CN107542157A - 一种地下集水坑的快速成型施工方法 - Google Patents

一种地下集水坑的快速成型施工方法 Download PDF

Info

Publication number
CN107542157A
CN107542157A CN201610483033.5A CN201610483033A CN107542157A CN 107542157 A CN107542157 A CN 107542157A CN 201610483033 A CN201610483033 A CN 201610483033A CN 107542157 A CN107542157 A CN 107542157A
Authority
CN
China
Prior art keywords
forming die
die box
underground
catch pit
side wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610483033.5A
Other languages
English (en)
Inventor
邱战武
苏元洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201610483033.5A priority Critical patent/CN107542157A/zh
Publication of CN107542157A publication Critical patent/CN107542157A/zh
Pending legal-status Critical Current

Links

Abstract

一种地下集水坑的快速成型施工方法,其特征在于包括以下步骤:a、制作成型模盒(8):据地下集水坑大小和深度采用≥8mm厚钢板,切割钢板获取一块成型模盒底板(3),二块成型模盒长向侧壁(2)和二块成型模盒短向侧壁(1),b、安放成型模盒:用挖机开挖好地下集水坑,用抽水泵将地下集水坑内水抽干,提供吊车将制作的成型模盒吊至地下集水坑内,定好位后迅速进行成型模盒四周侧壁混凝土填充,待混凝土终凝后,拆除成型模盒,达成地下集水坑成型。本发明具有成型模盒结构简单、制作方便,快速的使集水坑成型,提高劳动效率,比支护法节约施工成本,安全施工,降低安全风险,成型模盒可以重复利用和降低工程成本的优点。

Description

一种地下集水坑的快速成型施工方法
技术领域
本发明涉及一种地下集水坑成型施工方法,具体地说,是一种地下集水坑的快速成型施工方法。
背景技术
在建筑施工中,地下建筑一般均会设计有集水坑,且埋深比较深,在基坑开挖时,不易成型。特别是在复杂地质、地下水丰富的情况下,集水坑很难成型施工。常规采取两种方法施工:支护法和支反模法。支护法需在开挖前对集水坑处进行搅拌桩支护,这种方法虽能保证后期施工安全,但施工成本极高;支反模法需在开挖中采取迅速进行边抽水边支设反模最后浇筑混凝土成型,时间要求紧,比较麻烦、费力、安全风险大。
因此已知的地下集水坑成型施工方法存在着上述种种不便和问题。
发明内容
本发明的目的,在于提出一种使用预制成型模盒的地下集水坑的快速成型施工方法。
为实现上述目的,本发明的技术解决方案是:
一种地下集水坑的快速成型施工方法,其特征在于包括以下步骤:
a、制作成型模盒:据地下集水坑大小和深度采用≥8mm厚钢板,切割钢板获取一块成型模盒底板,二块成型模盒长向侧壁和二块成型模盒短向侧壁,将成型模盒长向侧壁、成型模盒短向侧壁与成型模盒底板相互拼合焊接成以成型模盒底板为底部的桶体,成型模盒长向侧壁与成型模盒短向侧壁板之间焊接钢筋斜撑增强,在成型模盒长向两侧壁的中间位置焊接若干“U”型钢筋吊耳,制作成型模盒完成;
b、安放成型模盒:用挖机开挖好地下集水坑,用抽水泵将地下集水坑内水抽干,提供吊车将制作的成型模盒吊至地下集水坑内,定好位后迅速进行成型模盒四周侧壁混凝土填充,待混凝土终凝后,拆除成型模盒,达成地下集水坑成型。
本发明的地下集水坑的快速成型施工方法还可以采用以下的技术措施来进一步实现。
前述的方法,其中所述成型模盒底板为矩形或正方形。
采用上述技术方案后,本发明的地下集水坑的快速成型施工方法具有以下优点:
1、成型模盒结构简单、制作方便,利用普通钢板等制作成型模盒,就地取材、制作简单,无需专业人员即可制作;
2、快速的使集水坑成型,提高劳动效率,比支护法节约施工成本;
3、安全施工,降低安全风险,成型模盒可以重复利用,降低工程成本。
附图说明
图1为本发明实施例的成型模盒结构示意图;
图2为本发明实施例的成型模盒使用状态示意图。
图中:1短向侧壁,2长向侧壁,3底板,4吊耳,5斜撑,6砂土,7混凝土,8成型模盒,9地下水。
具体实施方式
以下结合实施例及其附图对本发明作更进一步说明。
实施例1
本发明的地下集水坑的快速成型施工方法,包括以下步骤:
现请参阅图1,图1为本发明实施例的成型模盒结构示意图。
a、制作成型模盒8:据地下集水坑大小和深度采用≥8mm厚钢板,切割钢板获取一块成型模盒底板3,二块成型模盒长向侧壁2和二块成型模盒短向侧壁1,将成型模盒长向侧壁、成型模盒短向侧壁与成型模盒底板相互拼合焊接成以成型模盒底板为底部的桶体,成型模盒长向侧壁与成型模盒短向侧壁板之间焊接钢筋斜撑5增强,在成型模盒长向两侧壁的中间位置焊接2个“U”型钢筋吊耳4,制作成型模盒完成。所述成型模盒底板3为矩形。
b、安放成型模盒:用挖机开挖好地下集水坑,用抽水泵将地下集水坑内水抽干,提供吊车将制作的成型模盒吊至地下集水坑内,定好位后迅速进行成型模盒四周侧壁混凝土填充,待混凝土终凝后,拆除成型模盒,达成地下集水坑成型。图2为本发明实施例的成型模盒使用状态示意图。
本发明具有实质性特点和显著的技术进步,本发明的地下集水坑的快速成型施工方法,制作了成型模盒,就地取材、制作方便、简单,能够快速的使集水坑浇筑成型,比传统的支护法和支设反模法经济、快捷、安全。
本发明的地下集水坑的快速成型施工方法在宝钢湛江钢铁1550冷轧工程中运用,地下设备基础,电气室地下室等建筑物地下结构均设计有大小不等的集水坑,且位于地下水丰富的粘土及砂质土层中,若采取支护法,需在开挖前对集水坑处进行搅拌桩支护,施工成本极高;若采取支护法,需在开挖中采取迅速进行边抽水边支设反模最后浇筑混凝土成型,时间要求紧,比较麻烦、费力、安全风险大。本发明的地下集水坑的快速成型施工方法,利用吊车吊运安放后及时填充混凝土的方法成型,其简单、方便、快捷、安全效果好、投入少、节约成本、适用性强、可重复利用。
以上实施例仅供说明本发明之用,而非对本发明的限制,有关技术领域的技术人员,在不脱离本发明的精神和范围的情况下,还可以作出各种变换或变化。因此,所有等同的技术方案也应该属于本发明的范畴,应由各权利要求限定。

Claims (2)

1.一种地下集水坑的快速成型施工方法,其特征在于包括以下步骤:
a、制作成型模盒(8):据地下集水坑大小和深度采用≥8mm厚钢板,切割钢板获取一块成型模盒底板(3),二块成型模盒长向侧壁(2)和二块成型模盒短向侧壁(1),将成型模盒长向侧壁、成型模盒短向侧壁与成型模盒底板相互拼合焊接成以成型模盒底板为底部的桶体,成型模盒长向侧壁与成型模盒短向侧壁板之间焊接钢筋斜撑(5)增强,在成型模盒长向两侧壁的中间位置焊接若干“U”型钢筋吊耳(4),制作成型模盒完成;
b、安放成型模盒:用挖机开挖好地下集水坑,用抽水泵将地下集水坑内水抽干,提供吊车将制作的成型模盒吊至地下集水坑内,定好位后迅速进行成型模盒四周侧壁混凝土填充,待混凝土终凝后,拆除成型模盒,达成地下集水坑成型。
2.如权利要求1所述的地下集水坑的快速成型施工方法,其特征在于,所述成型模盒底板(3)为矩形或正方形。
CN201610483033.5A 2016-06-28 2016-06-28 一种地下集水坑的快速成型施工方法 Pending CN107542157A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610483033.5A CN107542157A (zh) 2016-06-28 2016-06-28 一种地下集水坑的快速成型施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610483033.5A CN107542157A (zh) 2016-06-28 2016-06-28 一种地下集水坑的快速成型施工方法

Publications (1)

Publication Number Publication Date
CN107542157A true CN107542157A (zh) 2018-01-05

Family

ID=60962073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610483033.5A Pending CN107542157A (zh) 2016-06-28 2016-06-28 一种地下集水坑的快速成型施工方法

Country Status (1)

Country Link
CN (1) CN107542157A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109881684A (zh) * 2019-04-08 2019-06-14 江苏建筑职业技术学院 一种基坑土建施工防潮水设施

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101220669A (zh) * 2005-06-06 2008-07-16 邱则有 一种现浇砼空心板用空腔模壳构件
KR101205814B1 (ko) * 2011-12-12 2012-11-28 성우건설 주식회사 터널 포장면 용출수 방지를 위한 집수정과 집수정 시공방법
CN103015456A (zh) * 2011-09-21 2013-04-03 五冶集团上海有限公司 地下混凝土构筑物基础底板中的坑中坑快速支模法
CN103556819A (zh) * 2013-11-23 2014-02-05 中建四局第六建筑工程有限公司 一种在梁板上预留构造柱孔洞的施工方法
CN104947677A (zh) * 2014-03-28 2015-09-30 中国二十冶集团有限公司 坑中坑快速围堰填充施工方法
CN104963345A (zh) * 2015-06-06 2015-10-07 黄勤 胎模结构及浇筑方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101220669A (zh) * 2005-06-06 2008-07-16 邱则有 一种现浇砼空心板用空腔模壳构件
CN103015456A (zh) * 2011-09-21 2013-04-03 五冶集团上海有限公司 地下混凝土构筑物基础底板中的坑中坑快速支模法
KR101205814B1 (ko) * 2011-12-12 2012-11-28 성우건설 주식회사 터널 포장면 용출수 방지를 위한 집수정과 집수정 시공방법
CN103556819A (zh) * 2013-11-23 2014-02-05 中建四局第六建筑工程有限公司 一种在梁板上预留构造柱孔洞的施工方法
CN104947677A (zh) * 2014-03-28 2015-09-30 中国二十冶集团有限公司 坑中坑快速围堰填充施工方法
CN104963345A (zh) * 2015-06-06 2015-10-07 黄勤 胎模结构及浇筑方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109881684A (zh) * 2019-04-08 2019-06-14 江苏建筑职业技术学院 一种基坑土建施工防潮水设施
CN109881684B (zh) * 2019-04-08 2024-03-15 江苏建筑职业技术学院 一种基坑土建施工防潮水设施

Similar Documents

Publication Publication Date Title
CN105926803B (zh) 一种具有凹凸纹路的3d打印配筋砌体剪力墙结构
CN206298900U (zh) 一种地下连续墙预埋式钢围檩堵头体系
CN105839946B (zh) 砖混结构建筑物提升增层方法
CN103882869A (zh) 一种用于基坑围护的斜向支撑桩结构及其施工方法
CN101793023A (zh) 一种基坑施工方法
CN105133619B (zh) 电梯井深基坑施工方法
CN104328790B (zh) 现浇喷射混凝土暗承台及暗地梁胎模
CN104775439B (zh) 一种基坑支护止水一体化结构及其施工方法
CN104358275B (zh) 较深电梯井或集水井施工方法
CN206204972U (zh) 一种兼作井点降水的预制管桩
CN110886311A (zh) 一种大体量装配式地胎模
CN206768860U (zh) 一种连拱式挡土墙
CN204959787U (zh) 一种新型塔吊组合式基础
CN110004974A (zh) 一种预制防水挡土墙板结构及其施工方法
CN111827280B (zh) 一种异位浇筑顶升就位挖孔桩护壁装置及其施工方法
CN107542157A (zh) 一种地下集水坑的快速成型施工方法
CN104131570A (zh) 用于基坑施工的钢箱围护装置及其施工方法
CN108104112B (zh) 一种基于原土原位制浆的地下墙体施工方法
CN203049588U (zh) 坑中坑筒模
CN105625435B (zh) 海积岛屿多截面、多层次异型设备深基坑快速成型方法
CN203947481U (zh) 组合式型钢桩横挡板支护结构
CN203334294U (zh) 一种基坑组合支护结构
CN109653193B (zh) 逆作地下连续墙施工方法
CN102561389B (zh) 一种地下连续墙接头管的施工方法
CN203603162U (zh) 一种位于基坑边的施工电梯荷载基础系统

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180105

RJ01 Rejection of invention patent application after publication