CN107544093A - The structure interpretation layer depth system compensation method of borehole restraint - Google Patents

The structure interpretation layer depth system compensation method of borehole restraint Download PDF

Info

Publication number
CN107544093A
CN107544093A CN201610496754.XA CN201610496754A CN107544093A CN 107544093 A CN107544093 A CN 107544093A CN 201610496754 A CN201610496754 A CN 201610496754A CN 107544093 A CN107544093 A CN 107544093A
Authority
CN
China
Prior art keywords
compensation method
system compensation
layer depth
carried out
depth system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610496754.XA
Other languages
Chinese (zh)
Inventor
姜瑞波
王永诗
马立驰
孙超
赵约翰
辛也
孙耀庭
谢传金
张悦
许淑芳
鲍倩倩
毕俊凤
王亚琳
熊伟
杨贵丽
许晓凤
魏晓燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Exploration and Development Research Institute of Sinopec Henan Oilfield Branch Co
Exploration and Development Research Institute of Sinopec Shengli Oilfield Co
Original Assignee
China Petroleum and Chemical Corp
Exploration and Development Research Institute of Sinopec Henan Oilfield Branch Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Exploration and Development Research Institute of Sinopec Henan Oilfield Branch Co filed Critical China Petroleum and Chemical Corp
Priority to CN201610496754.XA priority Critical patent/CN107544093A/en
Publication of CN107544093A publication Critical patent/CN107544093A/en
Pending legal-status Critical Current

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

The present invention provides a kind of structure interpretation layer depth system compensation method of borehole restraint, and the structure interpretation layer depth system compensation method of the borehole restraint includes:Step 1, according to the well-log information of drilling well, seismic horizon explanation is carried out;Step 2, fault interpretation is carried out, completes to carry out fault combination in the plane after explaining on seismic profile;Step 3, preliminary tectonic ore-forming is carried out to the layer position explained;Step 4, after preliminary tectonic ore-forming, error correction is carried out using drilling well actual grade, so as to obtain relatively accurate structural map.The structure interpretation layer depth system compensation method of the borehole restraint effectively solves structural map and mismatched with real drilling depth, the problem of construction feature and big actual variance, significant especially for high degree of prospecting area, the present invention is simple and practical, it is workable, there is preferable promotion prospect.

Description

The structure interpretation layer depth system compensation method of borehole restraint
Technical field
The present invention relates to petroleum geology exploration field, a kind of structure interpretation layer depth system of borehole restraint is especially related to Bearing calibration.
Background technology
In geophysical exploration, underground medium speed is a very crucial factor.Accurate speed is asked for, and is always The key problem of seismic prospecting.Accurate speed is only obtained, just can determine that depth, the inclination angle on the stratum for producing reflection or refraction With the position on stratum.It is the most frequently used to determine that speed method is superposition (skew) speed in processes, underground is asked for by Dix formula Speed.It is built upon in the upper unconverted hypothesis of velocity field transverse direction.
As the continuous intensification of exploration and development degree, the difficulty of exploration and development are also increasing.The emphasis of exploration and development is Switch to find structure with lower amplitude oil-gas reservoir and hidden complex lithology oil-gas reservoir by past searching macrostructure oil-gas reservoir, this is to surveying Visit development technique and propose higher requirement, higher requirement also is proposed to the precision of tectonic ore-forming.Conventional tectonic ore-forming Although method can also reflect the structural configuration of subsurface formations, when research area construction complexity, higher formation clination, tomography it is more and When speed vertically and horizontally changes greatly, tectonic ore-forming is carried out with the drawing methods of routine, frequently can lead to the result of mistake, increase The risk of exploration.For this we have invented a kind of structure interpretation layer depth system compensation method of new borehole restraint, solve with Upper technical problem.
The content of the invention
Knot of the structural map with drilling well at well point is made by the correction of drilling depth it is an object of the invention to provide a kind of Fruit coincide, and keeps the structure interpretation layer depth system compensation method of the borehole restraint of rational tectonic framework in the plane.
The purpose of the present invention can be achieved by the following technical measures:The structure interpretation layer depth system compensation side of borehole restraint Method, the structure interpretation layer depth system compensation method of the borehole restraint include:Step 1, according to the well-log information of drilling well, carry out ground Layer position is shaken to explain;Step 2, fault interpretation is carried out, completes to carry out fault combination in the plane after explaining on seismic profile;Step 3, preliminary tectonic ore-forming is carried out to the layer position explained;Step 4, after preliminary tectonic ore-forming, drilling well actual grade is utilized Error correction is carried out, so as to obtain relatively accurate structural map.
The purpose of the present invention can be also achieved by the following technical measures:
The structure interpretation layer depth system compensation method of the borehole restraint also includes, and before step 1, understands the base in research area This geologic aspects, and the related data of structural evolution is collected, it is familiar with tectonic movement and the stress direction of research area experience.
In step 1, according to interval transit time, density these log synthetic seismograms demarcation stratum, stratum is carried out Explain, to check whether interpretation horizon closes during stratigraphic interpretation.
In step 2, in seismic profile explain tomography when it is first noted that tomography upper and lower adjacent layer position inheritance, Its secondary structural evolution history with reference to research area judges that tomography is normal fault or reversed fault, if meets the construction in the period Whether stress direction, tomography cutting relation are correct.
In step 3, the interval velocity on stratum is tried to achieve by dix formula algorithms using stack velocity spectrum, and then is tried to achieve average Speed, recycle stereoscopic graticule to format technology, establish the average velocity field in space, carry out time and depth transfer and form depthwise construction figure.
In step 4, when being corrected to some layer of position or construction face, with the following method:Each mouth well is calculated first Error between upper earthquake and well layering, the mean error of multiple wells is uniformly subtracted, to ensure that the configuration of construction is constant;So Error information gridding is finally corrected, the aspect after being corrected to original layers position grid according to Kriging method afterwards Grid, obtain final structural map.
The structure interpretation layer depth system compensation method of borehole restraint in the present invention, by actual well drilled depth to earthquake solution A layer structural map is released to be corrected.This method is to grasp research area construction feature, and on the basis of common version flow, Preliminary structural map is obtained with variable speed mapping method, Error Grid is then established and is modified, so as to obtain more accurate structure Make figure.The problem of this method effectively solves structural map and mismatched with real drilling depth, and construction feature and actual variance are big, it is special Not significant for high degree of prospecting area, the present invention is simple and practical, workable, has before preferably promoting Scape.
Brief description of the drawings
Fig. 1 is the flow of a specific embodiment of the structure interpretation layer depth system compensation method of the borehole restraint of the present invention Figure;
Fig. 2 is the schematic diagram that seismic horizon explains with fault interpretation in a specific embodiment of the invention;
Fig. 3 is seismic reflection layer structural map in a specific embodiment of the invention;
Fig. 4 is the structural map after well depth correction in a specific embodiment of the invention.
Embodiment
For enable the present invention above and other objects, features and advantages become apparent, it is cited below particularly go out preferable implementation Example, and coordinate shown in accompanying drawing, it is described in detail below.
As shown in figure 1, Fig. 1 is the flow chart of the structure interpretation layer depth system compensation method of the borehole restraint of the present invention.
First had to before the present invention is implemented detailed to the Basic Geological overview in research area and the progress of region evolutionary process Solution.It is familiar with tectonic movement and the stress direction of research area experience.Ensure the geology feelings for meeting this area of next step structure interpretation Condition so that structure interpretation has more reasonability.
Step 101:Seismic reflection layer explains that, according to the well-log information of drilling well, the flow that conventionally layer is explained is entered Row is explained.
This step is the basis of this invention, and mainly conventionally layer explains flow, utilizes as shown in Figure 2 The interpretation softwares such as landmark, Geoframe carry out structure interpretation, concretely comprise the following steps an AC (interval transit time), DEN (density) etc. Log imported into seismic interpretation software-synthetic seismogram demarcation stratum-stratigraphic interpretation.Will during stratigraphic interpretation Check whether interpretation horizon closes.
Step 102:Fault interpretation, complete to carry out fault combination in the plane after explaining on seismic profile.
Means of interpretation in seismic profile as shown in Fig. 2 it is first noted that tomography is in upper and lower adjacent layer position when explaining tomography Inheritance, its it is secondary with reference to research area structural evolution history judge that tomography is normal fault or reversed fault, if meet this Whether the tectonic stress direction in period, tomography cutting relation are correct etc..
Step 103:Initial construction is into figure
The layer position explained carries out preliminary tectonic ore-forming (such as Fig. 3) with software.The key of this step is building for velocity field It is vertical.The interval velocity on stratum is tried to achieve by dix formula algorithms using stack velocity spectrum, and then tries to achieve average speed, is recycled three-dimensional Gridding technology, the average velocity field in space is established, carry out time and depth transfer and form depthwise construction figure.
Step 104:Well depth about beam alignment, error correction is carried out using drilling well actual grade, it is relatively accurate so as to obtain Structural map.
When being corrected to some layer of position or construction face, with the following method:Earthquake and well on each mouth well are calculated first Error between layering, the mean error of multiple wells is uniformly subtracted, to ensure that the configuration of construction is constant.
Then error information gridding is finally corrected to original layers position grid, obtains school according to Kriging method Aspect grid after just, obtain final structural map (such as Fig. 4).
By the front and rear structural map error contrast of the well depth of table 1 correction as can be seen that the structural map precision after correction is obvious Improve.
The front and rear structural map error contrast table of the well depth of table 1 correction
Well-name It is real to bore layer depth Error before structural map correction Error before structural map correction
Stake 204 2592 18 -2
Stake 306 2555 35 5
Stake 207 2600 30 3
Stake 301 2578 43 6
Stake 302 2515 35 -5

Claims (6)

1. the structure interpretation layer depth system compensation method of borehole restraint, it is characterised in that the structure interpretation layer depth of the borehole restraint System compensation method includes:
Step 1, according to the well-log information of drilling well, seismic horizon explanation is carried out;
Step 2, fault interpretation is carried out, completes to carry out fault combination in the plane after explaining on seismic profile;
Step 3, preliminary tectonic ore-forming is carried out to the layer position explained;
Step 4, after preliminary tectonic ore-forming, error correction is carried out using drilling well actual grade, it is relatively accurate so as to obtain Structural map.
2. the structure interpretation layer depth system compensation method of borehole restraint according to claim 1, it is characterised in that the well is about The structure interpretation layer depth system compensation method of beam also includes, and before step 1, understands the Basic Geological overview in research area, and The related data of structural evolution is collected, is familiar with tectonic movement and the stress direction of research area experience.
3. the structure interpretation layer depth system compensation method of borehole restraint according to claim 1, it is characterised in that in step In 1, according to interval transit time, density these log synthetic seismograms demarcation stratum, stratigraphic interpretation is carried out, in stratigraphic interpretation During to check whether interpretation horizon closes.
4. the structure interpretation layer depth system compensation method of borehole restraint according to claim 1, it is characterised in that in step In 2, it is first noted that tomography is in the inheritance of upper and lower adjacent layer position, its secondary reference research during explanation tomography in seismic profile The structural evolution history in area judges that tomography is normal fault or reversed fault, if meets the tectonic stress direction in the period, tomography Whether cutting relation is correct.
5. the structure interpretation layer depth system compensation method of borehole restraint according to claim 1, it is characterised in that in step In 3, the interval velocity on stratum is tried to achieve by dix formula algorithms using stack velocity spectrum, and then tries to achieve average speed, is recycled three-dimensional Gridding technology, the average velocity field in space is established, carry out time and depth transfer and form depthwise construction figure.
6. the structure interpretation layer depth system compensation method of borehole restraint according to claim 1, it is characterised in that in step In 4, when being corrected to some layer of position or construction face, with the following method:Earthquake on each mouth well is calculated first to be layered with well Between error, the mean errors of multiple wells is uniformly subtracted, to ensure that the configuration of construction is constant;Then calculated according to Ke Lijin Method is finally corrected to original layers position grid, the aspect grid after being corrected, obtained final to error information gridding Structural map.
CN201610496754.XA 2016-06-29 2016-06-29 The structure interpretation layer depth system compensation method of borehole restraint Pending CN107544093A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610496754.XA CN107544093A (en) 2016-06-29 2016-06-29 The structure interpretation layer depth system compensation method of borehole restraint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610496754.XA CN107544093A (en) 2016-06-29 2016-06-29 The structure interpretation layer depth system compensation method of borehole restraint

Publications (1)

Publication Number Publication Date
CN107544093A true CN107544093A (en) 2018-01-05

Family

ID=60966193

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610496754.XA Pending CN107544093A (en) 2016-06-29 2016-06-29 The structure interpretation layer depth system compensation method of borehole restraint

Country Status (1)

Country Link
CN (1) CN107544093A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763814A (en) * 2019-01-09 2019-05-17 浙江财经大学 Stratum matching visual analysis method based on multi-dimensional logging data
CN110058306A (en) * 2019-04-11 2019-07-26 中国石油天然气股份有限公司 Determine the method, apparatus and computer storage medium of three-dimensional velocity body
CN111308549A (en) * 2020-03-09 2020-06-19 中国石油化工股份有限公司 Variable-speed mapping method based on model inversion
CN111999768A (en) * 2020-08-24 2020-11-27 中国石油化工股份有限公司 Construction elevation determination method based on construction model in drilling layered design
CN112529981A (en) * 2020-11-24 2021-03-19 中国煤炭地质总局地球物理勘探研究院 Depth domain coal seam floor contour line mapping method
CN113064215A (en) * 2020-01-02 2021-07-02 中国石油天然气股份有限公司 Method, device and system for constructing well calibration of map
CN114690246A (en) * 2020-12-30 2022-07-01 中国石油化工股份有限公司 Method for identifying multi-stress buried hill fault by three-principle method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5570321A (en) * 1994-03-03 1996-10-29 Atlantic Richfield Company Seismic velocity model optimization method using simulated annearling to determine prestack travel-times
CN101201408A (en) * 2006-12-12 2008-06-18 中国石油天然气集团公司 Method for constructing complex 2D seismic data flat spot control image
CN101329406A (en) * 2007-06-20 2008-12-24 中国石油天然气集团公司 Broken layer accurate homing method for improving structure diagram precision
CN101598806A (en) * 2008-06-04 2009-12-09 中国石油天然气集团公司 A kind of deviation eliminating method that improves accuracy of structural diagram

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5570321A (en) * 1994-03-03 1996-10-29 Atlantic Richfield Company Seismic velocity model optimization method using simulated annearling to determine prestack travel-times
CN101201408A (en) * 2006-12-12 2008-06-18 中国石油天然气集团公司 Method for constructing complex 2D seismic data flat spot control image
CN101329406A (en) * 2007-06-20 2008-12-24 中国石油天然气集团公司 Broken layer accurate homing method for improving structure diagram precision
CN101598806A (en) * 2008-06-04 2009-12-09 中国石油天然气集团公司 A kind of deviation eliminating method that improves accuracy of structural diagram

Non-Patent Citations (11)

* Cited by examiner, † Cited by third party
Title
刘文岭等: "具有外部漂移的克里金方法在绘制构造图中的应用", 《石油物探》 *
吴胜和等: "《油矿地质学(第四版)》", 30 June 2011, 北京:石油工业出版社 *
季玉新等: "由等t0图进行变速空间校正绘制深度构造图的计算机实现方法", 《石油物质》 *
栾鑫: "浅谈井斜校正对构造成图精度的影响", 《大庆石油地质与开发》 *
王东: "时深转换速度分析与建场方法的研究及软件实现", 《中国优秀硕士学位论文全文数据库 基础科学辑》 *
王兴军等: "低幅度构造变速成图技术", 《石油地球物理勘探》 *
甘利灯: "高含水油田地震油藏描述关键技术", 《石油勘探与开发》 *
秦政等: "用地震叠偏剖面编制构造图的原理及方法", 《石油地球物理勘探》 *
蔡希源: "《油气勘探工程师手册》", 31 December 2012, 北京:中国石化出版社 *
谢清惠等: "贝叶斯—克里金估计方法在变速成图中的应用", 《石油物探》 *
郝晓红等: "深度域地震资料解释探讨", 《海洋石油》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763814A (en) * 2019-01-09 2019-05-17 浙江财经大学 Stratum matching visual analysis method based on multi-dimensional logging data
CN109763814B (en) * 2019-01-09 2022-05-13 浙江财经大学 Stratum matching visual analysis method based on multi-dimensional logging data
CN110058306A (en) * 2019-04-11 2019-07-26 中国石油天然气股份有限公司 Determine the method, apparatus and computer storage medium of three-dimensional velocity body
CN110058306B (en) * 2019-04-11 2020-10-09 中国石油天然气股份有限公司 Method, apparatus and computer storage medium for determining three-dimensional velocity volume
CN113064215A (en) * 2020-01-02 2021-07-02 中国石油天然气股份有限公司 Method, device and system for constructing well calibration of map
CN111308549A (en) * 2020-03-09 2020-06-19 中国石油化工股份有限公司 Variable-speed mapping method based on model inversion
CN111308549B (en) * 2020-03-09 2022-01-11 中国石油化工股份有限公司 Variable-speed mapping method based on model inversion
CN111999768A (en) * 2020-08-24 2020-11-27 中国石油化工股份有限公司 Construction elevation determination method based on construction model in drilling layered design
CN111999768B (en) * 2020-08-24 2022-05-20 中国石油化工股份有限公司 Construction elevation determination method based on construction model in drilling layered design
CN112529981A (en) * 2020-11-24 2021-03-19 中国煤炭地质总局地球物理勘探研究院 Depth domain coal seam floor contour line mapping method
CN114690246A (en) * 2020-12-30 2022-07-01 中国石油化工股份有限公司 Method for identifying multi-stress buried hill fault by three-principle method
CN114690246B (en) * 2020-12-30 2023-07-07 中国石油化工股份有限公司 Method for identifying multi-stress down-the-hill fault by three principle method

Similar Documents

Publication Publication Date Title
CN107544093A (en) The structure interpretation layer depth system compensation method of borehole restraint
CN104360385B (en) The method for setting up ID interval velocity model is integrated with reference to earthquake geological knowledge
CN104977618B (en) A kind of method evaluated shale gas reservoir and find dessert area
US20180203146A1 (en) Seismic Constrained Discrete Fracture Network
Radwan Three-dimensional gas property geological modeling and simulation
CN106597533A (en) Depth domain velocity modeling method for piedmont zone seismic data processing
CN102681013B (en) Method and device for establishing carbonate rock reservoir space model
CN102636812B (en) Method for obtaining volume of reserving space of carbonate reservoir
Ampomah et al. An integrated approach for characterizing a sandstone reservoir in the Anadarko Basin
WO2017035104A1 (en) Velocity model seismic static correction
CN101634717A (en) Fine shear-wave (S-wave) impedance access technology based on logging and prestack channel set seismic data
CN104459782B (en) Horizon chromatography inversion earthquake speed modeling method with thin layers used and modeling unit
CN103733089A (en) System and method for subsurface characterization including uncertainty estimation
CN106285642B (en) Stratum pore pressure prediction method based on seismic data
CN104122582B (en) The method that accurately seismic velocity is asked for using stack velocity
CN105114063A (en) Inclined-well dual laterolog curve correction method
CN115877449B (en) Computer-implemented method for obtaining subsurface superimposed images within a survey area
Patterson et al. Integration of microseismic data, completion data, and production data to characterize fracture geometry in the Permian Basin
CN106597545A (en) Seismic prestack inversion method and device for horizontal cracks
Yin et al. Numerical simulation of the in situ stress in a high-rank coal reservoir and its effect on coal-bed methane well productivity
Yusof et al. Uncertainty analysis of hydrocarbon in place calculation using 3D seismic and well data during appraisal stage–Case study of Goldie Field, offshore Sarawak
Barthwal et al. Passive seismic tomography using recorded microseismicity: Application to mining-induced seismicity
CN104237946A (en) Single-layer reflected P-wave and reflection converted shear wave amplitude matching method based on well control
CN105589098B (en) Carbonate rock removes the reservoir inversion method and system that deposition shale laterally influences
Singleton Geophysical data processing, rock property inversion, and geomechanical model building in a Midland Basin development project, Midland/Ector counties, Texas

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180105