CN107516115A - 一种基于k‑中心点算法的负荷模型典型参数提取方法 - Google Patents

一种基于k‑中心点算法的负荷模型典型参数提取方法 Download PDF

Info

Publication number
CN107516115A
CN107516115A CN201710795435.3A CN201710795435A CN107516115A CN 107516115 A CN107516115 A CN 107516115A CN 201710795435 A CN201710795435 A CN 201710795435A CN 107516115 A CN107516115 A CN 107516115A
Authority
CN
China
Prior art keywords
sample
load model
cluster
msub
mrow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710795435.3A
Other languages
English (en)
Other versions
CN107516115B (zh
Inventor
唐卓尧
王颖
周剑
陆超
徐光虎
张欣然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsinghua University
China Southern Power Grid Co Ltd
Original Assignee
Tsinghua University
China Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsinghua University, China Southern Power Grid Co Ltd filed Critical Tsinghua University
Priority to CN201710795435.3A priority Critical patent/CN107516115B/zh
Publication of CN107516115A publication Critical patent/CN107516115A/zh
Application granted granted Critical
Publication of CN107516115B publication Critical patent/CN107516115B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F18/00Pattern recognition
    • G06F18/20Analysing
    • G06F18/23Clustering techniques
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Physics & Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Computer Hardware Design (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Artificial Intelligence (AREA)
  • Bioinformatics & Cheminformatics (AREA)
  • Bioinformatics & Computational Biology (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Evolutionary Biology (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明涉及一种基于k‑中心点算法的负荷模型典型参数提取方法,属于电力系统负荷建模的研究领域。该方法针对相量测量单元(Phasor Measurement Unit,PMU)量测所得负荷节点电压幅值、电压相角、有功功率、无功功率的量测曲线以及由相应量测曲线辨识所得负荷模型参数进行分析,以量测曲线与中心点负荷模型参数之间的拟合度替代距离的度量,采用改进的k‑中心点聚类算法得到负荷模型典型参数。采用本发明方法可以在没有增加大量仿真难度的前提下在一定程度上描述电力负荷的时变特性,这对电力系统稳定与控制的仿真分析具有重要的指导意义。

Description

一种基于k-中心点算法的负荷模型典型参数提取方法
技术领域
本发明涉及一种基于k-中心点算法的负荷模型典型参数提取方法,属于电力系统负荷建模领域。
背景技术
电力系统仿真是电力系统分析的一个重要手段,而电力系统仿真的基础是电力系统模型的建立,其中负荷模型的建立具有重要的价值和意义。
传统负荷建模主要包括模型结构的选择和模型参数辨识两个方面。负荷模型结构方面常用的模型为由恒阻抗、恒电流和恒功率描述负荷静态特性,由感应电动机描述负荷动态特性的综合负荷模型,若负荷中恒电流和恒功率所占比重较小,则可以进一步忽略,用恒阻抗模型来描述负荷的静态特性。模型参数辨识主要有统计综合法和总体测辨法,近年来,同步相量测量单元(Phasor Measurement Unit,PMU)的发展为电力系统分析提供了重要的数据来源,因此基于量测数据的总体测辨法成为当前负荷模型参数辨识的研究热点。
总体测辨法利用系统量测可以得到不同运行场景下的负荷模型参数,但辨识所得到的负荷模型参数如何应用到实际仿真系统中仍然有待进一步的研究。采用固定一套负荷模型参数的方法很难反映电力负荷的时变特性,而根据实测辨识参数更改仿真模型参数会增加电力系统仿真的难度。
发明内容
本发明的目的是提出一种基于k-中心点算法的负荷模型典型参数提取方法,以克服已有技术的不足之处,针对相量测量单元(Phasor Measurement Unit,PMU)量测所得负荷节点电压幅值、电压相角、有功功率、无功功率的量测曲线以及由此辨识所得到的负荷模型参数进行分析,采用k-中心点聚类算法,以得到多组能够表征负荷时变性的负荷模型典型参数。
本发明提出的基于k-中心点算法的负荷模型典型参数提取方法,包括以下步骤:
(1)从电力系统的相量测量单元中分别获取电力系统的n组负荷节点的电压幅值Um、电压相角θ、有功功率Pm和无功功率Qm的量测曲线,得到n组量测曲线;
(2)根据上述量测曲线,建立一个电力系统的恒阻抗并联感应电动机的综合负荷模型,采用差分进化方法,辨识该综合负荷模型,得到上述每组量测曲线的四个负荷模型参数,四个负荷模型参数分别为转子开路电抗X、转子暂态电抗X'、转子开路时间常数Td0和静负荷电阻R,将上述步骤(1)的电压幅值Um、电压相角θ、有功功率Pm和无功功率Qm的量测曲线以及四个负荷模型参数组成一个样本,遍历n组量测曲线,重复本步骤,得到n个样本;
(3)初始化时,从上述n个样本中随机选择k个样本,作为初始聚类中心点;
(4)利用下式,分别计算剩余n-k个非聚类中心点样本中任意一个样本的量测曲线与k个聚类中心点样本的负荷模型参数之间的拟合度fit:
其中,Pm和Qm分别为上述步骤(1)中的有功功率量测曲线和无功功率量测曲线,Pp和Qp分别为将非聚类中心点样本的量测电压幅值Um和量测电压相角θ输入到聚类中心点样本的负荷模型中,计算得到的有功功率曲线和无功功率曲线,||·||2为向量的二阶范数,比较k个拟合度的大小,并将该样本以及与该样本拟合度最大的聚类中心点作为同一簇,遍历n-k个样本,重复本步骤,并将该样本划归到与该样本的拟合度最大的聚类中心点所在的簇中,得到k个簇;
(5)定义一个代价函数C,根据上述步骤(4)的拟合度计算用n-k个非聚类中心点样本中的任意一个Oh替代k个聚类中心点样本中的任意一个Oi的代价函数,其中所有样本中任意一个样本Oj的代价函数的计算包括如下四种:
(5-1)当Oj属于Oi,且Oi被Oh替换后使Oj离另一个聚类中心点样本Om为最近,则代价函数Cjih=d(j,m)-d(j,i);
(5-2)当Oj属于Oi,且Oi被Oh替换后使Oj属于Oh,则代价函数Cjih=d(j,h)-d(j,i);
(5-3)当Oj属于Om,且Oi被Oh替换后使Oj属于Om,则代价函数Cjih=0;
(5-4)当Oj属于Om,且Oi被Oh替换后使Oj属于Oh,则代价函数Cjih=d(j,h)-d(j,m);
其中,d(j,m)表示样本m的负荷模型参数对样本j的量测曲线的拟合度,d(j,i)表示样本i的负荷模型参数对样本j的量测曲线的拟合度,d(j,h)表示样本h的负荷模型参数对样本j的量测曲线的拟合度;
(6)对上述所有样本的代价函数求和,得到n-k个非聚类中心点样本中的任意一个Oh替代k个聚类中心点样本中的任意一个Oi的总代价函数Cih,Cih=∑Cjih,对总代价函数Cih进行判断,若代价函数Cih为正,则用非聚类中心点样本Oh替代原聚类中心点样本Oi,形成新的聚类中心点,并使该新的聚类中心点替代原聚类中心点,返回步骤(4),若代价函数Cih非正,则返回步骤(5);
(7)重复上述步骤(4)—步骤(6),遍历非聚类中心点样本替代聚类中心点样本后停止计算,最终聚类中心点样本的负荷模型参数即为负荷模型典型参数。
本发明提出的基于k-中心点算法的负荷模型典型参数提取方法,其优点是:
本发明方法首先计算量测曲线与中心点负荷模型参数之间的拟合度,然后以拟合度替代k-中心点算法的距离度量实现对负荷模型参数的聚类并得到相应的负荷模型典型参数。利用本发明的负荷模型典型参数提取方法,可以得到用于电力系统仿真的多组负荷模型参数,本方法相对于传统固定负荷模型参数的处理,其优点主要体现在:利用本发明方法得到的多组负荷模型典型参数,可以在没有增加大量仿真难度的情况下,描述负荷的时变特性;本发明最终所得负荷模型典型参数对电力系统稳定与控制的仿真具有重要的指导意义。
附图说明
图1为本发明方法的流程框图。
图2为本发明实施例中所用综合负荷模型结构示意图。
具体实施方式
本发明提出的基于k-中心点算法的负荷模型典型参数提取方法,其流程框图如图1所示,该方法首先计算量测曲线与中心点负荷模型参数之间的拟合度,然后以拟合度替代k-中心点算法的距离度量实现对负荷模型参数的聚类并得到相应的负荷模型典型参数。该方法包括以下步骤:
(1)从电力系统的相量测量单元(Phasor Measurement Unit,PMU)中分别获取电力系统的n组负荷节点的电压幅值Um、电压相角θ、有功功率Pm和无功功率Qm的量测曲线,得到n组量测曲线,本发明的一个实施例中,共获取99组量测曲线;
(2)根据上述量测曲线,建立一个电力系统的恒阻抗并联感应电动机的综合负荷模型,采用差分进化方法,辨识该综合负荷模型(该综合负荷模型的示意图如图2所示),得到上述每组量测曲线的四个负荷模型参数,四个负荷模型参数分别为转子开路电抗X、转子暂态电抗X'、转子开路时间常数Td0和静负荷电阻R,将上述步骤(1)的电压幅值Um、电压相角θ、有功功率Pm和无功功率Qm的量测曲线以及四个负荷模型参数组成一个样本,遍历n组量测曲线,重复本步骤,得到n个样本;
(3)初始化时,从上述n个样本中随机选择k个样本,作为初始聚类中心点,实施例中选择4个样本;
(4)利用下式,分别计算剩余n-k个非聚类中心点样本中任意一个样本的量测曲线与k个聚类中心点样本的负荷模型参数之间的拟合度fit:
其中,Pm和Qm分别为上述步骤(1)中的有功功率量测曲线和无功功率量测曲线,Pp和Qp分别为将非聚类中心点样本的量测电压幅值Um和量测电压相角θ输入到聚类中心点样本的负荷模型中,计算得到的有功功率曲线和无功功率曲线,||·||2为向量的二阶范数,比较k个拟合度的大小,并将该样本以及与该样本拟合度最大的聚类中心点作为同一簇,遍历n-k个样本,重复本步骤,并将该样本划归到与该样本的拟合度最大的聚类中心点所在的簇中,得到k个簇,实施例中为95个非聚类中心点样本中任意一个样本的量测曲线与4个聚类中心点样本的负荷模型参数之间的拟合度;
(5)定义一个代价函数C,根据上述步骤(4)的拟合度计算用n-k个非聚类中心点样本中的任意一个Oh替代k个聚类中心点样本中的任意一个Oi的代价函数,其中所有样本中任意一个样本Oj的代价函数的计算包括如下四种:
(5-1)当Oj属于Oi,且Oi被Oh替换后使Oj离另一个聚类中心点样本Om为最近,则代价函数Cjih=d(j,m)-d(j,i);
(5-2)当Oj属于Oi,且Oi被Oh替换后使Oj属于Oh,则代价函数Cjih=d(j,h)-d(j,i);
(5-3)当Oj属于Om,且Oi被Oh替换后使Oj属于Om,则代价函数Cjih=0;
(5-4)当Oj属于Om,且Oi被Oh替换后使Oj属于Oh,则代价函数Cjih=d(j,h)-d(j,m);
其中,d(j,m)表示样本m的负荷模型参数对样本j的量测曲线的拟合度,d(j,i)表示样本i的负荷模型参数对样本j的量测曲线的拟合度,d(j,h)表示样本h的负荷模型参数对样本j的量测曲线的拟合度;
(6)对上述所有样本的代价函数求和,得到n-k个非聚类中心点样本中的任意一个Oh替代k个聚类中心点样本中的任意一个Oi的总代价函数Cih,Cih=∑Cjih,对总代价函数Cih进行判断,若代价函数Cih为正,则用非聚类中心点样本Oh替代原聚类中心点样本Oi,形成新的聚类中心点,并使该新的聚类中心点替代原聚类中心点,返回步骤(4),若代价函数Cih非正(即零或负),则返回步骤(5);
(7)重复上述步骤(4)—步骤(6),遍历非聚类中心点样本替代聚类中心点样本后停止计算,最终聚类中心点样本的负荷模型参数即为负荷模型典型参数。
本发明的实施例中,计算所得结果分别如表1和表2所示:
表1各聚类中心样本数量
表2改进k-中心聚类所得负荷模型典型参数
还可以根据上述最终非聚类中心点样本的量测数据与最终聚类中心点样本的负荷模型参数之间的拟合度的大小,将该非聚类中心点样本划归到与该非聚类中心点样本拟合度最大的聚类中心点样本所在的簇中,为电力系统仿真分析中负荷模型参数的选取提供指导。

Claims (1)

1.一种基于k-中心点算法的负荷模型典型参数提取方法,其特征在于,该方法包括以下步骤:
(1)从电力系统的相量测量单元中分别获取电力系统的n组负荷节点的电压幅值Um、电压相角θ、有功功率Pm和无功功率Qm的量测曲线,得到n组量测曲线;
(2)根据上述量测曲线,建立一个电力系统的恒阻抗并联感应电动机的综合负荷模型,采用差分进化方法,辨识该综合负荷模型,得到上述每组量测曲线的四个负荷模型参数,四个负荷模型参数分别为转子开路电抗X、转子暂态电抗X'、转子开路时间常数Td0和静负荷电阻R,将上述步骤(1)的电压幅值Um、电压相角θ、有功功率Pm和无功功率Qm的量测曲线以及四个负荷模型参数组成一个样本,遍历n组量测曲线,重复本步骤,得到n个样本;
(3)初始化时,从上述n个样本中随机选择k个样本,作为初始聚类中心点;
(4)利用下式,分别计算剩余n-k个非聚类中心点样本中任意一个样本的量测曲线与k个聚类中心点样本的负荷模型参数之间的拟合度fit:
<mrow> <mi>f</mi> <mi>i</mi> <mi>t</mi> <mo>=</mo> <mn>1</mn> <mo>-</mo> <mfrac> <mn>1</mn> <mn>2</mn> </mfrac> <mrow> <mo>(</mo> <mfrac> <mrow> <mo>|</mo> <mo>|</mo> <msub> <mi>P</mi> <mi>p</mi> </msub> <mo>-</mo> <msub> <mi>P</mi> <mi>m</mi> </msub> <mo>|</mo> <msup> <mo>|</mo> <mn>2</mn> </msup> </mrow> <mrow> <mo>|</mo> <mo>|</mo> <msub> <mi>P</mi> <mi>m</mi> </msub> <mo>-</mo> <mi>m</mi> <mi>e</mi> <mi>a</mi> <mi>n</mi> <mrow> <mo>(</mo> <msub> <mi>P</mi> <mi>m</mi> </msub> <mo>)</mo> </mrow> <mo>|</mo> <msup> <mo>|</mo> <mn>2</mn> </msup> </mrow> </mfrac> <mo>+</mo> <mfrac> <mrow> <mo>|</mo> <mo>|</mo> <msub> <mi>Q</mi> <mi>p</mi> </msub> <mo>-</mo> <msub> <mi>Q</mi> <mi>m</mi> </msub> <mo>|</mo> <msup> <mo>|</mo> <mn>2</mn> </msup> </mrow> <mrow> <mo>|</mo> <mo>|</mo> <msub> <mi>Q</mi> <mi>m</mi> </msub> <mo>-</mo> <mi>m</mi> <mi>e</mi> <mi>a</mi> <mi>n</mi> <mrow> <mo>(</mo> <msub> <mi>Q</mi> <mi>m</mi> </msub> <mo>)</mo> </mrow> <mo>|</mo> <msup> <mo>|</mo> <mn>2</mn> </msup> </mrow> </mfrac> <mo>)</mo> </mrow> <mo>,</mo> </mrow>
其中,Pm和Qm分别为上述步骤(1)中的有功功率量测曲线和无功功率量测曲线,Pp和Qp分别为将非聚类中心点样本的量测电压幅值Um和量测电压相角θ输入到聚类中心点样本的负荷模型中,计算得到的有功功率曲线和无功功率曲线,||·||2为向量的二阶范数,比较k个拟合度的大小,并将该样本以及与该样本拟合度最大的聚类中心点作为同一簇,遍历n-k个样本,重复本步骤,并将该样本划归到与该样本的拟合度最大的聚类中心点所在的簇中,得到k个簇;
(5)定义一个代价函数C,根据上述步骤(4)的拟合度计算用n-k个非聚类中心点样本中的任意一个Oh替代k个聚类中心点样本中的任意一个Oi的代价函数,其中所有样本中任意一个样本Oj的代价函数的计算包括如下四种:
(5-1)当Oj属于Oi,且Oi被Oh替换后使Oj离另一个聚类中心点样本Om为最近,则代价函数Cjih=d(j,m)-d(j,i);
(5-2)当Oj属于Oi,且Oi被Oh替换后使Oj属于Oh,则代价函数Cjih=d(j,h)-d(j,i);
(5-3)当Oj属于Om,且Oi被Oh替换后使Oj属于Om,则代价函数Cjih=0;
(5-4)当Oj属于Om,且Oi被Oh替换后使Oj属于Oh,则代价函数Cjih=d(j,h)-d(j,m);
其中,d(j,m)表示样本m的负荷模型参数对样本j的量测曲线的拟合度,d(j,i)表示样本i的负荷模型参数对样本j的量测曲线的拟合度,d(j,h)表示样本h的负荷模型参数对样本j的量测曲线的拟合度;
(6)对上述所有样本的代价函数求和,得到n-k个非聚类中心点样本中任意一个Oh替代k个聚类中心点样本中的任意一个Oi的总代价函数Cih,Cih=∑Cjih,对总代价函数Cih进行判断,若代价函数Cih为正,则用非聚类中心点样本Oh替代原聚类中心点样本Oi,形成新的聚类中心点,并使该新的聚类中心点替代原聚类中心点,返回步骤(4),若代价函数Cih非正(即零或负),则返回步骤(5);
(7)重复上述步骤(4)—步骤(6),遍历非聚类中心点样本替代聚类中心点样本后停止计算,最终聚类中心点样本的负荷模型参数即为负荷模型典型参数。
CN201710795435.3A 2017-09-06 2017-09-06 一种基于k-中心点算法的负荷模型典型参数提取方法 Active CN107516115B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710795435.3A CN107516115B (zh) 2017-09-06 2017-09-06 一种基于k-中心点算法的负荷模型典型参数提取方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710795435.3A CN107516115B (zh) 2017-09-06 2017-09-06 一种基于k-中心点算法的负荷模型典型参数提取方法

Publications (2)

Publication Number Publication Date
CN107516115A true CN107516115A (zh) 2017-12-26
CN107516115B CN107516115B (zh) 2019-11-19

Family

ID=60724685

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710795435.3A Active CN107516115B (zh) 2017-09-06 2017-09-06 一种基于k-中心点算法的负荷模型典型参数提取方法

Country Status (1)

Country Link
CN (1) CN107516115B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109613362A (zh) * 2018-12-14 2019-04-12 四川长虹电器股份有限公司 非侵入式电器数量识别方法
CN110601174A (zh) * 2019-07-06 2019-12-20 天津大学 一种基于深度学习的负荷建模与在线修正方法
CN110991786A (zh) * 2019-10-15 2020-04-10 国网浙江省电力有限公司台州供电公司 基于相似日负荷曲线的10kV静态负荷模型参数辨识方法
CN112419093A (zh) * 2020-11-26 2021-02-26 清华大学 基于聚类算法的负荷模型特征参数提取方法和装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103887815A (zh) * 2014-02-21 2014-06-25 华南理工大学 基于运行数据的风电场参数辨识及动态等值方法
CN105069236A (zh) * 2015-08-13 2015-11-18 山东大学 考虑风电场节点空间相关性的广义负荷联合概率建模方法
CN106055761A (zh) * 2016-05-25 2016-10-26 清华大学 一种基于决策树分类的负荷模型参数校验方法
US20170076178A1 (en) * 2015-09-14 2017-03-16 International Business Machines Corporation System, method, and recording medium for efficient cohesive subgraph identification in entity collections for inlier and outlier detection
CN106786524A (zh) * 2016-12-19 2017-05-31 清华大学 基于类噪声信号及改进差分进化的负荷模型参数辨识方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103887815A (zh) * 2014-02-21 2014-06-25 华南理工大学 基于运行数据的风电场参数辨识及动态等值方法
CN105069236A (zh) * 2015-08-13 2015-11-18 山东大学 考虑风电场节点空间相关性的广义负荷联合概率建模方法
US20170076178A1 (en) * 2015-09-14 2017-03-16 International Business Machines Corporation System, method, and recording medium for efficient cohesive subgraph identification in entity collections for inlier and outlier detection
CN106055761A (zh) * 2016-05-25 2016-10-26 清华大学 一种基于决策树分类的负荷模型参数校验方法
CN106786524A (zh) * 2016-12-19 2017-05-31 清华大学 基于类噪声信号及改进差分进化的负荷模型参数辨识方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
GUOPING SHI ETAL.: "Load clustering and synthetic modeling based on an improved fuzzy c means clustering algorithm", 《2011 4TH INTERNATIONAL CONFERENCE ON ELECTRIC UTILITY DEREGULATION AND RESTRUCTURING AND POWER TECHNOLOGIES (DRPT)》 *
李彦 等: "MapReduce框架下运用K-modes聚类算法进行负荷曲线预测", 《计算机与数字工程》 *
林济铿 等: "基于随机模糊聚类的负荷建模与参数辨识", 《电力系统自动化》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109613362A (zh) * 2018-12-14 2019-04-12 四川长虹电器股份有限公司 非侵入式电器数量识别方法
CN109613362B (zh) * 2018-12-14 2021-02-26 四川长虹电器股份有限公司 非侵入式电器数量识别方法
CN110601174A (zh) * 2019-07-06 2019-12-20 天津大学 一种基于深度学习的负荷建模与在线修正方法
CN110601174B (zh) * 2019-07-06 2023-04-18 天津大学 一种基于深度学习的负荷建模与在线修正方法
CN110991786A (zh) * 2019-10-15 2020-04-10 国网浙江省电力有限公司台州供电公司 基于相似日负荷曲线的10kV静态负荷模型参数辨识方法
CN110991786B (zh) * 2019-10-15 2022-06-24 国网浙江省电力有限公司台州供电公司 基于相似日负荷曲线的10kV静态负荷模型参数辨识方法
CN112419093A (zh) * 2020-11-26 2021-02-26 清华大学 基于聚类算法的负荷模型特征参数提取方法和装置

Also Published As

Publication number Publication date
CN107516115B (zh) 2019-11-19

Similar Documents

Publication Publication Date Title
CN107516115B (zh) 一种基于k-中心点算法的负荷模型典型参数提取方法
CN103887815B (zh) 基于运行数据的风电场参数辨识及动态等值方法
CN101882167B (zh) 一种大规模风电集中接入电网的风电场等值建模方法
CN105938578A (zh) 一种基于聚类分析的大规模光伏电站等值建模方法
CN103401238B (zh) 一种基于总体测辨法的电力负荷建模方法
CN112907075B (zh) 一种电力系统综合负荷模型参数辨识方法
CN100444494C (zh) 电力系统同调发电机组参数聚合方法
CN109245100A (zh) 考虑交直流配电网负荷组成时变性的负荷动态建模方法
CN103023015B (zh) 一种配电线路阻抗在线虚拟量测方法
CN110119570A (zh) 一种实测数据驱动的风电场模型参数校核方法
CN103595040A (zh) 含直流分布式电源的配电网及其综合负荷特性的分析方法
CN106682407B (zh) 基于戴维南等值和支路传输功率极限的电压稳定评估方法
CN103033716B (zh) 一种电网综合负荷模型中各负荷成分所占比例的计算方法
CN103793556B (zh) 综合出线负荷的变电站负荷建模方法
CN103592528A (zh) 一种基于动态轨迹灵敏度的光伏逆变器模型参数辨识方法
CN106410825B (zh) 预测多端直流系统接入后电力系统机电振荡模式的方法
CN102904518A (zh) 一种同步发电机q轴参数在线辨识方法
CN115392133A (zh) 采用高斯混合模型的风电场最优聚类等值方法
CN105260521B (zh) 一种基于层次分析法的负荷融合建模方法
CN110703038B (zh) 一种适用于风机接入配电网的谐波阻抗估算方法
CN110474323B (zh) 一种电力系统惯性时间常数测量方法
CN111293693A (zh) 基于扩展卡尔曼滤波的双馈风机变流器控制参数辨识方法
CN109188084B (zh) 电力系统阻抗模型的测辩方法及系统
CN104267243B (zh) 同步发电机内电势和电抗参数的测量方法及装置
CN110098610A (zh) 故障扰动下电力系统振荡主导模式的实时辨识方法及系统

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant