CN107524267A - Roof drainage system - Google Patents

Roof drainage system Download PDF

Info

Publication number
CN107524267A
CN107524267A CN201710909687.4A CN201710909687A CN107524267A CN 107524267 A CN107524267 A CN 107524267A CN 201710909687 A CN201710909687 A CN 201710909687A CN 107524267 A CN107524267 A CN 107524267A
Authority
CN
China
Prior art keywords
row portion
roof
charge
enclosing
enclosing body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710909687.4A
Other languages
Chinese (zh)
Inventor
马超
周元臻
李丹
吴婉雯
王大伟
刘锦玉
孙守龙
王智霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hainan Hengda Construction Technology Co Ltd
Original Assignee
Hainan Hengda Construction Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hainan Hengda Construction Technology Co Ltd filed Critical Hainan Hengda Construction Technology Co Ltd
Priority to CN201710909687.4A priority Critical patent/CN107524267A/en
Publication of CN107524267A publication Critical patent/CN107524267A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/04Roof drainage; Drainage fittings in flat roofs, balconies or the like
    • E04D13/0404Drainage on the roof surface
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/04Roof drainage; Drainage fittings in flat roofs, balconies or the like
    • E04D13/0404Drainage on the roof surface
    • E04D13/0409Drainage outlets, e.g. gullies
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/04Roof drainage; Drainage fittings in flat roofs, balconies or the like
    • E04D13/0404Drainage on the roof surface
    • E04D13/0445Drainage channels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/04Roof drainage; Drainage fittings in flat roofs, balconies or the like
    • E04D13/064Gutters

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)

Abstract

The invention discloses a kind of roof drainage system, including roof, the first enclosing body, the second enclosing body, the first permeable filtering body, the second permeable filtering body and earthing body.When the rainy day, rainwater is first to inside soil body infiltration is covered, and the filtering by the first permeable filtering body and the second permeable filtering body and osmosis, can be very good to filter out the soil being mingled with rainwater and other impurities afterwards;Rainwater after filtration treatment oozes row portion and second by first and oozes the soil and impurity of inner inclusion can be further removed after the secondary filter in row portion, so that cleaner rainwater is discharged into drainage channel after flowing into charge for remittance chamber, thus drainage channel can be avoided to block, ensure that excessive rainfall will not be accumulated in earthing body, it is ensured that the ecosystem and vegetation existence and roof drainage safety in soil;In addition, when even blocking, comprehensive backwash effect is carried out using High-Pressure Water, you can dredge blockage part, unimpeded maintenance mode is simple, uses manpower and material resources sparingly.

Description

Roof drainage system
Technical field
The present invention relates to construction drainage technical field, more particularly to a kind of roof drainage system.
Background technology
In recent years, because Climate Anomalies cause rainstorm weather to increase so that there occurs flood and waterlog for many cities in China Evil, the people's lives and property safety is seriously endangered, therefore country is just wideling popularize the utilization of sponge city technology.In sponge city In technology, a significant technology is exactly the application of greening roof drainage system, and its Normal practice is:In roof construction coagulation Native gutter, earthing side is connected by the pre-buried drainpipe in gutter bottom, ponding is led in gutter and discharged by drainage system.
The characteristics of due to green roof, it is generally deficient of filtration system, in the current of the pre-buried drainpipe discharge in gutter bottom Inevitably along with many soil and other impurities, draining blockage is easily caused.Once generation draining blockage, ponding It will be unable to enter gutter side, soil and vegetation have to be immersed in water, to the ecosystem in soil and vegetation living zone come Adverse effect.In addition, the rainwater into gutter also unavoidably contains more impurity, the drainage arrangement in gutter is easily caused (being usually roof drain) and the blocking of downstream drainage pipeline, endangers roof drainage safety.Meanwhile when pre-buried drainpipe blocks When, it is necessary to Point location detection blocking position finds plugging point in turn, then excavate gutter dredging pipeline, can so expend again substantial amounts of Manpower and materials.
The content of the invention
Based on this, the present invention is necessary to provide a kind of roof drainage system, can avoid soil and other impurity with rainwater Flow into drainpipe together and drainage arrangement results in blockage, it is ensured that the ecosystem and vegetation existence and roof drainage peace in soil Entirely, while unimpeded maintenance mode is simple, uses manpower and material resources sparingly.
Its technical scheme is as follows:
A kind of roof drainage system, including:
Roof, the roof offer drainage channel;
First enclosing body, the first enclosing body are arranged at intervals at the side of the drainage channel, and first enclosing Body offers at least one first and oozes row portion;
Second enclosing body, the second enclosing body are arranged at intervals at one of the drainage channel away from the first enclosing body Side, and the second enclosing body offers at least one second and oozes row portion, the first enclosing body and the second enclosing body it Between cooperatively form the charge for remittance chamber connected with the drainage channel, described first ooze row portion and described second ooze row portion with the remittance Water cavity connects;
First permeable filtering body, the first permeable filtering body are arranged on the roof and are located at first enclosing Body deviates from the side of the charge for remittance chamber;
Second permeable filtering body, the second permeable filtering body are arranged on the roof and are located at second enclosing Body deviates from the side of the charge for remittance chamber;And
Earthing body, the earthing body are enclosed located at the described first permeable filtering body and the second permeable filtering body away from described The side of charge for remittance chamber.
Above-mentioned roof drainage system to form the first enclosing body and the second enclosing due to being piled up respectively in the both sides of drainage channel Body, and make first to ooze row portion and second and ooze row portion and connected with charge for remittance chamber and drainage channel;The first permeable filtering body is set afterwards It is placed in the first enclosing body and deviates from charge for remittance chamber side, the second permeable filtering body is arranged at into the second enclosing body deviates from charge for remittance chamber side, Earthing body is finally enclosed to the outside for being located at the first permeable filtering body and the second permeable filtering body.So that during the rainy day, rainwater is first Elder generation permeates to inside soil body is covered, afterwards the filtering by the first permeable filtering body and the second permeable filtering body and osmosis, can The soil and other impurities being mingled with filtering out well in rainwater;Rainwater after filtration treatment oozes row portion and second by first The soil and impurity of inner inclusion can further be removed after the secondary filter in row portion by oozing so that cleaner rainwater, which flows into, to converge It is discharged into after water cavity in drainage channel, thus drainage channel can be avoided to block, it is ensured that excessive rain will not be accumulated in earthing body Water, it is ensured that the ecosystem and vegetation existence and roof drainage safety in soil;In addition, when even blocking, using height Current are pressed to carry out comprehensive backwash effect, you can dredge blockage part, unimpeded maintenance mode is simple, uses manpower and material resources sparingly.
The technical scheme of the application is further described below:
In one of the embodiments, the described first permeable filtering body and the second permeable filtering body include mutually supporting At least two filtering particles connect, cooperatively form between the two neighboring filtering particle and ooze row portion and described the with described first Two ooze the filtration channel of row portion connection.So mutually push against that the filtering particle of contact can stop the soil of solid-like and other are miscellaneous Matter, and only make rainwater by filtration channel by the way that so as to reach good filter effect, and its is simple in construction, good filtration effect.
In one of the embodiments, including at least two described first ooze row portion and at least two described second and ooze row Portion, at least two described first, which ooze short transverse of the row portion along the first enclosing body, is arranged at intervals, and at least two described second Short transverse of the row portion along the second enclosing body is oozed to be arranged at intervals.Row portion and second, which is oozed, thus by reasonable increase by first oozes row The quantity in portion can greatly promote the water efficiency excessively of the first enclosing body and the second enclosing body, improve system filtering and drainability.
In one of the embodiments, described first oozes row portion and described second to ooze row portion be to ooze row's aperture, described to ooze The diameter range for arranging aperture is 5~25mm.The discharge structure is designed and is simple to manufacture, and advantageously reduces manufacture and use cost, Simultaneously can be according to different use occasions and draining needs, flexible design oozes the pore size of row's aperture, improves being applicable for system Scope.
In one of the embodiments, described first oozes row portion and described second and oozes row portion and include installation through-hole and can Dismounting is arranged in the cartridge filter in the installation through-hole, and the cartridge filter includes cylinder body and is arranged at the interior of the cylinder body Screen pack on barrel.So not only make first to ooze row portion and second to ooze row portion there is the basis of excellent filtering and drainability On, when cartridge filter blocks, it can integrally be extracted out out of installation through-hole and be changed or cleaned so that dredging unimpeded operation is more It is convenient to add.
In one of the embodiments, in addition to drainage arrangement, the drainage arrangement include being arranged at the drainage channel Interior drainpipe and the drainage part for being arranged at the water inlet of the drainage channel and being connected with the drainpipe.So can The soil or impurity further carried secretly in the rainwater to entering charge for remittance chamber carry out filtering isolation, avoid enter into drainpipe or draining is led to Resulted in blockage in road.
In one of the embodiments, in addition to protective cover, the first enclosing body is additionally provided with the first installation step, described Second enclosing body is additionally provided with second installation step relative with first installation step, and the protective cover is withheld in described first On installation step and second installation step and cover in the top of the charge for remittance chamber.Fall so that people will not step on sky Enter charge for remittance intracavitary, while can also stop in environment or the rubbish of large-size enters in drainage channel in rainwater, avoid occurring stifled Plug.
In one of the embodiments, the protective cover offers at least one osculum connected with the charge for remittance chamber. While isolation outside rubbish rainwater can be made to enter charge for remittance chamber through osculum, reduce the burden of protective cover, improve simultaneously The drainability of system.
In one of the embodiments, the protective cover is additionally provided with lift-pull handle away from the side of the charge for remittance chamber.When need When being cleaned to charge for remittance intracavitary portion or dredge unimpeded, by lift-pull handle can it is more laborsaving, easily open protective cover.
Brief description of the drawings
Fig. 1 is the structural representation of the roof drainage system described in the embodiment of the present invention.
Description of reference numerals:
100th, roof, 110, drainage channel, the 200, first enclosing body, 210, first oozes row portion, the 220, first installation step, 300th, the second enclosing body, 310, second oozes row portion, the 320, second installation step, and 400, charge for remittance chamber, the 500, first permeable filtering body, 600th, the second permeable filtering body, 700, earthing body, 800, drainage part, 900, protective cover, 910, osculum, 1000, lift-pull handle, 1100th, proof mechanism of water.
Embodiment
For the objects, technical solutions and advantages of the present invention are more clearly understood, below in conjunction with accompanying drawing and specific embodiment party Formula, the present invention is described in further detail.It should be appreciated that embodiment described herein is only solving The present invention is released, does not limit protection scope of the present invention.
It should be noted that when element is referred to as " being fixedly arranged on ", " being arranged at " or " install in " another element, it can be with Directly on another element or there may also be element placed in the middle.When an element is considered as " connection " another yuan Part, it can be directly to another element or may be simultaneously present centering elements;One element and another element The concrete mode being fixedly connected can be achieved by the prior art, and will not be repeated here, it is preferred to use the fixation side of threaded connection Formula.
Unless otherwise defined, all of technologies and scientific terms used here by the article is with belonging to technical field of the invention The implication that technical staff is generally understood that is identical.Term used in the description of the invention herein is intended merely to description tool The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term as used herein " and/or " include one or more The arbitrary and all combination of related Listed Items.
Heretofore described " first ", " second " do not represent specific quantity and order, are only used for the differentiation of title.
As shown in figure 1, be a kind of drainage system of roof 100 of embodiment of the present invention, including:Roof 100, first Enclosing body 200, the second enclosing body 300, the first permeable filtering body 500, the second permeable filtering body 600 and earthing body 700;
Wherein, above-mentioned roof 100 offers drainage channel 110, for converging and discharging the rainwater of rainy day roofing accumulation;Institute The side that the first enclosing body 200 is arranged at intervals at the drainage channel 110 is stated, the second enclosing body 300 is arranged at intervals at institute State side of the drainage channel 110 away from the first enclosing body 200, in this preferred embodiment, the He of the first enclosing body 200 Second enclosing body 300 is symmetrical structure, and the optional wall piled up using water-permeable brick, i.e. wall have certain water penetration Performance, so as to form gutter.Certainly, in other embodiment, other can also be used to have the part replacement of similar functions saturating Water brick, the drainage gutter built compared to conventionally employed concreting, the difficulty of construction by the way of water-permeable brick piles up construction Low with cost, technique is relatively easy, and small to the gravitational load of roofing so that roofing is safer.
In addition, the first enclosing body 200, which offers at least one first, oozes row portion 210, the second enclosing body 300 is opened Ooze row portion 310 provided with least one second, cooperatively formed between the first enclosing body 200 and the second enclosing body 300 with The charge for remittance chamber 400 that the drainage channel 110 connects, that is, form the inner flow passage of gutter, and described first oozes row portion 210 and described the Two ooze row portion 310 connects with the charge for remittance chamber 400;The first permeable filtering body 500 is arranged on the roof 100, simultaneously Deviate from the side of the charge for remittance chamber 400 positioned at the first enclosing body 200;The second permeable filtering body 600 is arranged at described Deviate from the side of the charge for remittance chamber 400 on roof 100 and positioned at the second enclosing body 300;The earthing body 700, which encloses, to be located at The first permeable filtering body 500 and the second permeable filtering body 600 deviate from the side of the charge for remittance chamber 400.
In one embodiment, the described first permeable filtering body 500 and the second permeable filtering body 600 include mutual Abut at least two filtering particles, it is two neighboring it is described filtering particle between cooperatively form with described first ooze row portion 210 and Described second oozes the filtration channel of the connection of row portion 310.Specifically, above-mentioned first permeable 500 and second permeable filtering body of filtering body 600 are chosen as metalling (filtering particle), specifically into this preferred embodiment, including different broken of multiple particle sizes Stone, vertically arranged rubble wall is formed using stack manner.Because the shape of each crushed stone differs so that heap poststack it is broken Gap is formed between stone, and then forms the filtration channel of roundabout turnover, so mutually pushing against the filtering particle of contact can stop The soil and other impurities of solid-like, and only make rainwater by filtration channel by the way that so as to reach good filter effect, and it is tied Structure is simple, good filtration effect.
The above-mentioned drainage system of roof 100 to form the He of the first enclosing body 200 due to being piled up respectively in the both sides of drainage channel 110 Second enclosing body 300, and make first to ooze row portion 210 and second and ooze row portion 310 and connected with charge for remittance chamber 400 and drainage channel 110; The first permeable filtering body 500 is arranged at the first enclosing body 200 afterwards and deviates from the side of charge for remittance chamber 400, by the second permeable filtering body 600, which are arranged at the second enclosing body 300, deviates from the side of charge for remittance chamber 400, finally encloses earthing body 700 and is located at the first permeable filtering body 500 and second permeable filtering body 600 outside.So that during the rainy day, rainwater is first to the internal penetration of earthing body 700, afterwards Filtering and osmosis by the first permeable 500 and second permeable filtering body 600 of filtering body, can be very good to filter out rainwater In the soil that is mingled with and other impurities;Rainwater after filtration treatment oozes row portion 210 and second by first and oozes the secondary of row portion 310 The soil and impurity of inner inclusion can be further removed after filtering so that cleaner rainwater flows into the heel row of charge for remittance chamber 400 Enter in drainage channel 110, thus drainage channel 110 can be avoided to block, it is ensured that excessive rain will not be accumulated in earthing body 700 Water, it is ensured that the ecosystem and vegetation existence and roof drainage safety in soil;In addition, when even blocking, using height Current are pressed to carry out comprehensive backwash effect, you can dredge blockage part, unimpeded maintenance mode is simple, uses manpower and material resources sparingly.
Please continue to refer to Fig. 1, further, in addition to proof mechanism of water 1100, the proof mechanism of water 1100 are covered in described On roof 100.Specifically, proof mechanism of water 1100 includes the structural slab being covered on roofing, waterproof layer is additionally provided with structural slab, Optional waterproof layer is water-repellent paint or waterproof cloth.Afterwards again by above-mentioned first enclosing body 200, the second enclosing body 300, first is permeable Filtering body 500, the second permeable filtering body 600 and earthing body 700 are built on proof mechanism of water by predeterminated position, so as to lift roof 100 antiseepage outlet capacity, avoids rain penetration from getting in.
In addition, oozing row portion 210 and at least two described second including at least two described first oozes row portion 310, at least two Individual described first, which oozes short transverse of the row portion 210 along the first enclosing body 200, is arranged at intervals, and at least two described second ooze row Short transverse of the portion 310 along the second enclosing body 300 is arranged at intervals.Row portion 210 and the are oozed thus by reasonable increase by first Two quantity for oozing row portion 310 can greatly promote the water efficiency excessively of the first enclosing body 200 and the second enclosing body 300, improve system mistake Filter and drainability.
Specific in present embodiment, described first oozes row portion 210 and described second to ooze row portion 310 be to ooze row's aperture, The diameter range for oozing row's aperture is 5~25mm.The discharge structure is designed and is simple to manufacture, and is advantageously reduced manufacture and is used Cost, while can be according to different use occasions and draining needs, flexible design oozes the pore size of row's aperture, improves system The scope of application.
In another embodiment, described first oozes row portion 210 and described second and oozes row portion 310 to include installation logical Hole and the cartridge filter being detachably arranged in the installation through-hole, the cartridge filter include cylinder body and are arranged at the cylinder sheet Screen pack on the inner tube wall of body.So not only make first to ooze row portion 210 and second to ooze row portion 310 there is excellent filtering and row On the basis of outlet capacity, when cartridge filter blocks, it can integrally be extracted out out of installation through-hole and be changed or cleaned so that dredged Logical unimpeded operation is more convenient, better.
On the basis of any of the above-described embodiment, in addition to drainage arrangement, the drainage arrangement include being arranged at the row Drainpipe in aquaporin 110 and it is arranged at the water inlet of the drainage channel 110 and the drainage connected with the drainpipe Part 800;Alternatively, it is roof drain that drainage part 800 is optional, or other possess the part of trap drainage function.It can so enter The soil or impurity that one step is carried secretly in the rainwater to entering charge for remittance chamber 400 carry out filtering isolation, avoid enter into drainpipe or draining Resulted in blockage in passage 110.
Please continue to refer to Fig. 1, on the basis of any of the above-described embodiment, in addition to protective cover 900, this specific embodiment party In formula, protective cover 900 is rain perforaled strainer, and the first enclosing body 200 is additionally provided with the first installation step 220, second enclosing Body 300 is additionally provided with second installation step 320 relative with first installation step 220, and rain perforaled strainer is withheld in described first On installation step 220 and second installation step 320 and cover in the top of the charge for remittance chamber 400.So that people are not Sky can be stepped on to fall into charge for remittance chamber 400, while can also be stopped in environment or the rubbish of large-size enters drainage channel 110 in rainwater It is interior, avoid blocking.
Further, the protective cover 900 offers at least one osculum 910 connected with the charge for remittance chamber 400. While the rubbish of isolation outside rainwater can be made to enter charge for remittance chamber 400 through osculum 910, the load-bearing for reducing protective cover 900 is born Load, while improve the drainability of system.The protective cover 900 is additionally provided with lift-pull handle away from the side of the charge for remittance chamber 400 1000.When needing to being cleaned inside charge for remittance chamber 400 or dredging unimpeded, by lift-pull handle 1000 can it is more laborsaving, It is convenient to open protective cover 900.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope that this specification is recorded all is considered to be.
Embodiment described above only expresses the several embodiments of the present invention, and its description is more specific and detailed, but simultaneously Can not therefore it be construed as limiting the scope of the patent.It should be pointed out that come for one of ordinary skill in the art Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (9)

  1. A kind of 1. roof drainage system, it is characterised in that including:
    Roof, the roof offer drainage channel;
    First enclosing body, the first enclosing body is arranged at intervals at the side of the drainage channel, and the first enclosing body is opened Row portion is oozed provided with least one first;
    Second enclosing body, the second enclosing body are arranged at intervals at side of the drainage channel away from the first enclosing body, And the second enclosing body offers at least one second and oozes row portion, matches somebody with somebody between the first enclosing body and the second enclosing body Close and form the charge for remittance chamber that is connected with the drainage channel, described first ooze row portion and described second ooze row portion with the charge for remittance chamber Connection;
    First permeable filtering body, the first permeable filtering body are arranged on the roof and carried on the back positioned at the first enclosing body From the side of the charge for remittance chamber;
    Second permeable filtering body, the second permeable filtering body are arranged on the roof and carried on the back positioned at the second enclosing body From the side of the charge for remittance chamber;And
    Earthing body, the earthing body encloses deviates from the charge for remittance located at the described first permeable filtering body and the second permeable filtering body The side of chamber.
  2. 2. roof drainage system according to claim 1, it is characterised in that the first permeable filtering body and described second Permeable filtering body include mutually abut at least two filtering particles, it is two neighboring it is described filtering particle between cooperatively form with Described first oozes row portion oozes the filtration channel that row portion connects with described second.
  3. 3. roof drainage system according to claim 1, it is characterised in that including at least two described first ooze row portion and At least two described second ooze row portion, and at least two described first, which ooze short transverse interval of the row portion along the first enclosing body, sets Put, at least two described second, which ooze short transverse of the row portion along the second enclosing body, is arranged at intervals.
  4. 4. roof drainage system according to claim 3, it is characterised in that described first, which oozes row portion and described second, oozes row Portion is to ooze row's aperture, and the diameter range for oozing row's aperture is 5~25mm.
  5. 5. roof drainage system according to claim 3, it is characterised in that described first, which oozes row portion and described second, oozes row Portion includes installation through-hole and the cartridge filter that is detachably arranged in the installation through-hole, the cartridge filter include cylinder body and The screen pack being arranged on the inner tube wall of the cylinder body.
  6. 6. roof drainage system according to claim 1, it is characterised in that also including drainage arrangement, the drainage arrangement Including the drainpipe being arranged in the drainage channel and be arranged at the drainage channel water inlet and with the drainpipe The drainage part of connection.
  7. 7. roof drainage system according to claim 1, it is characterised in that also including protective cover, the first enclosing body The first installation step is additionally provided with, the second enclosing body is additionally provided with second installation step relative with first installation step, The protective cover is withheld on first installation step and second installation step and covering in the upper of the charge for remittance chamber Side.
  8. 8. roof drainage system according to claim 7, it is characterised in that the protective cover offers and the charge for remittance chamber At least one osculum of connection.
  9. 9. the roof drainage system according to claim 7 or 8, it is characterised in that the protective cover deviates from the charge for remittance chamber Side be additionally provided with lift-pull handle.
CN201710909687.4A 2017-09-29 2017-09-29 Roof drainage system Pending CN107524267A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710909687.4A CN107524267A (en) 2017-09-29 2017-09-29 Roof drainage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710909687.4A CN107524267A (en) 2017-09-29 2017-09-29 Roof drainage system

Publications (1)

Publication Number Publication Date
CN107524267A true CN107524267A (en) 2017-12-29

Family

ID=60683989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710909687.4A Pending CN107524267A (en) 2017-09-29 2017-09-29 Roof drainage system

Country Status (1)

Country Link
CN (1) CN107524267A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111206725A (en) * 2020-01-11 2020-05-29 宁波中鼎建筑设计有限公司 Siphon roof rainwater recycling system
CN112105778A (en) * 2018-04-26 2020-12-18 亚科赛福林阿尔曼有限公司 Connection device, discharge system and method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH579187A5 (en) * 1973-07-27 1976-08-31 Braas & Co Gmbh Gully for flat roofs with drain funnel and filter - has additional section for height adjustment of filter cover surface with respect to funnel (DK100375)
CN203878883U (en) * 2014-03-20 2014-10-15 武汉联创迈特建筑集成有限公司 Water preventing and draining structure of people loading platform of truss type steel house for building
KR101630151B1 (en) * 2015-12-30 2016-06-24 주식회사 코이스틸 Steel based roof waterproof system
CN205712784U (en) * 2016-04-13 2016-11-23 海南建设工程股份有限公司 A kind of roof waterproof structure
CN205822612U (en) * 2016-07-05 2016-12-21 西安科技大学 Planted roof internal drainage joint structure
CN206205290U (en) * 2016-11-29 2017-05-31 胡世琴 A kind of roof rainwater collection processing system
CN206289887U (en) * 2016-12-23 2017-06-30 雅克设计有限公司 One kind building and its open valley structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH579187A5 (en) * 1973-07-27 1976-08-31 Braas & Co Gmbh Gully for flat roofs with drain funnel and filter - has additional section for height adjustment of filter cover surface with respect to funnel (DK100375)
CN203878883U (en) * 2014-03-20 2014-10-15 武汉联创迈特建筑集成有限公司 Water preventing and draining structure of people loading platform of truss type steel house for building
KR101630151B1 (en) * 2015-12-30 2016-06-24 주식회사 코이스틸 Steel based roof waterproof system
CN205712784U (en) * 2016-04-13 2016-11-23 海南建设工程股份有限公司 A kind of roof waterproof structure
CN205822612U (en) * 2016-07-05 2016-12-21 西安科技大学 Planted roof internal drainage joint structure
CN206205290U (en) * 2016-11-29 2017-05-31 胡世琴 A kind of roof rainwater collection processing system
CN206289887U (en) * 2016-12-23 2017-06-30 雅克设计有限公司 One kind building and its open valley structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112105778A (en) * 2018-04-26 2020-12-18 亚科赛福林阿尔曼有限公司 Connection device, discharge system and method
CN111206725A (en) * 2020-01-11 2020-05-29 宁波中鼎建筑设计有限公司 Siphon roof rainwater recycling system
CN111206725B (en) * 2020-01-11 2021-09-14 宁波中鼎建筑设计有限公司 Siphon roof rainwater recycling system

Similar Documents

Publication Publication Date Title
CN204919757U (en) Rainwater normal position purifies repair system
CN110886303A (en) Prevent arranging integration underground drainage system
CN206635928U (en) A kind of sponge city filter structure
CN107524267A (en) Roof drainage system
CN204898828U (en) Rainwater conserves - restores integrative device
CN206987218U (en) Roof drainage structure
CN213653091U (en) Drainage bituminous pavement
CN212835769U (en) Sponge municipal drainage pipe network regulation system
CN210216685U (en) Rainwater infiltration structure is used in sponge city
CN207861912U (en) A kind of filtration underground sand bed for sponge city
CN208309746U (en) The rainwater recovery device of basement structure top plate
CN206768590U (en) Greenbelt rainwater utilization system under a kind of overpass
CN105178519A (en) Green roof structure
CN206428751U (en) A kind of drainage system rainwater collection collector
CN109024645A (en) Integrated water-stop curtain, sponge city water cycle system and method
CN211353228U (en) Roof rainwater garden holds drainage and recycling system
CN206245174U (en) Road drainage structure
CN211973742U (en) Drainage structure of underground evacuation stair
CN107864781A (en) The cultivation matrix structure and method of construction in roof rain water garden
CN211080473U (en) Formula greenery patches rainwater collecting system that basement roof is recessed
CN109024831A (en) A kind of hollow cell system of biology for rainwater infiltration and purification
CN208250856U (en) Discharge structure and porous pavement drainage system
CN208415468U (en) A kind of peak clipping dirty removal capacities inlet for stom water soakaway trench
CN206941335U (en) A kind of road for storing rainwater
CN107268374A (en) A kind of pavement structure with stability bearing capacity

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171229

RJ01 Rejection of invention patent application after publication