CN201561756U - Assistant alignment device for construction setting-out - Google Patents

Assistant alignment device for construction setting-out Download PDF

Info

Publication number
CN201561756U
CN201561756U CN200920207167XU CN200920207167U CN201561756U CN 201561756 U CN201561756 U CN 201561756U CN 200920207167X U CN200920207167X U CN 200920207167XU CN 200920207167 U CN200920207167 U CN 200920207167U CN 201561756 U CN201561756 U CN 201561756U
Authority
CN
China
Prior art keywords
alignment device
level crossing
unwrapping wire
construction
construction work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200920207167XU
Other languages
Chinese (zh)
Inventor
刘国模
邹星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN200920207167XU priority Critical patent/CN201561756U/en
Application granted granted Critical
Publication of CN201561756U publication Critical patent/CN201561756U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to an assistant alignment device for construction setting-out, which comprises a planar mirror and support legs arranged at the bottom of the planar mirror, wherein a circular level is arranged on the planar mirror. The assistant alignment device for construction setting-out has simple structure, can determine the setting out-position accurately and easily and is convenient to operate.

Description

The construction work unwrapping wire is assisted the alignment device
Technical field
The utility model relates in the building engineering construction industry, builds on the construction ground during unwrapping wire planning to build, and determines the auxiliary alignment device of construction work unwrapping wire of unwrapping wire position.
Background technology
Needing to carry out the construction line-putting in building construction, road construction and structures construction, is exactly that the pattern in the construction drawing is thrown on the ground with the lime line or the line of ink marker, just carries out program of following step then.Ground before the building operation has the bigger gradient, pit and fluctuating, unwrapping wire on such ground, present way is to draw the back to adopt the ceiling hammer location stay cord, one people's lifting plumb bob, another people is at underground definite alignment (point), and ceiling hammer all around rocks and is difficult to stablize during operation, and moving also of ceiling hammer bothers very much, the line position that emits is of poor quality, if half-hearted check will bring hidden danger to construction quality.
The utility model content
The purpose of this utility model provides the auxiliary alignment device of a kind of construction work unwrapping wire, can make things convenient for the ground unwrapping wire position of determining exactly before building operation.
Construction work unwrapping wire described in the utility model is assisted the alignment device, is made up of level crossing and the feet that is installed in the level crossing bottom surface, and level crossing is provided with circular bubble.
Circular bubble is installed in the level crossing center position, and the even mounting arrangements of also available circular bubble more than two is at the level crossing edge.
The feet lower end is tip shape, when this construction work unwrapping wire of installation is assisted the alignment device, feet can be inserted in the soil, and this device can firmly be positioned on the up-and-down ground.
Feet preferably can carry out height to be regulated, and when this construction work unwrapping wire of installation is assisted the alignment device, by the adjusting to the feet height, can conveniently level crossing be transferred to level.
During use, this device is positioned over the low lying ground place, be positioned at the stay cord that draws under, regulate the height of feet, make level crossing be in horizontality by observing circular bubble, at this moment, to in level crossing, see the image of stay cord the observer above the stay cord, when the observer moves sight line, when stay cord image in stay cord and the level crossing is coincided, it is the unwrapping wire position that the stay cord that the observer saw projects to ground position, and the operator at the low lying ground place can rule according to the commander of the observer above the stay cord.
The auxiliary alignment apparatus structure of construction work unwrapping wire described in the utility model is simple, can carry out accurately determining to the unwrapping wire position at an easy rate, and operation is very easy.
Description of drawings
Now in conjunction with the accompanying drawings the utility model is described in further detail.
Fig. 1 looks synoptic diagram for the master of a kind of concrete structure of the utility model;
Fig. 2 is the vertical view of Fig. 1;
Fig. 3 looks synoptic diagram for the master of the another kind of concrete structure of the utility model;
Fig. 4 is the vertical view of Fig. 3.
Embodiment
Embodiment one:
As depicted in figs. 1 and 2, the auxiliary alignment device of this construction work unwrapping wire is made up of level crossing 2 and feet 3, level crossing 2 is oval, three feets 3 are installed in level crossing 2 bottom surfaces, the height of feet 3 can be regulated, its lower end is tip shape, at level crossing 2 center positions a circular bubble 1 is installed.
Embodiment two:
As shown in Figure 3 and Figure 4, the auxiliary alignment device of this construction work unwrapping wire is made up of level crossing 2 and feet 3, level crossing 2 is circular, three feets 3 are installed in level crossing 2 bottom surfaces, the height of feet 3 can be regulated, its lower end is tip shape, at level crossing 2 edges three circular bubbles 1 is installed, and it is evenly distributed on the edge of level crossing 2.

Claims (4)

1. the auxiliary alignment device of a construction work unwrapping wire is characterized in that: be made up of level crossing (2) and the feet (3) that is installed in the level crossing bottom surface, level crossing is provided with circular bubble (1).
2. according to the auxiliary alignment device of the described construction work unwrapping wire of claim 1, it is characterized in that: circular bubble (1) is installed in level crossing (2) center position.
3. according to the auxiliary alignment device of the described construction work unwrapping wire of claim 1, it is characterized in that: circular bubble (1) has two at least, and its even mounting arrangements is at level crossing (2) edge.
4. according to the auxiliary alignment device of the described construction work unwrapping wire of claim 1, it is characterized in that: feet (3) lower end is tip shape.
CN200920207167XU 2009-11-17 2009-11-17 Assistant alignment device for construction setting-out Expired - Fee Related CN201561756U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920207167XU CN201561756U (en) 2009-11-17 2009-11-17 Assistant alignment device for construction setting-out

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920207167XU CN201561756U (en) 2009-11-17 2009-11-17 Assistant alignment device for construction setting-out

Publications (1)

Publication Number Publication Date
CN201561756U true CN201561756U (en) 2010-08-25

Family

ID=42626902

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920207167XU Expired - Fee Related CN201561756U (en) 2009-11-17 2009-11-17 Assistant alignment device for construction setting-out

Country Status (1)

Country Link
CN (1) CN201561756U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103471573A (en) * 2013-10-06 2013-12-25 中国二十二冶集团有限公司 Leveling reflector device and horizontal line quick releasing method thereof
CN109936405A (en) * 2019-01-30 2019-06-25 合肥学院 Captive unmanned plane emergency communication system based on fiber optic stretch

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103471573A (en) * 2013-10-06 2013-12-25 中国二十二冶集团有限公司 Leveling reflector device and horizontal line quick releasing method thereof
CN103471573B (en) * 2013-10-06 2016-03-02 中国二十二冶集团有限公司 Anping mirror apparatus and the method for horizontal line high speed payout thereof
CN109936405A (en) * 2019-01-30 2019-06-25 合肥学院 Captive unmanned plane emergency communication system based on fiber optic stretch

Similar Documents

Publication Publication Date Title
CN202562406U (en) Mining fissure monitoring device
CN204781624U (en) Floor elevation and roughness controlling means
CN106638318B (en) The localization method and cable guide pipe installation method of cable-stayed bridge beam-ends anchor point
CN205156916U (en) Detection apparatus for be used for constructional steel form setting straightness that hangs down
CN103471573B (en) Anping mirror apparatus and the method for horizontal line high speed payout thereof
CN201561756U (en) Assistant alignment device for construction setting-out
CN102966254B (en) Arrangement method for measuring tower used for construction of stub matching method
CN202119433U (en) Laser vertical line device
CN103983256B (en) A kind of contact network in tunnel casts anchor construction survey method
CN104006798B (en) Pier stud verticality measuring instrument
CN203323740U (en) Building settlement nondestructive measurement leveling rod bracket
CN209541687U (en) A kind of cross distribution point method measurement combined bay
CN203772295U (en) Inverted ruler frame capable of adjusting observation position of leveling staff
CN201081703Y (en) Aircraft body level measuring point tester
CN206311102U (en) Simple slope construction lofting instrument
CN204313839U (en) A kind of laser plummet axis projection mounting base
CN208984063U (en) A kind of engineering construction setting-out Sopwith staff device
CN104180777A (en) Measuring tool
CN203893846U (en) Pier stud perpendicularity measuring instrument
CN102494579A (en) Box body state measurement method in one-dimensional jacking construction process of large box body
CN202787986U (en) Paying off auxiliary device in constructional engineering
CN204831200U (en) Pavement width automatic measuring device
CN209243768U (en) A kind of convenient utility for building inspection shaft
CN203364827U (en) Plumb positioning measurement device for high-rise building
CN206311097U (en) A kind of earth excavation control device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100825