CN107503445A - A kind of assembled heat insulation wall and its construction method - Google Patents
A kind of assembled heat insulation wall and its construction method Download PDFInfo
- Publication number
- CN107503445A CN107503445A CN201710829624.8A CN201710829624A CN107503445A CN 107503445 A CN107503445 A CN 107503445A CN 201710829624 A CN201710829624 A CN 201710829624A CN 107503445 A CN107503445 A CN 107503445A
- Authority
- CN
- China
- Prior art keywords
- wall
- hollow
- reinforcing bar
- core construction
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
Abstract
The invention discloses a kind of assembled heat insulation wall and its construction method.Including some walls one and some walls two;The wall one and wall two include load-bearing reinforced concrete wall, hollow-core construction, heat-insulation layer, steel wire rack-layer and fireproof jointing sheath;The inside of the load-bearing reinforced concrete wall is equipped with hollow-core construction, and reinforcing bar is provided with hollow-core construction;Concrete Filled is used at connection gap between wall two and neighboring walls one, and up and down at the hollow-core construction of wall and the gap of reinforcing bar.The assembled heat insulation wall inclination is reasonable, compact-sized, and the construction method of assembled heat insulation wall of the invention is simple and convenient, mitigates labor strength, shortens the construction period, can effectively improve efficiency of construction;Reach agent structure steel bar stress and be vertically connected with insertion, turn into an entirety, sound construction.
Description
Technical field
The present invention relates to wall construction technical field, specifically a kind of assembled heat insulation wall and its construction method.
Background technology
With the development of today's society building trade, the application of self heat insulation wall is more and more extensive, and its performance requirement is also got over
Come higher.Wall self-insulation system refers to according to certain building structure, using energy-saving materials for wall and supporting dedicated mortar
The physical performance indexs such as reactive hot properties is met the construction wall thermal insulation system of respective standard, can make using this system
Construction is convenient, improves security performance and extends the wall life-span, reduces building cost.But traditional assembled heat insulation wall
Form of construction work be to lay bricks at the construction field (site), insulating foam is installed, its operating efficiency is relatively low, while traditional crab-bolt structure is inadequate
Firmly.Therefore, the present invention provides a kind of assembled heat insulation wall and its construction method, and it will directly meet the assembling of national standard
Formula heat-preserving wall connects, and efficiency of construction is higher.
The content of the invention
It is an object of the invention to provide a kind of assembled heat insulation wall and its construction method, to solve above-mentioned background technology
The problem of middle proposition.
To achieve the above object, the present invention provides following technical scheme:
A kind of assembled heat insulation wall, including some walls one and some walls two;The wall one and wall two wrap
Include load-bearing reinforced concrete wall, hollow-core construction, heat-insulation layer, steel wire rack-layer and fireproof jointing sheath;The load-bearing reinforced concrete wall
Inside is equipped with hollow-core construction, and reinforcing bar is provided with hollow-core construction;Heat-insulation layer is sequentially provided with vitro in load-bearing reinforced concrete wall and is prevented
Fiery protective layer;Steel wire rack-layer is provided between load-bearing reinforced concrete wall, heat-insulation layer and fireproof jointing sheath;A left side for wall one,
Right both sides are provided with anchor rib, and anchor rib is symmetrical structure, connect in one end of wall two provided with caving inward to coordinate with anchor rib
The connecting groove connect, and at the connection gap between wall two and neighboring walls one, and the hollow-core construction and steel of wall up and down
Concrete Filled is used at gap between muscle.
A kind of construction method of assembled heat insulation wall as claimed in claim, comprises the following steps:
First, the preparation of wall one and wall two:According to the actual needs hollow-core construction is done on load-bearing reinforced concrete wall;According to
It is secondary to spread steel wire rack-layer, heat-insulation layer and fireproof jointing sheath;
2nd, reinforcing bar is fixed on building body base surface as needed;
Three and then the above-mentioned wall one made and wall two are transported into building site, pass through tower crane or other relevant devices
Wall one and wall two are sling;Reinforcing bar is passed vertically through into hollow-core construction, upper and lower wall runs through connection by identical reinforcing bar, most lower
Headwall body is placed on building body base surface by reinforcing bar, and is connected with both sides wall or so, is fitted and connected with upper end wall body;Wall
When being connected between body one and wall two, the anchor rib of wall one is accessed in the connecting groove of wall two, then in connecting portion
Concrete is injected, and concrete is also injected at the gap between the hollow-core construction of upper and lower wall and reinforcing bar.
As the further scheme of the present invention:The anchor rib of the left and right ends of wall one is removed, and in wall one or so two
End sets connecting groove, the opposite side of wall two is set into connecting groove, i.e. assembled heat insulation wall includes some walls three;Phase
Position of connecting groove of adjacent wall three or so is corresponding;And at the connecting groove gap between neighboring walls three, and upper and lower wall
Concrete Filled is used at gap between the hollow-core construction and reinforcing bar of body.
As the further scheme of the present invention:Reinforcing bar is equipped with the connecting groove at the both ends of wall three.
A kind of construction method of assembled heat insulation wall, comprises the following steps:
First, the preparation of wall three:Some identical or different diameters are done on load-bearing reinforced concrete wall according to the actual needs
Hole, hollow-core construction is made;Steel wire rack-layer, heat-insulation layer and fireproof jointing sheath are spread successively;
2nd, reinforcing bar is fixed on building body base surface as needed;
Three and then the above-mentioned wall three made is transported into building site, by tower crane or other relevant devices by wall three
Sling;Reinforcing bar is passed vertically through into hollow-core construction, upper and lower wall is put by identical reinforcing bar through connection, bottom wall by reinforcing bar
Put on building body base surface, and connect with both sides wall or so, be fitted and connected with upper end wall body;When being connected between wall three,
The connecting groove of neighboring walls three is relative;Then in the connecting groove of neighboring walls three, and the hollow knot of wall up and down
Concrete is injected at gap between structure and reinforcing bar.
Compared with prior art, the beneficial effects of the invention are as follows:
The assembled heat insulation wall inclination is reasonable, compact-sized, the construction method letter of assembled heat insulation wall of the invention
It is single convenient, mitigate labor strength, shorten the construction period, efficiency of construction can be effectively improved;Agent structure stress steel is reached
Muscle is vertically connected with insertion, turns into an entirety, and sound construction reduces risk, and promotional value is high.
Brief description of the drawings
Fig. 1 is the structural representation of the embodiment of the present invention 1.
Fig. 2 is one of structural representation of the embodiment of the present invention 2.
Fig. 3 is the structural representation of wall one in the present invention.
Fig. 4 is the two of the structural representation of the embodiment of the present invention 2.
Wherein:1- load-bearing reinforced concrete wall, 2- hollow-core constructions, 3- heat-insulation layers, 4- steel wires rack-layer, 5- fireproof jointing sheaths,
6- anchor ribs, 7- concrete, 8- walls two, 9- reinforcing bars, 10- walls three, 11- connecting grooves, 12- building body base surfaces.
Embodiment
The technical scheme of this patent is described in more detail with reference to embodiment.
Embodiment 1
Refer to Fig. 1 and Fig. 3, a kind of assembled heat insulation wall, including some walls one and some walls 28;The wall
Body one and wall 28 include load-bearing reinforced concrete wall 1, hollow-core construction 2, heat-insulation layer 3, steel wire rack-layer 4 and fireproof jointing sheath
5;The inside of the load-bearing reinforced concrete wall 1 is equipped with hollow-core construction 2, and reinforcing bar 9 is provided with hollow-core construction 2, to fixed branch
Spherical the air containment body and wall in hollow-core construction 2 are supportted, hollow-core construction 2 can be circle, rectangle, square, ellipse etc.
Various structures, it can be selected according to the situation of reality, while reinforcing bar number/shape on building body base surface is as needed
Selection;Heat-insulation layer 3 and fireproof jointing sheath 5 are sequentially provided with outside load-bearing reinforced concrete wall 1;In load-bearing reinforced concrete wall 1, heat-insulation layer
Steel wire rack-layer 4 is provided between 3 and fireproof jointing sheath 5;Unlike, it is provided with anchor rib 6, anchor in the arranged on left and right sides of wall one
Gu muscle 6 is symmetrical structure, the connecting groove 11 being connected with anchor rib 6 to cave inward, anchor are provided with one end of wall 28
Gu the insertion of muscle 6 is connected in connecting groove 11, and at the connection gap between wall 28 and neighboring walls one, and upper and lower wall
Filled at gap between the hollow-core construction and reinforcing bar of body using concrete seven.
A kind of construction method of assembled heat insulation wall, comprises the following steps:
First, the preparation of wall one and wall 28:According to the actual needs hollow-core construction is done on load-bearing reinforced concrete wall 1
2;Steel wire rack-layer 4, heat-insulation layer 3 and fireproof jointing sheath 5 are spread successively;It is required to reserve suitably among the process mated formation more than
Hollow-core construction 2, to ensure that reinforcing bar 9 is passed vertically through into hollow-core construction in work progress;
2nd, reinforcing bar 9 is fixed on building body base surface 12 as needed, the number and shape of reinforcing bar 9 are according to specific feelings
Condition is determined;
Three and then the above-mentioned wall one made and wall 28 are transported into building site, pass through tower crane or other relevant devices
Wall one and wall 28 are sling;Reinforcing bar 9 is passed vertically through into hollow-core construction 2, upper and lower wall runs through connection by identical reinforcing bar 9,
Bottom wall is placed on building body base surface by reinforcing bar, and is connected with both sides wall or so, shown consideration for the company of conjunction with upper end wall
Connect;When being connected between wall one and wall 28, the anchor rib 6 of wall one is accessed in the connecting groove 11 of wall 28, then
Concrete seven is injected in connecting portion, and concrete seven is also injected at the gap between the hollow-core construction of upper and lower wall and reinforcing bar.
Embodiment 2
Fig. 2-4, a kind of assembled heat insulation wall, including some walls 3 10 are referred to, i.e., the wall one in embodiment 1
Wall 3 10 is replaced with, the anchor rib 6 of the left and right ends of wall one can also be removed, and sets connection recessed in the left and right ends of wall one
Groove 11, the opposite side of wall 28 is equally set into connecting groove 11;The wall 3 10 includes load-bearing reinforced concrete wall 1, hollow
Structure 2, heat-insulation layer 3, steel wire rack-layer 4 and fireproof jointing sheath 5;The inside of the load-bearing reinforced concrete wall 1 is equipped with hollow knot
Structure 2, reinforcing bar 9 is provided with hollow-core construction 2, it is hollow to spherical the air containment body and wall in fixed support hollow-core construction 2
Structure 2 can be the various structures such as circle, rectangle, square, ellipse, can be selected according to the situation of reality, while
Reinforcing bar number/shape on building body base surface selects as needed;Heat-insulation layer 3 is sequentially provided with outside load-bearing reinforced concrete wall 1
With fireproof jointing sheath 5;Steel wire rack-layer 4 is provided between load-bearing reinforced concrete wall 1, heat-insulation layer 3 and fireproof jointing sheath 5;In wall
The left and right ends of body 3 10 are equipped with the connecting groove 11, the position of connecting groove 11 of neighboring walls 3 10 or so to cave inward
It is corresponding, it is equipped with horizontal reinforcing bar 9 in the connecting groove 11 at the both ends of wall 3 10;And the connecting groove between neighboring walls 3 10
Filled at 11 gaps, and up and down at the gap between the hollow-core construction of wall and reinforcing bar using concrete seven, neighboring walls three
10 are connected by reinforcing bar 9 with concrete seven;Wall 3 10 is unlike the structure of above-mentioned dry wall body one, the left and right of wall 3 10
Both ends are equipped with the connecting groove 11 to cave inward in the left and right ends of wall 3 10 without anchor rib 6;
A kind of construction method of assembled heat insulation wall, comprises the following steps:
First, the preparation of wall 3 10:Done according to the actual needs on load-bearing reinforced concrete wall 1 some identical or different straight
The hole in footpath, hollow-core construction 2 is made;Steel wire rack-layer 4, heat-insulation layer 3 and fireproof jointing sheath 5 are spread successively;The mistake mated formation more than
Cheng Dangzhong is required to reserve appropriate hollow-core construction 2, to ensure that reinforcing bar 9 is passed vertically through into hollow-core construction in work progress, on
Lower wall is by identical reinforcing bar 9 through connection;
2nd, reinforcing bar 9 is fixed on building body base surface 12 as needed, the number and shape of reinforcing bar 9 are according to specific feelings
Condition is determined;
Three and then the above-mentioned wall 3 10 made is transported into building site, by tower crane or other relevant devices by wall
3 10 sling;Reinforcing bar 9 is passed vertically through into hollow-core construction 2, upper and lower wall is led to by identical reinforcing bar 9 through connection, bottom wall
Cross reinforcing bar to be placed on building body base surface, and connect with both sides wall or so, be fitted and connected with upper end wall body;Wall 3 10 it
Between when connecting, the connecting groove 11 of neighboring walls 3 10 is relative;Then in the connecting groove 11 of neighboring walls 3 10, and
Concrete seven is injected at gap between the hollow-core construction and reinforcing bar of upper and lower wall.
The assembled heat insulation wall inclination is reasonable, compact-sized, and the present invention reserves hollow-core construction on wall, passes through stress
Reinforcing bar will up and down corresponding to wall through connection, then placing concrete is by the gap filling between the wall of left and right;The dress of the present invention
Construction method with formula heat-preserving wall is simple and convenient, mitigates labor strength, shortens the construction period, can effectively improve construction effect
Rate;Agent structure steel bar stress is reached and has been vertically connected with insertion, turned into an entirety, sound construction, reduce risk, promotional value
It is high.
, it is necessary to which explanation, is advised unless otherwise clear and definite in the description of this assembled heat insulation wall and its construction method
It is fixed with limit, term " setting ", " connected " and " connection " should be interpreted broadly, for example, it may be being fixedly connected or can
Dismantling connection, or be integrally connected;Can be joined directly together, can also be indirectly connected by intermediary, can be two members
Connection inside part.For the ordinary skill in the art, above-mentioned term can be understood in the present invention with concrete condition
Concrete meaning.
The better embodiment of this patent is explained in detail above, but this patent is not limited to above-mentioned embodiment party
Formula, can also be on the premise of this patent objective not be departed from one skilled in the relevant art's possessed knowledge
Make a variety of changes.
Claims (5)
1. a kind of assembled heat insulation wall, it is characterised in that including some walls one and some walls two (8);The wall one
Include load-bearing reinforced concrete wall (1), hollow-core construction (2), heat-insulation layer (3), steel wire rack-layer (4) and fire prevention with wall two (8)
Protective layer (5);The inside of the load-bearing reinforced concrete wall (1) is equipped with hollow-core construction (2), and steel is provided with hollow-core construction (2)
Muscle (9);Heat-insulation layer (3) and fireproof jointing sheath (5) are sequentially provided with outside load-bearing reinforced concrete wall (1);In load-bearing reinforced concrete wall
(1) steel wire rack-layer (4), is provided between heat-insulation layer (3) and fireproof jointing sheath (5);Anchoring is provided with the arranged on left and right sides of wall one
Muscle (6), anchor rib (6) are symmetrical structure, are connected in one end of wall two (8) provided with caving inward with anchor rib (6)
Connecting groove (11), and at the connection gap between wall two (8) and neighboring walls one, and the hollow-core construction of wall up and down
Filled at gap between reinforcing bar using concrete (7).
2. a kind of construction method of assembled heat insulation wall as claimed in claim 1, it is characterised in that comprise the following steps:
First, the preparation of wall one and wall two (8):According to the actual needs hollow-core construction is done on load-bearing reinforced concrete wall (1)
(2);Steel wire rack-layer (4), heat-insulation layer (3) and fireproof jointing sheath (5) are spread successively;
2nd, reinforcing bar (9) is fixed on building body base surface (12) as needed;
Three and then the above-mentioned wall one made and wall two (8) are transported into building site, pass through tower crane or other relevant devices will
Wall one and wall two (8) are sling;Reinforcing bar (9) is passed vertically through into hollow-core construction (2), upper and lower wall is passed through by identical reinforcing bar (9)
Wear connection, bottom wall is placed on building body base surface by reinforcing bar, and connect with both sides wall or so, with upper end wall
It is fitted and connected;When being connected between wall one and wall two (8), the connection that the anchor rib (6) of wall one is accessed to wall two (8) is recessed
In groove (11), then in connecting portion injection concrete (7), and at the gap between the hollow-core construction of upper and lower wall and reinforcing bar
It is also injected into concrete (7).
3. assembled heat insulation wall according to claim 1, it is characterised in that by the anchor rib of the left and right ends of wall one
(6) remove, and connecting groove (11) is set in the left and right ends of wall one, the opposite side of wall two (8) is set into connecting groove
(11), i.e., assembled heat insulation wall includes some walls three (10);The position of the connecting groove (11) of neighboring walls three (10) is left
Right correspondence;And at connecting groove (11) gap between neighboring walls three (10), and the hollow-core construction and reinforcing bar of wall up and down
Between gap at using concrete (7) fill.
4. assembled heat insulation wall according to claim 3, it is characterised in that the connection at described (10) both ends of wall three is recessed
Reinforcing bar (9) is equipped with groove (11).
5. a kind of construction method of assembled heat insulation wall as claimed in claim 4, it is characterised in that comprise the following steps:
First, the preparation of wall three (10):Done according to the actual needs on load-bearing reinforced concrete wall (1) some identical or different straight
The hole in footpath, hollow-core construction (2) is made;Steel wire rack-layer (4), heat-insulation layer (3) and fireproof jointing sheath (5) are spread successively;
2nd, reinforcing bar (9) is fixed on building body base surface (12) as needed;
Three and then the above-mentioned wall three (10) made is transported into building site, by tower crane or other relevant devices by wall three
(10) sling;Reinforcing bar (9) is passed vertically through into hollow-core construction (2), upper and lower wall is by identical reinforcing bar (9) through connection, bottom
Wall is placed on building body base surface by reinforcing bar, and is connected with both sides wall or so, is fitted and connected with upper end wall body;Wall
It is when being connected between three (10), the connecting groove (11) of neighboring walls three (10) is relative;Then in the company of neighboring walls three (10)
Connect in groove (11), and concrete (7) is injected at the gap between the hollow-core construction of upper and lower wall and reinforcing bar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710829624.8A CN107503445A (en) | 2017-09-11 | 2017-09-11 | A kind of assembled heat insulation wall and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710829624.8A CN107503445A (en) | 2017-09-11 | 2017-09-11 | A kind of assembled heat insulation wall and its construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107503445A true CN107503445A (en) | 2017-12-22 |
Family
ID=60696668
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710829624.8A Pending CN107503445A (en) | 2017-09-11 | 2017-09-11 | A kind of assembled heat insulation wall and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107503445A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1996016238A1 (en) * | 1994-11-07 | 1996-05-30 | Megawall Corporation | Modular precast wall system with mortar joints |
CN202767230U (en) * | 2012-09-01 | 2013-03-06 | 初明进 | Assembly integrated shear wall construction structure |
CN202866043U (en) * | 2012-09-07 | 2013-04-10 | 初明进 | Connection structure of precast concrete walls |
CN104120806A (en) * | 2013-04-26 | 2014-10-29 | 杜朝锁 | Technical system for polyphenyl-caulked thermal insulation composite load bearing wall construction |
CN105113708A (en) * | 2015-08-24 | 2015-12-02 | 北京珠穆朗玛绿色建筑科技有限公司 | Prefabricated reinforced concrete component and assembly type building comprising same |
CN106437010A (en) * | 2016-09-30 | 2017-02-22 | 浙江宝业现代建筑工业化制造有限公司 | Sandwich thermal insulation external wallboard |
-
2017
- 2017-09-11 CN CN201710829624.8A patent/CN107503445A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1996016238A1 (en) * | 1994-11-07 | 1996-05-30 | Megawall Corporation | Modular precast wall system with mortar joints |
CN202767230U (en) * | 2012-09-01 | 2013-03-06 | 初明进 | Assembly integrated shear wall construction structure |
CN202866043U (en) * | 2012-09-07 | 2013-04-10 | 初明进 | Connection structure of precast concrete walls |
CN104120806A (en) * | 2013-04-26 | 2014-10-29 | 杜朝锁 | Technical system for polyphenyl-caulked thermal insulation composite load bearing wall construction |
CN105113708A (en) * | 2015-08-24 | 2015-12-02 | 北京珠穆朗玛绿色建筑科技有限公司 | Prefabricated reinforced concrete component and assembly type building comprising same |
CN106437010A (en) * | 2016-09-30 | 2017-02-22 | 浙江宝业现代建筑工业化制造有限公司 | Sandwich thermal insulation external wallboard |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105696817B (en) | A kind of multilayer cold formed steel is integral prefabricated to assemble house and its joining method | |
CN206143951U (en) | Connected node of rammed earth wall and blockwork | |
CN103321323B (en) | Cast-in-place composite foam concrete self heat insulation wall and preparation technology thereof | |
CN105781010B (en) | A kind of combined wall board and its cast in place and precast construction | |
CN203213340U (en) | Reinforced masonry wall | |
CN104179363B (en) | A kind of brick-concrete composite buildings door-window opening ruggedized construction and reinforcement means | |
CN206467824U (en) | A kind of assembly concrete frame wall filled with masonry | |
CN108149696A (en) | The composite supporting construction and construction method that a kind of gib soil nail wall is combined with permanent anti-float anchor rod | |
CN106930436A (en) | A kind of reinforced concrete shear wall of built-in prestress steel diagonal brace | |
CN215054263U (en) | L-shaped connecting joint of prefabricated wall panel | |
CN110409900A (en) | Hybrid connection precast prestressed concrete circle warehouse structure | |
CN211597171U (en) | Masonry anti-seismic wall structure | |
CN107503445A (en) | A kind of assembled heat insulation wall and its construction method | |
CN201874121U (en) | Multi-row bore heat insulating building block reinforcing bar masonry wall system | |
CN208830530U (en) | A kind of industrialization light gauge cold-formed steel shape combined wall | |
CN107130634A (en) | A kind of noncontact attachment structure of the prefabricated piping lane of split-type | |
CN103726592B (en) | Z-shaped column frame built-in single-row reinforcement light block body of wall and the practice | |
CN206844149U (en) | A kind of connecting node of prefabricated assembled pipe gallery | |
CN206815592U (en) | Novel wall and steel pipe bundle combining structure building system | |
CN105667005A (en) | Production method of light composite board for floor separation and roof | |
CN205712560U (en) | A kind of wallboard connects node | |
CN105888282B (en) | A kind of seismic reinforcing structure and method that big hole is opened for transformer station's masonry wall | |
CN213268513U (en) | Outer wall structure | |
CN207633583U (en) | A kind of connection structure of prefabricated post and prefabricated partition wall | |
CN209620310U (en) | Nuclear power plant's steel plate concrete-reinforced concrete structure wall crosses connection structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 252000 Dongshou Road North, Weier Road, Fenghuang Industrial Park, Dongchangfu District, Liaocheng City, Shandong Province Applicant after: Shandong Mingwang Energy Saving Technology Co.,Ltd. Address before: 252000 Shandong city in Liaocheng Province Road West (pastoral village about the East District of liangshuizhen) Applicant before: LIAOCHENG MINGWANG BUILDING MATERIALS Co.,Ltd. |
|
CB02 | Change of applicant information | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171222 |
|
RJ01 | Rejection of invention patent application after publication |