CN107503956A - 水工模型试验中的轴流泵泵站分离式测流控制方法 - Google Patents
水工模型试验中的轴流泵泵站分离式测流控制方法 Download PDFInfo
- Publication number
- CN107503956A CN107503956A CN201710976967.7A CN201710976967A CN107503956A CN 107503956 A CN107503956 A CN 107503956A CN 201710976967 A CN201710976967 A CN 201710976967A CN 107503956 A CN107503956 A CN 107503956A
- Authority
- CN
- China
- Prior art keywords
- model
- axial
- flow
- pump
- water inlet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F04—POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
- F04D—NON-POSITIVE-DISPLACEMENT PUMPS
- F04D15/00—Control, e.g. regulation, of pumps, pumping installations or systems
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F04—POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
- F04D—NON-POSITIVE-DISPLACEMENT PUMPS
- F04D15/00—Control, e.g. regulation, of pumps, pumping installations or systems
- F04D15/0088—Testing machines
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Control Of Positive-Displacement Pumps (AREA)
Abstract
水工模型试验中的轴流泵泵站分离式测流控制方法,及水利试验领域。根据去除泵装置的原型轴流泵站制作模型进水流道、模型出水流道,模型进水流道、模型出水流道之间通过外置管路连接,外置管路上另串接循环动力泵,使得模型进水流道、模型出水流道、循环动力泵分别成为独立部件,再通过循环动力泵完成模型进水流道、模型出水流道之间的水流输送,来实现水工模型轴流泵泵站的模拟试验。本发明能够适应水工模型轴流泵泵站试验,通过将循环动力泵与模拟进水流道、模拟出水流道之间的结构分离优化布置,使所有轴流泵机组在模型中都能单独控制和流量测量,并且安装使用方便快捷。
Description
技术领域
本发明涉及水利试验领域,具体为一种水工模型试验中的轴流泵泵站分离式测流控制方法。
背景技术
图3所示为原型模型轴流泵泵站的剖视示意图,具体结构:包括进水流道1和出水流道2、轴流泵机组6,进水流道1和出水流道2之间通过轴流泵机组6的水泵装置3连接,进水流道1的进口端设置有进水流道闸门4,出水流道2的出口端设置有出水流道闸门5。
轴流泵泵站的进水流道1和出水流道2具有多种结构,如进水流道1有图3所示的肘形进水结构、图4所示的钟形进水结构等;出水流道2有如图3所示的直管出水结构、如图4所示的虹吸出水结构等,在此就不一一列举了。
轴流泵泵站水工模型试验一般需花费大量时间、经费制作轴流泵模型机组来进行试验研究,由于每座泵站有多台套轴流泵机组,试验研究模型中需要单台套轴流泵机组可控制、可测流,而轴流泵机组由于其结构的特殊性,轴流泵和进、出水流道融为一体,结构紧凑,加上模型是按比尺缩小的,模型泵机组的尺寸更小,每台模型泵机组按比尺缩小制作技术要求高,易产生误差,仅可单独控制开启,也不可单独测流,加上水工模型试验对泵机组的要求仅是进出水流与原型相似,与泵装置无关,所以花费大量时间、经费制作模型轴流泵泵机组也无必要,但目前没有较好的方法解决这一问题,仅能通过制作模型泵机组,实现单泵可控,然后通过测其进或出口流速测算流量的方法满足试验要求。
因此设计一种简洁、方便的水工模型试验中模型轴流泵泵站测流控制的方法就非常必要。
发明内容
本发明的目的是提供一种水工模型试验中的轴流泵泵站分离式测流控制方法,可以有效解决背景技术中的问题。
实现上述目的的技术方案是:水工模型试验中的轴流泵泵站分离式测流控制方法,其特征在于:根据去除泵装置的原型轴流泵站制作模型进水流道、模型出水流道,模型进水流道、模型出水流道之间通过外置管路连接,外置管路上串接循环动力泵,使得模型进水流道、模型出水流道、循环动力泵分别成为独立部件,再通过循环动力泵完成模型进水流道、模型出水流道之间的水流输送,来实现水工模型轴流泵泵站的模拟试验。
本发明能够适应水工模型轴流泵泵站试验,通过将循环动力泵与模拟进水流道、模拟出水流道之间的结构分离优化布置,使所有轴流泵机组在模型中都能单独控制和流量测量,并且安装使用方便快捷。
进一步地,外置管路上还串接有用于流量调节的调节阀,便于在试验过程中实现流量调节。
进一步地,外置管路上还串接有用于流量监测的流量计,便于在试验过程中实现流量统计。
附图说明
图1为第一实施例的系统示意图;
图2为第二实施例的系统示意图;
图3为肘形进水直管出水原型轴流泵的结构示意图;
图4为钟形进水虹吸出水原型轴流泵的结构示意图。
具体实施方式
第一实施例:
水工模型试验中的轴流泵泵站分离式测流控制方法,具体为:根据去除泵装置的原型轴流泵制作模型进水流道8、模型出水流道9,模型进水流道8、模型出水流道9分别与原型轴流泵的进水流道、出水流道的形状相似,使得模型进水流道8的进水流态与原型进水流道的进水流态相似、模型出水流道9的出水流态与原型出水流道的出水流态相似。
模型进水流道8、模型出水流道9之间通过外置管路10连接,外置管路10上串接循环动力泵11、调节阀12、流量计13,再通过循环动力泵11完成模型进水流道8、模型出水流道9之间的水流输送、调节阀12实现流量调节、流量计13用于流量监测,最终实现水工模型轴流泵的模拟试验。
本实施例的模型进水流道8为肘形进水结构,模型出水流道9为直管式出水结构。
本发明单台套轴流泵的具体试验过程为:
启动循环动力泵11,水流由模型进水流道8进入、依次经循环动力泵11、流量计13、流量调节阀12、模拟出水流道9流出,在试验过程中可通过流量调节阀12调节流量,通过流量计13对流量进行计量,实现水工模型试验中单台套模拟轴流泵的单泵控制和单泵流量测量,此方法简洁高效,控制方便、试验可靠度高,试验精度可满足水工模型规范要求。
轴流泵站中的多台套轴流泵均按上述方法进行试验,具体过程不再赘述。
第二实施例
第二实施例和第一实施例的结构基本相同,不同点在于:如图2所示,模型进水流道14为钟形进水结构,模型出水流道15为虹吸出水结构。
模型进水流道和模型出水流道的结构不限于第一实施例和第二实施例的所述结构,本领域技术人员可以清楚地知道,所有原型轴流泵的进水流道和出水流道的结构均可以以本发明公开的测流系统完成模拟试验。
Claims (3)
1.水工模型试验中的轴流泵泵站分离式测流控制方法,其特征在于:根据去除泵装置的原型轴流泵站制作模型进水流道、模型出水流道,模型进水流道、模型出水流道之间通过外置管路连接,外置管路上另串接循环动力泵,使得模型进水流道、模型出水流道、循环动力泵分别成为独立部件,再通过循环动力泵完成模型进水流道、模型出水流道之间的水流输送,来实现水工模型轴流泵泵站的模拟试验。
2.根据权利要求1所述的水工模型试验中的轴流泵泵站分离式测流控制方法,其特征在于:外置管路上还串接有用于流量调节的调节阀。
3.根据权利要求1所述的水工模型试验中的轴流泵泵站分离式测流控制方法,其特征在于:外置管路上还串接有用于流量监测的流量计。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710976967.7A CN107503956B (zh) | 2017-10-19 | 2017-10-19 | 水工模型试验中的轴流泵泵站分离式测流控制方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710976967.7A CN107503956B (zh) | 2017-10-19 | 2017-10-19 | 水工模型试验中的轴流泵泵站分离式测流控制方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107503956A true CN107503956A (zh) | 2017-12-22 |
CN107503956B CN107503956B (zh) | 2019-02-01 |
Family
ID=60702085
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710976967.7A Active CN107503956B (zh) | 2017-10-19 | 2017-10-19 | 水工模型试验中的轴流泵泵站分离式测流控制方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107503956B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114483603A (zh) * | 2022-02-24 | 2022-05-13 | 贾轩闻 | 泵站不同动静间距大小效率实验的实验装置及实验方法 |
CN114623085A (zh) * | 2022-03-23 | 2022-06-14 | 合肥凯泉电机电泵有限公司 | 一种开敞式进水泵站性能模型试验装置 |
CN116123107A (zh) * | 2023-03-14 | 2023-05-16 | 扬州大学 | 一种双导水锥轴流泵水工模型试验测控装置 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1086219A1 (ru) * | 1982-09-16 | 1984-04-15 | Автодоркомбинат N17 Главмосавтотранса | Стенд дл испытаний гидромашин |
CN104454564A (zh) * | 2014-11-10 | 2015-03-25 | 扬州大学 | 基于试验的轴流泵装置导叶体水力优化方法 |
CN205349682U (zh) * | 2015-12-28 | 2016-06-29 | 江苏大学 | 一种立式长距离管道泵站模型试验装置 |
CN206360895U (zh) * | 2016-09-29 | 2017-07-28 | 扬州大学 | 一种连体式模型试验泵装置 |
-
2017
- 2017-10-19 CN CN201710976967.7A patent/CN107503956B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1086219A1 (ru) * | 1982-09-16 | 1984-04-15 | Автодоркомбинат N17 Главмосавтотранса | Стенд дл испытаний гидромашин |
CN104454564A (zh) * | 2014-11-10 | 2015-03-25 | 扬州大学 | 基于试验的轴流泵装置导叶体水力优化方法 |
CN205349682U (zh) * | 2015-12-28 | 2016-06-29 | 江苏大学 | 一种立式长距离管道泵站模型试验装置 |
CN206360895U (zh) * | 2016-09-29 | 2017-07-28 | 扬州大学 | 一种连体式模型试验泵装置 |
Non-Patent Citations (1)
Title |
---|
汤方平等: "轴流泵站进出水流道水力损失的试验研究", 《排灌机械》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114483603A (zh) * | 2022-02-24 | 2022-05-13 | 贾轩闻 | 泵站不同动静间距大小效率实验的实验装置及实验方法 |
CN114623085A (zh) * | 2022-03-23 | 2022-06-14 | 合肥凯泉电机电泵有限公司 | 一种开敞式进水泵站性能模型试验装置 |
CN114623085B (zh) * | 2022-03-23 | 2024-04-09 | 合肥凯泉电机电泵有限公司 | 一种开敞式进水泵站性能模型试验装置 |
CN116123107A (zh) * | 2023-03-14 | 2023-05-16 | 扬州大学 | 一种双导水锥轴流泵水工模型试验测控装置 |
Also Published As
Publication number | Publication date |
---|---|
CN107503956B (zh) | 2019-02-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107503956B (zh) | 水工模型试验中的轴流泵泵站分离式测流控制方法 | |
CN107341320B (zh) | 一种抽水蓄能电站的尾水调压室设置判别方法 | |
CN104594855B (zh) | 页岩气高压排采集成橇装装置及其排采工艺和安装方法 | |
CN114112304B (zh) | 一种模拟水力压裂套管射孔流动冲蚀的实验装置及方法 | |
CN107806423B (zh) | 水工模型试验中双向流道泵站分离式测流控制方法 | |
CN206290502U (zh) | 一种大孔径可控流量虹吸装置 | |
CN205330649U (zh) | 自动选井分离计量装置 | |
CN107725404B (zh) | 水工模型试验中的贯流泵站分离式测流控制方法 | |
CN107299915A (zh) | 一种矿用离心泵导叶的水力设计方法 | |
CN108086968B (zh) | 一种煤层气丛式井橇装装置 | |
CN110618719A (zh) | 一种大型输调水提水系统流量控制的装置及其操作方法 | |
CN112833030B (zh) | 一种基于前置竖井式进水流道的泵站现场流量监测方法 | |
CN106122122B (zh) | 一种大孔径可控流量虹吸装置 | |
RU123824U1 (ru) | Конструкция газовой скважины | |
CN209671233U (zh) | 一种新型进口畸变流场轴流泵实验装置 | |
CN104075117A (zh) | 一种矿浆输送泵的保护系统 | |
CN103470863A (zh) | 一种增压管 | |
CN206726031U (zh) | 一种化水处理涡轮流量计的测量控制系统 | |
CN204753179U (zh) | 一种注入液态洗涤助剂的装置 | |
CN110083950B (zh) | 一种基于bim技术的倒虹吸设计施工方法 | |
CN204373746U (zh) | 一种油田用井下流量计检定装置 | |
CN209035031U (zh) | 一种液压管道冲洗供油通道 | |
CN102786018A (zh) | 一种定量灌装装置及其灌装方法 | |
RU2722899C1 (ru) | Способ эксплуатации газовой скважины | |
CN205978955U (zh) | 一种高速流水管防汽蚀机构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |