CN107542104A - A kind of pre-buried support of derrick crane lower margin - Google Patents

A kind of pre-buried support of derrick crane lower margin Download PDF

Info

Publication number
CN107542104A
CN107542104A CN201610469711.2A CN201610469711A CN107542104A CN 107542104 A CN107542104 A CN 107542104A CN 201610469711 A CN201610469711 A CN 201610469711A CN 107542104 A CN107542104 A CN 107542104A
Authority
CN
China
Prior art keywords
punching block
bolt
horizontal
ground
tower crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610469711.2A
Other languages
Chinese (zh)
Inventor
申泽民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610469711.2A priority Critical patent/CN107542104A/en
Publication of CN107542104A publication Critical patent/CN107542104A/en
Pending legal-status Critical Current

Links

Abstract

A kind of pre-buried support of derrick crane lower margin of the present invention belongs to Architectural Equipment field, overcome in traditional tower crane ground and pre-embedded bolt process of construction and simply simply use horizon rule and tape measure, positioning to the level and pre-embedded bolt of ground operates, it is unhorizontal to easily cause terrace, Bolt sizes are not accurate, tower crane has tilt phenomenon after installing, and causes potential safety hazard.Solves the support that the former deficiency has invented tower crane foundation ditch terrace level and pre-embedded bolt positioning, bolt is positioned using horizontal and vertical punching block standard size bolt hole, put down over the ground equipped with high-accuracy water level on horizontal and vertical punching block and carry out horizontal detection, it is ensured that tower crane installs perpendicular to the ground.

Description

A kind of pre-buried support of derrick crane lower margin
Technical field
A kind of pre-buried support of derrick crane lower margin of the present invention belongs to Architectural Equipment field, and more particularly to terrace is horizontal when mounted and pre-embedded bolt accurate positioning for tower crane.
Background technology
Simply simply horizon rule and tape measure are used in traditional tower crane ground and pre-embedded bolt work progress, the level of ground and the positioning of pre-embedded bolt are operated, easily cause that terrace is not horizontal, and Bolt sizes are not accurate, tower crane has tilt phenomenon after installing, and causes potential safety hazard.
Patent of invention content
A kind of pre-buried support of derrick crane lower margin of the present invention, overcome in traditional tower crane ground and pre-embedded bolt process of construction and simply simply use horizon rule and tape measure, positioning to the level and pre-embedded bolt of ground operates, it is unhorizontal to easily cause terrace, Bolt sizes are not accurate, tower crane has tilt phenomenon after installing, and causes potential safety hazard.Solves the support that the former deficiency has invented tower crane foundation ditch terrace level and pre-embedded bolt positioning, bolt is positioned using horizontal and vertical punching block standard size bolt hole, put down over the ground equipped with high-accuracy water level on horizontal and vertical punching block and carry out horizontal detection, it is ensured that tower crane installs perpendicular to the ground.
Present invention is achieved through the following technical solutions:
A kind of pre-buried support of derrick crane lower margin:Longitudinal punching block 1, horizontal punching block 2, bolt positioning punching block 3, pre-embedded bolt 4, lateral level 5, vertical equity instrument 6, center fixing bolt 7 can be divided into, longitudinal punching block 1 is connected by center fixing bolt 7 with horizontal punching block 2, bolt positioning punching block 3 is respectively arranged in the both ends of longitudinal punching block 1 and horizontal punching block 2, pre-embedded bolt 4 is connected with bolt positioning punching block 3, lateral level 5 is installed on the centre position of horizontal punching block 2, and vertical equity instrument 6 is installed on the centre position of longitudinal punching block 1.
Brief description of the drawings
Fig. 1 is a kind of pre-buried support front view of derrick crane lower margin:
Embodiment
Further illustrate how the present invention is implemented in conjunction with accompanying drawing 1:
A kind of pre-buried support of derrick crane lower margin:Longitudinal punching block, horizontal punching block, bolt positioning punching block, pre-embedded bolt, lateral level, vertical equity instrument, center fixing bolt can be divided into, longitudinal punching block is connected by center fixing bolt with horizontal punching block, bolt positioning punching block is respectively arranged in the both ends of longitudinal punching block and horizontal punching block, pre-embedded bolt is connected with bolt positioning punching block, lateral level is installed on the centre position of horizontal punching block, and vertical equity instrument is installed on the centre position of longitudinal punching block.
A kind of pre-buried support of derrick crane lower margin of the present invention is in use,First foundation ditch is dug to defined standard,The concrete poured into again to foundation ditch,The bolt positioning punching block of the pre-embedded bolt supporting with tower crane base and horizontal location support is sequentially connected and installed,The bottom surface of horizontal stand is painted into releasing agent,Pre-embedded bolt and horizontal location support are integrally put into foundation ditch,The one of pre-embedded bolt band hook is upside down,The one side of horizontal location supporting band level meter is upward,Bottom surface and ground keep level of the vertical equity support with transverse horizontal support,It is defined by horizontal pointer,And it is suspended on foundation ditch center,Foundation ditch concrete is filled up,Vibratory concrete is reached into dense effect with vibrating head,And the horizontal and vertical level of horizontal stand is adjusted by level meter,Make being intimately associated for concrete and horizontal stand bottom surface,After treating 120 hours,Unload horizontal location support,Can construction and installation tower crane.

Claims (1)

  1. A kind of 1. pre-buried support of derrick crane lower margin:Longitudinal punching block (1) can be divided into, horizontal punching block (2), bolt positioning punching block (3), pre-embedded bolt (4), lateral level (5), vertical equity instrument (6), center fixing bolt (7), it is characterized in that longitudinal punching block (1) is connected by center fixing bolt (7) with horizontal punching block (2), bolt positioning punching block (3) is respectively arranged in the both ends of longitudinal punching block (1) and horizontal punching block (2), pre-embedded bolt (4) is connected with bolt positioning punching block (3), lateral level (5) is installed on the centre position of horizontal punching block (2), vertical equity instrument (6) is installed on the centre position of longitudinal punching block (1).
CN201610469711.2A 2016-06-26 2016-06-26 A kind of pre-buried support of derrick crane lower margin Pending CN107542104A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610469711.2A CN107542104A (en) 2016-06-26 2016-06-26 A kind of pre-buried support of derrick crane lower margin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610469711.2A CN107542104A (en) 2016-06-26 2016-06-26 A kind of pre-buried support of derrick crane lower margin

Publications (1)

Publication Number Publication Date
CN107542104A true CN107542104A (en) 2018-01-05

Family

ID=60959901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610469711.2A Pending CN107542104A (en) 2016-06-26 2016-06-26 A kind of pre-buried support of derrick crane lower margin

Country Status (1)

Country Link
CN (1) CN107542104A (en)

Similar Documents

Publication Publication Date Title
CN204286365U (en) Foundation pit side-wall displacement monitor
CN105926672A (en) Mined metro station steel pipe column construction method
CN205808417U (en) A kind of vertical detection device of building template
CN205296121U (en) Automatic inclinometer of compensating beam
CN104404888B (en) A kind of large-scale aerial gradient adjustment Lift-on/Lift-off System and application
CN203798350U (en) Open caisson squareness measurement device
CN203908537U (en) Earth' surface three dimensional deformation integrated monitoring device
CN107542104A (en) A kind of pre-buried support of derrick crane lower margin
CN205116524U (en) Adjustable jib
CN103938646A (en) Bracket for leveling tower cane foundation pit terrace and positioning embedded bolts
CN107542100A (en) A kind of fixing means of derrick crane lower margin embedded bracket
CN206208430U (en) A kind of tension measuring device and system
CN203846521U (en) Support for leveling terrace of foundation ditch of tower crane and positioning embedded bolts
CN105297762A (en) Adjustable high-precision supporting frame
CN104006798B (en) Pier stud verticality measuring instrument
CN201561756U (en) Assistant alignment device for construction setting-out
CN109750685A (en) A kind of tower crane bracket
CN204163124U (en) In a kind of cotton rope formula hole, position embedded device demarcated by instrument
CN204127480U (en) A kind of detachable built-in pipe channel fixing device
CN209025090U (en) A kind of foundation pit construction parameter detection device
CN204645628U (en) Street lamp post stone bolt locating template
KR101487464B1 (en) Survey Control Point Cradle
KR102170676B1 (en) Control point for surveying
CN203747354U (en) Portable coal mine well traverse point
CN204694255U (en) A kind of square installs and measures frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180105