CN107491609A CN201710721554.4A CN201710721554A CN107491609A CN 107491609 A CN107491609 A CN 107491609A CN 201710721554 A CN201710721554 A CN 201710721554A CN 107491609 A CN107491609 A CN 107491609A
Authority
CN
China
Prior art keywords
real
folding
time
disconnecting switch
state
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710721554.4A
Other languages
Chinese (zh)
Inventor
曹权林
王雁南
杨堂华
白彪
谢照祥
李文亮
李长生
宋哲
杨国君
罗庆兵
张冠
张冠一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Puer Supply Power Bureau of Yunnan Power Grid Co Ltd
Original Assignee
Puer Supply Power Bureau of Yunnan Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Puer Supply Power Bureau of Yunnan Power Grid Co Ltd filed Critical Puer Supply Power Bureau of Yunnan Power Grid Co Ltd
Priority to CN201710721554.4A priority Critical patent/CN107491609A/en
Publication of CN107491609A publication Critical patent/CN107491609A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Software Systems (AREA)
  • Computer Graphics (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of substation equipment visualizes real-time dynamic folding display methods, comprises the following steps:1) three-dimensional transformer substation model scene is established;2) equipment threedimensional model folding object is established;3) real-time folding database is established;4) establish real-time dynamic folding and show correlation rule;5) formed and completely visualize real-time dynamic folding display function;Substation equipment provided by the invention visualizes real-time dynamic folding display methods, is included using transformer station's three-dimensional scenic storehouse is combined:The display models such as ground above building structure, water conservancy project, HVAC, fire-fighting, electrical primary secondary device, shaft tower, cable.Pass and breaker folding object model are respectively left based on transformer station simultaneously and the real-time folding data of SCADA are interrelated.Using three-dimensional intuitive way, transformer station's actual field equipment dynamic folding situation can be quickly checked.Three-dimensional intuitively real-time dynamic queries environment is provided for power transformation business personnel, meets the demand of the quick understanding on-site actual situations during O&M.

Description

A kind of substation equipment visualizes real-time dynamic folding display methods
Technical field
The invention belongs to the method and technology of power informatization technology, especially three-dimensional transformer substation equipment dynamic and visual.
Technical background
Bottom-up employee still obtains information and processing information by computer, paper document, can not be combined when working at the scene Field condition quick obtaining real-time dynamic data information and corresponding processing method.It is unfavorable for making quick response for problem. In equipment control, substantial amounts of two-dimentional drawing browses, document browsing is not directly perceived, it is not easy to and allow people quickly to catch core information, three It is figure by data and conversions concepts that visualization technique, which is tieed up, by computer, and complex information is passed into audient, it is quickly disappeared Change and understand.
In transformer station's three-dimensional scenic, by the essential electrical primary equipment breaker and the dynamic of disconnecting switch in transformer station Folding information, by the visual mode of threedimensional model, non-intuitive 0 and 1 data originally directly reduce using visual expression Mode, can be power transformation business operation maintenance personnel quickly check on-site actual situations, there is provided efficiently, safety, accurate technology Means, aid in the development of maintenance work.
The content of the invention
The present invention overcomes above-mentioned the shortcomings of the prior art and provides a kind of easily model mobilism, data message Change, the real-time dynamic folding display methods of visual transformer.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is:
Substation equipment visualizes real-time dynamic folding display methods, comprises the following steps:
1) three-dimensional transformer substation model scene is established
As-constructed drawing data based on transformer substation construction, the drawing data of two dimension is subjected to three-dimensional using Three-dimensional Design Software Modeling reduction;Three-dimensional transformer substation model scene after foundation should include transformer station's prevailing scenario appearance information:More than ground build Structure, water conservancy project, HVAC, fire-fighting, electrical primary secondary device, shaft tower, cable etc.;
2) equipment threedimensional model folding library of object is established
The main folding equipment of electrical primary in three-dimensional transformer substation model scene is divided into two classes, respectively disconnecting switch and Breaker;
Its dynamic folding active component is built for disconnecting switch, including:Object mould under a set of disconnecting switch "On" state Type;Object model under a set of disconnecting switch " conjunction " state;Object model under a set of disconnecting switch " ground connection " state;It is a set of to keep apart Object model under " unearthed " state of closing;Its name mark of the object model of structure should include "ON" " conjunction " " ground connection " respectively simultaneously " unearthed ";
Its dynamic folding active component is built for breaker, including:Object entity mould under a set of breaker "On" state Type;The translucent model of object under a set of breaker " conjunction " state;Its name mark of the object model of structure should include respectively simultaneously "ON" " conjunction ";
3) real-time folding database is established
It is according to the scheduling of transformer station SCADA real-time running datas, the disconnecting switch in transformer station and breaker is real-time Folding data volume is integrated, while forms Real-Time Switch database;Disconnecting switch and the real-time folding data of breaker should include: Plant stand name, plant stand number, title, full name, description, point Id, device name.Disconnecting switch corresponding to simultaneously and short-circuiting device switching value point Other method for expressing is:Corresponding " 0 " " 1 " numerical value of disconnecting switch "ON" " conjunction " state, " unearthed " " ground connection " state are corresponding " 0 " " 1 " Numerical value.Corresponding " 0 " " 1 " numerical value of breaker "ON" " conjunction " state;
4) establish real-time dynamic folding and show correlation rule
It will be carried out in real-time folding data in equipment threedimensional model folding library of object in step 2) and step 3) mutual Association, establish real-time dynamic folding and show mapping table;
Mapping table isolates disconnecting switch "ON" " conjunction " object model title in step 2) with real-time data base in step 3) Corresponding " 0 " " 1 " numerical associations of "ON" " conjunction " state of switch correspond;
Mapping table by disconnecting switch in step 2) " ground connection " " unearthed " object model title with 3) in real-time data base every Corresponding " 0 " " 1 " numerical associations of pass " unearthed " " ground connection " state are left to correspond;
Mapping table is by real-time data base breaker in breaker "ON" " conjunction " object model title in step 2) and step 3) Corresponding " 0 " " 1 " numerical associations of "ON" " conjunction " state correspond;
5) formed and completely visualize real-time dynamic folding display function
Carried out based on the equipment threedimensional model folding library of object in transformer station's three-dimensional scenic storehouse in step 1) and step 2) Die closing operation, establish the three-dimensional transformer substation with electrical switch disconnector folding object model.Simultaneously by being established in step 4) Real-time dynamic folding show correlation rule, realize in three-dimensional transformer substation scene, dynamically check disconnecting switch and open circuit in real time Device Three-Dimensional Dynamic folding condition.
The present invention has following advantageous effects compared with prior art.
Substation equipment provided by the invention visualizes real-time dynamic folding display methods, using combination transformer station three dimensional field Jing Ku is included:The outward appearance moulds such as ground above building structure, water conservancy project, HVAC, fire-fighting, electrical primary secondary device, shaft tower, cable Type.Pass and breaker folding object model are respectively left based on transformer station simultaneously and the real-time folding data of SCADA are interrelated.Using Three-dimensional intuitive way, it can quickly check transformer station's actual field equipment dynamic folding situation.For power transformation, business personnel provides Three-dimensional intuitively real-time dynamic queries environment, meet the demand of the quick understanding on-site actual situations during O&M.
Brief description of the drawings
Fig. 1 is basic framework figure of the present invention;
Fig. 2 is the SCADA information data tables of the present invention;
Fig. 3 is the dynamic folding comparison diagram of the present invention.
Embodiment
Substation equipment visualizes real-time dynamic folding display methods, comprises the following steps:
1) three-dimensional transformer substation model scene is established
As-constructed drawing data based on transformer substation construction, the drawing data of two dimension is subjected to three-dimensional using Three-dimensional Design Software Modeling reduction;Three-dimensional transformer substation model scene after foundation should include transformer station's prevailing scenario appearance information:More than ground build Structure, water conservancy project, HVAC, fire-fighting, electrical primary secondary device, shaft tower, cable etc.;
2) equipment threedimensional model folding library of object is established
The main folding equipment of electrical primary in three-dimensional transformer substation model scene is divided into two classes, respectively disconnecting switch and Breaker;
Its dynamic folding active component is built for disconnecting switch, including:Object mould under a set of disconnecting switch "On" state Type;Object model under a set of disconnecting switch " conjunction " state;Object model under a set of disconnecting switch " ground connection " state;It is a set of to keep apart Object model under " unearthed " state of closing;Its name mark of the object model of structure should include "ON" " conjunction " " ground connection " respectively simultaneously " unearthed ";
Its dynamic folding active component is built for breaker, including:Object entity mould under a set of breaker "On" state Type;The translucent model of object under a set of breaker " conjunction " state;Its name mark of the object model of structure should include respectively simultaneously "ON" " conjunction ";
3) real-time folding database is established
It is according to the scheduling of transformer station SCADA real-time running datas, the disconnecting switch in transformer station and breaker is real-time Folding data volume is integrated, while forms Real-Time Switch database;Disconnecting switch and the real-time folding data of breaker should include: Plant stand name, plant stand number, title, full name, description, point Id, device name.Disconnecting switch corresponding to simultaneously and short-circuiting device switching value point Other method for expressing is:Corresponding " 0 " " 1 " numerical value of disconnecting switch "ON" " conjunction " state, " unearthed " " ground connection " state are corresponding " 0 " " 1 " Numerical value.Corresponding " 0 " " 1 " numerical value of breaker "ON" " conjunction " state;
4) establish real-time dynamic folding and show correlation rule
It will be carried out in real-time folding data in equipment threedimensional model folding library of object in step 2) and step 3) mutual Association, establish real-time dynamic folding and show mapping table;
Mapping table isolates disconnecting switch "ON" " conjunction " object model title in step 2) with real-time data base in step 3) Corresponding " 0 " " 1 " numerical associations of "ON" " conjunction " state of switch correspond;
Mapping table by disconnecting switch in step 2) " ground connection " " unearthed " object model title with 3) in real-time data base every Corresponding " 0 " " 1 " numerical associations of pass " unearthed " " ground connection " state are left to correspond;
Mapping table is by real-time data base breaker in breaker "ON" " conjunction " object model title in step 2) and step 3) Corresponding " 0 " " 1 " numerical associations of "ON" " conjunction " state correspond;
5) formed and completely visualize real-time dynamic folding display function
Carried out based on the equipment threedimensional model folding library of object in transformer station's three-dimensional scenic storehouse in step 1) and step 2) Die closing operation, establish the three-dimensional transformer substation with electrical switch disconnector folding object model;Simultaneously by being established in step 4) Real-time dynamic folding show correlation rule, realize in three-dimensional transformer substation scene, dynamically check disconnecting switch and open circuit in real time Device Three-Dimensional Dynamic folding condition.

Claims (1)

1. a kind of substation equipment visualizes real-time dynamic folding display methods, it is characterised in that comprises the following steps:
1) three-dimensional transformer substation model scene is established
As-constructed drawing data based on transformer substation construction, the drawing data of two dimension is subjected to three-dimensional modeling using Three-dimensional Design Software Reduction;Three-dimensional transformer substation model scene after foundation should include transformer station's prevailing scenario appearance information:Ground above building structure, Water conservancy project, HVAC, fire-fighting, electrical primary secondary device, shaft tower, cable;
2) equipment threedimensional model folding library of object is established
The main folding equipment of electrical primary in three-dimensional transformer substation model scene is divided into two classes, respectively disconnecting switch and open circuit Device;
Its dynamic folding active component is built for disconnecting switch, including:Object model under a set of disconnecting switch "On" state;One Object model under disconnecting switch " conjunction " state of covering;Object model under a set of disconnecting switch " ground connection " state;A set of disconnecting switch is " not Object model under ground connection " state;Its name mark of the object model of structure should include "ON" " conjunction " " ground connection " respectively and " not connect simultaneously Ground ";
Its dynamic folding active component is built for breaker, including:Object entity model under a set of breaker "On" state;One The translucent model of object under breaker " conjunction " state of covering;Its name mark of the object model of structure should include "ON" respectively simultaneously " conjunction ";
3) real-time folding database is established
According to the scheduling of transformer station SCADA real-time running datas, by the disconnecting switch in transformer station and the real-time folding of breaker Data volume is integrated, while forms Real-Time Switch database;Disconnecting switch and the real-time folding data of breaker should include:Plant stand Name, plant stand number, title, full name, description, point Id, device name;Disconnecting switch corresponding to simultaneously and short-circuiting device switching value difference table Show that method is:Corresponding " 0 " " 1 " numerical value of disconnecting switch "ON" " conjunction " state, corresponding " 0 " " 1 " numerical value of " unearthed " " ground connection " state. Corresponding " 0 " " 1 " numerical value of breaker "ON" " conjunction " state;
4) establish real-time dynamic folding and show correlation rule
By the equipment threedimensional model folding library of object in step 2) with carried out in the real-time folding data in step 3) it is interrelated, Establish real-time dynamic folding and show mapping table;
Mapping table is by real-time data base disconnecting switch in disconnecting switch "ON" " conjunction " object model title in step 2) and step 3) Corresponding " 0 " " 1 " numerical associations of "ON" " conjunction " state correspond;
Mapping table by disconnecting switch in step 2) " ground connection " " unearthed " object model title with 3) in real-time data base keep apart Corresponding " 0 " " 1 " numerical associations of " unearthed " " ground connection " state of closing correspond;
Mapping table is by real-time data base breaker "ON" in breaker "ON" " conjunction " object model title in step 2) and step 3) Corresponding " 0 " " 1 " numerical associations of " conjunction " state correspond;
5) formed and completely visualize real-time dynamic folding display function
Matched moulds is carried out based on the equipment threedimensional model folding library of object in transformer station's three-dimensional scenic storehouse in step 1) and step 2) Operation, establish the three-dimensional transformer substation with electrical switch disconnector folding object model;Reality by being established in step 4) simultaneously When dynamic folding show correlation rule, realize in three-dimensional transformer substation scene, dynamically check disconnecting switch and breaker three in real time Tie up dynamic folding condition.
CN201710721554.4A 2017-08-22 2017-08-22 A kind of substation equipment visualizes real-time dynamic folding display methods Pending CN107491609A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710721554.4A CN107491609A (en) 2017-08-22 2017-08-22 A kind of substation equipment visualizes real-time dynamic folding display methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710721554.4A CN107491609A (en) 2017-08-22 2017-08-22 A kind of substation equipment visualizes real-time dynamic folding display methods

Publications (1)

Publication Number Publication Date
CN107491609A true CN107491609A (en) 2017-12-19

Family

ID=60646161

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710721554.4A Pending CN107491609A (en) 2017-08-22 2017-08-22 A kind of substation equipment visualizes real-time dynamic folding display methods

Country Status (1)

Country Link
CN (1) CN107491609A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019149193A1 (en) * 2018-01-31 2019-08-08 杭州优工品科技有限公司 Data processing method and device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103226841A (en) * 2012-11-29 2013-07-31 北京科东电力控制系统有限责任公司 Substation visual operation method based on virtual reality technology
CN105574777A (en) * 2015-12-31 2016-05-11 中国南方电网有限责任公司 Three-dimensional intelligent construction method of substation
CN105843125A (en) * 2016-05-10 2016-08-10 国网山东省电力公司德州供电公司 Transformer station sequence operation system and method based on state identification technology
CN106208372A (en) * 2016-08-03 2016-12-07 国家电网公司 Based on visualization and the switch remote operation method of anti-error topological analysis comprehensively
CN106339792A (en) * 2016-08-12 2017-01-18 云南电网有限责任公司普洱供电局 Transformer substation three-dimensional model and SCADA real-time data access method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103226841A (en) * 2012-11-29 2013-07-31 北京科东电力控制系统有限责任公司 Substation visual operation method based on virtual reality technology
CN105574777A (en) * 2015-12-31 2016-05-11 中国南方电网有限责任公司 Three-dimensional intelligent construction method of substation
CN105843125A (en) * 2016-05-10 2016-08-10 国网山东省电力公司德州供电公司 Transformer station sequence operation system and method based on state identification technology
CN106208372A (en) * 2016-08-03 2016-12-07 国家电网公司 Based on visualization and the switch remote operation method of anti-error topological analysis comprehensively
CN106339792A (en) * 2016-08-12 2017-01-18 云南电网有限责任公司普洱供电局 Transformer substation three-dimensional model and SCADA real-time data access method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019149193A1 (en) * 2018-01-31 2019-08-08 杭州优工品科技有限公司 Data processing method and device

Similar Documents

Publication Publication Date Title
CN107679281A (en) Intelligent station three-dimensional scenic analogue system and implementation method based on Unity dynamic generations
CN103066698B (en) Implement method for automatic generation of visible power grid trend chart in dispatching system
CN103366059B (en) A kind of Substation Training Simulator secondary device model data describing method
CN104166892A (en) Engineering management and control method and system based on three-dimensional design system
CN105807658A (en) Method for graph-model information sharing of intelligent substation and dispatching master station
CN102768308B (en) Method for carrying out visual simulation test on dielectric loss of current transformer
CN103093007A (en) Power transmission iron tower three-dimensional virtual assembly method
CN104866613A (en) Method for establishing three-dimensional component model database of power grid equipment and facility
CN105894576A (en) 3D substation panoramic real-time control system based on virtual simulation technology
CN103065513A (en) Three-dimensional virtual training system of transformer equipment
CN103412741B (en) The transformer SVG graphic joining method and system of association CIM
CN205721989U (en) A kind of 3D transformer station based on Virtual Simulation panorama real-time monitoring system
CN103093493A (en) High-precision three-dimensional object modeling method with power grid equipment existing
CN107491609A (en) A kind of substation equipment visualizes real-time dynamic folding display methods
CN112184881B (en) Multi-level overall process monitoring method for power equipment
Duanmu et al. 3D Visual Management of Substation Based on Unity3D
CN103578046A (en) Graph splicing method for achieving layering display of electric grid structure
CN111047688A (en) Three-dimensional visual simulation method for power plant
CN111540046A (en) Power transmission channel simulation method based on virtual reality
Ren et al. Research on application of construction model based on 4D visualization in construction of intelligent substation
Liu et al. Research on key technology of 3D digitization for secondary system of power grid based on model application analysis
CN107368937A (en) Wind-powered electricity generation Flow visualisation method, apparatus and system based on virtual reality
CN109711001B (en) Hydropower station multidimensional all-digital modeling method based on flexible subsystem division and scene attribute clustering
CN203311704U (en) Substation model for installation training
CN112634436A (en) Equipment lightweight display system of power system BIM model

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171219