestion status display system and method | |
JP2012033127A (en) | Personnel management system, personnel management apparatus, personnel management method and program |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |