CN103066698B - Implement method for automatic generation of visible power grid trend chart in dispatching system - Google Patents

Implement method for automatic generation of visible power grid trend chart in dispatching system Download PDF

Info

Publication number
CN103066698B
CN103066698B CN201210545963.0A CN201210545963A CN103066698B CN 103066698 B CN103066698 B CN 103066698B CN 201210545963 A CN201210545963 A CN 201210545963A CN 103066698 B CN103066698 B CN 103066698B
Authority
CN
China
Prior art keywords
pel
plant stand
circuit
power grid
dispatching system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210545963.0A
Other languages
Chinese (zh)
Other versions
CN103066698A (en
Inventor
祝项英
金乃正
章立宗
张锋明
丁立新
罗刚
吴凌燕
刘永新
朱赤
邹全喜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Shaoxing Electric Power Bureau
Dongfang Electronics Co Ltd
Original Assignee
State Grid Corp of China SGCC
Shaoxing Electric Power Bureau
Dongfang Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Shaoxing Electric Power Bureau, Dongfang Electronics Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201210545963.0A priority Critical patent/CN103066698B/en
Publication of CN103066698A publication Critical patent/CN103066698A/en
Application granted granted Critical
Publication of CN103066698B publication Critical patent/CN103066698B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/40Display of information, e.g. of data or controls

Abstract

The invention discloses an implement method for automatic generation of a visible power grid trend chart in a dispatching system. The method comprises the following steps: (1) according to set chart forming granularity filter conditions, station pels and circuit pels are generated in a picture through a drawing tool of the dispatching system; (2) intelligent layout is conducted to the station pels through a network topological graph arithmetic based on an expanding mechanical model; (3) intelligent wiring is conducted to the picture after the intelligent layout by using a maze arithmetic; (4) a parameter in a bank is related automatically and labels such as measurement, a dynamic trend and a visible pie chart are conducted automatically, and the visible power grid trend chart is generated finally. According to the implement method for automatic generation of the visible power grid trend chart in the dispatching system, the visible power grid trend chart needed by the dispatching system can be generated rapidly, so that powerful technical support is provided to implement of the dispatching system and power grid analytical research. Due to intelligent and automatic chart forming process, efficiency is improved, omissions caused by human factors are greatly reduced and technical guarantee is provided to safe and stably running of a power grid.

Description

Automatically the implementation method of visual electric network current diagram is generated in mixing system
Technical field
The present invention relates to a kind of implementation method automatically generating visual electric network current diagram in mixing system.
Background technology
In electrical network allotment supervisory control system, monitor and adjust the distribution of electric power system tide, it is an important duty of modern electric dispatch automated system, power system operation dispatcher needs to pay close attention at any time and adjusts electric network swim distribution, and electric network swim is that electric power allotment automated system is implemented, a requisite part is studied in network analysis.In current supervisory control system, draw power system network topology diagram and electric network current diagram, all according to monitored electrical network real topology by maintenance person or engineer, utilize dispatching patcher drawing instrument, hand drawn out, describes power system network structure with the figure of physically based deformation wiring, labeled data on figure, data and figure are combined, trend is distributed very clear.
Along with the development of intelligent grid and the communication technology, the scale of supervisory control system is increasing, and the plant stand of monitoring, the quantity of circuit are more and more, and power network topology complexity is also more and more higher.By manually drawing electric network current diagram, often needing to expend huge manpower and time, and easily makeing mistakes, again unsightly; Meanwhile, if dispatch automated system carries out plant stand dilatation, trend distribution will change, and need to re-start tidal current chart layout, secondary maintenance also can be very inconvenient.Therefore, seek a kind of tidal current chart intelligence drawing methods, become the joint demand of supervisory control system manufacturer and power supply enterprise, also can bring great help for the engineering construction of dispatch automated system and regular maintenance.
Summary of the invention
The object of the present invention is to provide a kind of implementation method automatically generating visual electric network current diagram in mixing system, the present invention aims to provide a kind of in big-and-middle-sized allotment automated system, automatically generates the method for visual electric network current diagram fast.Technical problem to be solved is, in electric power system mixing system engineering construction and maintenance process, according to the electric network model and the Real-time Power Flow that comprise various complicated connection type, one method is fast and accurately provided, the trend figure of the electrical network in the whole electrical network of automatic generation or certain region, and with visual effect plays to user, monitoring for it and adjusting electric network swim provides supplementary means.Specifically, invent a kind of method of automatic generation complex electric network model tidal current chart exactly, in automatic mapping process, adopt the network map layout algorithm based on expansion mechanical model, autoplacement is carried out to each plant stand node in tidal current chart, reach have the plant stand node of connection as far as possible close, plant stand Node distribution evenly, the effect that can not too press close between plant stand and circuit; Adopt labyrinth algorithm to the circuit intelligent wiring between each plant stand, accomplish that path is optimum; Last auto-associating storehouse parameter, and automatically carry out measuring, the mark of dynamic power flow, visual pie chart etc., finally generate visual electric network current diagram.
In order to reach above-mentioned purpose, solution of the present invention is:
In mixing system, automatically generate an implementation method for visual electric network current diagram, comprise the steps: 1) according to the one-tenth figure granularity filter condition arranged, utilize mixing system drawing instrument to generate plant stand pel and circuit pel in the graphic; 2) use the network map layout algorithm based on expansion mechanical model, intelligent distribution is carried out to plant stand pel; 3) labyrinth algorithm is used to carry out intelligent wiring to the figure after intelligent distribution; 4) last auto-associating storehouse parameter, and automatically carry out measuring, the mark of dynamic power flow, visual pie chart etc., finally generate visual electric network current diagram.
Described step is: 1) according to the one-tenth figure granularity filter condition pre-set, qualified plant stand and line information is searched out from current electric grid model, in mixing system drawing instrument, plant stand pel is drawn on figure by the mode be evenly distributed, utilize the topological relation between plant stand, the plant stand be connected to each other circuit pel is connected;
2) use the network map layout algorithm based on expansion mechanical model, intelligent distribution is carried out to plant stand pel; Finally reach that crossing elimination is minimum, the plant stand that the has connection effect that is evenly distributed of close, plant stand as far as possible;
3) utilize labyrinth algorithm to carry out intelligent wiring to the figure after intelligent distribution, generate the smooth vertical and horizontal orthogonal graph that grid monitoring system uses.In layout process, adopt labyrinth algorithm to carry out path and solve, take into full account the situation of plant stand outgoing lines and many inlet wires, thus the paths intersect reaching drafting is minimum, shortest path, show effect clearly;
4) by the relevant parameter of circuit pel and plant stand figure element lane database, the measurement pel of this circuit of the other mark of circuit pel, circuit pel generates visual pie chart pel, the load factor of this circuit in this visual pie chart figure element database, circuit generates the dynamic power flow pel representing direction of tide and size, the visual electric network current diagram of final generation.
Described step 2) in based on expansion mechanical model network map layout algorithm in network topological diagram be made up of node and two, limit key element; Plant stand pel is mapped as the node in network topology nomography, and circuit pel is mapped as limit, carries out intelligent distribution to plant stand pel.
Beneficial effect of the present invention is: feature of the present invention is 1) according to the electric network tide model in auxiliary tone system, in conjunction with actual flow data, automatically can generate dispatcher and carry out the supervision of auxiliary tone system load flow and the requisite trend figure of dispatching office; After the actual tide model of electrical network changes or changes, the trend graphic change caused, algorithm can accurately identify.2) setting of layout granularity condition, ensure that the trend figure that namely automatically can generate the whole network, also according to actual needs, can generate the trend figure of the partial electric grid be concerned about.3) intelligent distribution can carry out autoplacement to each plant stand node of trend figure automatically, and ensure that plant stand Node distribution is even, have the plant stand node of connection as far as possible close, the intersection between circuit is minimum, can not too press close between plant stand node and circuit.4) intelligent wiring ensure that line route between each plant stand is the shortest, it is minimum to intersect, and meets the smooth vertical and horizontal orthogonal graph custom that dispatcher uses.5) automatic marking of device parameter, makes the consistency of picture library be ensured.Playing up of the effect of visualization such as visual pie chart, dynamic power flow pel, more makes figure clear, attractive in appearance.
In sum: the present invention can generate the visual trend figure required for electrical network mixing system fast, for auxiliary tone systems engineering building and electrical network analysis research provide strong technical support, intelligence is mapping process automatically, not only can raise the efficiency, and greatly reduce the careless omission that human factor may cause, for power grid security, stable operation provide technical guarantee.
Embodiment
Embodiment 1
The present invention is further illustrated below in conjunction with concrete case study on implementation.
1) be arranged to figure granularity filter condition, plant stand type be set to transformer station that electric pressure is 10kV ~ 220kV and switching station, mark measurement amount type selecting mark A phase current, meritorious, idle.From current electric grid model, search out qualified plant stand and line information, generate plant stand pel and circuit pel in mixing system drawing instrument, each plant stand pel is evenly distributed, and has generation circuit pel between the plant stand of connection to connect.
2) use the network map layout algorithm based on expansion mechanical model to carry out intelligent distribution to plant stand pel, this algorithm is to the innovatory algorithm based on Repulsion-Tension model algorithm;
Described is made up of node and two, limit key element based on the network topological diagram in the network map layout algorithm of expansion mechanical model.One clearly topological diagram should meet the following conditions: a) node is uniformly distributed .b) can not too press close between node and limit; C) limit is rationally distributed, avoids intersecting as far as possible.
By carrying out the topological graph of layout according to physical system modeling, using each plant stand as a node, each circuit is as a limit; Each node can regard the particle that has quality as; Each limit can regard the rubber band that has contractility as, and it has natural length (namely not by length during external force), if be elongated, then shows tension force; Asking of two nodes has mutually repulsion effect.
In order to make, for making node and limit keep appropriate distance, to give repulsion between limit and node, if the subpoint of node q is on the e of limit, then think may there is repulsion between q and e.Node can move under repulsion effect, and limit then maintains static.Repulsion and distance are inversely proportional to, if the hypotelorism between node and limit, node can be pushed in the other direction by repulsion; If the spacing on node and limit is greater than certain distance d, then repulsion is 0, produces excessive impact to avoid a limit repulsion to node layout.
For such physical system, to each particle (node) arbitrary position, it just can be allowed to run voluntarily according to physics law.In each step, what calculate that each corner is subject to makes a concerted effort, and allows this node move certain distance along resultant direction, until finally reach balance.Under ideal conditions, the initial velocity of all nodes is 0, and namely the overall initial momentum of system is 0, and system is not by the effect of external force, thus the conservation of momentum, the aggregated momentum of system is 0 always.This guarantees terminal stage or the internal node vibration of system, otherwise static, and overallly can not move to a direction or rotate.
To each plant stand node in system, obtain tension force suffered by each node and repulsion by tension force-repulsion formulae discovery, tension force and repulsion are added and obtain making a concerted effort, then by vector addition, Orthogonal Decomposition is the power in X-axis, y-axis direction.When system does not balance (initial situation), make each node along the direction displacement of making a concerted effort, thus X-axis, the y-axis coordinate information of each node can be obtained, one-tenth figure effect meets tidal current chart limit and intersects as far as possible few, Node distribution distance evenly, have the node of direct line to be distributed in the requirement at a place as far as possible, graphical distribution is rationally attractive in appearance.
3), after plant stand position is determined, the intelligent wiring of circuit will be carried out.The line requirements of automatic generation is smooth vertical and horizontal, will avoid intersecting between circuit as far as possible.Employing fan official algorithm carries out the intelligent wiring of circuit, makes circuit smooth vertical and horizontal, and ensures that intersection is minimum, and between many circuits, spacing evenly, rationally, and dislocation-free, nothing cover.
4) by the relevant parameter of circuit pel and plant stand figure element lane database, the measurement pel of this circuit of the other mark of circuit pel, circuit pel generates visual pie chart pel, the load factor of this circuit in this visual pie chart figure element database, circuit generates the dynamic power flow pel representing direction of tide and size, the visual electric network current diagram of final generation.
The feature of the present embodiment is 1) according to the electric network tide model in auxiliary tone system, in conjunction with actual flow data, automatically can generate dispatcher and carry out the supervision of auxiliary tone system load flow and the requisite trend figure of dispatching office; After the actual tide model of electrical network changes or changes, the trend graphic change caused, algorithm can accurately identify.2) setting of layout granularity, ensure that the trend figure that both automatically can generate the whole network, also according to actual needs, can generate the trend figure of the partial electric grid be concerned about.3) intelligent distribution can carry out autoplacement to each plant stand node of trend figure automatically, and ensure that plant stand Node distribution is even, have the plant stand of connection as far as possible close, the intersection between circuit is minimum, can not too press close between plant stand node and circuit.4) intelligent wiring ensure that shortest path between each circuit, and meets the smooth vertical and horizontal orthogonal graph custom that dispatcher uses.5) automatic marking of device parameter, makes the consistency of picture library be ensured.Visual pie chart, dynamic power flow make figure clear, attractive in appearance.
In sum: the present embodiment can generate the visual trend figure required for electrical network mixing system fast, for auxiliary tone systems engineering building and electrical network analysis research provide strong technical support, intelligence is mapping process automatically, not only can raise the efficiency, and greatly reduce the careless omission that human factor may cause, for power grid security, stable operation provide technical guarantee.

Claims (2)

1. in mixing system, automatically generate an implementation method for visual electric network current diagram, it is characterized in that comprising the steps:
1) according to the one-tenth figure granularity filter condition pre-set, qualified plant stand and line information is searched out from current electric grid model, mixing system drawing instrument is utilized to generate plant stand pel and circuit pel in the graphic, in mixing system drawing instrument, plant stand pel is drawn on figure by the mode be evenly distributed, utilize the topological relation between plant stand, the plant stand be connected to each other circuit pel is connected;
2) use the network map layout algorithm based on expansion mechanical model, intelligent distribution carried out to plant stand pel, finally reach that crossing elimination is minimum, the plant stand that the has connection effect that is evenly distributed of close, plant stand as far as possible;
3) utilize labyrinth algorithm to carry out intelligent wiring to the figure after intelligent distribution, generate the smooth vertical and horizontal orthogonal graph that grid monitoring system uses; In layout process, adopt labyrinth algorithm to carry out path and solve, take into full account the situation of plant stand outgoing lines and many inlet wires, thus the paths intersect reaching drafting is minimum, shortest path, show effect clearly;
4) by the relevant parameter of circuit pel and plant stand figure element lane database, and automatically carry out measuring, the mark of dynamic power flow, visual pie chart, the measurement pel of this circuit of the other mark of circuit pel, circuit pel generates visual pie chart pel, the load factor of this circuit in this visual pie chart figure element database, circuit generates the dynamic power flow pel representing direction of tide and size, the visual electric network current diagram of final generation.
2. a kind of implementation method automatically generating visual electric network current diagram in mixing system as claimed in claim 1, is characterized in that: described step 2) in network topological diagram placement algorithm in network topological diagram be made up of node and two, limit key element; Plant stand pel is mapped as the node in network topology nomography, and circuit pel is mapped as limit, carries out intelligent distribution.
CN201210545963.0A 2012-12-17 2012-12-17 Implement method for automatic generation of visible power grid trend chart in dispatching system Active CN103066698B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210545963.0A CN103066698B (en) 2012-12-17 2012-12-17 Implement method for automatic generation of visible power grid trend chart in dispatching system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210545963.0A CN103066698B (en) 2012-12-17 2012-12-17 Implement method for automatic generation of visible power grid trend chart in dispatching system

Publications (2)

Publication Number Publication Date
CN103066698A CN103066698A (en) 2013-04-24
CN103066698B true CN103066698B (en) 2015-03-18

Family

ID=48109204

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210545963.0A Active CN103066698B (en) 2012-12-17 2012-12-17 Implement method for automatic generation of visible power grid trend chart in dispatching system

Country Status (1)

Country Link
CN (1) CN103066698B (en)

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103473714A (en) * 2013-09-06 2013-12-25 国家电网公司 Graph model automatic maintaining method in distribution network system
CN103699960B (en) * 2013-12-11 2018-11-06 国家电网公司 A kind of medium voltage distribution power grid operation state visualization method
CN103810395B (en) * 2014-03-03 2017-08-11 国网浙江象山县供电公司 Computational methods, device and the arranging system of electric network current diagram plant stand node coordinate
CN104240148A (en) * 2014-08-28 2014-12-24 国家电网公司 Power grid visualization method based on plugins
CN104268801A (en) * 2014-10-10 2015-01-07 东方电子股份有限公司 Visual debugging method for electric power system looped network load flow calculation
CN104463438B (en) * 2014-11-21 2019-01-04 贵州电网公司电力调度控制中心 Electric power system tide figure Computer Aided Analysis System
CN106056465A (en) * 2016-05-20 2016-10-26 国网辽宁省电力有限公司大连供电公司 Alarm range display method based on power grid flow diagram
CN106451412B (en) * 2016-05-25 2019-02-15 国网山东省电力公司日照供电公司 Important load based on power supply backward protects electric decision-making technic and visual display method
CN106022964B (en) * 2016-05-26 2019-06-21 东方电子股份有限公司 A kind of recognition methods of the SVG figure trend flow direction differentiated based on European path
CN106875086A (en) * 2016-12-30 2017-06-20 中国电力科学研究院 A kind of electric network data modeling method and its system based on graphical interactive operation
CN107480409B (en) * 2017-10-16 2020-06-30 国网四川省电力公司电力科学研究院 Topological hierarchical layout method for visual simulation model of power system
CN107664954B (en) * 2017-10-16 2021-02-09 国网四川省电力公司电力科学研究院 Automatic generation method of electromagnetic transient visual simulation model of power system
CN109101585B (en) * 2018-07-23 2020-10-09 北京科东电力控制系统有限责任公司 Method and device for embedding power grid panoramic tidal current diagram into station wiring picture
CN109460564B (en) * 2018-09-07 2022-09-13 国电南瑞科技股份有限公司 Power grid tidal current graph wiring method
CN109728959A (en) * 2019-03-15 2019-05-07 广东电网有限责任公司 A kind of network topology structure automatic analysis method, device and equipment
CN111444587B (en) * 2020-02-27 2022-08-12 国网信通亿力科技有限责任公司 Electric power graph drawing method based on automatic drawing technology
CN111935256B (en) * 2020-07-30 2023-04-07 许昌许继软件技术有限公司 Orthogonal graph Web publishing method and system for distribution network master station system
CN112256900A (en) * 2020-10-09 2021-01-22 国电南瑞科技股份有限公司 Factory station near zone tidal current diagram automatic generation method based on voice driving
CN113315233B (en) * 2021-06-17 2022-12-16 上海山源电子科技股份有限公司 Automatic drawing method and system for power grid topological graph

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6516326B1 (en) * 2000-10-30 2003-02-04 Stone And Webster Consultants, Inc. System and method for integrating electrical power grid and related data from various proprietary raw data formats into a single maintainable electrically connected database
CN101673949A (en) * 2009-09-25 2010-03-17 中国南方电网有限责任公司 Method for automatically generating electric network current diagram

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6516326B1 (en) * 2000-10-30 2003-02-04 Stone And Webster Consultants, Inc. System and method for integrating electrical power grid and related data from various proprietary raw data formats into a single maintainable electrically connected database
CN101673949A (en) * 2009-09-25 2010-03-17 中国南方电网有限责任公司 Method for automatically generating electric network current diagram

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
基于斥力-张力和迷宫算法的电网潮流智能成图;程月波等;《电工技术》;20100531(第5期);第25-27页 *

Also Published As

Publication number Publication date
CN103066698A (en) 2013-04-24

Similar Documents

Publication Publication Date Title
CN103066698B (en) Implement method for automatic generation of visible power grid trend chart in dispatching system
CN102521398B (en) Modeling method for substation-dispatching center two-level distributed type power grid
CN105373655B (en) A kind of method of one electrical secondary system connection figure of organic association Intelligent transformer station
CN104462473B (en) A kind of method that the inscribed line chart of CIM G forms plant stand is automatically generated based on CIM E electric network models
CN104951844B (en) A kind of power distribution network thematic map layout optimization method
CN104598671B (en) A kind of digital electric network construction method based on online data
CN102360398B (en) IEC61850-based CAD electric power graphic generation analysis method
CN104616101B (en) A kind of integrated power system resource model and foundation and maintaining method
CN101499109A (en) Power distribution management information graphic system
CN107679281A (en) Intelligent station three-dimensional scenic analogue system and implementation method based on Unity dynamic generations
CN103020335A (en) Method for automatically converting distribution network geographic wiring diagram into region orthogonal diagram
CN104123675A (en) Power distribution network simulation research and analysis system and method based on network-wide data
CN103093024A (en) Web geographic information system (WEBGIS)-based visualized showing method for planning power grid
CN103715685A (en) Graph visualization system used for electric system load flow and stability analysis
CN108493828A (en) Real time information Three-Dimensional Dynamic intelligence display systems
CN102957205A (en) Method and system for establishing distribution network model
CN109145362A (en) A kind of power network modeling method and system
CN106202662A (en) A kind of distribution network structure figure draws mapping method automatically
CN103488837B (en) A kind of Net Frame of Electric Network figure autoplacement method based on plant stand geography information
CN104408270A (en) Method for drawing distribution network geographical wiring diagram
CN106452887A (en) Electric power communication system visual display system based on diagram-model-data integration
CN105976262A (en) Power plant granularity based power grid model version sharing method
CN103823952A (en) Data flow design method for large grid control integrated full-process simulation training system
CN104091514A (en) Power grid dispatching personnel training simulation system
CN103699960A (en) Medium voltage distribution power grid operation state visualization method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant