CN206815592U - Novel wall and steel pipe bundle combining structure building system - Google Patents

Novel wall and steel pipe bundle combining structure building system Download PDF

Info

Publication number
CN206815592U
CN206815592U CN201720445428.6U CN201720445428U CN206815592U CN 206815592 U CN206815592 U CN 206815592U CN 201720445428 U CN201720445428 U CN 201720445428U CN 206815592 U CN206815592 U CN 206815592U
Authority
CN
China
Prior art keywords
steel pipe
pipe bundle
novel wall
location division
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720445428.6U
Other languages
Chinese (zh)
Inventor
张凤芳
陈照锡
方俊忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Star Integrated Building Ltd By Share Ltd
Original Assignee
Shandong Star Integrated Building Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Star Integrated Building Ltd By Share Ltd filed Critical Shandong Star Integrated Building Ltd By Share Ltd
Priority to CN201720445428.6U priority Critical patent/CN206815592U/en
Application granted granted Critical
Publication of CN206815592U publication Critical patent/CN206815592U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of novel wall and steel pipe bundle combining structure building system, is related to the technical field of architectural engineering, and the utility model first aspect provides a kind of novel wall, including:Steel pipe bundle combining structure;The steel pipe bundle combining structure includes multigroup steel pipe bundle and the connector for connecting multigroup steel pipe bundle;Multigroup steel pipe bundle is arranged in order along longitudinal direction, and steel pipe bundle is connected by connector described in two adjacent groups.Effective and precise positioning when the novel wall that the utility model first aspect provides can realize installation steel pipe bundle in steel pipe bundle connection procedure, improves the bonding strength between steel pipe bundle, ensures the construction quality of wall, while accelerating construction progress.The steel pipe bundle combining structure building system that the utility model second aspect provides is provided with the novel wall of the utility model first aspect offer, so as to all beneficial effects possessed by the novel wall with the offer of the utility model first aspect.

Description

Novel wall and steel pipe bundle combining structure building system
Technical field
Construction engineering technical field is the utility model is related to, is built more particularly, to novel wall and steel pipe bundle combining structure System.
Background technology
In architectural engineering, traditional wall is coagulating cement cob wall, and concrete structure has long construction period, is constructed into The shortcomings of this height, poor seismic behavior.Steel pipe bundle combining structure shear wall is effectively to combine steel construction with concrete structure A kind of novel wall, given full play to the architectural composition of concrete shear force wall flexibly, structure steel fabrication industrialization degree is high, applies The fireballing advantage of work, while played the big material property advantage of steel high-strength light, concrete rigidity.
Steel pipe bundle combining structure shear wall needs to install multiple steel pipe bundles, when installing steel pipe bundle, the company between steel pipe bundle The problem of relation of connecing is very crucial.
Therefore, how to solve the connectivity problem in wall between steel pipe bundle be need on the basis of existing technology improve and Improved place.
Utility model content
The purpose of this utility model is to provide a kind of novel wall and steel pipe bundle combining structure building decorum, can realized Effective and precise positioning in steel pipe bundle connection procedure, the bonding strength between steel pipe bundle is improved, ensures the construction of novel wall Quality, while accelerating construction progress.
To achieve the above object, the utility model provides following technical scheme:
In a first aspect, the utility model provides a kind of novel wall, including:Steel pipe bundle combining structure;
The steel pipe bundle combining structure includes multigroup steel pipe bundle formed by multiple steel pipes side by side and for connecting multigroup institute State the connector of steel pipe bundle;Length direction of multigroup steel pipe bundle along the steel pipe bundle is arranged in order, and described in two adjacent groups Steel pipe bundle is connected by connector.
Further, the connector includes connecting plate and bolt, and the bolt will be attached on the outside of the steel pipe bundle The connecting plate is fixed on the outside of the steel pipe bundle.
Further, the keeper when connector also includes connecting multigroup steel pipe bundle for positioning;
The keeper on the steel pipe bundle includes the first location division and the second location division;
First location division is located at one end of the steel pipe bundle, and second location division deviates from institute located at the steel pipe bundle State one end of the first location division.
Further, the keeper and the steel pipe bundle integral structure;Or
The keeper is detachably connected with the steel pipe bundle.
Further, first location division is groove, and second location division is the projection coordinated with the groove;Or Person, second location division are groove, and first location division is the projection coordinated with the groove.
Further, first location division is wedge, and second location division is the wedge coordinated with the wedge Shape groove.
Further, the novel wall is also described for protecting including being successively set on outside the steel pipe bundle combining structure Anticorrosive coat, fireprotection layer and the facing sand pulp layer of steel pipe bundle combining structure;
The fireprotection layer is outside the anticorrosive coat;
The facing sand pulp layer is outside the fireprotection layer.
Further, the anticorrosive coat includes ceramic filler coating.
Further, the fireprotection layer includes fire-proof heat insulation board, and/or, fiberglass gridding cloth.
Second aspect, the utility model also provides a kind of steel pipe bundle combining structure building system, including appoints in first aspect Novel wall described in one.
Novel wall and steel pipe bundle combining structure building system provided by the utility model has the advantages that:
The utility model first aspect provides a kind of novel wall, including:Steel pipe bundle combining structure;The steel pipe bundle combination Structure includes multigroup steel pipe bundle and the connector for connecting multigroup steel pipe bundle;Multigroup steel pipe bundle is arranged successively along longitudinal direction Row, and steel pipe bundle is connected by connector described in two adjacent groups.
Steel pipe bundle combining structure needs to install multigroup steel pipe bundle, when installing steel pipe bundle, leads between two adjacent groups steel pipe bundle Connector connection is crossed, steel pipe bundle junction is whole steel pipe bundle combining structure intensity place the weakest, and in the prior art Multigroup steel pipe bundle between weld and compare, the steel pipe bundle attachment structure that the utility model first aspect provides is connected by connector Connect, not only increase connection precision, more improve bonding strength, reinforcement is played a part of by connector.
When the novel wall that the utility model first aspect provides can realize installation steel pipe bundle in steel pipe bundle connection procedure Effective and precise positioning, improve the bonding strength between steel pipe bundle, ensure the construction quality of wall, at the same accelerate to construct into Degree.
The steel pipe bundle combining structure building system that the utility model second aspect provides is provided with the utility model first party The novel wall of face offer, so as to all possessed beneficial effects of the novel wall provided with the utility model first aspect Fruit.
Brief description of the drawings
, below will be right in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art The required accompanying drawing used is briefly described in embodiment or description of the prior art, it should be apparent that, describe below In accompanying drawing be some embodiments of the present utility model, for those of ordinary skill in the art, do not paying creativeness On the premise of work, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation for the steel pipe bundle combining structure that the utility model embodiment provides;
Fig. 2 is the structural representation for the steel pipe bundle that the utility model embodiment provides;
Fig. 3 is the structural representation for the steel pipe bundle that the utility model embodiment provides;
Fig. 4 is the structural representation for the novel wall that the utility model embodiment provides.
Icon:100- steel pipe bundles;200- connectors;210- keepers;The location divisions of 211- first;The location divisions of 212- second; 300- anticorrosive coats;400- fireprotection layers;500- facing sand pulp layer.
Embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with accompanying drawing, it is clear that described Embodiment is the utility model part of the embodiment, rather than whole embodiments.Based on the embodiment in the utility model, sheet The every other embodiment that field those of ordinary skill is obtained under the premise of creative work is not made, belongs to this practicality Novel protected scope.
, it is necessary to explanation in description of the present utility model, term " " center ", " on ", " under ", it is "left", "right", " perpendicular Directly ", the orientation of the instruction such as " level ", " interior ", " outer " or position relationship are based on orientation shown in the drawings or position relationship, are only Described for the ease of description the utility model and simplifying, rather than instruction or imply signified device or element must have it is specific Orientation, with specific azimuth configuration and operation, therefore it is not intended that to limitation of the present utility model.In addition, term " the One ", " second ", " the 3rd " are only used for describing purpose, and it is not intended that instruction or hint relative importance.
, it is necessary to which explanation, unless otherwise clearly defined and limited, term " are pacified in description of the present utility model Dress ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integratedly Connection;Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected by intermediary, It can be the connection of two element internals.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition Concrete meaning of the language in the utility model.
Specific embodiment of the present utility model is described in detail below in conjunction with accompanying drawing.It should be appreciated that herein Described embodiment is merely to illustrate and explained the utility model, is not limited to the utility model.
Fig. 1, Fig. 2, Fig. 3 and Fig. 4 are refer to, the novel wall provided below in conjunction with accompanying drawing the utility model embodiment And the steel pipe bundle combining structure building decorum elaborates.
The embodiment of the utility model first aspect provides a kind of novel wall, including:Steel pipe bundle combining structure;
Steel pipe bundle combining structure includes multigroup steel pipe bundle 100 formed by multiple steel pipes side by side and for connecting multigroup steel pipe The connector 200 of beam 100;Length direction of multigroup steel pipe bundle 100 along steel pipe bundle 100 is arranged in order, and two adjacent groups steel pipe bundle 100 are connected by connector 200.
The embodiment of the utility model first aspect provides a kind of novel wall, including:Steel pipe bundle combining structure;Steel pipe bundle Combining structure includes multigroup steel pipe bundle 100 and the connector 200 for connecting multigroup steel pipe bundle 100;Multigroup steel pipe bundle 100 is along vertical To being arranged in order, and two adjacent groups steel pipe bundle 100 is connected by connector 200.
Steel pipe bundle combining structure needs to install multigroup steel pipe bundle 100, when installing steel pipe bundle 100, two adjacent groups steel pipe bundle Connected between 100 by connector 200, the junction of steel pipe bundle 100 is whole steel pipe bundle combining structure intensity ground the weakest Side, compared with being welded between multigroup steel pipe bundle 100 of the prior art, the steel of the embodiment offer of the utility model first aspect Restrain 100 attachment structures to connect by connector 200, not only increase connection precision, more improve bonding strength, pass through connection Part 200 plays a part of reinforcement.
It should be noted that the novel wall that the embodiment of the utility model first aspect provides can realize that installation is multigroup Effective and precise positioning of the two adjacent groups steel pipe bundle 100 in connection procedure during steel pipe bundle 100, improve steel pipe bundle 100 between Bonding strength, ensure the construction quality of wall, while accelerating construction progress.
Further, connector 200 includes connecting plate and bolt, and bolt will be attached to the connecting plate in the outside of steel pipe bundle 100 It is fixed on the outside of steel pipe bundle 100.
It should be noted that after the mutually locking of two adjacent groups steel pipe bundle 100, by connector 200 by two adjacent groups steel pipe Beam 100 is connected.Specifically, connector 200 includes connecting plate and bolt.
Connecting plate is attached to the outside of steel pipe bundle 100, and covers the phase connection of two adjacent groups steel pipe bundle 100, then uses bolt The junction of two adjacent groups steel pipe bundle 100 is fixed on after connecting plate is tightened.Also, it is attached to by connecting plate outside steel pipe bundle 100 Side, and the phase connection of two adjacent groups steel pipe bundle 100 is covered, the bonding strength of two groups of steel pipe bundles 100 can also be improved.
Further, the keeper 210 when connector 200 also includes connecting multigroup steel pipe bundle 100 for positioning;
Keeper 210 on steel pipe bundle 100 includes the first location division 211 and the second location division 212;
First location division 211 is located at one end of steel pipe bundle 100, and the second location division 212 is fixed away from first located at steel pipe bundle 100 The one end in position portion 211.
It should be noted that in the novel wall that the embodiment of the utility model first aspect provides, steel pipe bundle combination knot The connector 200 of structure also includes being used for locking the keeper 210 of adjacent steel pipe bundle 100, and multigroup steel pipe bundle 100 is along steel pipe bundle 100 Length direction be arranged in order, and same plane is held in by keeper 210;Keeper 210 on steel pipe bundle 100 wraps Include the first location division 211 and the second location division 212;First location division 211 is located at one end of steel pipe bundle 100, the second location division 212 Deviate from one end of the first location division 211 located at steel pipe bundle 100.
The novel wall that the embodiment of the utility model first aspect provides needs to install multigroup steel pipe bundle 100, is installing During steel pipe bundle 100, by the positioning limit of keeper 210 between two adjacent groups steel pipe bundle 100, a kind of embodiment is adjacent In two groups of steel pipe bundles 100, the second location division 212 of the first location division 211 and the second steel pipe bundle 100 in the first steel pipe bundle 100 Match spacing.After the second location division 212 of the second steel pipe bundle 100 is inserted in the first location division 211 in first steel pipe bundle 100, even First steel pipe bundle 100 and the second steel pipe bundle 100 are connected by fitting 200, and it is strong can to effectively improve connection compared with prior art Degree.
Further, keeper 210 and the integral structure of steel pipe bundle 100;Or
Keeper 210 is detachably connected with steel pipe bundle 100.
It should be noted that it can specifically be divided into for the connected mode of keeper 210 and steel pipe bundle 100:
Mode one, keeper 210 have integral structure with steel pipe bundle 100.
It should be noted that keeper 210 and the integral structure that steel pipe bundle 100 can be casting, in production, in order to Production cost is saved, keeper 210 and steel pipe bundle 100 are made of one formula structure, simplify process.And integral structure is more Add firmly, when in use, be not easy to damage in keeper 210 and the interface of steel pipe bundle 100, the connection for improving steel pipe bundle 100 is strong Degree.
Mode two, keeper 210 are detachably connected with steel pipe bundle 100.
Specifically, keeper 210 can be to be threadedly coupled with steel pipe bundle 100.Keeper 210 and steel pipe bundle 100 are detachable Connection can separately transport keeper 210 and steel pipe bundle 100, avoid in transportation that the length of steel pipe bundle 100 is long to ask Topic.Also, separately transport can also ensure that keeper 210 is not destroyed in transportation for keeper 210 and steel pipe bundle 100, Improve positioning precision.Such design only needs that keeper 210 is arranged on steel pipe bundle 100 at the construction field (site), carries The high positioning precision of keeper 210, it can more accurately complete the connectivity problem of multigroup steel pipe bundle 100.
Further, the first location division 211 is groove, and the second location division 212 is the projection coordinated with groove;Or the Two location divisions 212 are groove, and the first location division 211 is the projection coordinated with groove.
It should be noted that keeper 210 can be groove and raised fit structure, steel is realized in projection insertion groove The positioning of tube bank 100.
Specifically, the first location division 211 can be groove, and the second location division 212 can be the projection coordinated with groove;Or Person, the second location division 212 can be groove, and the first location division 211 can be the projection coordinated with groove.
Further, the first location division 211 and the second location division 212 are the wedge structure to cooperate.
It should be noted that keeper 210 can be groove and raised fit structure, specifically groove and male cooperation Structure can be the wedge structure to cooperate.
Specifically, wedge structure sawtooth like shape, and at least one chisel teeth.With being capable of pinpoint chisel teeth Wedge structure make it that the positioning between two adjacent groups steel pipe bundle 100 is more accurate.
Further, the first location division 211 is wedge, and the second location division 212 is the wedge-shaped slot coordinated with wedge.
It should be noted that keeper 210 includes locating slot and plug connector, plug connector is inserted in locating slot, by steel pipe bundle 100 lockings.Both locating slot and plug connector coordinate, and realize positioning between two adjacent groups steel pipe bundle 100, bit function.
Specifically, the first location division 211 is wedge, and the second location division 212 is the wedge-shaped slot coordinated with wedge.
In a kind of embodiment, wedge-shaped slot is located inside steel pipe bundle 100.Intermediate location inside steel pipe bundle 100 It is all provided with being set to inclined-plane, ensures that during joints cement dead angle will not be left, pour completely, ensured construction quality.
Keeper 210 in embodiment of the present utility model make it that the connection between two adjacent groups steel pipe bundle 100 is more accurate, Facilitate follow-up joints cement.
Further, the first location division 211 is to be anchored at reinforcing bar in steel pipe bundle 100, and the second location division 212 is and reinforcing bar The steel bar groove for accommodating reinforcing bar coordinated;Or
Second location division 212 is to be anchored at reinforcing bar in steel pipe bundle 100, the first location division 211 be with reinforcing bar coordinate can Accommodate the steel bar groove of reinforcing bar.
It should be noted that steel pipe bundle 100 is several standardization, the part steel pipe of modularization is joined together to form side by side Steel pipe bundle 100, internal casting concrete forms steel pipe bundle combining structure component, as main supporting member and lateral resistant member. Therefore, the first location division 211 is the reinforcing bar being anchored in steel pipe bundle 100, and the second location division 212 is to be accommodated with what reinforcing bar coordinated The steel bar groove of reinforcing bar;Or second location division 212 be to be anchored at reinforcing bar in steel pipe bundle 100, the first location division 211 is and steel The steel bar groove for accommodating reinforcing bar that muscle coordinates.
In the concrete that Bar Anchorage pours in steel pipe bundle 100, reinforcing bar is at least one, is specifically as follows two steel Muscle, the design of two reinforcing bars, the orientation problem along the two adjacent groups steel pipe bundle 100 in length of steel pipe direction can not only be realized, moreover it is possible to One moment of torsion is provided, vertical plane of the steel pipe bundle 100 along length of steel pipe direction is avoided and rotates.
Further, novel wall, which also includes being successively set on outside steel pipe bundle combining structure, is used to protect steel pipe bundle combination knot Anticorrosive coat 300, fireprotection layer 400 and the facing sand pulp layer 500 of structure;
Fireprotection layer 400 is outside anticorrosive coat 300;
Facing sand pulp layer 500 is outside fireprotection layer 400.
It should be noted that anticorrosive coat 300 is used for the steel pipe of steel pipe bundle 100 for protecting inside, the setting of fireprotection layer 400 can be with The fire prevention and heat-proof quality, the setting of facing sand pulp layer 500 for playing a part of strengthening the wall of steel pipe bundle 100 make it that surface of wall is more firm Lean on, be not easy to burst.
Further, anticorrosive coat 300 includes ceramic filler coating.
It should be noted that ceramic filler coating is applied to the ceramic filler coating system brushed, design is applied to steel, mixed Solidifying soil etc..
Further, fireprotection layer 400 includes fire-proof heat insulation board, and/or, fiberglass gridding cloth.
It should be noted that fire-proof heat insulation board possesses heat-insulated, insulation, fire prevention, waterproof, anti-corrosion, anti-swollen, nonshrink, resistance to compression etc. Function, is high-tech environment protecting and power-saving material of new generation, and its combination property is unique.Fiberglass gridding cloth is with glass Fibre fabric is base material, soaks coating through the anti-emulsion of macromolecule.So as to good alkali resistance, pliability and through broadwise Height stretching resistance, the insulation of building external and internal wall, waterproof, cracking resistance etc. can be widely used in.
The embodiment of the utility model second aspect provides a kind of steel pipe bundle combining structure building system, including first aspect Any novel wall in embodiment.
It is new that the steel pipe bundle combining structure building system that the embodiment of the utility model second aspect provides is provided with this practicality The novel wall that the embodiment of type first aspect provides, it is new so as to have the embodiment that the utility model first aspect carries to supply All beneficial effects possessed by wall.
Finally it should be noted that:Various embodiments above is only to illustrate the technical solution of the utility model, rather than it is limited System;Although utility model is described in detail with reference to foregoing embodiments, one of ordinary skill in the art should manage Solution:It can still modify to the technical scheme described in foregoing embodiments, either to which part or whole skills Art feature carries out equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from the utility model The scope of each embodiment technical scheme.

Claims (10)

  1. A kind of 1. novel wall, it is characterised in that including:Steel pipe bundle combining structure;
    The steel pipe bundle combining structure includes multigroup steel pipe bundle (100) formed by multiple steel pipes side by side and for connecting multigroup institute State the connector (200) of steel pipe bundle (100);Length direction of multigroup steel pipe bundle (100) along the steel pipe bundle (100) is successively Arrangement, and steel pipe bundle described in two adjacent groups (100) is connected by connector (200).
  2. 2. novel wall according to claim 1, it is characterised in that the connector (200) includes connecting plate and bolt, The connecting plate being attached on the outside of the steel pipe bundle (100) is fixed on the outside of the steel pipe bundle (100) by the bolt.
  3. 3. novel wall according to claim 2, it is characterised in that the connector (200) also includes connecting multigroup institute Keeper (210) when stating steel pipe bundle (100) for positioning;
    The keeper (210) on the steel pipe bundle (100) includes the first location division (211) and the second location division (212);
    First location division (211) is located at one end of the steel pipe bundle (100), and second location division (212) is located at described Steel pipe bundle (100) deviates from one end of first location division (211).
  4. 4. novel wall according to claim 3, it is characterised in that the keeper (210) and the steel pipe bundle (100) Integral structure;Or
    The keeper (210) is detachably connected with the steel pipe bundle (100).
  5. 5. novel wall according to claim 3, it is characterised in that first location division (211) is groove, described Two location divisions (212) are the projection coordinated with the groove;Or second location division (212) is groove, described first is fixed Position portion (211) is the projection coordinated with the groove.
  6. 6. novel wall according to claim 5, it is characterised in that first location division (211) is wedge, described Second location division (212) is the wedge-shaped slot coordinated with the wedge.
  7. 7. novel wall according to claim 1, it is characterised in that also include being successively set on the steel pipe bundle combination knot It is used for the anticorrosive coat (300), fireprotection layer (400) and facing sand pulp layer (500) for protecting the steel pipe bundle combining structure outside structure;
    The fireprotection layer (400) is outside located at the anticorrosive coat (300);
    The facing sand pulp layer (500) is outside located at the fireprotection layer (400).
  8. 8. novel wall according to claim 7, it is characterised in that the anticorrosive coat (300) includes ceramic filler coating.
  9. 9. novel wall according to claim 7, it is characterised in that the fireprotection layer (400) includes fire-proof heat insulation board, And/or fiberglass gridding cloth.
  10. 10. a kind of steel pipe bundle combining structure building system, it is characterised in that including new any one of claim 1 to 9 Type wall.
CN201720445428.6U 2017-04-26 2017-04-26 Novel wall and steel pipe bundle combining structure building system Expired - Fee Related CN206815592U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720445428.6U CN206815592U (en) 2017-04-26 2017-04-26 Novel wall and steel pipe bundle combining structure building system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720445428.6U CN206815592U (en) 2017-04-26 2017-04-26 Novel wall and steel pipe bundle combining structure building system

Publications (1)

Publication Number Publication Date
CN206815592U true CN206815592U (en) 2017-12-29

Family

ID=60754621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720445428.6U Expired - Fee Related CN206815592U (en) 2017-04-26 2017-04-26 Novel wall and steel pipe bundle combining structure building system

Country Status (1)

Country Link
CN (1) CN206815592U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114457927A (en) * 2022-02-23 2022-05-10 凯第建筑集团有限公司 Steel pipe bundle outer-wrapped aerated plate structure and construction method thereof
CN115324234A (en) * 2022-09-02 2022-11-11 江苏省江建集团有限公司 Assembled steel construction building steel tube bundle combination wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114457927A (en) * 2022-02-23 2022-05-10 凯第建筑集团有限公司 Steel pipe bundle outer-wrapped aerated plate structure and construction method thereof
CN115324234A (en) * 2022-09-02 2022-11-11 江苏省江建集团有限公司 Assembled steel construction building steel tube bundle combination wall
CN115324234B (en) * 2022-09-02 2023-11-24 江苏省江建集团有限公司 Assembled steel construction building steel tube bundle composite wall

Similar Documents

Publication Publication Date Title
CN205917838U (en) Balcony board installation node
CN207436373U (en) A kind of assembled is bolted steel core concrete column entirely
CN105275222B (en) The raw-soil fills out core pattern traditional residence wall reinforcement structure and reinforcement means
CN108978949A (en) The plug-in filling wall construction system of steel frame, assembled filled-in panel and construction method
CN206815592U (en) Novel wall and steel pipe bundle combining structure building system
CN109372130A (en) The novel full assembly concrete shaped section steel frame node of one kind and its construction method
CN109024993A (en) A kind of assembly concrete frame wall filled with masonry structural system and its construction method
CN207003634U (en) A kind of balcony slab installs node
CN208934192U (en) A kind of assembly concrete frame wall filled with masonry structural system
CN107724540A (en) Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates
CN105089206B (en) Prefabricated assembled concrete component reinforcing steel bar connecting device and connection method
CN208472974U (en) A kind of steel bar girder plate end connects steel structure girder node structure
CN206128281U (en) Balcony board installation node
CN206815593U (en) Steel pipe bundle attachment means and wall
CN107700747A (en) A kind of prefabricated building
CN107700671A (en) A kind of balcony guardrail built-in fitting
CN210177701U (en) Cold bridge prevention overlap joint formula built-in fitting
CN110424534A (en) A kind of prefabricated assembled non-reinforced concrete frame and its construction method
CN206815555U (en) Wall element, wall assemblies and walling system
CN206034665U (en) Waterproof board and use thereof
CN205975956U (en) Prefabricated component
CN205894366U (en) Two board connected node of shingle nail and post suitable for super high -rise building
CN106894579A (en) A kind of basis of assembled architecture and connecting structure of wall
CN207919877U (en) A kind of prefabricated GRC assembled wall boards
CN207003856U (en) A kind of prepared roofing vapor-permeable hole crash bearer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171229

Termination date: 20200426