CN107489427A - A kind of water-rich sand layer shield launching termination ruggedized construction and its construction method - Google Patents

A kind of water-rich sand layer shield launching termination ruggedized construction and its construction method Download PDF

Info

Publication number
CN107489427A
CN107489427A CN201710933229.4A CN201710933229A CN107489427A CN 107489427 A CN107489427 A CN 107489427A CN 201710933229 A CN201710933229 A CN 201710933229A CN 107489427 A CN107489427 A CN 107489427A
Authority
CN
China
Prior art keywords
freezing
shield launching
shield
termination
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710933229.4A
Other languages
Chinese (zh)
Inventor
王占兵
张慧鹏
聂鸿
梁超
梁纯
王淮滨
叶小龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Four Bureau Group Co Ltd Urban Rail Transit Engineering Branch Co
Nanchang Rail Transit Group Co Ltd Metro Project Management Branch
Urban Rail Traffic Engineering Branch Co Ltd of CTCE Group
Original Assignee
China Railway Four Bureau Group Co Ltd Urban Rail Transit Engineering Branch Co
Nanchang Rail Transit Group Co Ltd Metro Project Management Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Four Bureau Group Co Ltd Urban Rail Transit Engineering Branch Co, Nanchang Rail Transit Group Co Ltd Metro Project Management Branch filed Critical China Railway Four Bureau Group Co Ltd Urban Rail Transit Engineering Branch Co
Priority to CN201710933229.4A priority Critical patent/CN107489427A/en
Publication of CN107489427A publication Critical patent/CN107489427A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0642Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield having means for additional processing at the front end

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The present invention relates to a kind of water-rich sand layer shield launching termination ruggedized construction and its construction method, belong to end well stratum consolidation technical field, be in particular a kind of shield launching structure and its construction method that three axles+vertical freezing strengthening construction is used in tunneling boring water-rich sand layer.Starting well end regions are located at the front end of vertical frozen reinforcing area;Freezing pipe is located in vertical frozen reinforcing area, and freezing pipe is perpendicular to the direction of shield starting;Freezing pipe is connected by saline line with Freezing Station.The present invention avoids the weak point present in traditional water-rich sand layer shield launching termination reinforcement technique, to ensure quickly and safely carry out shield launching in the case where place is limited.

Description

A kind of water-rich sand layer shield launching termination ruggedized construction and its construction method
Technical field
The present invention relates to a kind of water-rich sand layer shield launching termination ruggedized construction and its construction method, belong to end well stratum Reinforcement technique field, in particular it is a kind of shield that three axles+vertical freezing strengthening construction is used in tunneling boring water-rich sand layer Structure originates structure and its construction method.
Background technology
It is continuously increased with the raising and urban congestion of urban compact degree, ground can utilize space fewer and fewer, shield method Subway tunneling technique of constructing is fast-developing, and what traditional water-rich sand layer shield launching termination reinforcement means used is all the stirring of three axles The form of stake+termination precipitation carries out shield launching.
But in some cases .., due to limited by place so as to cause end portion region can not carry out three axle reinforcings with And termination periphery can not carry out precipitation well construction, so as to cause shield launching very big security risk to be present.
For example Nanchang Line 2 Metro fourth highway southern station~Nanchang railway station running tunnel engineering originating terminal is in Nanchang train Stand, shield receiving terminal is stirred in fourth highway southern station, the wherein former design of Nanchang railway station termination stratum consolidation using the axles of 850@of φ 600 3 Stake is mixed to be reinforced(Strengthening length is 10.5m)1 row's dual pipe high pressure is being set in the range of the ground-connecting-wall 40cm of station simultaneously Churning water-seal pile and a number of dewatering well is set on termination periphery, to ensure that shield launching is smoothed out.
Due to this section starting end head well adjacent Nanchang railway station eastern station platform, originate well head and platform wall distance only 7.8~ It is Luoyang road tunnel fender post, stake diameter 1m, the long 18~20m of stake, stake spacing 1.1m at 11.4m, foundation ditch north side 6.5m, foundation ditch is northern Side transformation cabinet buries a diameter 1.2m sewage conduct, buried depth 2m and station termination away from well head distance 2.7m, platform wall bottom All construction finishes and waits cause influence well ground-connecting-wall, causes starting end head can not be according to design requirement progress stratum consolidation and drop Water is constructed, so as to bring great potential safety hazard to shield launching driving.
The content of the invention
It is an object of the invention to provide a kind of water-rich sand layer shield launching termination ruggedized construction and its construction method, so that The weak point present in traditional water-rich sand layer shield launching termination reinforcement technique is avoided, to ensure situation about being limited in place Under can quickly and safely carry out shield launching.
The present invention to achieve these goals, adopts the following technical scheme that:
A kind of water-rich sand layer shield launching termination ruggedized construction, before starting well end regions are located at vertical frozen reinforcing area End;
Freezing pipe is located in vertical frozen reinforcing area, and freezing pipe is perpendicular to the direction of shield starting;
Freezing pipe is connected by saline line with Freezing Station.
Further, the quantity of saline line is two.
A kind of construction method of water-rich sand layer shield launching termination ruggedized construction:
A), reinforced using three axes agitating pile in starting well end regions, it is tunnel each 3.0-5.0m up and down that soil layer, which reinforces thickness, Each 3.0-5.0m in left and right, strengthening length 7-12m;
B), after through 28-30 days unconfined compressive strengths of three axes agitating pile soil mass consolidation be not less than 0.8MPa after, vertical frozen adds Gu region carries out stratum and vertically freezes reinforcing, cement mixing method body is 2-5m with freezing reinforcing body intersection region;Soil layer is reinforced thick To spend for 3-5m, lower 3-5m on tunnel, each 3-5m in left and right, frost wall length is 5-8m, pitch-row 0.6-0.8m, array pitch 0.8-1.1m, First row pitch-row ground-connecting-wall 0.4-0.6m;
Duration of freezing is 30-35 days;Freeze to be connected with saline line and Freezing Station after pipe construction, to ensure Freezing Station Caused cold is cemented out the high temperature in the soil body by saline line;Soil body mean temperature after freezing is not higher than -10 DEG C when, that is, meet shield launching condition;
C), before shield launching, the freezing pipe in the range of the barrel of termination need to be pulled out to tunnel scope and pulled out to away from tunnel top 0.3- At 0.6m, can be carried out with to ensure shield in origination process it is secondary freeze, treat that shield machine all passes through reinforcing body and portal enters After row closure, stop freezing, and cryovial is all pulled out.
Beneficial effects of the present invention:
1st, the present invention disclosure satisfy that under the conditions of limited space, can carry out termination reinforcing, and whole work progress is safe efficient, It is less demanding for construction site, it can adapt to narrow and small and complicated surrounding terrain place.
2nd, the present invention more effectively solves shield launching mistake by setting conventional reinforcing and consolidation by freezing cross-coincidence region Two kinds of reinforcing body seam crossing faces may occur in journey water burst, sand problem is gushed, further increase the safety of shield launching Coefficient.
Brief description of the drawings
Fig. 1 reinforces plan for three axes agitating pile in the present invention with vertical frozen;
Fig. 2 is reinforced for three axles in the present invention and is reinforced drawing in side sectional elevation with vertical frozen;
Fig. 3 is vertical frozen profilograph in the present invention;
Fig. 4 is freezing pipe in the present invention and shield machine location diagram.
Embodiment
The present invention will be described in detail below in conjunction with the accompanying drawings:
A kind of water-rich sand layer shield launching termination ruggedized construction:
Starting well end regions 1 are located at the front end of vertical frozen reinforcing area 2;
Freezing pipe 3 is located in vertical frozen reinforcing area 2, and freezing pipe 3 is perpendicular to the direction of shield starting;
Freezing pipe 3 is connected by saline line with Freezing Station.
The quantity of saline line is two.
A kind of construction method of water-rich sand layer shield launching termination ruggedized construction:
A), reinforced using three axes agitating pile in starting well end regions 1, it is tunnel each 3.0- up and down that soil layer, which reinforces thickness, 5.0m, each 3.0-5.0m in left and right, strengthening length 7-12m;
B), after through 28-30 days unconfined compressive strengths of three axes agitating pile soil mass consolidation be not less than 0.8MPa after, vertical frozen adds Gu region carries out stratum and vertically freezes reinforcing, cement mixing method body is 2-5m with freezing reinforcing body intersection region;Soil layer is reinforced thick To spend for 3-5m, lower 3-5m on tunnel, each 3-5m in left and right, frost wall length is 5-8m, pitch-row 0.6-0.8m, array pitch 0.8-1.1m, First row pitch-row ground-connecting-wall 0.4-0.6m;
Duration of freezing is 30-35 days;Freezing pipe 3 is connected after constructing with saline line and Freezing Station, to ensure to freeze Cold caused by standing is cemented out the high temperature in the soil body by saline line;Soil body mean temperature after freezing not higher than- At 10 DEG C, that is, meet shield launching condition;
C), before shield launching, the freezing pipe 3 in the range of the barrel of termination need to be pulled out to tunnel scope and pulled out to away from tunnel top 0.3- At 0.6m, can be carried out with to ensure shield in origination process it is secondary freeze, treat that shield machine all passes through reinforcing body and portal enters After row closure, stop freezing, and cryovial is all pulled out.

Claims (3)

  1. A kind of 1. water-rich sand layer shield launching termination ruggedized construction, it is characterised in that:
    Starting well end regions(1)Positioned at vertical frozen reinforcing area(2)Front end;
    Freezing pipe(3)Positioned at vertical frozen reinforcing area(2)In, and freezing pipe(3)Perpendicular to the direction of shield starting;
    Freezing pipe(3)It is connected by saline line with Freezing Station.
  2. 2. water-rich sand layer shield launching termination ruggedized construction according to claim 1, it is characterised in that:The number of saline line Measure as two.
  3. 3. a kind of construction method of water-rich sand layer shield launching termination ruggedized construction as claimed in claim 1 or 2, its feature exist In:
    A), in starting well end regions(1)Middle to be reinforced using three axes agitating pile, it is tunnel each 3.0- up and down that soil layer, which reinforces thickness, 5.0m, each 3.0-5.0m in left and right, strengthening length 7-12m;
    B), after through 28-30 days unconfined compressive strengths of three axes agitating pile soil mass consolidation be not less than 0.8MPa after, vertical frozen adds Gu region(2)Carry out stratum and vertically freeze reinforcing, cement mixing method body is 2-5m with freezing reinforcing body intersection region;Soil layer is reinforced Thickness is 3-5m, lower 3-5m on tunnel, and each 3-5m in left and right, frost wall length is 5-8m, pitch-row 0.6-0.8m, array pitch 0.8- 1.1m, first row pitch-row ground-connecting-wall 0.4-0.6m;
    Duration of freezing is 30-35 days;Freezing pipe(3)Connected after construction with saline line and Freezing Station, to ensure to freeze Cold is cemented out the high temperature in the soil body by saline line caused by knot station;Soil body mean temperature after freezing is not high When -10 DEG C, that is, meet shield launching condition;
    C), before shield launching, need to be to the freezing pipe in the range of the barrel of termination(3)Pull out to tunnel scope and pull out to away from tunnel top 0.3- At 0.5m, can be carried out with to ensure shield in origination process it is secondary freeze, treat that shield machine all passes through reinforcing body and portal enters After row closure, stop freezing, and cryovial is all pulled out.
CN201710933229.4A 2017-10-10 2017-10-10 A kind of water-rich sand layer shield launching termination ruggedized construction and its construction method Pending CN107489427A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710933229.4A CN107489427A (en) 2017-10-10 2017-10-10 A kind of water-rich sand layer shield launching termination ruggedized construction and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710933229.4A CN107489427A (en) 2017-10-10 2017-10-10 A kind of water-rich sand layer shield launching termination ruggedized construction and its construction method

Publications (1)

Publication Number Publication Date
CN107489427A true CN107489427A (en) 2017-12-19

Family

ID=60653940

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710933229.4A Pending CN107489427A (en) 2017-10-10 2017-10-10 A kind of water-rich sand layer shield launching termination ruggedized construction and its construction method

Country Status (1)

Country Link
CN (1) CN107489427A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108457662A (en) * 2018-02-05 2018-08-28 浙江大学城市学院 A kind of control of weak soil shield launching and reinforcement means
CN108678781A (en) * 2018-06-12 2018-10-19 中铁二十局集团轨道交通工程有限公司 One kind closing on river shield launching end stratum consolidation method
CN109899073A (en) * 2019-03-19 2019-06-18 上海城建市政工程(集团)有限公司 A kind of shield launching method
CN109944596A (en) * 2019-03-20 2019-06-28 中铁四局集团有限公司 A kind of shield crossing water-rich sand layer second consolidation method near a river
CN109989759A (en) * 2019-03-20 2019-07-09 中铁四局集团有限公司 A kind of richness Water containing silty and fine sand bed shield launching design reinforcement method
CN110005419A (en) * 2019-04-09 2019-07-12 上海市机械施工集团有限公司 A kind of shield tunnel end reinforcement means
CN110056361A (en) * 2019-03-20 2019-07-26 中铁四局集团有限公司 A kind of ultra-deep stratum shield export & import reinforcement means
CN111911167A (en) * 2020-08-31 2020-11-10 上海市机械施工集团有限公司 Shield reinforcing construction process
CN112302669A (en) * 2020-12-01 2021-02-02 长江勘测规划设计研究有限责任公司 Subway shield arrival auxiliary construction method and structure under complex environment condition

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102352753A (en) * 2011-06-29 2012-02-15 中铁第四勘察设计院集团有限公司 Freezing consolidation and soil-accumulating watering shield arrival method
CN102797468A (en) * 2012-08-22 2012-11-28 中铁第四勘察设计院集团有限公司 Minimum over-burden originating method for shield tunnel
CN103590835A (en) * 2013-11-28 2014-02-19 北京中煤矿山工程有限公司 PVC freezing pipe for shield tunneling freeze-consolidation
CN104695964A (en) * 2013-12-04 2015-06-10 宏润建设集团股份有限公司 Subway shield tunnel freeze entering method
CN104790961A (en) * 2015-04-27 2015-07-22 海南大学 Vertical cup type freezing reinforcement structure and method at shield tunnel end
CN205369234U (en) * 2015-12-17 2016-07-06 海南大学 Freeze high pressure jet grouting pile
JP2016160717A (en) * 2015-03-05 2016-09-05 西松建設株式会社 Freezing method and freezing device of shield tunnel construction
CN206299392U (en) * 2016-12-08 2017-07-04 中铁第一勘察设计院集团有限公司 A kind of high osmosis water-rich sand layer shield end reinforcement system
CN207212340U (en) * 2017-10-10 2018-04-10 南昌轨道交通集团有限公司地铁项目管理分公司 A kind of water-rich sand layer shield launching termination ruggedized construction

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102352753A (en) * 2011-06-29 2012-02-15 中铁第四勘察设计院集团有限公司 Freezing consolidation and soil-accumulating watering shield arrival method
CN102797468A (en) * 2012-08-22 2012-11-28 中铁第四勘察设计院集团有限公司 Minimum over-burden originating method for shield tunnel
CN103590835A (en) * 2013-11-28 2014-02-19 北京中煤矿山工程有限公司 PVC freezing pipe for shield tunneling freeze-consolidation
CN104695964A (en) * 2013-12-04 2015-06-10 宏润建设集团股份有限公司 Subway shield tunnel freeze entering method
JP2016160717A (en) * 2015-03-05 2016-09-05 西松建設株式会社 Freezing method and freezing device of shield tunnel construction
CN104790961A (en) * 2015-04-27 2015-07-22 海南大学 Vertical cup type freezing reinforcement structure and method at shield tunnel end
CN205369234U (en) * 2015-12-17 2016-07-06 海南大学 Freeze high pressure jet grouting pile
CN206299392U (en) * 2016-12-08 2017-07-04 中铁第一勘察设计院集团有限公司 A kind of high osmosis water-rich sand layer shield end reinforcement system
CN207212340U (en) * 2017-10-10 2018-04-10 南昌轨道交通集团有限公司地铁项目管理分公司 A kind of water-rich sand layer shield launching termination ruggedized construction

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108457662A (en) * 2018-02-05 2018-08-28 浙江大学城市学院 A kind of control of weak soil shield launching and reinforcement means
CN108678781A (en) * 2018-06-12 2018-10-19 中铁二十局集团轨道交通工程有限公司 One kind closing on river shield launching end stratum consolidation method
CN109899073A (en) * 2019-03-19 2019-06-18 上海城建市政工程(集团)有限公司 A kind of shield launching method
CN109944596A (en) * 2019-03-20 2019-06-28 中铁四局集团有限公司 A kind of shield crossing water-rich sand layer second consolidation method near a river
CN109989759A (en) * 2019-03-20 2019-07-09 中铁四局集团有限公司 A kind of richness Water containing silty and fine sand bed shield launching design reinforcement method
CN110056361A (en) * 2019-03-20 2019-07-26 中铁四局集团有限公司 A kind of ultra-deep stratum shield export & import reinforcement means
CN109989759B (en) * 2019-03-20 2020-08-07 中铁四局集团有限公司 Shield initial design and reinforcement method for fine sand layer rich in water powder
CN110005419A (en) * 2019-04-09 2019-07-12 上海市机械施工集团有限公司 A kind of shield tunnel end reinforcement means
CN111911167A (en) * 2020-08-31 2020-11-10 上海市机械施工集团有限公司 Shield reinforcing construction process
CN112302669A (en) * 2020-12-01 2021-02-02 长江勘测规划设计研究有限责任公司 Subway shield arrival auxiliary construction method and structure under complex environment condition

Similar Documents

Publication Publication Date Title
CN107489427A (en) A kind of water-rich sand layer shield launching termination ruggedized construction and its construction method
CN102839674B (en) Support of Foundation Pit Excavation structure and construction method thereof on proximal head well shield tunnel
CN103541762B (en) A kind of High aititude severe cold rich water tunnel faces the antifreeze water discharge method of combination forever
CN105839643A (en) Tunnel in-hole construction method adopting foundation pit support
CN106968712A (en) Water rich strata tunnel bottom discharge structure and its construction method
CN106761782A (en) A kind of tunneling construction method for wearing operation tunnel under shield in rich water powder land floor
CN106869969A (en) A kind of excavation supporting construction method of soft rock large section tunnel
CN105649653B (en) Circle special cross section Tunneling by mining method structure and its construction method are not waited up and down
CN106499399A (en) A kind of Shield Construction Method Used method of overlapping tunnel in rich water powder land floor
CN106437726A (en) Ground fracture crushed zone passing construction method for shallow-buried tunnel excavation
CN207212340U (en) A kind of water-rich sand layer shield launching termination ruggedized construction
CN105464134A (en) Top-down and bottom-up combined construction method and supporting structure of multi-layer underground space below existing facility
CN209924998U (en) Shallow earthing shield tunnel is worn road reinforcement protection architecture down
CN104963351A (en) Reinforced structure for reinforcing treatment of artificial filled soil slopes and construction method thereof
CN109296371A (en) MJS method and horizontal freezing joint reinforcement pressure-bearing rich water arenaceous stratum overlap the system and its construction method that section is worn under station
CN110344834A (en) Nearly section water-rich silty sand layers shield machine receives construction method
CN109518699A (en) Miniature steel pipe pile adds grid spray anchor deep foundation ditch combination supporting scheme system and its construction method
CN211500658U (en) Shallow tunnel supporting construction that nearly connects that buries suitable for sand ground
CN106677791B (en) A kind of construction method of shallow embedding shield driven tunnel crossing highway
CN206888992U (en) A kind of water-bed mine shield tunnel combination docking structure form
CN106089271A (en) A kind of tunnel filling formula composite support and construction method thereof
CN206204972U (en) A kind of prefabricated tubular pile as well-points dewatering
CN105625446B (en) A kind of construction method of tunnel undercrossing tunnel
CN207033489U (en) Water rich strata tunnel bottom discharge structure
CN104131566A (en) Method for constructing basement foundation pit without horizontal braces

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171219