CN107515976A - Surface subsidence Forecasting Methodology based on slurry shield construction main contral parameter - Google Patents

Surface subsidence Forecasting Methodology based on slurry shield construction main contral parameter Download PDF

Info

Publication number
CN107515976A
CN107515976A CN201710694731.4A CN201710694731A CN107515976A CN 107515976 A CN107515976 A CN 107515976A CN 201710694731 A CN201710694731 A CN 201710694731A CN 107515976 A CN107515976 A CN 107515976A
Authority
CN
China
Prior art keywords
shield
ground settlement
stage
section
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710694731.4A
Other languages
Chinese (zh)
Other versions
CN107515976B (en
Inventor
李磊
肖晓春
杨宏燕
凌宇峰
吴惠明
李永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tunnel Engineering Co Ltd
Original Assignee
Shanghai Tunnel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tunnel Engineering Co Ltd filed Critical Shanghai Tunnel Engineering Co Ltd
Priority to CN201710694731.4A priority Critical patent/CN107515976B/en
Publication of CN107515976A publication Critical patent/CN107515976A/en
Application granted granted Critical
Publication of CN107515976B publication Critical patent/CN107515976B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • General Physics & Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The present invention relates to a kind of surface subsidence Forecasting Methodology based on slurry shield construction main contral parameter, comprise the following steps:During setting shield-tunneling construction prediction;The otch pressure influence stage is divided into during the shield-tunneling construction is predicted, shield passes through stage and shield tail subsidence stage;Establish forecast model and obtain the ground settlement prediction curve expression formula of the corresponding three phases;And obtain initializaing variable according to design drawing, exploration report and shield tunnelling parameters, the variate-value that combined ground settlement monitoring data is corrected, and then obtain the ground settlement prediction curve during current driving ring corresponds to the shield-tunneling construction prediction further according to the ground settlement prediction curve expression formula.The present invention easy to use, programmable, is easy to engineering construction personnel to adjust shield-tunneling construction main contral parameter accordingly, in time, is effectively controlled surface subsidence using shield tunnelling parameters prediction ground settlement curve.

Description

Surface subsidence Forecasting Methodology based on slurry shield construction main contral parameter
Technical field
The present invention relates to shield-tunneling construction field, refers in particular to a kind of surface subsidence prediction based on slurry shield construction main contral parameter Method.
Background technology
Disturbed around Stratum Loss caused by shield driving and shield tunnel or by failure by shear manipulated soil it is solid again Knot, is the main reason for shield method tunnel construction causes surface subsidence.In shield tunneling process, Stratum Loss successively occurs for ground Sedimentation and soil solidifying sedimentation, but both formation mechenisms and display form have essential distinction.Said in terms of speed is settled, Compared to the consolidation settlement of disturbed soil, the development speed of Stratum Loss sedimentation is many soon.Different classes of soil layer, its stratum The speed of loss sedimentation and consolidation settlement is also different.Said in terms of settling amount size, the size and shield tunnel of Stratum Loss sedimentation The ground loss amount of road unit length is relevant, and the size of consolidation settlement depend on shield-tunneling construction to the level of disruption of the soil body and The factors such as the infiltration coefficient of the soil body, modulus of compressibility.
It is existing to have horizontal surface subsidence Peck formula and longitudinally on Stratum Loss settlement prediction caused by shield driving Face sedimentation Peck correction formulas etc., when carrying out the prediction of Stratum Loss sedimentation based on Peck formula, ground loss ratio and ground sink Drop well width coefficient is two decisive parameters, but its value has that discrete type and region are empirical, and is difficult to directly reflect shield Influence of the structure construction active control parameters to ground settlement.
Hyperbolic model ground settlement above research shield tunnel axis changes with time in relation using more wide General, such as prior art literature, (" slurry shield tunnel construction caused by subsidence Analysis and prediction ", woods are deposited just etc., and building is built Build and environmental project, the 5th phase of volume 34 in October, 2012) in subsidence Analysis caused by slurry shield tunnel construction and prediction The hyperbola formula of ground consolidation settlement is disclosed, but hyperbolic model is used for shield and supervised by rear longitudinal ground long-term settlement The fitting of data is surveyed, to the prediction settled for soil solidifying, then the value of hyperbola constant needs to further investigate.
(application publication number is for Chinese formerly patent:CN103195435A, invention and created name are:One kind control shield is worn More building dense area induce surface subsidence method) in propose the shield tunnel Land-Subsidence Control side based on Stratum Loss Method, by establishing the relational model of " shield tunnelling parameters-Stratum Loss-surface subsidence ", set using method for numerical simulation inverse Soil cabin pressure corresponding to fixed ground loss ratio and grouting amount parameter, in this, as the target of Construction control.This method needs to build Vertical numerical analysis model, it is unfavorable for engineering site technical staff and grasps and apply, and only analyze Stratum Loss sedimentation, does not relate to And soil solidifying sedimentation.
In summary, the interim deformation mechanism based on stratum and its construction inducement, while consider Stratum Loss sedimentation and The shield tunnel axis longitudinal direction ground settlement prediction of soil solidifying sedimentation, and it is easy to engineering construction personnel to grasp, the method for application Still locate blank.
The content of the invention
The defects of it is an object of the invention to overcome prior art, there is provided a kind of based on slurry shield construction main contral parameter Surface subsidence Forecasting Methodology, solve not relate to present in existing Peck formula, hyperbolic model and numerical simulation reverse calculation algorithmses And soil solidifying settles and is unfavorable for the problem of engineering site technical staff grasps surface subsidence prediction, is additionally operable to fill up while examines Consider the shield tunnel axis longitudinal direction ground settlement prediction of Stratum Loss sedimentation and soil solidifying sedimentation, and be easy to engineering construction personnel Grasp, the blank of the method for application.
Realizing the technical scheme of above-mentioned purpose is:
The invention provides a kind of surface subsidence Forecasting Methodology based on slurry shield construction main contral parameter, including following step Suddenly:
It is to deviate from from section of jurisdiction at the ring of shield tail 100 to shield during the shield-tunneling construction prediction during setting shield-tunneling construction prediction In front of structure otch at a setpoint distance;
Built-in vertical ground settlement and the coordinate system of section of jurisdiction ring number during the shield-tunneling construction is predicted;
The otch pressure influence stage is divided into during the shield-tunneling construction is predicted, shield is settled by stage and shield tail Stage;
Establish forecast model and obtain the corresponding otch pressure influence stage, the shield passes through stage and described The ground settlement prediction curve expression formula of shield tail subsidence stage;And
Initializaing variable is obtained according to shield tunnelling parameters, the initializaing variable is input in the forecast model, and root Ground settlement during obtaining the corresponding shield-tunneling construction prediction according to the ground settlement prediction curve expression formula is initially pre- Survey curve.
Surface subsidence Forecasting Methodology provided by the invention based on slurry shield construction main contral parameter, according to the shield-tunneling construction phase Between the mechanism that deforms of stratum stage type, the inducement based on shield-tunneling construction active control parameters to ground achievement, propose it is a kind of simultaneously Consider the shield tunnel axis longitudinal direction ground settlement prediction method of Stratum Loss sedimentation and soil solidifying sedimentation.The present invention utilizes shield The ground settlement prediction curve during shield-tunneling construction prediction at the corresponding current construction of structure construction parameter prediction, easy to use, Programmable, it is easy to engineering construction personnel to adjust shield-tunneling construction main contral parameter accordingly, in time, effectively controls surface subsidence.
The present invention based on slurry shield construction main contral parameter surface subsidence Forecasting Methodology further improvement is that, establish Forecast model and the ground settlement prediction curve expression formula for obtaining the corresponding otch pressure influence stage, including:
Section of jurisdiction ring number corresponding to the end points O in otch pressure influence stage is set as n0, section of jurisdiction ring number corresponding to terminal A is n1, The ground settlement prediction curve in the otch pressure influence stage is the parabola from end points O to terminal A;
The ground settlement in the otch pressure influence stage is corresponded to according to bubble cabin calculation of pressure, and draws surface subsidence Measuring prediction curve expression formula is:
In formula group one, S (n) is ground settlement, n corresponding to the ring number n of section of jurisdiction1≤n≤n0, S (n1) it is bubble lock pressure power PaCorresponding surface uplift amount;Earth pressure at rest σ0=K0γ (H+D/2), coefficient of static earth pressureRankine quilt Dynamic soil pressure σp=γ (H+D/2) Kp+2c(Kp)1/2, coefficient of passive earth pressure To be rubbed in the soil body Wipe angle;C is soil body cohesion;H is tunnel thickness of earth covering;D is tunnel-liner outer circumference diameter;γ is soil body unit weight;n2For shield Currently propel ring number;Shield machine otch corresponds to ring number and n2Difference to round up functionLsFor shield Shell length;W is section of jurisdiction ring width.
The present invention based on slurry shield construction main contral parameter surface subsidence Forecasting Methodology further improvement is that, it is described The size of the ground settlement of terminal A and bubble lock pressure power are linear, and Pa∈[σ0p], corresponding S (n1) ∈ [0,10], So as to obtain the S (n in formula group one1) expression formula.
The present invention based on slurry shield construction main contral parameter surface subsidence Forecasting Methodology further improvement is that, establish Forecast model simultaneously obtains ground settlement prediction curve expression formula of the corresponding shield by the stage, including:
The end point that the shield passes through the stage is terminal A, and setting shield passes through section of jurisdiction ring number corresponding to the terminal B in stage For n2, the shield is the straight line from terminal A to terminal B by the ground settlement prediction curve in stage;
The ground settlement of terminal B is calculated according to the ground settlement of the terminal A:
S(n2)=S (n1)-500(Ds-Ds11(formula one)
In formula one, S (n2) it is section of jurisdiction ring number n2Corresponding ground settlement, n2The section of jurisdiction ring number currentlyyed propel for shield, S (n1) it is bubble lock pressure power PaCorresponding surface uplift amount, α1For cutterhead shield tail diameter difference reduction coefficient, DsIt is straight for shield cutter Footpath, Ds1For shield tail diameter;
It is pre- by the ground settlement in stage that the corresponding shield is obtained according to described formula one and described formula group one Surveying curve representation formula is:
In formula two, S (n) is ground settlement, n corresponding to the ring number n of section of jurisdiction2≤n≤n1
The present invention based on slurry shield construction main contral parameter surface subsidence Forecasting Methodology further improvement is that, establish Forecast model and the ground settlement prediction curve expression formula for obtaining the corresponding shield tail subsidence stage, including:
The end point of the shield tail subsidence stage is terminal B, sets the ground settlement prediction of the shield tail subsidence stage Curve is hyperbola, and hyperbola passing point C, section of jurisdiction ring number corresponding to the point C are n3, set section of jurisdiction ring number n3To depart from shield The section of jurisdiction ring number of tail two days later;
Point C ground settlement is calculated according to described formula one:
S(n3)=S (n2)-1000Sg(formula three)
In formula three, S (n3) it is section of jurisdiction ring number n3Corresponding ground settlement, S (n2) it is section of jurisdiction ring number n2Corresponding ground sinks Drop amount, SgThe Stratum Loss amount in stage is filled for slurries;
The ground settlement prediction of the shield tail subsidence stage according to corresponding to obtaining described formula three and described formula one Curve representation formula is:
In formula group two, S (n) is ground settlement, n corresponding to the ring number n of section of jurisdiction2-100≤n≤n2, a sign shield tail disengagings Initial stage ground sinking speed, b determine ground final settlement size, VlFor the ground loss amount of shield tunnel unit length, i is Surface subsidence well width coefficient, α2For synchronous slurries fill factor, VgIt is the every endless tube piece synchronous grouting amount of shield.
The present invention based on slurry shield construction main contral parameter surface subsidence Forecasting Methodology further improvement is that, also wrap Include:
During shield machine tunnels, Ground Subsidence Monitoring data are obtained in real time;
Utilize acquired Ground Subsidence Monitoring data and the corresponding ground settlement initial predicted curve amendment institute State the variable in ground settlement prediction curve expression formula;
According to the variable combination shield tunnelling parameters for the ground settlement prediction curve expression formula corrected again according to institute State and be predicted during ground settlement prediction curve expression formula is predicted the shield-tunneling construction and obtain ground settlement prediction Curve.
The present invention based on slurry shield construction main contral parameter surface subsidence Forecasting Methodology further improvement is that, it is described Shield otch in front of setpoint distance to be in the ground settlement with the position in the coordinate system of section of jurisdiction ring number be corresponding section of jurisdiction Ring number n0End points O, the ground settlement of the end points O is zero;
The setpoint distance is set as T0, obtain:
In formula four, H is tunnel thickness of earth covering;D is tunnel-liner outer circumference diameter,For soil body internal friction angle.
The present invention based on slurry shield construction main contral parameter surface subsidence Forecasting Methodology further improvement is that, it is described Initializaing variable includes shield tunnel physical dimension parameter, formation parameter, shield-tunneling construction main contral parameter and undetermined coefficient parameter, institute Shield tunnel physical dimension parameter, formation parameter and the shield-tunneling construction main contral parameter stated according to design drawing, exploration report and Shield tunnelling parameters obtain;
The undetermined coefficient parameter rule of thumb obtains initial value.
The present invention based on slurry shield construction main contral parameter surface subsidence Forecasting Methodology further improvement is that, also wrap Include:Obtain ground settlement Monitoring Data in work progress;
The initial value of the undetermined coefficient is modified so as to be corrected using the ground settlement Monitoring Data Value;
The correction value of the undetermined coefficient, described shield tunnel physical dimension parameter, formation parameter and shield are applied Work main contral parameter is re-entered into the forecast model, and is obtained correspondingly according to the ground settlement prediction curve expression formula Ground settlement prediction curve during the shield-tunneling construction prediction.
The present invention based on slurry shield construction main contral parameter surface subsidence Forecasting Methodology further improvement is that, it is described Shield tunnel physical dimension parameter include shield cutter diameter, shield tail diameter, shield shell length, tunnel-liner outer circumference diameter with And section of jurisdiction ring width;
The formation parameter includes tunnel thickness of earth covering, soil body cohesion, soil body internal friction angle and soil body unit weight;
The shield-tunneling construction main contral parameter include shield driving speed, shield currently propel ring number, bubble lock pressure power and Shield is per ring synchronous grouting amount.
Brief description of the drawings
Fig. 1 sinks for the ground established in surface subsidence Forecasting Methodology of the present invention based on slurry shield construction main contral parameter Drop amount and the schematic diagram of the coordinate system of section of jurisdiction ring number.
Embodiment
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
It is fixed the invention provides a kind of surface subsidence Forecasting Methodology based on slurry shield construction main contral parameter refering to Fig. 1 It is that during shield-tunneling construction is predicted, this is predicted between a setpoint distance to section of jurisdiction departs from the ring of shield tail 100 in front of adopted shield otch Period is divided into three phases, and ground settlement prediction curve expression formula corresponding to each phase sets, otch therein The stratum deformation in pressure influence stage depends on otch pressure and the magnitude relationship of front Water And Earth Pressures, and bubble lock pressure power is the rank Section shield-tunneling construction active control parameters;Shield cutterhead rotating speed and is pushed away by the sedimentation in stage and cutterhead and shield tail diameter difference correlation It is the parameter that the stage shield-tunneling construction is actively set to enter speed;The deformation of shield tail subsidence stage and grouting pressure, grouting amount and soil Body discharging consolidation is related.The Forecasting Methodology of the present invention, while consider the shield tunnel of Stratum Loss sedimentation and soil solidifying sedimentation The ground settlement prediction of axis longitudinal direction, and it is easy to engineering construction personnel to grasp and apply.Below in conjunction with the accompanying drawings to the present invention based on The surface subsidence Forecasting Methodology of slurry shield construction main contral parameter illustrates.
The invention provides a kind of surface subsidence Forecasting Methodology based on slurry shield construction main contral parameter, including following step Suddenly:
It is to deviate from from section of jurisdiction at the ring of shield tail 100 to shield during setting shield-tunneling construction prediction, during shield-tunneling construction prediction In front of otch at a setpoint distance;As shown in figure 1, it is section of jurisdiction ring number n during shield-tunneling construction prediction0To section of jurisdiction ring number n4Area Between, the tunneling construction at the certain depth in the soil body of shield machine 10, during shield machine 10 advances, in the shield of shield machine 10 Segment assembly 11 successively at tail, form section of jurisdiction ring.According to engineering experience, after the section of jurisdiction abjection ring of shield tail 100, caused by shield-tunneling construction Stratum deformation tends towards stability, so one end selection during the shield-tunneling construction prediction of the present invention is at the section of jurisdiction abjection ring of shield tail 100.
After during selected good shield-tunneling construction prediction, built-in vertical ground settlement and section of jurisdiction ring number during shield-tunneling construction is predicted Coordinate system, using section of jurisdiction ring number n as axis of abscissas, with ground settlement S (n) for axis of ordinates, the ground settlement S's (n) Unit is mm.The point of intersection of axis of ordinates and axis of abscissas is ground elevation, the data on axis of ordinates above intersection point Surface uplift amount (value of ground settlement now is just) is represented, the data below intersection point represent subsurface drop amount (this When the value of ground settlement be negative).
Setpoint distance is in ground settlement and section of jurisdiction ring in front of shield otch during wherein setting shield-tunneling construction prediction Number coordinate system in position be respective tube piece ring number n0End points O, end points O ground settlements are zero.The choosing of setpoint distance Take:Using the minimum point of tunnel-liner periphery as summit, the summit is tunnel thickness of earth covering H and tunnel-liner periphery to edge lengths Diameter D sums, the adjacent side on the summit are setpoint distance, and the angle of adjacent side and hypotenuse isTo be rubbed in the soil body The angle of angle, adjacent side and opposite side is right angle.It is as follows so as to obtain the calculation formula of setpoint distance:
It is assumed that the setpoint distance is T0, obtain:
In formula four, H is tunnel thickness of earth covering;D is tunnel-liner outer circumference diameter,For soil body internal friction angle.
Ground settlement is established with after the coordinate system of section of jurisdiction ring number, otch pressure is divided into during shield-tunneling construction is predicted Power influences the stage, shield passes through stage and shield tail subsidence stage;The division in above three stage considers slurry shield construction Process and stratum deformation mechanism, otch pressure influence stage respective segments I, namely end points O is to the section of terminal A, shield By stage respective segments II, namely terminal A is to the section of terminal B, shield tail subsidence stage respective segments III, namely terminal B is extremely End points E section.
End points O is to the otch pressure influence stage of terminal A, and the deformation on stratum is depending on otch pressure and front Water And Earth Pressures Magnitude relationship, the soil body is squeezed in front of excavation face or Unloading Effect triggers land upheaval or sedimentation and deformation.With regard to practice of construction For, in order to preferably maintain excavation face to stablize and control ground final settlement, it otch pressure is slightly larger than excavation face Front Water And Earth Pressures, the front soil body are in passive earth pressure state.Muddy water air pressure balance shield is by adjusting the air in bubble cabin The mud hydraulic pressure in Stress control muddy water cabin, bubble lock pressure power are shield-tunneling construction active control parameters.
Terminal A to terminal B shield by the stage, due to the frictional resistance between shield shell and surrounding soil cause " back of the body soil ", Shield correction, cutterhead such as are backbreak at the reason, this in stage stratum normally behave as sedimentation and deformation, settling amount and cutterhead and shield tail it is straight Footpath difference is directly related.Cutterhead rotating speed and fltting speed are the parameters that the stage shield-tunneling construction is actively set.
Terminal B to end points E shield tail subsidence stage includes slurries filling and two stages of soil body discharging consolidation.The BC stages are Slurries fill the stage, its stratum deformation is mainly relevant with grouting pressure and grouting amount, synchronous slurry pressure after the completion of slip casting by Fade scattered, consolidation and sclerosis, volume contraction deformation cause Stratum Loss to settle to slurries therewith.Surpass caused by being disturbed with shield-tunneling construction Pore water pressure dribbles, and the CE stage soil bodys start discharging consolidation, and then trigger surface subsidence.
Then set up forecast model and obtain the corresponding otch pressure influence stage, shield passes through stage and shield tail sedimentation The ground settlement prediction curve expression formula in stage;Forecast model includes three sections of ground settlements prediction of corresponding three phases Curve representation formula, when establishing forecast model, ground subsidence curve form and special point coordinates are carried out it is assumed that then drawing first Corresponding ground settlement prediction curve expression formula;Specifically, carried out for surface subsidence curve form it is assumed that setting otch pressure The curve form that power influences the OA sections in stage is summit in end points O, the parabola being open to terminal A;Setting shield passes through the stage AB sections be straight line;Then to setting special point coordinates:The ground settlement size of terminal A and shield bubble lock pressure power are linear Relation, the seat of the terminal A is (n1, S (n1)), and Pa∈[σ0p], corresponding S (n1) ∈ [0,10], PaFor shield bubble lock pressure Power, unit bar, σ0For excavation face front stationary soil pressure, unit kPa, σpFor passive earth pressure in front of excavation face, unit For kPa, so as to obtain S (n1) expression formula,S(n1) value for just, represent bubble cabin Pressure PaCorresponding surface uplift amount, unit mm.Point C is the point on hyperbola BE, it is assumed that section of jurisdiction ring number corresponding to point C For n3, set section of jurisdiction ring number n3To depart from the section of jurisdiction ring number of shield tail two days later, point C ground settlement fills the stage for slurries Stratum Loss amount, equal to the maximum ground settling amount in Peck formula.Ring number n in section of jurisdiction corresponding to terminal B2Currentlyyed propel for shield Ring number, n3=n2- 2 × v, v are shield driving speed, and unit is ring/day.
The expression formula of surface subsidence prediction curve can use three sections of function representations:
First paragraph, the ground settlement prediction curve expression formula in corresponding otch pressure influence stage, including:
Section of jurisdiction ring number corresponding to the end points O in otch pressure influence stage is set as n0, section of jurisdiction ring number corresponding to terminal A is n1, The ground settlement prediction curve in otch pressure influence stage is the parabola from end points O to terminal A;
The ground settlement in otch pressure influence stage is corresponded to according to bubble cabin calculation of pressure, and show that ground settlement is pre- Surveying curve representation formula is:
In formula group one, S (n) is ground settlement (unit mm), n corresponding to the ring number n of section of jurisdiction1≤n≤n0, S (n1) be Bubble lock pressure power PaCorresponding surface uplift amount (unit mm);Earth pressure at rest σ0=K0γ (H+D/2), earth pressure at rest system NumberRankine passive earth pressure σp=γ (H+D/2) Kp+2c(Kp)1/2, coefficient of passive earth pressure For soil body internal friction angle (unit is °);C is soil body cohesion (unit kPa);H is tunnel Thickness of earth covering (unit m);D is tunnel-liner outer circumference diameter (unit m);γ is soil body unit weight (unit kN/m3);n2For Shield currentlys propel ring number;Shield machine otch corresponds to ring number and n2Difference to round up functionLsFor Shield shell length (unit m);W is section of jurisdiction ring width (unit m).
Second segment, corresponding ground settlement prediction curve expression formula of the shield by the stage, including:
The end point that shield passes through the stage is terminal A, set shield by section of jurisdiction ring number corresponding to the terminal B in stage as n2, the shield is the straight line from terminal A to terminal B by the ground settlement prediction curve in stage;
The ground settlement of terminal B is calculated according to the ground settlement of terminal A:
S(n2)=S (n1)-500(Ds-Ds11(formula one)
In formula one, S (n2) it is section of jurisdiction ring number n2Corresponding ground settlement, n2The section of jurisdiction ring number currentlyyed propel for shield, S (n1) it is bubble lock pressure power PaCorresponding surface uplift amount, α1For cutterhead shield tail diameter difference reduction coefficient, DsFor shield cutter diameter (unit m), Ds1For shield tail diameter (unit m);
Obtaining the ground settlement prediction curve expression formula that correspondingly shield passes through the stage according to formula one and formula group one is:
In formula two, S (n) is ground settlement, n corresponding to the ring number n of section of jurisdiction2≤n≤n1
3rd section, the ground settlement prediction curve expression formula of corresponding shield tail subsidence stage, including:
The end point of shield tail subsidence stage is terminal B, and it is double to set the ground settlement prediction curve of shield tail subsidence stage Curve, and hyperbola passing point C, section of jurisdiction ring number corresponding to point C are n3, set section of jurisdiction ring number n3To depart from the pipe of shield tail two days later Piece ring number;Section of jurisdiction ring number corresponding to the end points E of shield tail subsidence stage is n4, n4=n2-100;
Point C ground settlement is calculated according to formula one:
S(n3)=S (n2)-1000Sg(formula three)
In formula three, S (n3) it is section of jurisdiction ring number n3Corresponding ground settlement, S (n2) it is section of jurisdiction ring number n2Corresponding ground sinks Drop amount, SgStratum Loss amount (the unit m) in stage is filled for slurries;
The ground settlement prediction curve expression formula that corresponding shield tail subsidence stage is obtained according to formula three and formula one is:
In formula group two, S (n) is ground settlement, n corresponding to the ring number n of section of jurisdiction2-100≤n≤n2, a is that hyperbola is normal Number, characterize shield tail and depart from initial stage (time is less than or equal to 10 days) surface subsidence speed (unit mm-1D), b determines that ground finally sinks Drop amount size (unit mm-1), VlFor ground loss amount (the unit m of shield tunnel unit length3/ m), i is surface subsidence Well width coefficient (unit m), α2For synchronous slurries fill factor, VgIt is every endless tube piece synchronous grouting amount (the unit m of shield3)。 BE sections are hyp theoretical foundation from technical literature (" subsidence Analysis caused by slurry shield tunnel construction and pre- Survey ", woods is deposited just etc., civil construction and environmental project, the 5th phase of volume 34 in October, 2012) caused by slurry shield tunnel construction Hyperbolic model disclosed in subsidence Analysis and prediction, by terminal B and point C coordinate so that the hyperbola be calculated Expression formula, i.e. formula group two.
After establishing forecast model, initializaing variable is obtained according to shield tunnelling parameters, initializaing variable is input to prediction mould In type, and the ground settlement obtained according to ground predicting subsidence curve representation formula during corresponding shield-tunneling construction is predicted is initially pre- Survey curve.
As the better embodiment of the present invention, the forecast model of foundation is had for what is formed based on computer program The forecasting system of forecast function, in the forecasting system provided with input module, the computing module being connected with input module and with meter The output module of module connection is calculated, computing module therein is used for the calculating for realizing three sections of functions in forecast model, input module Can be initializaing variable for receiving the supplemental characteristic needed for prediction, input can be using being manually entered or automatic data collection typing Mode.Supplemental characteristic is input in computing module by the input module, and corresponding shield-tunneling construction is calculated by computing module The value of the ground settlement of each section of jurisdiction ring number during prediction, and those values are sent to output module, output module should The value of a little ground settlements is marked in coordinate system and forms ground settlement initial predicted curve, and then is shown.Realize The sequencing of calculating process, the display directly perceived of result of calculation.
As another better embodiment of the present invention, in addition to:
During shield machine tunnels, Ground Subsidence Monitoring data are obtained in real time;
Sunk using acquired Ground Subsidence Monitoring data and corresponding ground settlement initial predicted curve amendment ground Variable in drop amount prediction curve expression formula;
According to the variable for the ground settlement prediction curve expression formula corrected, with reference to current shield tunnelling parameters to shield It is predicted during construction prediction and obtains ground settlement prediction curve.Realize during driving, become in real time The amendment of amount, carry out the prediction of ground settlement again according to revised variable, improve the accuracy of prediction result, special energy Enough predictions for ensureing driving ring surface subsidence current to shield.
As the another better embodiment of the present invention, initializaing variable includes shield tunnel physical dimension parameter, stratum is joined Number, shield-tunneling construction main contral parameter and undetermined coefficient parameter, shield tunnel physical dimension parameter, formation parameter and shield-tunneling construction Main contral parameter obtains according to design drawing, exploration report and shield tunnelling parameters;
Undetermined coefficient parameter rule of thumb obtains initial value.
Further, parameter involved in the expression formula of the ground settlement prediction curve in forecast model includes shield Tunnel physical dimension parameter, formation parameter, shield-tunneling construction main contral parameter and undetermined coefficient parameter.
Shield tunnel physical dimension parameter therein includes shield cutter diameter, shield tail diameter, shield shell length, tunnel Lining cutting outer circumference diameter and section of jurisdiction ring width;Formation parameter include tunnel thickness of earth covering, soil body cohesion, soil body internal friction angle and Soil body unit weight;Shield-tunneling construction main contral parameter includes shield driving speed, shield currentlys propel ring number, bubble lock pressure power and shield Per ring synchronous grouting amount;Undetermined coefficient parameter includes cutterhead shield tail diameter difference folding coefficient, hyperbola constant and synchronous grouting and filled out Fill coefficient.
Further, in addition to:Obtain ground settlement Monitoring Data in work progress;
The initial value of undetermined coefficient is modified so as to obtain correction value using ground settlement Monitoring Data;
By the correction value of undetermined coefficient, shield tunnel physical dimension parameter, formation parameter and shield-tunneling construction main contral parameter It is re-entered into forecast model, and during obtaining corresponding shield-tunneling construction prediction according to ground predicting subsidence curve representation formula Ground settlement prediction curve.It can be obtained by ground settlement prediction curve every in during the corresponding shield-tunneling construction is predicted The surface subsidence value of endless tube piece.
The present invention realizes a kind of function of the undetermined coefficient of amendment in real time, that is, utilizes ground settlement Monitoring Data and prediction Predicted value in curve is compared, and levels off to Monitoring Data come prediction curve by correcting undetermined coefficient, is treated using this Determine the table that the correction value of coefficient and the formation parameter of adjacent current driving ring, shield-tunneling construction main contral parameter etc. bring prediction curve into Up to formula, that is, obtain corresponding tunnel axis longitudinal direction ground settlement prediction curve.
Surface subsidence Forecasting Methodology provided by the invention based on slurry shield construction main contral parameter, according to the shield-tunneling construction phase Between the interim deformation in stratum mechanism, the inducement based on shield-tunneling construction active control parameters to surface subsidence, propose it is a kind of simultaneously Consider the shield tunnel axis longitudinal direction ground settlement prediction method of Stratum Loss sedimentation and soil solidifying sedimentation.The present invention utilizes shield The ground settlement prediction curve during shield-tunneling construction prediction at the current driving ring of structure construction parameter prediction, it is easy to use, can Sequencing, can in real time, simultaneous display surface subsidence prediction curve, be easy to engineering construction personnel adjust accordingly shield-tunneling construction master control ginseng Number, in time, effectively control surface subsidence.
The present invention is described in detail above in association with accompanying drawing embodiment, those skilled in the art can be according to upper State and bright many variations example is made to the present invention.Thus, some details in embodiment should not form limitation of the invention, this Invention will be used as protection scope of the present invention using the scope that appended claims define.

Claims (10)

1. a kind of surface subsidence Forecasting Methodology based on slurry shield construction main contral parameter, it is characterised in that comprise the following steps:
It is to deviate to cut to shield at the ring of shield tail 100 from section of jurisdiction during setting shield-tunneling construction prediction, during the shield-tunneling construction prediction In front of mouthful at a setpoint distance;
Built-in vertical ground settlement and the coordinate system of section of jurisdiction ring number during the shield-tunneling construction is predicted;
The otch pressure influence stage is divided into during the shield-tunneling construction is predicted, shield settles rank by stage and shield tail Section;
Establish forecast model and obtain correspondingly the otch pressure influence stage, the shield and pass through stage and the shield tail The ground settlement prediction curve expression formula of subsidence stage;And
Initializaing variable is obtained according to shield tunnelling parameters, the initializaing variable is input in the forecast model, and according to institute The ground settlement initial predicted stated during ground settlement prediction curve expression formula obtains the corresponding shield-tunneling construction prediction is bent Line.
2. the surface subsidence Forecasting Methodology as claimed in claim 1 based on slurry shield construction main contral parameter, it is characterised in that Establish forecast model and obtain the ground settlement prediction curve expression formula in the corresponding otch pressure influence stage, including:
Section of jurisdiction ring number corresponding to the end points O in otch pressure influence stage is set as n0, section of jurisdiction ring number corresponding to terminal A is n1, it is described The ground settlement prediction curve in otch pressure influence stage is the parabola from end points O to terminal A;
The ground settlement in the otch pressure influence stage is corresponded to according to bubble cabin calculation of pressure, and show that ground settlement is pre- Surveying curve representation formula is:
In formula group one, S (n) is ground settlement, n corresponding to the ring number n of section of jurisdiction1≤n≤n0, S (n1) it is bubble lock pressure power PaIt is right The surface uplift amount answered;Earth pressure at rest σ0=K0γ (H+D/2), coefficient of static earth pressureRankine is broken ground Pressure σp=γ (H+D/2) Kp+2c(Kp)1/2, coefficient of passive earth pressure To be rubbed in the soil body Angle;C is soil body cohesion;H is tunnel thickness of earth covering;D is tunnel-liner outer circumference diameter;γ is soil body unit weight;n2Work as shield Preceding propulsion ring number;Shield machine otch corresponds to ring number and n2Difference to round up functionLsFor shield shell Body length;W is section of jurisdiction ring width.
3. the surface subsidence Forecasting Methodology as claimed in claim 2 based on slurry shield construction main contral parameter, it is characterised in that The size of the ground settlement of the terminal A and bubble lock pressure power are linear, and Pa∈[σ0p], corresponding S (n1)∈[0, 10], so as to obtaining the S (n in formula group one1) expression formula.
4. the surface subsidence Forecasting Methodology as claimed in claim 2 based on slurry shield construction main contral parameter, it is characterised in that Establish forecast model and obtain ground settlement prediction curve expression formula of the corresponding shield by the stage, including:
The end point that the shield passes through the stage is terminal A, sets shield by section of jurisdiction ring number corresponding to the terminal B in stage as n2, The shield is the straight line from terminal A to terminal B by the ground settlement prediction curve in stage;
The ground settlement of terminal B is calculated according to the ground settlement of the terminal A:
S(n2)=S (n1)-500(Ds-Ds11(formula one)
In formula one, S (n2) it is section of jurisdiction ring number n2Corresponding ground settlement, n2The section of jurisdiction ring number currentlyyed propel for shield, S (n1) be Bubble lock pressure power PaCorresponding surface uplift amount, α1For cutterhead shield tail diameter difference reduction coefficient, DsFor shield cutter diameter, Ds1For Shield tail diameter;
The corresponding shield is obtained according to described formula one and described formula group one song is predicted by the ground settlement in stage Line expression formula is:
In formula two, S (n) is ground settlement, n corresponding to the ring number n of section of jurisdiction2≤n≤n1
5. the surface subsidence Forecasting Methodology as claimed in claim 4 based on slurry shield construction main contral parameter, it is characterised in that Establish forecast model and obtain the ground settlement prediction curve expression formula of the corresponding shield tail subsidence stage, including:
The end point of the shield tail subsidence stage is terminal B, sets the ground settlement prediction curve of the shield tail subsidence stage For hyperbola, and hyperbola passing point C, section of jurisdiction ring number corresponding to the point C are n3, set section of jurisdiction ring number n3To depart from shield tail two Section of jurisdiction ring number after it;
Point C ground settlement is calculated according to described formula one:
S(n3)=S (n2)-1000Sg(formula three)
In formula three, S (n3) it is section of jurisdiction ring number n3Corresponding ground settlement, S (n2) it is section of jurisdiction ring number n2Corresponding ground settlement, SgThe Stratum Loss amount in stage is filled for slurries;
The ground settlement prediction curve of the shield tail subsidence stage according to corresponding to obtaining described formula three and described formula one Expression formula is:
In formula group two, S (n) is ground settlement, n corresponding to the ring number n of section of jurisdiction2-100≤n≤n2, a characterize shield tail depart from initial stage Surface subsidence speed, b determine ground final settlement size, VlFor the ground loss amount of shield tunnel unit length, i is ground Subsider spread factor, α2For synchronous slurries fill factor, VgIt is the every endless tube piece synchronous grouting amount of shield.
6. the surface subsidence Forecasting Methodology as claimed in claim 1 based on slurry shield construction main contral parameter, it is characterised in that Also include:
During shield machine tunnels, Ground Subsidence Monitoring data are obtained in real time;
Using described in acquired Ground Subsidence Monitoring data and the corresponding ground settlement initial predicted curve amendment Variable in the predicting subsidence curve representation formula of face;
According to the variable combination shield tunnelling parameters for the ground settlement prediction curve expression formula corrected again according to describedly Face predicting subsidence curve representation formula is predicted during predicting the shield-tunneling construction and obtains ground settlement prediction curve.
7. the surface subsidence Forecasting Methodology as claimed in claim 1 based on slurry shield construction main contral parameter, it is characterised in that It is corresponding that setpoint distance, which is in the ground settlement with the position in the coordinate system of section of jurisdiction ring number, in front of described shield otch Section of jurisdiction ring number n0End points O, the ground settlement of the end points O is zero;
The setpoint distance is set as T0, obtain:
In formula four, H is tunnel thickness of earth covering;D is tunnel-liner outer circumference diameter,For soil body internal friction angle.
8. the surface subsidence Forecasting Methodology as claimed in claim 1 based on slurry shield construction main contral parameter, it is characterised in that The initializaing variable includes shield tunnel physical dimension parameter, formation parameter, shield-tunneling construction main contral parameter and undetermined coefficient ginseng Number, described shield tunnel physical dimension parameter, formation parameter and shield-tunneling construction main contral parameter are reported according to design drawing, prospecting Accuse and shield tunnelling parameters obtain;
The undetermined coefficient parameter rule of thumb obtains initial value.
9. the surface subsidence Forecasting Methodology as claimed in claim 8 based on slurry shield construction main contral parameter, it is characterised in that Also include:Obtain ground settlement Monitoring Data in work progress;
The initial value of the undetermined coefficient is modified using the ground settlement Monitoring Data, so as to obtain correction value;
By the correction value of the undetermined coefficient, described shield tunnel physical dimension parameter, formation parameter and shield-tunneling construction master Control parameter is re-entered into the forecast model, and according to corresponding to the ground settlement prediction curve expression formula Ground settlement prediction curve during shield-tunneling construction prediction.
10. the surface subsidence Forecasting Methodology as claimed in claim 8 based on slurry shield construction main contral parameter, its feature exist In, the shield tunnel physical dimension parameter include shield cutter diameter, shield tail diameter, shield shell length, outside tunnel-liner All diameters and section of jurisdiction ring width;
The formation parameter includes tunnel thickness of earth covering, soil body cohesion, soil body internal friction angle and soil body unit weight;
The shield-tunneling construction main contral parameter includes shield driving speed, shield currentlys propel ring number, bubble lock pressure power and shield Per ring synchronous grouting amount.
CN201710694731.4A 2017-08-15 2017-08-15 Ground settlement prediction method based on main control parameters of slurry shield construction Active CN107515976B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710694731.4A CN107515976B (en) 2017-08-15 2017-08-15 Ground settlement prediction method based on main control parameters of slurry shield construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710694731.4A CN107515976B (en) 2017-08-15 2017-08-15 Ground settlement prediction method based on main control parameters of slurry shield construction

Publications (2)

Publication Number Publication Date
CN107515976A true CN107515976A (en) 2017-12-26
CN107515976B CN107515976B (en) 2020-05-08

Family

ID=60722010

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710694731.4A Active CN107515976B (en) 2017-08-15 2017-08-15 Ground settlement prediction method based on main control parameters of slurry shield construction

Country Status (1)

Country Link
CN (1) CN107515976B (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108520085A (en) * 2018-01-31 2018-09-11 浙江大学城市学院 Soil deformation caused by saturated soil shield driving and excess pore water pressure computational methods
CN108763752A (en) * 2018-05-28 2018-11-06 中铁十六局集团有限公司 The method that water channel determines construction boring parameter is worn under a kind of shield tunnel
CN109359412A (en) * 2018-11-01 2019-02-19 山东大学 The calculation method and system that prediction tunneling shield digging process deforms entirely
CN111460737A (en) * 2020-04-09 2020-07-28 昆山阳翎机器人科技有限公司 Intelligent settlement prediction method and system for slurry air pressure balance shield
CN111485896A (en) * 2020-04-09 2020-08-04 上海隧道工程有限公司 Multi-variable fusion control method and system for slurry air pressure balance shield
CN112324451A (en) * 2020-11-02 2021-02-05 辽宁工程技术大学 Earth surface settlement and pipeline deformation early warning system based on muck monitoring for earth pressure balance shield
CN112483187A (en) * 2021-01-29 2021-03-12 中铁工程装备集团有限公司 Shield tunneling machine pipe piece settlement monitoring system and monitoring method
CN113190902A (en) * 2021-04-30 2021-07-30 中铁十一局集团有限公司 Method and system for predicting earth surface displacement caused by tunnel construction
CN113239439A (en) * 2021-05-21 2021-08-10 上海大学 Shield construction ground surface settlement prediction system and method
WO2021184507A1 (en) * 2020-03-20 2021-09-23 中铁十四局集团有限公司 Stratum deformation control method and apparatus for shield construction process and non-volatile storage medium
CN114075978A (en) * 2021-03-25 2022-02-22 上海大学 Surface subsidence control method and system
CN114462185A (en) * 2021-11-30 2022-05-10 中国建筑第五工程局有限公司 Method for estimating five-dimensional evolution of space form of surface subsider caused by tunnel construction
CN114722681A (en) * 2022-04-28 2022-07-08 江苏南京地质工程勘察院 Simulation prediction method for ground settlement caused by shield construction
CN117988867A (en) * 2024-02-01 2024-05-07 中交隧道工程局有限公司 Shield segment floating prediction method considering forming sequence influence

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106372292A (en) * 2016-08-29 2017-02-01 浙江大学城市学院 Calculation method for building settlement caused by shield tunnel construction

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106372292A (en) * 2016-08-29 2017-02-01 浙江大学城市学院 Calculation method for building settlement caused by shield tunnel construction

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
YONG FANG 等: "Surface settlement prediction for EPB shield tunneling in sandy ground", 《KSCE JOURNAL OF CIVIL ENGINEERING》 *
张忠苗 等: "泥水盾构施工引起的地面固结沉降实例研究", 《浙江大学学报(工学版)》 *
李鹏飞: "地铁盾构施工引起的地表沉降预警预测研究", 《中国优秀硕士学位论文全文数据库-工程科技Ⅱ辑》 *

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108520085A (en) * 2018-01-31 2018-09-11 浙江大学城市学院 Soil deformation caused by saturated soil shield driving and excess pore water pressure computational methods
CN108763752A (en) * 2018-05-28 2018-11-06 中铁十六局集团有限公司 The method that water channel determines construction boring parameter is worn under a kind of shield tunnel
CN108763752B (en) * 2018-05-28 2022-06-17 中铁十六局集团北京轨道交通工程建设有限公司 Method for determining construction tunneling parameters of lower water passing channel of shield tunnel
CN109359412A (en) * 2018-11-01 2019-02-19 山东大学 The calculation method and system that prediction tunneling shield digging process deforms entirely
CN109359412B (en) * 2018-11-01 2021-04-16 山东大学 Calculation method and system for predicting total deformation of tunnel shield excavation process
US11927098B2 (en) 2019-03-20 2024-03-12 China Railway 14Th Bureau Group Co., Ltd. Method and apparatus for controlling stratum deformation in shield construction process, and non-volatile storage medium
WO2021184507A1 (en) * 2020-03-20 2021-09-23 中铁十四局集团有限公司 Stratum deformation control method and apparatus for shield construction process and non-volatile storage medium
CN111460737A (en) * 2020-04-09 2020-07-28 昆山阳翎机器人科技有限公司 Intelligent settlement prediction method and system for slurry air pressure balance shield
CN111485896A (en) * 2020-04-09 2020-08-04 上海隧道工程有限公司 Multi-variable fusion control method and system for slurry air pressure balance shield
CN111460737B (en) * 2020-04-09 2023-12-29 昆山阳翎机器人科技有限公司 Intelligent settlement prediction method and system for slurry air pressure balance shield
CN112324451A (en) * 2020-11-02 2021-02-05 辽宁工程技术大学 Earth surface settlement and pipeline deformation early warning system based on muck monitoring for earth pressure balance shield
CN112483187A (en) * 2021-01-29 2021-03-12 中铁工程装备集团有限公司 Shield tunneling machine pipe piece settlement monitoring system and monitoring method
CN114075978A (en) * 2021-03-25 2022-02-22 上海大学 Surface subsidence control method and system
CN114075978B (en) * 2021-03-25 2024-01-26 上海大学 Surface subsidence control method and system
CN113190902B (en) * 2021-04-30 2023-10-17 中铁十一局集团有限公司 Prediction method and system for earth surface displacement caused by tunnel construction
CN113190902A (en) * 2021-04-30 2021-07-30 中铁十一局集团有限公司 Method and system for predicting earth surface displacement caused by tunnel construction
CN113239439B (en) * 2021-05-21 2022-04-05 上海大学 Shield construction ground surface settlement prediction system and method
CN113239439A (en) * 2021-05-21 2021-08-10 上海大学 Shield construction ground surface settlement prediction system and method
CN114462185A (en) * 2021-11-30 2022-05-10 中国建筑第五工程局有限公司 Method for estimating five-dimensional evolution of space form of surface subsider caused by tunnel construction
CN114722681A (en) * 2022-04-28 2022-07-08 江苏南京地质工程勘察院 Simulation prediction method for ground settlement caused by shield construction
CN117988867A (en) * 2024-02-01 2024-05-07 中交隧道工程局有限公司 Shield segment floating prediction method considering forming sequence influence
CN117988867B (en) * 2024-02-01 2024-08-23 中交隧道工程局有限公司 Shield segment floating prediction method considering forming sequence influence

Also Published As

Publication number Publication date
CN107515976B (en) 2020-05-08

Similar Documents

Publication Publication Date Title
CN107515976A (en) Surface subsidence Forecasting Methodology based on slurry shield construction main contral parameter
CN107330194B (en) Numerical simulation analysis method for influence of shield tunnel excavation on adjacent pile group foundation
CN102080548B (en) Construction method of tunnel to cross airport runway by shield method
CN102352757B (en) Method for controlling upward floating of pipe piece during shield machine air pushing through mining tunnel
CN111058855A (en) Deformation control method and evaluation system for shield underpassing structure
CN102306225A (en) Method for simulating construction course and tunnel deformation influence value of multiline overlapping tunnel
CN105804761A (en) Construction method suitable for making shield penetrate through building in close range on liquefied sandy soil stratum
CN102505598A (en) Method for reinforcement construction of soft soil foundation by exchange-filling with foam lightweight soil
CN103603670A (en) Construction method of ultra-deep-earthed shield crossing complex formations
CN104455726A (en) Pipe-jacking construction method for pipeline bottom grouting reinforcement
CN103235853B (en) Adopt the multiple base pool layout method based on earthwork balance in limit for coal-mining subsidence rand
CN106812150A (en) A kind of mountain area steep slope region Road Bridge Pile Foundation construction method
CN104533432A (en) Construction method for shield to penetrate through buildings in old town of downtown in complex stratums
CN109707406A (en) A kind of method of determining tunnel rich water fault belt grouting reinforced region thickness
CN103473394A (en) Earthwork balance optimization design method for multiple station section type field leveling layout
CN105512411A (en) Calculation method of jacking-pipe jacking force based on surrounding rock deformation space-time effect
CN113094778A (en) High-ground-stress interbed soft rock tunnel failure mechanism and construction control research method
CN114413839B (en) Device and method for monitoring complete stacking section of up-down stacking type tunnel
CN106121662A (en) Backbreak region synchronous grouting dynamic compensation of shield digging local fills control method
CN107448204A (en) Closely wear construction method of deep foundation ditch down in sandy gravel accumulation horizon shallow burial hidden digging tunnel
Shi et al. Optimal design and dynamic control of construction dewatering with the consideration of dewatering process
Zhang Achievements and problems of geotechnical engineering investigation in China
CN112282849A (en) Monitoring device and method for measuring external water pressure of lining of deep-buried tunnel
CN109184705B (en) Method for controlling stratum deformation in shield tunnel complex tunneling environment
CN108222954B (en) Construction method for shield to penetrate through sandstone material backfill area

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant