CN107512655A - A kind of hanging method of ultralong overweight wire insulation substring - Google Patents

A kind of hanging method of ultralong overweight wire insulation substring Download PDF

Info

Publication number
CN107512655A
CN107512655A CN201710723301.0A CN201710723301A CN107512655A CN 107512655 A CN107512655 A CN 107512655A CN 201710723301 A CN201710723301 A CN 201710723301A CN 107512655 A CN107512655 A CN 107512655A
Authority
CN
China
Prior art keywords
gold utensil
insulator
block group
wire insulation
lifting block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710723301.0A
Other languages
Chinese (zh)
Other versions
CN107512655B (en
Inventor
马龙
邵丽东
肖长生
郭玉珠
谢虎
陈江华
王伟
赵冬
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Power Transmission & Transformation Corp
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Original Assignee
Jiangsu Power Transmission & Transformation Corp
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Power Transmission & Transformation Corp, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd filed Critical Jiangsu Power Transmission & Transformation Corp
Priority to CN201710723301.0A priority Critical patent/CN107512655B/en
Publication of CN107512655A publication Critical patent/CN107512655A/en
Application granted granted Critical
Publication of CN107512655B publication Critical patent/CN107512655B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/22Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Electric Cable Installation (AREA)

Abstract

The present invention relates to a kind of hanging method of ultralong overweight wire insulation substring, comprise the following steps:Prepare equipment;Top gold utensil is installed on cross-arm hanging hole;Bottom gold utensil is connected, and forms armour clamp assembly;By the gold utensil sub-assembly in step s3 by supporting boatswain chair to connect lifting block group, the lifting block group includes steel wire rope;Assemble insulator chain:Lifting tackle pulley is lifted, and insulator is connected to form insulator chain with the gold utensil in lifting block group piecewise;Integral lifting suspension insulator string, insulator chain is connected with the gold utensil on cross-arm hanging hole.Insulator is connected on gold utensil by the present invention piecewise on the ground, and insulator chain is lifted by crane in connection procedure, avoids work high above the ground, and the simple and safe property of supply and demand is high.

Description

A kind of hanging method of ultralong overweight wire insulation substring
Technical field
The present invention relates to a kind of hanging method of insulator chain, more particularly to a kind of ultralong overweight wire insulation substring to lift Method.
Background technology
At present, super-huge transmission line of electricity crossover tower wire suspension insulator design uses tetrad structure, insulator chain Ultralong overweight, influenceed by steel tower cross-arm structure and insulator chain structure, when the coaster axle center distance of lifting block group two reaches During minimum allowable range, insulator chain overall time can not be still installed in place, it is necessary to spliced using burst, substep, high-altitude Hanging method, high-altitude application step is more, and security risk is big, and construction efficiency is low.
Further, since yoke plate is closer to the distance at the top of crossover tower pendency hanging hole and suspension string, the basic nothing of common hanging method Method is simultaneously in place.In some Great span work progress, when suspension string is close to cross-arm hanging hole, risen simultaneously using multigroup chain block The method of installation is hung, though can reach installation purpose, work high above the ground is too many, and Work tool is acted on porcelain vase during construction, holds Easily porcelain vase is caused to damage.
The shortcomings that to overcome conventional construction method, it is badly in need of using a kind of safe and reliable overall time hanging method, carries High ultralong overweight wire insulation substring high-altitude installation exercise work efficiency, high-altitude working safety risk is reduced, mitigate labor strength.
The content of the invention
The present invention is in order to solve the above problems, there is provided a kind of ultralong overweight wire insulation substring hanging method, this method The workload of hoisting process high and medium operation is greatly reduced, reduces the security risk in hoisting process.
The technical solution used in the present invention is:A kind of hanging method of ultralong overweight wire insulation substring, including it is following Step
S1 prepares equipment;
S2 installs top gold utensil on cross-arm hanging hole;
S3 connections bottom gold utensil, and form armour clamp assembly;
By the gold utensil sub-assembly in step s3 by supporting boatswain chair to connect lifting block group, the lifting block group includes S4 Steel wire rope;
S5 assembles insulator chain:Lifting tackle pulley is lifted, and insulator is connected with the gold utensil in lifting block group piecewise Form insulator chain;
S6 integral lifting suspension insulator strings, insulator chain is connected with the gold utensil on cross-arm hanging hole.
Further, step s3 and step s4 are operated on the ground, in the step s5 by insulator piecewise with gold utensil It is connected and forms insulator chain process and operate on the ground.
Further, the top gold utensil in the step s2 includes the first tower gold utensil and U-shaped link, during Assembly and erection of crossing tower, Suspension insulator the first tower gold utensil is installed on cross-arm hanging hole, when Assembly and erection of crossing tower finishes and after intermediate acceptance, U type links are installed on cross-arm suspension string hanging hole.
Further, the step s3 is to connect with triangle yoke plate right-angle hanging ring and ball-eye to form bottom gold utensil and combine Part.
Further, the triangle yoke plate is bolted to connection with support boatswain chair.
Further, lifting block group fixed block is connected by shackle with support boatswain chair mounting hole.
Further, lifting tackle pulley is lifted from hoist engine, lifts insulator chain extremely during connecting insulator piecewise Whole string installation, the hoist engine are placed on the cross-arm.
Further, colligation is carried out between the insulator chain.
Further, in addition to step s9:Lifting block group and support boatswain chair are removed, starts hoist engine, returns loose lifting block The steel wire rope of group, when lifting block group does not stress completely, high-altitude personnel remove support boatswain chair and lifting block group.
Beneficial effect caused by the present invention:Insulator is connected on gold utensil by the present invention piecewise on the ground, and even Insulator chain is lifted by crane in termination process, avoids work high above the ground, and the simple and safe property of supply and demand is high;Lifting block group in the present invention is led to Supporting vertical plate connection triangle yoke plate is crossed, adds steadiness and security.
Brief description of the drawings
Fig. 1 tetrad wire insulation substring structural front views;
Fig. 2 tetrad wire insulation substring structural side views;
Fig. 3 supports boatswain chair front view;
Fig. 4 supports boatswain chair top view;
Fig. 5 supports boatswain chair right view;
1, trunnion hanging panel in figure, 2, U-shaped link, 3, triangle yoke plate, 4, right angle hanging plate, 5, ball-eye, 6, insulator, 7, Support stressed plate, 8, fixed plate, 9, reinforcement floor, 10, shackle mounting hole, 11, hole is fixedly mounted.
Embodiment
Further details of explanation is done to the present invention with reference to the accompanying drawings and detailed description, it should be appreciated that Protection scope of the present invention is not limited by embodiment.
The super-huge serial type formula generally use tetrad structure of transmission line of electricity crossover tower wire suspension insulator 6, typical wire hang The string assembling figure of insulator 6 of hanging down is shown in Fig. 1 and Fig. 2.Generally, 1000kV extra-high voltage AC circuits Great span uses tetrad insulator 6 String, is always about 16~18m, always weighs about 10~12t.Hanging method used by the string of ultralong overweight wire insulation 6 in the present invention Comprise the following steps:
1st, equipment prepares
The equipment used in the string overall time hoisting process of ultralong overweight wire insulation 6 includes:Hoist engine, lifting are slided Car group, load clamp, corner block, support boatswain chair.
1) hoist engine
Hoisting winding uses 8t hoist engines.
2) lifting block group
Lifting block group includes lifting block and hoist rope.Lifting block uses 160kN tackle pulleys (1-1).Lifting Steel wire rope (mill rope) uses the steel wire ropes of Φ 22 (Nominal Tensile 1670MPa, Fracture Force 288kN, weight 2.02kg/m).
3) load clamp
Load clamp uses 16t shackles.
4) corner block
Corner block uses 8t speciality corner blocks, for steering of the hoist rope (mill rope) on cross-arm.
5) boatswain chair is supported
Because super-huge transmission line of electricity suspension string is coupled structure using tetrad or six more, for that can accomplish whole string while lift by crane, Particular design processing construction suspender-support boatswain chair is needed, support hanger plate structure is as in Figure 3-5.Boatswain chair is supported by support stressed plate 7th, fixed plate 8, reinforcement floor 9 are formed, and the shackle mounting hole 10 of connection crane is set on support stressed plate 7, is set in fixed plate 8 Hole 11 is fixedly mounted in the wire pendency series board for putting connection connecting insulator string.Support boatswain chair uses Q235 materials, can ensure Certain bearing strength.
The 2nd, top gold utensil is installed
During Assembly and erection of crossing tower, install the first tower gold utensil-GD gudgeons of string of suspension insulator 6 in advance on cross-arm hanging hole and hang Plate 1.When Assembly and erection of crossing tower finishes and after intermediate acceptance, U-shaped link 2 is installed on cross-arm the first tower gold utensil.
3rd, installation support boatswain chair
On the ground, right angle hanging plate 4 and ball-eye 5 are connected with suspension string top triangle yoke plate 3, then triangle is joined Plate 3 installs with support boatswain chair.
4th, lifting block group (steel wire rope) is connected
On the ground, 16t lifting block group fixed blocks are connected with support boatswain chair mounting hole using 16t shackles.
5th, assembling insulator 6 is gone here and there
On the ground, gone here and there using overhanging way assembling insulator 6, i.e., lifting tackle pulley is first passed through into load clamp and insulation Support boatswain chair between the string of son 6 is connected, and support boatswain chair is fixedly connected with bolt with 4 mounting holes on triangle yoke plate 3, as lifting work Tool.
Lifting tackle pulley is lifted, insulator 6 is connected with gold utensil piecewise, until whole string installation, four strings or six strings are exhausted Stout carrying pole or the reliable colligation of the lumps of wood are used between edge 6, prevents mutual damaged in collision.
When assembling starts, first start 8t hoist engines on cross-arm, support boatswain chair is lifted slightly.When support boatswain chair is apart from ground During about 1m, start that insulator 6 is installed, ball-eye 5 should be connected reliably with insulator 6 during connection, porcelain vase the rim of a bowl direction answers one Cause.Lift slightly after every 3 insulators 6 install, then by support boatswain chair, continue that insulator 6 is installed.When insulator 6 is pacified After dress, then the installation of the bottom of insulator 6 is good (in addition to the gold utensil of connection suspension clamp).
6th, integral lifting
After the string of suspension insulator 6 installs, start 8t hoist engines on cross-arm, integral lifting suspension insulator 6 is gone here and there.
7th, high-altitude is installed in place
When the hanging hole of triangle yoke plate 3 is close to U-shaped link 2 below cross-arm hanging hole, hoist engine is closed.High-altitude personnel will afterwards U-shaped link is connected with triangle yoke plate 3.
8th, lifting block group and support boatswain chair are removed
Start hoist engine, return loose hoist rope (mill rope), when lifting block group does not stress completely, high-altitude personnel remove Support boatswain chair and lifting block group.
Above-mentioned hanging method is only the preferred method of the present invention, and those skilled in the art will be understood that the base in the above method The simple transformation carried out on plinth still falls within protection scope of the present invention.

Claims (9)

  1. A kind of 1. hanging method of ultralong overweight wire insulation substring, it is characterised in that:Comprise the following steps
    S1 prepares equipment;
    S2 installs top gold utensil on cross-arm hanging hole;
    S3 connections bottom gold utensil, and form armour clamp assembly;
    For S4 by the gold utensil sub-assembly in step s3 by supporting boatswain chair to connect lifting block group, the lifting block group includes steel wire Rope;
    S5 assembles insulator chain:Lifting tackle pulley is lifted, and insulator is connected to be formed piecewise with the gold utensil in lifting block group Insulator chain;
    S6 integral lifting suspension insulator strings, insulator chain is connected with the gold utensil on cross-arm hanging hole.
  2. 2. the hanging method of ultralong overweight wire insulation substring according to claim 1, it is characterised in that:Step s3 and step Rapid s4 is operated on the ground, and insulator is connected to form insulator chain process on ground piecewise with gold utensil in the step s5 Upper operation.
  3. 3. the hanging method of ultralong overweight wire insulation substring according to claim 1, it is characterised in that:The step s2 In top gold utensil include the first tower gold utensil and U-shaped link, during Assembly and erection of crossing tower, pendency insulation is installed on cross-arm hanging hole Substring the first tower gold utensil, when Assembly and erection of crossing tower finishes and after intermediate acceptance, U-shaped extension is installed on cross-arm suspension string hanging hole Ring.
  4. 4. the hanging method of ultralong overweight wire insulation substring according to claim 1, it is characterised in that:The step s3 For right-angle hanging ring and ball-eye are connected to form bottom gold utensil sub-assembly with triangle yoke plate.
  5. 5. the hanging method of ultralong overweight wire insulation substring according to claim 4, it is characterised in that:, the triangle Yoke plate is bolted to connection with support boatswain chair, and the support boatswain chair is provided with the mounting hole for installation bolt.
  6. 6. the hanging method of the ultralong overweight wire insulation substring according to claim 1 or 4, it is characterised in that:Lifting is slided Car group fixed block is connected by shackle with support boatswain chair mounting hole.
  7. 7. the hanging method of ultralong overweight wire insulation substring according to claim 1, it is characterised in that:From hoist engine Lifting tackle pulley is lifted, insulator chain to whole string installation, the hoist engine is lifted during connecting insulator piecewise puts In on the cross-arm.
  8. 8. the hanging method of ultralong overweight wire insulation substring according to claim 1, it is characterised in that:The insulator Colligation is carried out between string.
  9. 9. the hanging method of ultralong overweight wire insulation substring according to claim 1, it is characterised in that:Also include step s9:Lifting block group and support boatswain chair are removed, starts hoist engine, the steel wire rope of loose lifting block group is returned, when lifting block group is complete When not stressing entirely, high-altitude personnel remove support boatswain chair and lifting block group.
CN201710723301.0A 2017-08-22 2017-08-22 A kind of hanging method of ultralong overweight wire insulation substring Active CN107512655B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710723301.0A CN107512655B (en) 2017-08-22 2017-08-22 A kind of hanging method of ultralong overweight wire insulation substring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710723301.0A CN107512655B (en) 2017-08-22 2017-08-22 A kind of hanging method of ultralong overweight wire insulation substring

Publications (2)

Publication Number Publication Date
CN107512655A true CN107512655A (en) 2017-12-26
CN107512655B CN107512655B (en) 2019-08-13

Family

ID=60723530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710723301.0A Active CN107512655B (en) 2017-08-22 2017-08-22 A kind of hanging method of ultralong overweight wire insulation substring

Country Status (1)

Country Link
CN (1) CN107512655B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11234826A (en) * 1998-02-16 1999-08-27 Kansai Electric Power Co Inc:The Method for lifting insulator string for steel tower and auxiliary brace for lifter
CN202737385U (en) * 2012-07-04 2013-02-13 湖北省输变电工程公司 Suspending insulator string assembly trolley
CN202997425U (en) * 2012-12-31 2013-06-12 湖南省送变电建设公司 Hoisting device capable of replacing suspension type insulator chain under electrified state
CN104538129A (en) * 2014-12-23 2015-04-22 国家电网公司 Synchronous hoisting type duplex insulator string
CN105762702A (en) * 2016-04-01 2016-07-13 中国南方电网有限责任公司超高压输电公司南宁局 Method for replacing L-shaped insulator string of +/-800kV direct current transmission line
CN106992466A (en) * 2017-05-18 2017-07-28 国家电网公司 The strain insulator string electrification replacing tool of extra-high voltage six and replacing options

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11234826A (en) * 1998-02-16 1999-08-27 Kansai Electric Power Co Inc:The Method for lifting insulator string for steel tower and auxiliary brace for lifter
CN202737385U (en) * 2012-07-04 2013-02-13 湖北省输变电工程公司 Suspending insulator string assembly trolley
CN202997425U (en) * 2012-12-31 2013-06-12 湖南省送变电建设公司 Hoisting device capable of replacing suspension type insulator chain under electrified state
CN104538129A (en) * 2014-12-23 2015-04-22 国家电网公司 Synchronous hoisting type duplex insulator string
CN105762702A (en) * 2016-04-01 2016-07-13 中国南方电网有限责任公司超高压输电公司南宁局 Method for replacing L-shaped insulator string of +/-800kV direct current transmission line
CN106992466A (en) * 2017-05-18 2017-07-28 国家电网公司 The strain insulator string electrification replacing tool of extra-high voltage six and replacing options

Also Published As

Publication number Publication date
CN107512655B (en) 2019-08-13

Similar Documents

Publication Publication Date Title
CN205603040U (en) Special lifting device and work piece hoisting structure with adjustable nuclear power station focus deviation
CN202080812U (en) Dedicated sling system for large-scaled reinforcing cage
CN104444762B (en) Wind power foundation ring overturning device and method for overturning foundation ring by using same
CN107161857B (en) The Lift-on/Lift-off System and method upright suitable for flat thin-wall member
CN107954306A (en) Precast stair Lift-on/Lift-off System and hanging method
CN204848091U (en) Steel sheet cross arm hoisting accessory
CN100567129C (en) A kind of hoisting device for loop wheel machine
CN102430923A (en) Method for turning over turning wheel of water turbine in the air
CN208964364U (en) A kind of assembled laminated floor slab Automatic hook block
CN101649683A (en) Method for hoisting power transmission iron tower by assembly holding pole technology
CN208394600U (en) A kind of prefabricated part hanging device
CN105822132A (en) Unit type assembly and erection method of extra-high-voltage power transmission iron pylon
CN107512655B (en) A kind of hanging method of ultralong overweight wire insulation substring
CN207158591U (en) A kind of ultralong overweight wire insulation substring hangs auxiliary lifting appliance
CN201825635U (en) Hoisting structure of power station boiler
CN210065018U (en) Rotatory davit device of synthetic insulator chain hangs in pair L type
CN215666631U (en) Lifting device for hub of wind generating set
CN105060124B (en) Intra-frame portal crane system and hoisting use method thereof
CN218860135U (en) Insulator integral hoisting tool
CN107381324A (en) A kind of ultralong overweight wire insulation substring hangs auxiliary lifting appliance
CN109516390B (en) Flat-head tower crane convenient for manual carrying and installation and field installation method
CN207142688U (en) A kind of boom hoisting of pot superstructure
CN201236098Y (en) Combined pressure bar sling
CN201704035U (en) Lifting device of large-sized gas holder top
CN113629571A (en) Method for hoisting high-voltage post insulator

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant