CN107526026A - Inspection tool for FPC grafting - Google Patents

Inspection tool for FPC grafting Download PDF

Info

Publication number
CN107526026A
CN107526026A CN201710771341.2A CN201710771341A CN107526026A CN 107526026 A CN107526026 A CN 107526026A CN 201710771341 A CN201710771341 A CN 201710771341A CN 107526026 A CN107526026 A CN 107526026A
Authority
CN
China
Prior art keywords
fpc
plugboard
magnetic part
connecting seat
grafting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710771341.2A
Other languages
Chinese (zh)
Other versions
CN107526026B (en
Inventor
陈建
焦云翔
蔺德御
刘国强
刘大海
林伟东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BOE Technology Group Co Ltd
Beijing BOE Vacuum Technology Co Ltd
Original Assignee
BOE Technology Group Co Ltd
Beijing BOE Optoelectronics Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BOE Technology Group Co Ltd, Beijing BOE Optoelectronics Technology Co Ltd filed Critical BOE Technology Group Co Ltd
Priority to CN201710771341.2A priority Critical patent/CN107526026B/en
Publication of CN107526026A publication Critical patent/CN107526026A/en
Application granted granted Critical
Publication of CN107526026B publication Critical patent/CN107526026B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/28Testing of electronic circuits, e.g. by signal tracer
    • G01R31/2801Testing of printed circuits, backplanes, motherboards, hybrid circuits or carriers for multichip packages [MCP]
    • G01R31/2806Apparatus therefor, e.g. test stations, drivers, analysers, conveyors
    • G01R31/2808Holding, conveying or contacting devices, e.g. test adapters, edge connectors, extender boards
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K3/00Apparatus or processes for manufacturing printed circuits
    • H05K3/36Assembling printed circuits with other printed circuits
    • H05K3/361Assembling flexible printed circuits with other printed circuits
    • H05K3/365Assembling flexible printed circuits with other printed circuits by abutting, i.e. without alloying process

Abstract

The invention discloses a kind of inspection tool for FPC grafting, including:Support;First circuit board, first circuit board are located on support, and first circuit board is provided with connecting seat;Plugboard, plugboard are provided with mounting groove, and FPC is located in mounting groove, and plugboard is movably located on support so that FPC is connected or separated with connecting seat.According to the inspection tool for FPC grafting of the present invention, by setting moveable plugboard on support, and FPC is located in the mounting groove on plugboard, FPC and connecting seat connection can be realized during plugboard moves and separated, realize FPC autopatching, grafting speed is fast, efficiency high, it is possible to prevente effectively from inserting the bad phenomenon such as inclined, anti-inserted, improve qualification rate, cost is reduced, avoids the waste of goods, materials and equipments.In addition, this kind of structure, without being operated with hand, connecting seat does not contact with hand, can preferably protect connecting seat, prevent that connecting seat is damaged.

Description

Inspection tool for FPC grafting
Technical field
The present invention relates to FPC grafting technical fields, more particularly, to a kind of inspection tool for FPC grafting.
Background technology
In correlation technique, existing module end points lamp inspection looks into tool, manually can only control FPC and lighting inspection Tool is attached, then could lighting inspection.However, manual plugging mode has a variety of shortcomings, such as grafting speed is slow, efficiency It is low, easily insert partially, it is easily anti-inserted, breakage etc. is easily made, these shortcomings have seriously affected the raising of production capacity, the reduction of cost, production Protection of product etc..Therefore, a kind of FPC autopatchings are designed and check that tool is the inexorable trend of intelligence manufacture development.
The content of the invention
It is contemplated that at least solves one of technical problem present in prior art.Therefore, the present invention proposes a kind of use In the inspection tool of FPC grafting, the inspection tool for FPC grafting has the advantages of grafting speed is fast, efficiency high.
Inspection tool for FPC grafting according to embodiments of the present invention, including:Support;First circuit board, described first Circuit board is set on the bracket, and the first circuit board is provided with connecting seat;Plugboard, the plugboard are provided with installation Groove, the FPC are located in the mounting groove, the plugboard movably set on the bracket so that the FPC with it is described Connecting seat connects or separation.
Inspection tool for FPC grafting according to embodiments of the present invention, by setting moveable grafting on support Plate, and FPC is located in the mounting groove on plugboard, the company of FPC and connecting seat can be realized during plugboard moves Connect and separate, realize FPC autopatching, grafting speed is fast, efficiency high, it is possible to prevente effectively from inserting inclined, anti-inserted etc. bad existing As improving qualification rate, reducing cost, avoid the waste of goods, materials and equipments.In addition, this kind of structure need not be operated with hand, connecting seat Do not contacted with hand, can preferably protect connecting seat, prevent that connecting seat is damaged.
According to some embodiments of the present invention, the support is provided with the first magnetic part and the second magnetic part, and described first The moving direction of magnetic part and second magnetic part along the plugboard is arranged at intervals, and the plugboard is provided with magnetic part, The magnetic part is located between first magnetic part and second magnetic part.
According to some embodiments of the present invention, moving direction extension of the mounting groove along the plugboard.
According to some embodiments of the present invention, the plugboard is provided with stopper slot, the stopper slot and the mounting groove Connection, the FPC are provided with the projection coordinated with the groove.
In some embodiments of the invention, the bottom wall of the stopper slot is provided with alignment pin, it is described it is raised be provided with The positioning hole of the detent fit.
According to some embodiments of the present invention, in addition to cover plate, the cover plate and the plugboard be rotatably coupled with Open or close the opening of the mounting groove.
In some embodiments of the invention, the rotary shaft of the cover plate is located at the remote connecting seat of the mounting groove End, the bottom wall of the end of the mounting groove is provided with the through hole run through.
In some embodiments of the invention, the cover plate is provided with multiple 3rd magnetic parts, and the plugboard is provided with Multiple the 4th magnetic parts coordinated with the 3rd magnetic part.
According to some embodiments of the present invention, in addition to micrometer, one end of the micrometer is connected with the support, institute The one end for stating micrometer is connected with the plugboard.
According to some embodiments of the present invention, in addition to:Second circuit board, the second circuit board are located at the support On, the second circuit board is provided with light emitting diode.
The additional aspect and advantage of the present invention will be set forth in part in the description, and will partly become from the following description Obtain substantially, or recognized by the practice of the present invention.
Brief description of the drawings
The above-mentioned and/or additional aspect and advantage of the present invention will become in the description from combination accompanying drawings below to embodiment Substantially and it is readily appreciated that, wherein:
Fig. 1 is the structural representation of the support of the inspection tool for being used for FPC grafting according to embodiments of the present invention;
Fig. 2 is the part-structure schematic diagram of the inspection tool for being used for FPC grafting according to embodiments of the present invention;
Fig. 3 is the part-structure schematic diagram of the inspection tool for being used for FPC grafting according to embodiments of the present invention;
Fig. 4 is the part-structure schematic diagram of the according to embodiments of the present invention inspection tool for being used for FPC grafting, its cover plate In open mode;
Fig. 5 is the part-structure schematic diagram of the according to embodiments of the present invention inspection tool for being used for FPC grafting, its cover plate In open mode, and FPC separates with connecting seat;
Fig. 6 is the part-structure schematic diagram of the according to embodiments of the present invention inspection tool for being used for FPC grafting, its cover plate It is closed;
Fig. 7 is the part-structure schematic diagram of the according to embodiments of the present invention inspection tool for being used for FPC grafting, its cover plate It is closed and FPC is connected with connecting seat.
Reference:
Tool 100 is checked,
Support 1, bottom plate 11, pinboard 111, the first mounting bracket 12, mounting hole 121, the first magnetic part 122, the second installation Frame 13, module supporting plate 14, die cavity 141, screen 15,
First circuit board 2, connecting seat 21,
Plugboard 3, mounting groove 31, stopper slot 32, alignment pin 321, magnetic part 33, through hole 34, the 4th magnetic part 35,
Cover plate 4, the 3rd magnetic part 41,
FPC 5, projection 51, positioning hole 52,
Micrometer 6, second circuit board 7, light emitting diode 71, electric source line interface 72.
Embodiment
Embodiments of the invention are described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning to end Same or similar label represents same or similar element or the element with same or like function.Below with reference to attached The embodiment of figure description is exemplary, is only used for explaining the present invention, and is not considered as limiting the invention.
In the description of the invention, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " length ", " width ", " thickness ", " on ", " under ", "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom " " interior ", " outer ", " up time The orientation or position relationship of the instruction such as pin ", " counterclockwise ", " axial direction ", " radial direction ", " circumference " be based on orientation shown in the drawings or Position relationship, it is for only for ease of and describes the present invention and simplify description, rather than indicates or imply that signified device or element must There must be specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.In addition, limit Surely there is " first ", one or more this feature can be expressed or be implicitly included to the feature of " second ".The present invention's In description, unless otherwise indicated, " multiple " are meant that two or more.
In the description of the invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can To be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected by intermediary, Ke Yishi The connection of two element internals.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this Concrete meaning in invention.
Below with reference to Fig. 1-Fig. 7 descriptions inspection tool 100 for the grafting of FPC 5 according to embodiments of the present invention, check Tool 100 can be that module end points lamp inspection looks into tool 100.
As shown in Fig. 1-Fig. 7, the inspection tool 100 for the grafting of FPC 5 according to embodiments of the present invention, including:Support 1st, first circuit board 2 and plugboard 3.
Specifically, as shown in figure 1, module supporting plate 14 can be provided with support 1, die cavity can be provided with module supporting plate 14 141, screen 15 can be provided with die cavity 141, first circuit board 2 is located on support 1, and first circuit board 2 is connected with screen 15, and One circuit board 2 is provided with connecting seat 21.As shown in Figure 4 and Figure 5, plugboard 3 is provided with mounting groove 31, and FPC 5 is located at mounting groove In 31, plugboard 3 is movably located on support 1 so that FPC 5 is connected or separated with connecting seat 21, and plugboard 3 is mobile During, drive the FPC 5 in mounting groove 31 to move, so as to realize FPC 5 and connecting seat 21 connection and separate.
Inspection tool 100 for the grafting of FPC 5 according to embodiments of the present invention, it is removable by being set on support 1 Plugboard 3, and FPC 5 is located in the mounting groove 31 on plugboard 3, FPC can be realized during plugboard 3 moves 5 with the connection of connecting seat 21 and separate, realize FPC 5 autopatching, grafting speed is fast, efficiency high, it is possible to prevente effectively from The bad phenomenon such as inclined, anti-inserted is inserted, qualification rate is improved, reduces cost, avoid the waste of goods, materials and equipments.In addition, this kind of structure without It need to be operated with hand, connecting seat 21 does not contact with hand, can preferably protect connecting seat 21, prevents that connecting seat 21 is damaged.
In some embodiments of the invention, as shown in Fig. 2, Fig. 4-Fig. 7, support 1 is provided with the first magnetic part 122 and the Two magnetic parts, the moving direction of the first magnetic part 122 and the second magnetic part along plugboard 3 are arranged at intervals, and plugboard 3 is provided with magnetic Suction portion 33, magnetic part 33 are located between the first magnetic part 122 and the second magnetic part.When the first magnetic part 122 and the phase of magnetic part 33 During suction, magnetic part 33 moves towards the direction of the first magnetic part 122, so as to drive plugboard 3 towards the side of the first magnetic part 122 To movement, when the second magnetic part and magnetic part 33 are attracting, magnetic part 33 moves towards the direction of the second magnetic part, so as to drive Plugboard 3 moves towards the direction of the second magnetic part, so as to realize FPC 5 and connecting seat 21 automatic connection and separate, so as to Reach the purpose of lighting inspection.
For example, in the example shown in Fig. 2, Fig. 4-Fig. 7, the first magnetic part 122 and the second magnetic part prop up to be multiple Frame 1 is provided with the first mounting bracket 12 and the second mounting bracket 13, and the first mounting bracket 12 is set close to connecting seat 21, the first mounting bracket 12 For two, two the first mounting brackets 12 are respectively provided at the both sides of plugboard 3, and the first mounting bracket 12 is provided with multiple through side wall Mounting hole 121, the first magnetic part 122 are located in the mounting hole 121 of the first mounting bracket 12;Second mounting bracket 13 is away from connecting seat 21 Set, the second mounting bracket 13 is two, and two the second mounting brackets 13 are respectively provided at the both sides of plugboard 3, on the second mounting bracket 13 Provided with multiple mounting holes 121 through side wall, the second magnetic part is located in the mounting hole 121 of the second mounting bracket 13.Magnetic simultaneously Portion 33 is provided with the magnetic absorption member through magnetic part 33, one end of magnetic absorption member be suitable to it is attracting with the first magnetic part 122, magnetic absorption member it is another One end is suitable to attracting with the second magnetic part.
As shown in Figure 4 and Figure 5, when the magnetic absorption member in magnetic part 33 and the second magnetic part on the second mounting bracket 13 are attracting When, magnetic part 33 is bonded with the second mounting bracket 13, and FPC 5 separates with connecting seat 21;As shown in Figure 6 and Figure 7, when in magnetic part 33 Magnetic absorption member and the first mounting bracket 12 on the first magnetic part 122 it is attracting when, magnetic part 33 is bonded with the first mounting bracket 12, FPC 5 are connected with connecting seat 21.
In some embodiments of the invention, as shown in Figure 4 and Figure 5, moving direction of the mounting groove 31 along plugboard 3 prolongs Stretch.Correspondingly, moving direction extensions of the FPC 5 along plugboard 3.Thus it is easy to FPC 5 and connecting seat 21 connection and separates, just Lighting inspection is carried out in inspection tool 100.
In some embodiments of the invention, plugboard 3 is provided with stopper slot 32, and stopper slot 32 connects with mounting groove 31. As shown in Figure 4 and Figure 5, the both sides of mounting groove 31 are respectively equipped with a stopper slot 32 connected with mounting groove 31, two stopper slots 32 on mounting groove 31 center line it is symmetrical, stopper slot 32 is square groove, certainly, the invention is not restricted to this, stopper slot 32 Can also be circular trough, elliptical slot or other polygon grooves.FPC 5 is provided with the projection 51 coordinated with groove, it is possible thereby to Increase the reliability that mounting groove 31 and FPC 5 are fixed, so as to ensure reliability that FPC 5 is connected with connecting seat 21.
Further, as shown in Figure 4 and Figure 5, the bottom wall of stopper slot 32 is provided with alignment pin 321, projection 51 be provided with The positioning hole 52 that alignment pin 321 coordinates.When FPC 5 is installed in mounting groove 31, alignment pin 321 is determined through in projection 51 Position hole 52, can so as to be further ensured that FPC 5 is connected with connecting seat 21 so as to further improve the reliability that FPC 5 is fixed By property.
According to some embodiments of the present invention, as Figure 4-Figure 7, check that tool 100 also includes cover plate 4, cover plate 4 is with inserting Fishplate bar 3 is rotatably coupled to open or close the opening of mounting groove 31.Cover plate 4 can improve FPC 5 with the fastening of plugboard 3 and consolidate Fixed reliability.Further, as shown in Figure 4 and Figure 5, the rotary shaft of cover plate 4 is located at the remote connecting seat 21 of mounting groove 31 End, the bottom wall of the end of mounting groove 31 are provided with the through hole 34 run through.Thus, it is possible to the rotary shaft of cover plate 4 is avoided to FPC 5 Grafting produce interference, in addition FPC 5 tail end can be extended downwardly from by through hole 34 so that FPC 5 other end be crimped on turn On fishplate bar 111.
In some embodiments of the invention, cover plate 4 is provided with multiple 3rd magnetic parts 41, and plugboard 3 is provided with multiple The 4th magnetic part 35 coordinated with the 3rd magnetic part 41.Thus, it is possible to the reliability connected between cover plate 4 and plugboard 3 is improved, So as to improve the reliability of the fixations of FPC 5, and then improve the reliability that FPC 5 is connected with connecting seat 21.
In some embodiments of the invention, as shown in Figures 2 and 3, check that tool 100 also includes micrometer 6, micrometer 6 one end is connected with support 1, and one end of micrometer 6 is connected with the lower section of plugboard 3.Grafting FPC 5 and connecting seat 21 height It should be maintained at same level, if not at same level, be then adjusted by the micrometer 6 of the lower section of plugboard 3, so as to The connection being easy between FPC 5 and connecting seat 21.
In some embodiments of the invention, check that tool 100 also includes second circuit board 7, second circuit board 7 is located at branch On frame 1, second circuit board 7 is provided with light emitting diode 71.Because producing line PI end illumination illumination has strict demand, illumination is relatively low, When no lighting checks, low-light (level) can influence the eyesight of operator, so light emitting diode 71 is mainly operator range estimation FPC Whether 5 accurately insert illumination necessary to offer in connecting seat 21.
The inspection tool for the grafting of FPC 5 below with reference to Fig. 1-Fig. 7 descriptions according to a specific embodiment of the invention 100, it is worth understanding, it is described below simply exemplary, it is intended to for explaining the present invention, and it is not intended that to the present invention Limitation.
As shown in Fig. 1-Fig. 7, the inspection tool 100 for the grafting of FPC 5 according to embodiments of the present invention, including support 1, First circuit board 2, plugboard 3, cover plate 4, micrometer 6, second circuit board 7 etc..
As shown in figure 1, module supporting plate 14 can be provided with support 1, die cavity 141, die cavity can be provided with module supporting plate 14 Screen 15 can be provided with 141, the size of die cavity 141 is determined by actual product size.First circuit board 2 is located at module supporting plate 14 On, first circuit board 2 is connected with screen 15, and first circuit board 2 is provided with connecting seat 21, and the bottom plate 11 of support 1 is provided with switching Plate 111.Screen 15 is put into the die cavity 141 of module supporting plate 14, coarse positioning, module support are carried out with the die cavity 141 of module supporting plate 14 Plate 14 is provided with alignment pin 321, and first circuit board 2 is provided with the positioning hole 52 coordinated with alignment pin 321, by first circuit board 2 On positioning hole 52 to entering in the alignment pin 321 on module supporting plate 14, be herein fine positioning.The die cavity 141 of module supporting plate 14 is flat Worst error 0.02mm is spent, and the corner of die cavity 141 is pasted with soft foam, can effectively prevent from causing breakage when picking and placeing screen.
As shown in Figure 4 and Figure 5, plugboard 3 is movably located on support 1, and plugboard 3 is provided with mounting groove 31, installation The both sides of groove 31 are respectively equipped with a stopper slot 32 connected with mounting groove 31, center of two stopper slots 32 on mounting groove 31 Line is symmetrical, and stopper slot 32 is square groove, and FPC 5 is provided with the projection 51 coordinated with groove, set on the bottom wall of stopper slot 32 There is alignment pin 321, projection 51 is provided with the positioning hole 52 coordinated with alignment pin 321.Cover plate 4 is rotatably coupled with plugboard 3 To open or close the opening of mounting groove 31, the rotary shaft of cover plate 4 is located at the end of the remote connecting seat 21 of mounting groove 31, installation The bottom wall of the end of the connection ends of remote FPC 5 of groove 31 is provided with the square through hole 34 run through.FPC 5 is located at mounting groove 31 Interior, in two alignment pins 321 on the plugboard 3 of positioning hole 52 on FPC 5 (positioning FPC 5), FPC's 5 is other on one side from slotting Through the lower section of plugboard 3 in the square through hole 34 of fishplate bar 3.
As Figure 4-Figure 7, cover plate 4 is provided with four the 3rd magnetic parts 41, and plugboard 3 is provided with four and the 3rd magnetic The 4th magnetic part 35 that part 41 coordinates.Cover plate 4 is turned down by the 4th on the 3rd magnetic part 41 and plugboard 3 on cover plate 4 The attracting fixed FPC 5 of magnetic part 35.
As shown in Fig. 2, Fig. 4-Fig. 7, support 1 is provided with the first magnetic part 122 and the second magnetic part, the first magnetic part 122 It is arranged at intervals with moving direction of second magnetic part along plugboard 3, plugboard 3 is provided with magnetic part 33, and magnetic part 33 is located at the Between one magnetic part 122 and the second magnetic part.To be multiple, support 1 is provided with for first magnetic part 122 and the second magnetic part One mounting bracket 12 and the second mounting bracket 13, the first mounting bracket 12 are set close to connecting seat 21, and the first mounting bracket 12 is two, two First mounting bracket 12 is respectively provided at the both sides of plugboard 3, and the first mounting bracket 12 is provided with multiple mounting holes 121 through side wall, First magnetic part 122 is located in the mounting hole 121 of the first mounting bracket 12;Second mounting bracket 13 is set away from connecting seat 21, and second Mounting bracket 13 is two, and two the second mounting brackets 13 are respectively provided at the both sides of plugboard 3, and the second mounting bracket 13 is provided with multiple pass through The mounting hole 121 of side wall is worn, the second magnetic part is located in the mounting hole 121 of the second mounting bracket 13.Magnetic part 33 is provided with simultaneously Through the magnetic absorption member of magnetic part 33, one end of magnetic absorption member be suitable to it is attracting with the first magnetic part 122, the other end of magnetic absorption member be suitable to Second magnetic part is attracting.
As shown in Figure 4 and Figure 5, when lighting inspection finishes, and FPC 5 separates with connecting seat 21, the magnetic in magnetic part 33 Part and the second magnetic part on the second mounting bracket 13 are attracting, and magnetic part 33 is bonded with the second mounting bracket 13, in magnetic force and gravity Under effect, FPC 5 is smoothly extracted connecting seat 21 by plugboard 3;As shown in Figure 6 and Figure 7, when FPC 5 is connected with connecting seat 21, Magnetic absorption member in magnetic part 33 and the first magnetic part 122 on the first mounting bracket 12 are attracting, and magnetic part 33 is shelved with first and is bonded, In the presence of magnetic force, plugboard 3 ensures that FPC 5 can overcome gravity to influence, and firmly inserts in connecting seat 21 without gliding.
As shown in Figures 2 and 3, one end of micrometer 6 is connected with support 1, under the other end and plugboard 3 of micrometer 6 Side's connection.The height of grafting FPC 5 and connecting seat 21 should be maintained at same level, if not at same level, then by inserting The micrometer 6 of the lower section of fishplate bar 3 is adjusted, consequently facilitating the connection between FPC 5 and connecting seat 21.Pass through micrometer 6 Regulation, the tolerance that can control plugboard 3 is only 0.02mm, so as to reach High Precision Automatic grafting.
As Figure 4-Figure 7, second circuit board 7 is located on support 1, and second circuit board 7 is provided with the He of light emitting diode 71 Electric source line interface 72, electric source line interface 72 are connected with pinboard 111.Because producing line PI end illumination illumination has strict demand, illumination Relatively low, when no lighting checks, low-light (level) can influence the eyesight of operator, so light emitting diode 71 is mainly operator mesh Survey whether FPC 5 accurately inserts illumination necessary to offer in connecting seat 21.Need to readjust micrometer 6 if not, make FPC 5 is accurately inserted in connecting seat 21.In addition, the illumination that the light emitting diode 71 provides can cross and meet operator to connecting seat 21 The buckle action closing, close.And the installation site of second circuit board 7 makes light emitting diode 71 just be aligned at connecting seat 21, no Operator eyesight can be changed and produce considerable influence.It is powered in lighting-up equipment, when point button does not close, passes through lighting program Control diode to be powered, light.When a button closes, powered off by lighting programme-control diode, thus eliminating the need Influence of the light that diode is sent when lighting checks to operator eyesight.
In order to ensure in the high accurancy and precision of FPC 5 insertion connecting seat 21, the maximum of the manufacture of the steady pin on autopatching plate 3 Error is 0.02mm, and the worst error of connecting seat 21 is 0.1mm.Therefore, even if there is fine motion situation, because FPC 5 is fixed The worst error of pin is smaller, therefore is not in burn-in phenomenon.
It should be noted that before using tool 100 is checked, whether the upper all screws that need to confirm to check tool 100 twist Tightly, if not needing to tighten fixation in time, otherwise the particularly part of plugboard 3 occurs that the aligning accuracy of plugboard 3 is not high, FPC 5 cannot be accurately inserted in connecting seat 21.
The inspection tool 100 for the grafting of FPC 5 in the present invention has the advantage that:
1st, attraction and repulsive force caused by the first magnetic part 122, the second magnetic part and magnetic absorption member are utilized so that FPC 5 It can really realize that autopatching into the connecting seat 21 of the plate of first circuit board 2, reaches the purpose of lighting inspection.Grafting speed It hurry up, efficiency high, it is possible to prevente effectively from inserting the bad phenomenon such as inclined, anti-inserted.
2nd, the module end points lamp inspection of existing patent looks into tool 100 and manually carries out the grafting of FPC 5, it is easy to causes Connecting seat 21 is damaged.And the no hand contact with connecting seat 21 of the present invention, therefore can more efficient protection connecting seat 21.
3rd, micrometer 6 effectively can regulate and control tolerance in 0.02mm, and between 21 two neighboring pin of general connecting seat Tolerance is 0.1mm.Therefore high-precision grafting can be realized.
4th, the illumination of module end operating environment is distinctly claimed, and under a relatively low illumination environment, operator is shone by LED The illumination that bright module is sent, determines whether FPC 5 is precisely inserted in connecting seat 21.And the voltage electricity of LED illumination module The opening and closing of stream by lighting programme-control, do not influence normal lighting inspection completely.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " illustrative examples ", The description of " example ", " specific example " or " some examples " etc. means to combine specific features, the knot that the embodiment or example describe Structure, material or feature are contained at least one embodiment or example of the present invention.In this manual, to above-mentioned term Schematic representation is not necessarily referring to identical embodiment or example.Moreover, specific features, structure, material or the spy of description Point can combine in an appropriate manner in any one or more embodiments or example.
Although an embodiment of the present invention has been shown and described, it will be understood by those skilled in the art that:Not In the case of departing from the principle and objective of the present invention a variety of change, modification, replacement and modification can be carried out to these embodiments, this The scope of invention is limited by claim and its equivalent.

Claims (10)

  1. A kind of 1. inspection tool for FPC grafting, it is characterised in that including:
    Support;
    First circuit board, the first circuit board are set on the bracket, and the first circuit board is provided with connecting seat;
    Plugboard, the plugboard are provided with mounting groove, and the FPC is located in the mounting groove, and the plugboard is moveable If on the bracket so that the FPC is connected or separated with the connecting seat.
  2. 2. the inspection tool according to claim 1 for FPC grafting, it is characterised in that the support is provided with first Magnetic part and the second magnetic part, the moving direction interval of first magnetic part and second magnetic part along the plugboard are set Put, the plugboard is provided with magnetic part, and the magnetic part is located between first magnetic part and second magnetic part.
  3. 3. the inspection tool according to claim 1 for FPC grafting, it is characterised in that the mounting groove is inserted along described The moving direction extension of fishplate bar.
  4. 4. the inspection tool according to claim 1 for FPC grafting, it is characterised in that the plugboard is provided with limit Position groove, the stopper slot connect with the mounting groove, and the FPC is provided with the projection coordinated with the groove.
  5. 5. the inspection tool according to claim 4 for FPC grafting, it is characterised in that on the bottom wall of the stopper slot Provided with alignment pin, the raised positioning hole being provided with the detent fit.
  6. 6. the inspection tool according to claim 1 for FPC grafting, it is characterised in that also including cover plate, the cover plate It is rotatably coupled with the plugboard to open or close the opening of the mounting groove.
  7. 7. the inspection tool according to claim 6 for FPC grafting, it is characterised in that the rotation axle position of the cover plate In the end of the remote connecting seat of the mounting groove, the bottom wall of the end of the mounting groove is provided with the through hole run through.
  8. 8. the inspection tool according to claim 6 for FPC grafting, it is characterised in that the cover plate is provided with multiple 3rd magnetic part, the plugboard are provided with multiple the 4th magnetic parts coordinated with the 3rd magnetic part.
  9. 9. the inspection tool according to claim 1 for FPC grafting, it is characterised in that also including micrometer, described thousand One end of chi is divided to be connected with the support, one end of the micrometer is connected with the plugboard.
  10. 10. the inspection tool according to claim 1 for FPC grafting, in addition to:Second circuit board, second electricity Road plate is set on the bracket, and the second circuit board is provided with light emitting diode.
CN201710771341.2A 2017-08-31 2017-08-31 A inspection tool for FPC pegs graft Active CN107526026B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710771341.2A CN107526026B (en) 2017-08-31 2017-08-31 A inspection tool for FPC pegs graft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710771341.2A CN107526026B (en) 2017-08-31 2017-08-31 A inspection tool for FPC pegs graft

Publications (2)

Publication Number Publication Date
CN107526026A true CN107526026A (en) 2017-12-29
CN107526026B CN107526026B (en) 2020-04-28

Family

ID=60683039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710771341.2A Active CN107526026B (en) 2017-08-31 2017-08-31 A inspection tool for FPC pegs graft

Country Status (1)

Country Link
CN (1) CN107526026B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108508350A (en) * 2018-03-22 2018-09-07 苏州佳智彩光电科技有限公司 A kind of intensive display connector for flexible PCB partly presses power device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2718584Y (en) * 2004-08-03 2005-08-17 英业达股份有限公司 Testing device for testing determined panel
US20050215081A1 (en) * 2004-03-25 2005-09-29 Samantha Bench Method and apparatus for testing PCBA subcomponents
CN103019896A (en) * 2011-09-21 2013-04-03 鸿富锦精密工业(深圳)有限公司 Test card
CN103412425A (en) * 2013-09-04 2013-11-27 苏州华兴源创电子科技有限公司 Detection device for detecting liquid crystal module
CN103901340A (en) * 2014-04-16 2014-07-02 成都先进功率半导体股份有限公司 Chip testing method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050215081A1 (en) * 2004-03-25 2005-09-29 Samantha Bench Method and apparatus for testing PCBA subcomponents
CN2718584Y (en) * 2004-08-03 2005-08-17 英业达股份有限公司 Testing device for testing determined panel
CN103019896A (en) * 2011-09-21 2013-04-03 鸿富锦精密工业(深圳)有限公司 Test card
CN103412425A (en) * 2013-09-04 2013-11-27 苏州华兴源创电子科技有限公司 Detection device for detecting liquid crystal module
CN103901340A (en) * 2014-04-16 2014-07-02 成都先进功率半导体股份有限公司 Chip testing method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108508350A (en) * 2018-03-22 2018-09-07 苏州佳智彩光电科技有限公司 A kind of intensive display connector for flexible PCB partly presses power device
CN108508350B (en) * 2018-03-22 2023-12-01 苏州佳智彩光电科技有限公司 Dense display joint half-pressing power-on device for flexible circuit board

Also Published As

Publication number Publication date
CN107526026B (en) 2020-04-28

Similar Documents

Publication Publication Date Title
RU2567542C2 (en) Led lamp
CN102314814B (en) LED (Light-Emitting Diode) box body, LED display screen and maintenance tool
US9723658B2 (en) Light emission module, connector, and mounting structure for light emission module
KR20130001060U (en) Power device of led lighting module
EP3187774A1 (en) Track system
WO2013003002A2 (en) Led light fixture
CN107526026A (en) Inspection tool for FPC grafting
CN104937327B (en) Light bar system
CN106687741A (en) Vehicle headlamp
CN102147183B (en) Refrigerator and port frame thereof
CN204084003U (en) Assembly type guide rail cabinet lamp
CN109546587A (en) A kind of fixed device of Fast Installation formula high-voltage wiring harness and application method
CN203132061U (en) Air conditioner provided with display control box
CN201787527U (en) Lamp support, control computer board with same and electronic device
CN103068216B (en) Tape feeder
CN104421861A (en) Lamp device
US20120014119A1 (en) Lamp fastener of backlight module
CN211316051U (en) Optical effect piece auto-change over device
CN110425502A (en) A kind of rail system of power supply and the lamps and lanterns being coupled with the rail system
CA3068811C (en) Air conditioner communication interface
CN101203929B (en) Lighting controller having a captured offset linear guide system
CN204482174U (en) LED automatic placement machine and track limit-type drop suction nozzle motion structure thereof
CN101916678B (en) Permanent magnet operating mechanism for automatic change-over switch
CN217153926U (en) Driver for track spotlight
CN205646229U (en) LED illumination terminal, LED lamp

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210427

Address after: 100015 Jiuxianqiao Road, Beijing, No. 10, No.

Patentee after: BOE TECHNOLOGY GROUP Co.,Ltd.

Patentee after: BEIJING BOE VACUUM TECHNOLOGY Co.,Ltd.

Address before: 100015 Jiuxianqiao Road, Beijing, No. 10, No.

Patentee before: BOE TECHNOLOGY GROUP Co.,Ltd.

Patentee before: BEIJING BOE OPTOELECTRONICS TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right