CN107513963A - A kind of roadbed concrete guardrail recycles construction method - Google Patents

A kind of roadbed concrete guardrail recycles construction method Download PDF

Info

Publication number
CN107513963A
CN107513963A CN201610422468.9A CN201610422468A CN107513963A CN 107513963 A CN107513963 A CN 107513963A CN 201610422468 A CN201610422468 A CN 201610422468A CN 107513963 A CN107513963 A CN 107513963A
Authority
CN
China
Prior art keywords
guardrail
concrete
precast block
roadbed
concrete precast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610422468.9A
Other languages
Chinese (zh)
Inventor
苏高裕
闫书明
黄正昌
敬敏
苏敏
亢寒晶
钟纯耀
杨福宇
严琪
龚帅
叶镇
滕玉禄
梅宁
蒋鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG HIGHWAY CO Ltd
Beijing Hualuan Traffic Technology Co Ltd
Original Assignee
GUANGDONG HIGHWAY CO Ltd
Beijing Hualuan Traffic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG HIGHWAY CO Ltd, Beijing Hualuan Traffic Technology Co Ltd filed Critical GUANGDONG HIGHWAY CO Ltd
Priority to CN201610422468.9A priority Critical patent/CN107513963A/en
Publication of CN107513963A publication Critical patent/CN107513963A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F15/00Safety arrangements for slowing, redirecting or stopping errant vehicles, e.g. guard posts or bollards; Arrangements for reducing damage to roadside structures due to vehicular impact
    • E01F15/02Continuous barriers extending along roads or between traffic lanes
    • E01F15/04Continuous barriers extending along roads or between traffic lanes essentially made of longitudinal beams or rigid strips supported above ground at spaced points
    • E01F15/0484Installing; Repairing; Adjusting

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention relates to roadbed concrete guardrail to recycle construction method, belongs to traffic safety protection field, it is comprised the following steps that:(1) concrete precast block is made.(2) concrete precast block is assembled, forms temporary guard rail.(3) when guardrail is removed, first by the longitudinally connected dismounting of concrete precast block, then concrete precast block is removed standby.(4) concrete precast block is installed as roadbed guardrail and recycled.Construction method of the present invention is simple, reasonable, the construction period is short; it can be reused effectively roadbed concrete guardrail; being one for reconstruction and extension project reduces cost, simplifies the mode of construction, while also complies with the engineering construction theory of " resources conservation and environmental protection ".

Description

A kind of roadbed concrete guardrail recycles construction method
Technical field
The present invention relates to roadbed concrete guardrail to recycle construction method, belongs to traffic safety protection field.
Background technology
In recent years, China's expressway construction was fast-developing, and building up and runing for highway greatly facilitates the masses Trip and various regions on the way economic development.But with China's economy rapid growth and highway transportation cause flourish, The volume of traffic increases rapidly, and particularly large truck increases, and directly results in highway communication facility frequency of use and load Increase, the highway much built in early days can not adapt to the operation demand of the current volume of traffic, according to incompletely statistics, In the highway built before 2004, about 30,000 kilometers have been enter into the reorganization and expansion stage.
At present, so needing to set substantial amounts of temporary guard rail, it is used for often using " protecting logical " policy in reconstruction and extension project Ensure construction area safety.Temporary guard rail is divided into prefabricated and cast in situs, precast concrete guardrail foundation anchor power Shortcomings, leads Cause guardrail barrier propterty relatively low, poor, security protection scarce capacity is protected to oversize vehicle;A point band concrete protects in cast-in-place roadbed Column concrete foundation is connected firmly, and can reach compared with permanent protective property energy, but construction method is complex, is not easy in the case of " protecting logical " Site operation, and it is usually that destructiveness is removed to be removed after installing, not reproducible utilization.
Based on this, propose that a kind of roadbed concrete guardrail recycles construction method.
The content of the invention
The present invention proposes that a kind of roadbed concrete guardrail recycles construction method, roadbed concrete guardrail is had cast-in-place work concurrently The security protection performance of skill guardrail and the convenient of precasting process guardrail remove locomotive function, realize that the repetition of concrete guardrail is sharp again With the temporary guard rail that can be applied not only in reconstruction and extension project, could be applicable to newly-built road, greatly extend the use of guardrail In the life-span, the waste of material in engineering construction is reduced, and meet security protection demand, met " resources conservation and environmental protection " Engineering construction theory.
To achieve the above object, technical scheme is as follows:
The roadbed concrete guardrail recycles construction method specific steps:
(1) prefabricated fabrication of concrete prefabricated section;
(2) concrete precast block is assembled, and adjustment is linear, connects longitudinal connecting component, forms temporary guard rail;
(3) when dismantling guardrail, longitudinal connecting component is first opened, is then removed concrete precast block standby;
(4) concrete precast block is recycled and is installed as in roadbed a point band guardrail;
Further, the step (1):Guardrail reinforcing bar built in concrete precast block and longitudinally connected preburied component, when During the two position conflict, it should ensure that preburied component position is constant, suitably adjust reinforcement location.
Further, the step (2):Connection concrete precast block between it is longitudinally connected after lie against road surface, concrete Prefabricated section is connectionless with road surface.
Further, the step (3):Can not be to coagulation during opening connecting elements and removing concrete precast block Native prefabricated section causes transition to damage with preburied component.
Further, the step (4):After paved road basic unit, line setting installs leveling layer, and installation concrete is pre- Clamp dog, adjustment it is linear, and complete it is longitudinally connected, concrete precast block back install cross-brace block, installation guardrail correlation it is attached Belong to facility, highway surface layer of finally mating formation.
Further, the step (4):After paved road basic unit, line setting, mounting groove is reserved, public affairs of mating formation afterwards Supercrust, in installation trench bottom installation leveling layer, standby concrete precast block being positioned in mounting groove, adjustment is linear, and Complete it is longitudinally connected, concrete precast block back install cross-brace block, finally install guardrail associated satellite facility.
Further, construction muscle should be matched somebody with somebody when the leveling layer is excessive.
Compared with prior art, beneficial effects of the present invention
The roadbed concrete guardrail of the present invention recycles construction method, increases a point band concrete guardrail in roadbed and recycles Rate, general general work will soon grasp work progress, easy construction, cost-effective, environmental protection.
The roadbed concrete guardrail of the present invention recycles construction method, and guardrail wall body structure is not destroyed in work progress, protects The integrality and intensity of concrete precast block are demonstrate,proved.
The roadbed concrete guardrail of the present invention recycles construction method, and concrete precast block can be used for multiple times, and use the longevity Life length, it is easy to maintain.
The roadbed concrete guardrail of the present invention recycles construction method, and concrete guardrail prefabricated section can be used for multiple times, make It is easy to maintain with long lifespan.
Brief description of the drawings
In order to illustrate more clearly of the technical scheme of patent of the present invention, below by the required accompanying drawing used in embodiment It is briefly described:
Fig. 1 is that the roadbed concrete guardrail of the present invention recycles the schematic diagram of construction method step (1) process
Fig. 2 is that the roadbed concrete guardrail of the present invention recycles the schematic diagram of construction method step (2) process
Fig. 3 is that the roadbed concrete guardrail of the present invention recycles the schematic diagram of construction method step (3) process
Fig. 4 is that the roadbed concrete guardrail of the present invention recycles the schematic diagram of the step of construction method one (4) installation leveling layer
The roadbed concrete guardrail that Fig. 5 is the present invention recycles the step of construction method one (4) to recycle showing for guardrail installation It is intended to
The roadbed concrete guardrail that Fig. 6 is the present invention recycles the step of construction method one (4) to recycle guardrail integrally to illustrate Figure
The roadbed concrete guardrail that Fig. 7 is the present invention recycles the step of construction method two (4) to mat formation the signal of highway surface layer Figure
Fig. 8 is that the roadbed concrete guardrail of the present invention recycles the schematic diagram of the step of construction method two (4) installation leveling layer
The roadbed concrete guardrail that Fig. 9 is the present invention recycles the step of construction method two (4) to recycle showing for guardrail installation It is intended to
Figure 10 is that the roadbed concrete guardrail of the present invention recycles the schematic diagram of the step of construction method two (4) installation support block
The roadbed concrete guardrail that Figure 11 is the present invention recycles the step of construction method two (4) to recycle guardrail integrally to illustrate Figure
The roadbed concrete guardrail that Figure 12 is the present invention recycles construction method construction process figure.
Marked in figure as follows:
1. concrete precast block, 2. is longitudinally connected, 3. preburied components, 4. support blocks, 5. highway surface layers, 6. leveling blocks, and 7. Sub-surface, 8. affiliated facilities, 9. mounting grooves.
Embodiment
With reference to test example and embodiment, the present invention is described in further detail.But this should not be managed The scope solved as the above-mentioned theme of the present invention is only limitted to following embodiment, every to be belonged to based on the technology that present invention is realized The scope of the present invention.
Embodiment 1
Figure 12 is roadbed concrete guardrail recycling construction method flow chart, and its specific implementation process is as follows:
(1) roadbed concrete temporary guard rail makes:
Formwork casting concrete prefabricated section 1, guardrail reinforcing bar built in concrete precast block 1 and longitudinally connected 2 preburied component 3, when the two position conflicts, it should ensure that the position of preburied component 3 is constant, suitably adjust reinforcement location.Concrete precast block 1 pours Build must strict control, strictly observe drawing requirement construction, longitudinally connected 2 preburied component 3 should ensure that position is accurate.Obtain The structure of concrete precast block 1 such as Fig. 1.
(2) roadbed concrete temporary guard rail is installed:
Such as Fig. 2, concrete precast block 1 carries out assembly after being transported to scene, and adjustment is linear, connection longitudinally connected 2, and composition is interim Guardrail, road surface is lain against, it is connectionless with road surface.
(3) roadbed concrete temporary guard rail is removed:
Such as Fig. 3, first open longitudinally connected the 2 of concrete precast block 1, then remove concrete precast block 1 standby, tear open Except process should ensure that concrete precast block 1 is not destroyed with preburied component 3;
(4) the recycling installation of roadbed concrete guardrail:
Mode one, after paved road basic unit 7, line setting, leveling layer 6 is installed, such as Fig. 4;It is pre- that standby concrete is installed Clamp dog 1, adjustment is linear, and completes longitudinally connected 2, such as Fig. 5;The installation cross-brace block 4 at the back of concrete precast block 1;Installation Guardrail associated satellite facility 8;Finally mat formation highway surface layer 5, such as Fig. 6, complete a point band guardrail in roadbed and install.
Mode two, after paved road basic unit 7, then in strict accordance with drawing and combined concrete prefabricated on sub-surface 7 The actual size of block 1 carries out line setting, reserves the position of mounting groove 9, highway surface layer 5 of mating formation afterwards, such as Fig. 7;At the bottom of mounting groove 9 Leveling layer 6 is installed in portion, such as Fig. 8;Standby concrete precast block 1 is positioned in mounting groove 9, adjustment is linear, and completes longitudinal direction Connection 2, such as Fig. 9;The installation cross-brace block 4 at the back of concrete precast block 1, such as Figure 10;Finally installation guardrail associated satellite is set 8 are applied, such as Figure 11, a point band guardrail in roadbed is completed and installs.
Leveling layer 6 should match somebody with somebody construction muscle when sufficiently large, prevent leveling layer 6 to be broken, and influence guardrail installation.
Support block 4 can be any structure type, and cross-brace effect is played between guardrail.
Support block 4 firmly must make guardrail entirety stress with longitudinally connected 2.

Claims (7)

1. roadbed concrete guardrail recycles construction method, it is characterised in that the roadbed concrete guardrail recycles construction party Method step is as follows:
(1) prefabricated fabrication of concrete prefabricated section (1);
(2) concrete precast block (1) is assembled, and adjustment is linear, connection longitudinal connecting component (2), forms temporary guard rail;
(3) when dismantling guardrail, longitudinal connecting component (2) is first opened, is then removed concrete precast block (1) standby;
(4) concrete precast block (1) is recycled and is installed as in roadbed a point band guardrail.
2. roadbed concrete guardrail according to claim 1 recycles construction method, it is characterised in that the step (1): Guardrail reinforcing bar built in concrete precast block (1) and the preburied component (3) of longitudinally connected (2), when the two position conflicts, should ensure that Preburied component (3) position is constant, suitably adjusts reinforcement location.
3. roadbed concrete guardrail according to claim 1 recycles construction method, it is characterised in that the step (2): Road surface is lain against behind longitudinally connected (2) between connection concrete precast block (1), concrete precast block (1) and road surface are connectionless.
4. roadbed concrete guardrail according to claim 1 recycles construction method, it is characterised in that the step (3): Can not be to concrete precast block (1) and preburied component during opening connecting elements (2) and removing concrete precast block (1) (3) transition is caused to damage.
5. roadbed concrete guardrail according to claim 1 recycles construction method, it is characterised in that the step (4): After paved road basic unit (7), line setting, installation leveling layer (6), installation concrete precast block (1), adjustment is linear, and completes Longitudinally connected (2), in concrete precast block (1) back installation cross-brace block (4), guardrail associated satellite facility (8) is installed, most After mat formation highway surface layer (5).
6. roadbed concrete guardrail according to claim 1 recycles construction method, it is characterised in that the step (4): After paved road basic unit (7), line setting, mounting groove (9) is reserved, highway surface layer (5) of mating formation afterwards, at mounting groove (9) bottom Portion's installation leveling layer (6), standby concrete precast block (1) is positioned in mounting groove (9), adjustment is linear, and completes longitudinal direction Connect (2), in concrete precast block (1) back installation cross-brace block (4), guardrail associated satellite facility (8) is finally installed.
7. the roadbed concrete guardrail according to claim 5 or 6 recycles construction method, it is characterised in that:The leveling Layer (6) should match somebody with somebody construction muscle when excessive.
CN201610422468.9A 2016-06-16 2016-06-16 A kind of roadbed concrete guardrail recycles construction method Pending CN107513963A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610422468.9A CN107513963A (en) 2016-06-16 2016-06-16 A kind of roadbed concrete guardrail recycles construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610422468.9A CN107513963A (en) 2016-06-16 2016-06-16 A kind of roadbed concrete guardrail recycles construction method

Publications (1)

Publication Number Publication Date
CN107513963A true CN107513963A (en) 2017-12-26

Family

ID=60719830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610422468.9A Pending CN107513963A (en) 2016-06-16 2016-06-16 A kind of roadbed concrete guardrail recycles construction method

Country Status (1)

Country Link
CN (1) CN107513963A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110195419A (en) * 2019-06-28 2019-09-03 山东省交通规划设计院 A kind of concrete guardrail structure and its construction method
CN111206528A (en) * 2020-02-26 2020-05-29 安徽省交通控股集团有限公司 Mechanical device for improving installation precision of concrete guardrail

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011014131A1 (en) * 2009-07-25 2011-02-03 VÁHOSTAV-SK-PREFA, s. r. o. Sliding precast reinforced concrete barrier with a cam lock
CN102392426A (en) * 2011-10-14 2012-03-28 东南大学 Separated concrete barrier with longitudinal connection capable of moving rapidly and manufacturing method thereof
CN202809533U (en) * 2012-07-03 2013-03-20 武汉理工大学 Precast hollow concrete protective guard for rural highway
CN104612086A (en) * 2015-02-15 2015-05-13 北京中路安交通科技有限公司 Concrete road barrier wall and road barrier with same
JP5788840B2 (en) * 2012-08-09 2015-10-07 ケイコン株式会社 Continuous partition structure and construction method thereof
CN204753446U (en) * 2015-02-13 2015-11-11 徐州百斯特护栏科技有限公司 Concrete equipment guardrail

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011014131A1 (en) * 2009-07-25 2011-02-03 VÁHOSTAV-SK-PREFA, s. r. o. Sliding precast reinforced concrete barrier with a cam lock
CN102392426A (en) * 2011-10-14 2012-03-28 东南大学 Separated concrete barrier with longitudinal connection capable of moving rapidly and manufacturing method thereof
CN202809533U (en) * 2012-07-03 2013-03-20 武汉理工大学 Precast hollow concrete protective guard for rural highway
JP5788840B2 (en) * 2012-08-09 2015-10-07 ケイコン株式会社 Continuous partition structure and construction method thereof
CN204753446U (en) * 2015-02-13 2015-11-11 徐州百斯特护栏科技有限公司 Concrete equipment guardrail
CN104612086A (en) * 2015-02-15 2015-05-13 北京中路安交通科技有限公司 Concrete road barrier wall and road barrier with same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110195419A (en) * 2019-06-28 2019-09-03 山东省交通规划设计院 A kind of concrete guardrail structure and its construction method
CN111206528A (en) * 2020-02-26 2020-05-29 安徽省交通控股集团有限公司 Mechanical device for improving installation precision of concrete guardrail

Similar Documents

Publication Publication Date Title
CN101294447B (en) Buildings pile underpinning method
CN109610263B (en) Construction method of assembled construction access road
CN211144503U (en) High steep topography bridge tunnel meets section open cut tunnel and connects long structure
CN107513939A (en) A kind of bridge concrete guardrail recycles construction method
JP5843413B1 (en) Lowering method of existing tunnel
CN106702912A (en) Construction method of dismantling old beam top and introducing new bridge on existing railway
CN107513963A (en) A kind of roadbed concrete guardrail recycles construction method
JP3893056B2 (en) Construction method of underground structure
CN112921986A (en) Assembled underground structure and integrated construction method of assembled underground structure and foundation pit
JP3789100B2 (en) How to build a widening tunnel
JP6144726B2 (en) Rehabilitation method for mountain road tunnels on expressway and suspension pier for rehabilitation method
JP2612599B2 (en) How to repair the median strip
CN110700116A (en) Overpass reverse construction method suitable for loess area
CN112663431B (en) Concrete pavement fracture subsidence section treatment structure and construction method
CN108343085A (en) The subway work method of major urban arterial highway
KR100782551B1 (en) abutment construction method was used prefab abutment block
CN111501468A (en) Fabricated road structure and construction process
CN111364509A (en) Construction method for underground space below existing road
CN108149570A (en) Across the railroad bridge roadside barrier of one kind strengthens construction method
CN111305078A (en) Construction method of prefabricated concrete arch channel bridge
CN216892163U (en) Highway roadside safety protection and reinforcement system with limited space
KR100411311B1 (en) Method of Expanding Road Using Reinforced Soil Retaining Wall
CN117386384A (en) Temporary blocking structure of shield borehole hole and construction method
CN220598863U (en) Assembled coincide roof structure of station is dug to subway lid
KR100274747B1 (en) Method for installation of electric pole and supporting device of the same

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171226

RJ01 Rejection of invention patent application after publication