CN107516203A CN201710708194.4A CN201710708194A CN107516203A CN 107516203 A CN107516203 A CN 107516203A CN 201710708194 A CN201710708194 A CN 201710708194A CN 107516203 A CN107516203 A CN 107516203A
Authority
CN
China
Prior art keywords
data
user
cell phone
jing
phone application
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710708194.4A
Other languages
Chinese (zh)
Inventor
刘广袤
文耀宽
田珂
赵新雨
侯壮志
史辛琳
牛慧涛
李亚男
申志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN TENGLONG INFORMATION ENGINEERING Co Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Henan Electric Power Co Ltd
Original Assignee
HENAN TENGLONG INFORMATION ENGINEERING Co Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN TENGLONG INFORMATION ENGINEERING Co Ltd, State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Henan Electric Power Co Ltd filed Critical HENAN TENGLONG INFORMATION ENGINEERING Co Ltd
Priority to CN201710708194.4A priority Critical patent/CN107516203A/en
Publication of CN107516203A publication Critical patent/CN107516203A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q20/00Payment architectures, schemes or protocols
    • G06Q20/08Payment architectures
    • G06Q20/14Payment architectures specially adapted for billing systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q20/00Payment architectures, schemes or protocols
    • G06Q20/30Payment architectures, schemes or protocols characterised by the use of specific devices or networks
    • G06Q20/32Payment architectures, schemes or protocols characterised by the use of specific devices or networks using wireless devices
    • G06Q20/322Aspects of commerce using mobile devices [M-devices]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q20/00Payment architectures, schemes or protocols
    • G06Q20/30Payment architectures, schemes or protocols characterised by the use of specific devices or networks
    • G06Q20/32Payment architectures, schemes or protocols characterised by the use of specific devices or networks using wireless devices
    • G06Q20/327Short range or proximity payments by means of M-devices
    • G06Q20/3276Short range or proximity payments by means of M-devices using a pictured code, e.g. barcode or QR-code, being read by the M-device
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0283Price estimation or determination
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07FCOIN-FREED OR LIKE APPARATUS
    • G07F15/00Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity
    • G07F15/003Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity for electricity

Abstract

Lead to the invention discloses a kind of Jing Jing based on cell phone application and stop power transmission management system, including physical arrangement and data structure, according to State Grid Corporation of China's data classification principle, the data of the data structure are divided into two levels, and first layer is:Structural data, unstructured data;The second layer is:Structural data is divided into coding, business datum, flow data;Unstructured data is divided into file data, media data and data cached;The physical arrangement is made up of production application server, Production database server, inquiry database server, historical database server, test application server, test database server, interface server, read-write card dynamic base, electric power APP, electric power Intranet communication channel and other related service equipment;The present invention realizes the seamless connection and flexibly selection of remote bill control and local charge control two ways, so as to provide a variety of power purchase channels and a variety of means of payment, adapts to the demand of user individual.

Description

Jing Jing based on cell phone application is logical to stop power transmission management system
Technical field:
The present invention relates to one kind to supply field of power transformation, stops power transmission management system more particularly to a kind of Jing Jing based on cell phone application is logical.
Background technology:
Barcode scanning, which is paid, is used as a kind of new means of payment, common to be paid for Quick Response Code, a kind of to be built based on system of account The wireless payment scheme of a new generation, by the way that the Transaction Informations such as account, price, expense are assembled into a Quick Response Code, and is printed on On various carriers, user can realize the payment and settlement with businessman's payment account by scanning Quick Response Code, complete the branch to order Pay, it is more convenient, quick relative to traditional means of payment, it is the new means of payment popular at present.
With the hair of the new services channel such as the proposition of internet+concept and electric E treasured, palm electric power, the mobile operation of marketing Human being's production, the mode of life, deep effect are constantly transformed in exhibition, the application of Internet technology and the innovation of business model The behavioural habits of consumer.The innovation and application of management mode and internet+technology is promoted, using the planar bar code technology of modernization, By scanning agriculture row's expense control terminal Quick Response Code, realize that barcode scanning is irrigated, break away from " Jing Jing energizations " electric card user card punching process, thoroughly solution Certainly electric card lose, damage the problem of, facilitate that electric card user is autonomous, convenient irrigation electricity consumption.
The content of the invention:
The technical problems to be solved by the invention are:Overcome the deficiencies in the prior art, there is provided it is a kind of it is simple in construction, be easy to carry, The Jing Jing based on cell phone application that can be disassembled, can hang and can place on the ground, which leads to, stops power transmission management system.
The technical scheme is that:Jing Jing based on cell phone application is logical to stop power transmission management system, including physical arrangement sum According to structure, according to State Grid Corporation of China's data classification principle, the data of the data structure are divided into two levels, first layer For:Structural data, unstructured data;The second layer is:Structural data is divided into coding, business datum, flow data;It is non- Structural data is divided into file data, media data and data cached;The physical arrangement is by production application server, production Database server, inquiry database server, historical database server, test application server, test database service Device, interface server, read-write card dynamic base, electric power APP, electric power Intranet communication channel and other related service equipment composition;
It is comprised the following steps that:A, Jing Jing energizations user management, marketing system increase Jing Jing energization management modules, is realized to machine Well, motor-pumped well user, the management of irrigation and drainage card, blacklist management etc.;
B, electricity consumption is started, user is watered electricity consumption every time, and advanced row mode selection, acquiescence cell phone application account balance is irrigated the fields, and user makes With cell phone application barcode scanning success after, cell phone application call marketing system motor-pumped well status inquiry interface, as cross-check information it is errorless after, confirm Start electricity consumption, after cell phone application locks user account remaining sum, call marketing system to send power-off interface, pass through power information and gather system System issues power transmission instruction, user balance, motor-pumped well numbering etc. and is issued to terminal, and terminal is powered according to instruction to live meter;
C, during electricity consumption, terminal is controlled according to the remaining sum issued to user power utilization, and terminal passes through event master in every 15 minutes User power utilization information is offered collection by dynamic reporting functions, and collection is transferred to marketing system, is finally taken by the display of cell phone application foreground With if the electricity charge in real time are less than or equal to 0, terminal is operated a switch power-off immediately;
D, user power utilization terminates, and user clicks on end Electricity Functional, and cell phone application calls marketing system to send power-off interface, by using Power utilization information collection system issues cut-offing instruction to terminal, terminal and live meter is powered off according to instruction, and after powering off successfully, terminal is stood User power utilization information is offered by collection by active report of event function, collection is transferred to marketing system, marketing system transmission Page presentation is carried out to cell phone application, after user's use, fail power-off, when terminal can be according to the zero load electricity consumption of setting Between threshold values automatically power off and consumer record reports to collection corresponding to generating, eventually for charge calculation of marketing;
E, the electricity charge are deducted fees, and cell phone application is deducted fees automatically after receiving the customer consumption record of marketing system forwarding, and calls marketing system Interface carries out payment to user and write off, and marketing system is deposited to the virtual account of motor-pumped well user using the customer consumption amount of money as prestoring;
F, electricity charge reconciliation, marketing system use current reconciliation mode with cell phone application reconciliation;
G, the electricity charge are calculated, and when the Electric Power Marketing System the end of month electricity charge are issued, receivable data, receivable data hair are formed according to consumer record During row, the electricity charge will be eaten up part of in the account at virtual associated family automatically;
H, bill printing, marketing system monthly collect consumer record according to user's card number, and corresponding invoice is issued to user.
The production application server, Production database server, inquiry database server, historical data base service Device, interface server are connected by electric power Intranet with fire wall, in the electric power on the net be also associated with transaction in turnaround service device, Load equalizer, archive management server, the Production database server, inquiry database server, historical data base clothes Business device, archive management server and optical fiber switch are connected, and the optical fiber switch is connected with holder and controller.
The fire wall is connected by optical cable special line with banking system, by being wirelessly connected with electric power APP, with credible access Area's connection, be connected with corporate information management of provinces and cities Intranet, corporate information management of provinces and cities Intranet passes through PC terminals and OCX controls and reading The connection of card dynamic base is write, and is connected with test advertisement, the test advertisement includes test database server, test application Turnaround service device in server and test transaction, the banking system include banking terminal and bank main.
The beneficial effects of the invention are as follows:
1st, the present invention realizes the seamless connection and flexibly selection of remote bill control and local charge control two ways, a variety of so as to provide Power purchase channel and a variety of means of payment, the demand of user individual is adapted to, improve the service satisfaction of electricity consumption user.
2nd, the present invention because motor-pumped well meter electricity charge information it is cumulative from electric card customer consumption record, in the absence of charging error, So as to avoid customer complaint.
3rd, the present invention is promoted the innovation and application of management mode and internet+technology, opened up using the planar bar code technology of modernization Open up the application of user's electronic channel.
4th, the present invention thoroughly solves the problems, such as that electric card is lost, damaged, and its is applied widely, implementation easy to spread, has good Good economic benefit.
Brief description of the drawings:
Fig. 1 is the logical data shelf compositions for stopping power transmission management system of the Jing Jing based on cell phone application.
Fig. 2 is the logical physical structure figures for stopping power transmission management system of the Jing Jing based on cell phone application.
Fig. 3 is the work block diagram of inquiry motor-pumped well state.
Fig. 4 is with electrically operated work block diagram.
Fig. 5 is to terminate with electrically operated work block diagram.
Fig. 6 is the work block diagram for obtaining the irrigation and drainage process amount of money.
Fig. 7 is the work block diagram for obtaining customer consumption record.
Embodiment:
Embodiment:Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6 and Fig. 7, in figure, 1- production application servers, 2- creation datas Storehouse server, 3- inquiry database servers, 4- historical database servers, 5- interface servers, 6- electric power Intranets, 7- fire prevention Wall, turnaround service device in 8- transaction, 9- load equalizers, 10- archive management servers, 11- optical fiber switch, 12- holders, 13- controllers, 14- electric power APP, 15-PC terminal, 16- read-write card dynamic bases.
The application is described in detail below according to accompanying drawing;
Jing Jing based on cell phone application is logical to stop power transmission management system, including physical arrangement and data structure, according to State Grid Corporation of China Data classification principle, the data of the data structure are divided into two levels, and first layer is:Structural data, unstructured number According to;The second layer is:Structural data is divided into coding, business datum, flow data;Unstructured data is divided into number of files According to, media data and data cached;The physical arrangement is by production application server, Production database server, inquiry data Storehouse server, historical database server, test application server, test database server, interface server, read-write card are moved State storehouse, electric power APP, electric power Intranet communication channel and other related service equipment composition;
(1)Inquire about motor-pumped well state:
Cell phone application calls this query interface, and message is forwarded to marketing system, and marketing system is forwarded to acquisition system again, and collection turns Terminal is sent to, as a result terminal is back to acquisition system, and acquisition system is back to marketing system, and marketing system is back to cell phone application.
(2)Start electricity consumption:
Client by cell phone application barcode scanning success and cross-check information it is errorless after, confirm start electricity consumption, cell phone application is by under reclosing command Marketing system is sent to, after marketing system receives instruction, issues collection main website immediately, marketing system receives collection main website and returns to knot After fruit, cell phone application is returned immediately.
(3)Terminate electricity consumption:
User power utilization terminates, and end Electricity Functional is clicked in cell phone application, and the cell phone application instruction that will operate a switch is issued to marketing system, After marketing system receives instruction, acquisition system is issued immediately, after marketing system receives collection main website returning result, is returned immediately Cell phone application.
(4)Obtain the irrigation and drainage process amount of money:
After powering off successfully, user power utilization information is offered collection by terminal by active report of event function immediately, and collection is transferred to Marketing system, marketing system are transferred to cell phone application and carry out page presentation.
(5)Obtain customer consumption record:
Spending amount of the main website in active reporting user irrigation and drainage at the end of user irrigates the fields is gathered, interface uses middle database form. The interface calls for cell phone application.
The above described is only a preferred embodiment of the present invention, any formal limitation not is made to the present invention, it is all It is any simple modification, equivalent change and modification made according to the technical spirit of the present invention to above example, still falls within In the range of technical solution of the present invention.

Claims (3)

1. a kind of Jing Jing based on cell phone application is logical to stop power transmission management system, including physical arrangement and data structure, it is characterized in that: According to State Grid Corporation of China's data classification principle, the data of the data structure are divided into two levels, and first layer is:Structuring Data, unstructured data;The second layer is:Structural data is divided into coding, business datum, flow data;Unstructured number According to being divided into file data, media data and data cached;The physical arrangement is taken by production application server, Production database Business device, inquiry database server, historical database server, test application server, test database server, interface clothes Device, read-write card dynamic base, electric power APP, electric power Intranet communication channel and other related service equipment of being engaged in form;
It is comprised the following steps that:A, Jing Jing energizations user management, marketing system increase Jing Jing energization management modules, is realized to machine Well, motor-pumped well user, the management of irrigation and drainage card, blacklist management etc.;
B, electricity consumption is started, user is watered electricity consumption every time, and advanced row mode selection, acquiescence cell phone application account balance is irrigated the fields, and user makes With cell phone application barcode scanning success after, cell phone application call marketing system motor-pumped well status inquiry interface, as cross-check information it is errorless after, confirm Start electricity consumption, after cell phone application locks user account remaining sum, call marketing system to send power-off interface, pass through power information and gather system System issues power transmission instruction, user balance, motor-pumped well numbering etc. and is issued to terminal, and terminal is powered according to instruction to live meter;
C, during electricity consumption, terminal is controlled according to the remaining sum issued to user power utilization, and terminal passes through event master in every 15 minutes User power utilization information is offered collection by dynamic reporting functions, and collection is transferred to marketing system, is finally taken by the display of cell phone application foreground With if the electricity charge in real time are less than or equal to 0, terminal is operated a switch power-off immediately;
D, user power utilization terminates, and user clicks on end Electricity Functional, and cell phone application calls marketing system to send power-off interface, by using Power utilization information collection system issues cut-offing instruction to terminal, terminal and live meter is powered off according to instruction, and after powering off successfully, terminal is stood User power utilization information is offered by collection by active report of event function, collection is transferred to marketing system, marketing system transmission Page presentation is carried out to cell phone application, after user's use, fail power-off, when terminal can be according to the zero load electricity consumption of setting Between threshold values automatically power off and consumer record reports to collection corresponding to generating, eventually for charge calculation of marketing;
E, the electricity charge are deducted fees, and cell phone application is deducted fees automatically after receiving the customer consumption record of marketing system forwarding, and calls marketing system Interface carries out payment to user and write off, and marketing system is deposited to the virtual account of motor-pumped well user using the customer consumption amount of money as prestoring;
F, electricity charge reconciliation, marketing system use current reconciliation mode with cell phone application reconciliation;
G, the electricity charge are calculated, and when the Electric Power Marketing System the end of month electricity charge are issued, receivable data, receivable data hair are formed according to consumer record During row, the electricity charge will be eaten up part of in the account at virtual associated family automatically;
H, bill printing, marketing system monthly collect consumer record according to user's card number, and corresponding invoice is issued to user.
2. the Jing Jing according to claim 1 based on cell phone application is logical to stop power transmission management system, it is characterized in that:The production Application server, Production database server, inquiry database server, historical database server, interface server pass through Electric power Intranet is connected with fire wall, is also associated with turnaround service device in transaction, load equalizer, backup pipe in the electric power on the net Manage server, the Production database server, inquiry database server, historical database server, backup management service Device is connected with optical fiber switch, and the optical fiber switch is connected with holder and controller.
3. the Jing Jing according to claim 2 based on cell phone application is logical to stop power transmission management system, it is characterized in that:The fire prevention Wall is connected by optical cable special line with banking system, by being wirelessly connected, being connected with credible access area, public with provinces and cities with electric power APP The connection of information management Intranet is taken charge of, corporate information management of provinces and cities Intranet is connected by PC terminals and OCX controls with read-write card dynamic base, And be connected with test advertisement, the test advertisement includes test database server, test application server and test and handed over Turnaround service device, the banking system include banking terminal and bank main in easily.
CN201710708194.4A 2017-08-17 2017-08-17 Jing Jing based on cell phone application is logical to stop power transmission management system Pending CN107516203A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710708194.4A CN107516203A (en) 2017-08-17 2017-08-17 Jing Jing based on cell phone application is logical to stop power transmission management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710708194.4A CN107516203A (en) 2017-08-17 2017-08-17 Jing Jing based on cell phone application is logical to stop power transmission management system

Publications (1)

Publication Number Publication Date
CN107516203A true CN107516203A (en) 2017-12-26

Family

ID=60723372

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710708194.4A Pending CN107516203A (en) 2017-08-17 2017-08-17 Jing Jing based on cell phone application is logical to stop power transmission management system

Country Status (1)

Country Link
CN (1) CN107516203A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109472937A (en) * 2018-11-13 2019-03-15 国网河北省电力有限公司电力科学研究院 Barcode scanning method for electrically and terminal device
CN111353874A (en) * 2020-02-19 2020-06-30 山东建银科技有限责任公司 Intelligent service system of bank outlets
CN112085893A (en) * 2020-09-29 2020-12-15 王开全 Two-channel control two-dimensional output intelligent terminal
CN114900473A (en) * 2022-04-24 2022-08-12 深圳位置网科技有限公司 Transmission method for transmitting emergency data to security platform and transmission platform thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030130912A1 (en) * 2002-01-04 2003-07-10 Davis Tommy Lee Equipment management system
US20110145049A1 (en) * 2008-05-18 2011-06-16 Philipp Frank Hermann Udo Hertel Dispensing digital objects to an electronic wallet
CN201946103U (en) * 2010-12-31 2011-08-24 石家庄百盛源电力科技咨询有限公司 Remote country operation monitor meter copying system
CN104580390A (en) * 2014-12-19 2015-04-29 国家电网公司 Electric power information scheduling engine in self-service mobile phone electricity-bill-paying terminal and using method of electric power information scheduling engine
CN105809422A (en) * 2016-03-21 2016-07-27 上海乐充新能源设备有限公司 Intelligent charging remote management method and system as well as server
CN106364361A (en) * 2016-11-12 2017-02-01 国网山西省电力公司忻州供电公司 Electric automobile parking lot charging pile centralized-monitoring system
CN106779681A (en) * 2016-11-30 2017-05-31 潘能成 A kind of wechat payment system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030130912A1 (en) * 2002-01-04 2003-07-10 Davis Tommy Lee Equipment management system
US20110145049A1 (en) * 2008-05-18 2011-06-16 Philipp Frank Hermann Udo Hertel Dispensing digital objects to an electronic wallet
CN201946103U (en) * 2010-12-31 2011-08-24 石家庄百盛源电力科技咨询有限公司 Remote country operation monitor meter copying system
CN104580390A (en) * 2014-12-19 2015-04-29 国家电网公司 Electric power information scheduling engine in self-service mobile phone electricity-bill-paying terminal and using method of electric power information scheduling engine
CN105809422A (en) * 2016-03-21 2016-07-27 上海乐充新能源设备有限公司 Intelligent charging remote management method and system as well as server
CN106364361A (en) * 2016-11-12 2017-02-01 国网山西省电力公司忻州供电公司 Electric automobile parking lot charging pile centralized-monitoring system
CN106779681A (en) * 2016-11-30 2017-05-31 潘能成 A kind of wechat payment system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王妍婷: "冠县供电:智能排灌"井井通"", 《中国电力企业管理》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109472937A (en) * 2018-11-13 2019-03-15 国网河北省电力有限公司电力科学研究院 Barcode scanning method for electrically and terminal device
CN111353874A (en) * 2020-02-19 2020-06-30 山东建银科技有限责任公司 Intelligent service system of bank outlets
CN112085893A (en) * 2020-09-29 2020-12-15 王开全 Two-channel control two-dimensional output intelligent terminal
CN114900473A (en) * 2022-04-24 2022-08-12 深圳位置网科技有限公司 Transmission method for transmitting emergency data to security platform and transmission platform thereof

Similar Documents

Publication Publication Date Title
CN107516203A (en) Jing Jing based on cell phone application is logical to stop power transmission management system
CN102306423B (en) Electricity consumption interactive terminal prepaid system
CN103595816B (en) Expense plateform system is urged in power marketing integration
CN106204931A (en) A kind of keyholed back plate that takes the most in real time manages system and method
CN108846712A (en) A kind of electricity consumption payment management system based on cloud platform
CN107392450A (en) Corporate client marketing intellectualized management system based on cloud computing
CN105869282A (en) Operation monitoring management system of self-service equipment
CN106067137A (en) A kind of credit rating evaluation methodology based on intelligent grid monitoring system
CN104580390B (en) Power information scheduling engine and its method in electricity charge self-helping cell-phone payment terminal
CN108711044A (en) A kind of the remote meter reading settlement method and system of water meter
CN108696420A (en) Information push method in communication network and device
CN104937803A (en) Power management system
CN106357751A (en) Client browser electric charge payment system
CN107633420A (en) A kind of method of commerce that deduction consumption is announced by promoting
CN205880051U (en) Smart electric meter based on mobile internet
CN109472937A (en) Barcode scanning method for electrically and terminal device
EP1191776A3 (en) Method for automatically changing an access contract between a prepaid contract and a postpaid contract
CN205945807U (en) Tax is manipulated stock quotations and is concentrated service system that makes out an invoice
CN107480972A (en) Account is shared in the application process in shared power service
CN110490573A (en) System and method based on internet electricity payment
CN104167061B (en) Multi-mobile-phone-connected remote control intelligent IC card irrigation management controller and application method thereof
CN104751569A (en) Rural irrigation and drainage use water management system
CN107146329A (en) A kind of data processing equipment and method based on self-service electricity-selling terminal
CN201022023Y (en) Remote monitoring and recording system for distributed power quality
CN107993362A (en) The Compliance control method, apparatus and system of purifier

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication