CN107483229A - City integrated piping lane operation management system - Google Patents

City integrated piping lane operation management system Download PDF

Info

Publication number
CN107483229A
CN107483229A CN201710594296.8A CN201710594296A CN107483229A CN 107483229 A CN107483229 A CN 107483229A CN 201710594296 A CN201710594296 A CN 201710594296A CN 107483229 A CN107483229 A CN 107483229A
Authority
CN
China
Prior art keywords
management
piping lane
work station
control
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710594296.8A
Other languages
Chinese (zh)
Inventor
兰亭
李勇楠
于立松
宋宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Third Metallurgical Group Co Ltd
Original Assignee
China Third Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Third Metallurgical Group Co Ltd filed Critical China Third Metallurgical Group Co Ltd
Priority to CN201710594296.8A priority Critical patent/CN107483229A/en
Publication of CN107483229A publication Critical patent/CN107483229A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B17/00Fire alarms; Alarms responsive to explosion
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B25/00Alarm systems in which the location of the alarm condition is signalled to a central station, e.g. fire or police telegraphic systems
    • G08B25/12Manually actuated calamity alarm transmitting arrangements emergency non-personal manually actuated alarm, activators, e.g. details of alarm push buttons mounted on an infrastructure
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/04Network management architectures or arrangements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/18Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/04Network management architectures or arrangements
    • H04L41/042Network management architectures or arrangements comprising distributed management centres cooperatively managing the network

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • General Health & Medical Sciences (AREA)
  • Emergency Management (AREA)
  • General Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Primary Health Care (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Multimedia (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Computing Systems (AREA)
  • Medical Informatics (AREA)
  • Alarm Systems (AREA)

Abstract

City integrated piping lane operation management system disclosed by the invention, based on technology of Internet of things, by field regions controller layer, Internet and management and control central core up of three layers;Field regions controller layer is made up of fire-fighting system, equipment monitoring system, video monitoring system, environmental monitoring system, security protection system, and push is reported for the collection of pipe gallery field data and to management and control center progress data;The piping lane network link that Internet is formed by being wirelessly transferred with wire transmission, management and control center is the core of whole system, be responsible for coordinating, the work of each system of control and management field regions controller layer, realize pipe gallery data in each region focus on and application service;Piping lane inner structure parameter and Environmental security situation can be grasped in real time, further provides reference information for piping lane operation maintenance, the operation management of piping lane is worked and are accomplished United Dispatching, without any confusion, shoot the arrow at the target.

Description

City integrated piping lane operation management system
Technical field
The present invention relates to city integrated piping lane administrative skill field, more particularly to a kind of city integrated piping lane operation management system System.
Background technology
Pipe gallery operation management is the engineering of a system and complexity, can ensure that underground utilities are transported safely as one kind Battalion, and the facility of the and can comprehensive utilization underground space, pipe gallery has been obtained for the attention of departments of government, but after building up Pipe gallery be also faced with many operation management problems, on the one hand, because pipe gallery is integrally built in underground, only a small amount of throwing Material mouth, personnel gateway and ventilating opening communicate with the external world, there may be safe blind spot during actual operation, or even form safety Blind area, turn into the easy hair band of accident.On the other hand, pipe gallery space opposing seal, timely and effective alert notice can not sent In the case of, withdrawing the time of escape will become extremely limited.Above-mentioned reason can not only cause to facilities and equipment in pipe gallery The catastrophic effect such as destroy, even can also cause casualties.To solve this problem, it is necessary to make full use of modern advanced skill Art establishes a set of advanced administrative system (AAS) suitable for pipe gallery safe operation, realizes the comprehensive management and control to pipe gallery.
The content of the invention
For above the deficiencies in the prior art, it is an object of the invention to provide a kind of city integrated piping lane operation management system System, to solve the problems mentioned in the above background technology.
To achieve the above object, the present invention is realized using following technical scheme:
The city integrated piping lane operation management system, including field regions controller layer, Internet and management and control central core, The field regions controller layer is anti-by fire-fighting system, equipment monitoring system, video monitoring system, environmental monitoring system, safety Protecting system is formed, and push is reported for the collection of pipe gallery field data and to management and control center progress data;
The piping lane network link that the Internet is formed by being wirelessly transferred with wire transmission, is divided into Access Layer and core layer, Its core layer and the core switch of management and control central core link, according to the trend and feature in each section of pipe gallery, its Access Layer It is connected with the respective switch of field regions controller layer, is divided into several Subnetwork connections by section, forms kilomega optic fiber subring Net network;
The management and control central core includes management and control center, core switch, fire wall, router, and the management and control center is whole The core of individual system, it is responsible for the work of each system of coordination, control and management field regions controller layer, realizes comprehensive in each region Close piping lane data focus on and application service;The management and control center by server, engineer station, monitoring of tools work station, Video management work station, security protection work station, environmental monitoring work station, administration of the prevention and control work station, the network printer, giant-screen Show wall composition;Wherein core switch is provided with two core switch, the using and the reserved, the ring for forming core is interconnected with optical fiber Net network;Other higher level department is pipe gallery operation management unit, governmental agency, enters corridor pipeline unit and city inhabitant Unified user is provided and accesses interface.
The core switch respectively with server, engineer station, monitoring of tools work station, video management work station, peace Full protection work station, environmental monitoring work station administration of the prevention and control work station, the network printer, large screen display wall, fire wall are electrical Connection, the fire wall are electrically connected with router and pass through router wireless connection higher level department;The core switch leads to Cross fire-fighting interchanger of the piping lane network link respectively with fire-fighting system, the field exchange machine of equipment monitoring system, video monitoring system The video switch of system, the environment interchanger of environmental monitoring system, the security protection interchanger of safety and protection system are electrically connected with.
The fire-fighting system, including fire-fighting interchanger, fire-fighting control main frame, multiple fire compartments, temperature sensing sensor, sense cigarette Detector, gas sensor harmful gas detector, manual pull station, emergent traffic terminal, by wanting for every 200m one fire compartment of setting Ask, whole piping lane is provided with multiple fire compartments according to zoning requirements, and temperature sensing optical fiber, temperature-sensitive sensing are being arranged in piping lane Temperature conditions in device monitoring cabin, in air inlet, air draft computer room and setup of entrances and exits point type intelligence smoke-temperature sensing detector, once Detect that alarm signal reports rapidly incoming fire-fighting control main frame, and report administration of the prevention and control work station to enter by piping lane network link Row disposal, manual pull station, and emergent traffic terminal are also set up in piping lane, makes its alarm signal, information access region Automatic fire alarm system.
The kilomega optic fiber subring net network cochain of the equipment monitoring system composition is connected to multiple field exchange machines, each Field exchange machine is respectively connected with a field control cabinet, is provided with redundant PLC system, personnel positioning in switch board at the scene PFID, PLC system be connected with ventilating drainage monitoring, cable temperature monitoring, gate control system, manhole cover anti-theft invasion, electrical distribution and lighting, its Its instrument, the hand to the equipment such as exhaust blower, draining pump and power, illumination/auto state monitoring is realized, start-up and shut-down control, runs shape State shows, log, fault alarm and realizes various related logic control relations, statistical analysis, energy consumption measure, electric power Monitoring etc., it is ensured that it is various kinds of equipment system run all right, safe and reliable and efficient, and reach the management requirement of energy-conservation and environmental protection.
The kilomega optic fiber subring net network cochain of the video monitoring system composition is connected to multiple video switch, each Video switch is respectively connected with a video monitor unit, and multiple setting high definition intelligence are respectively connected with the front end of video monitor unit Energy IP Camera, signal are transmitted using optical fiber, powered by the small bus concentrated supply in video monitor unit;Video and control Signal accesses video switch, management and control center is uploaded to by piping lane network link after the processing of optical fiber transceiving opto-electronic conversion, The video management work station at management and control center can be with the real-time pictures in each place in any switching laws, display piping lane, in combination with it His subsystem, realizes the efficient management to piping lane.
The kilomega optic fiber subring net network cochain of the environmental monitoring system composition is connected to multiple environment interchangers, each Environment interchanger is respectively connected with an environment PLC device, and multiple setting multichannel gas are respectively connected with the front end of environment PLC device Body monitoring device so that multiple multi-channel gas monitoring devices are provided with whole piping lane, monitor air quality, temperature in piping lane Humidity, to ensure Environmental security in piping lane, environmental information is uploaded to environment PLC dresses by the detector of multi-channel gas monitoring device Put, and management and control center be uploaded to by piping lane network link, sent at the Environmental Management Work station at management and control center control command to Environment PLC device, it is run according to environmental safety requirements linkage fan, ensure air quality in piping lane.
The kilomega optic fiber subring net network cochain of the security protection system composition is connected to multiple security protection interchangers, each Security protection interchanger is respectively connected with a security protection PLC, and multiple infrared acquisitions are respectively connected with the front end of security protection PLC Device so that each gateway, dog-house in whole piping lane are provided with multiple infrared detectors, monitor people at each gateway Member enters artificial situation, once detecting that alarm signal reports rapidly incoming security protection PLC, and is reported by piping lane network link Security protection work station is disposed, and linkage illuminator and video monitoring system carry out live confirmation and video recording.
In addition, telephone socket, emergent traffic terminal are also set up in each gateway of whole piping lane and fire compartment, with Pass through telephone socket, emergent traffic terminal communication with the outside world when in case of emergency or personnel safeguard.
The present invention is acquired to the data during pipe gallery operation, transmits, deposited based on technology of Internet of things Storage, analysis and application, whole functional structure framework are divided into sensing layer, Internet, information resources layer, service application layer and door Layer;
The sensing layer is realized to pipe gallery running status using the various sensors at the scene that is installed on, enters corridor operation people The real-time collection of member's positional information;
The reliable delivery that the Internet is realized to pipe gallery field data using being wirelessly transferred with wire transmission technology;
Described information resource layer is stored and managed using the unified of database technique pipe gallery service data;
The service application layer integrates BIM technology, GIS technology and cloud computing, to field data and pipe gallery other Information is classified, assessed, and decision support is provided for the safe operation of pipe gallery;
The door layer is pipe gallery operation management unit, governmental agency, enters corridor pipeline unit and city inhabitant Unified user is provided and accesses interface.
The data staging evaluation system of the present invention is that field data and pipe gallery other information carry out data staging assessment Supporting is provided for the operation management of pipe gallery,
The data staging evaluation system by the data of sensing layer collection and is showed by means of the server platform at management and control center The data of field personal monitoring carry out layering arrangement, and the data in the database of combining information resource layer, by by set strategy Profound analysis, data are handled and judged from global angle, draw piping lane real-time architecture health score assigning, are proposed corresponding Maintenance and maintenance measure.
The data staging and processing are the layerings of data target, and the division of data target level is needed into integrated structure, row The specialty such as water is common to be formulated, the problem of also needing to exist in terms of collecting existing Project in Operation maintenance as far as possible in formulation process.For example, will It is designed into piping lane agent structure and threatens the environmental index of attendant's safety, CO, SO2 gas etc. and is divided into first class index; Catch pit liquid level in piping lane is divided into two-level index etc..
The processing data information is expert judging and weight analysis, and to being layered index combination expertise, construction judges Matrix, rational threshold value is set to index parameter.
The evaluation index collection and processing, are that service data in piping lane is entered by management and control center and artificial regular visit Row is compiled, and data storage carries out nondimensionalization processing in the database platform of information resources layer, and to data, establishes subitem Index scores.
The data message is judged, and is to carry out layering judgement to data in piping lane by management and control center, is generated different reports Table, rational suggest is proposed to piping lane operation maintenance management.
Beneficial effect:City integrated piping lane operation management system disclosed by the invention, based on technology of Internet of things, by existing Field areas controller layer, Internet and management and control central core up of three layers;Field regions controller layer is by fire-fighting system, monitoring of tools System, video monitoring system, environmental monitoring system, security protection system composition, for pipe gallery field data collection and Data, which are carried out, to management and control center reports push;The piping lane network link that Internet is formed by being wirelessly transferred with wire transmission, management and control Center is the core of whole system, is responsible for the work of each system of coordination, control and management field regions controller layer, is realized each In region pipe gallery data focus on and application service;Piping lane inner structure parameter and Environmental security can be grasped in real time Situation, reference information further is provided for piping lane operation maintenance, the operation management of piping lane is worked and accomplish United Dispatching, have bar not It is disorderly, shoot the arrow at the target.
Brief description of the drawings
Fig. 1 is the main assembly block diagram of the present invention;
Fig. 2 is the functional structure Organization Chart of the present invention;
Fig. 3 is the data staging evaluation system block diagram of the present invention.
Embodiment
The present invention is described in detail with reference to Figure of description, it should be noted that the implementation of the present invention is unlimited In following embodiment.
As shown in figure 1, being the main assembly block diagram of the present invention, the city integrated piping lane operation management system uses three layers Framework, including field regions controller layer, Internet and management and control central core, the field regions controller layer by fire-fighting system, Equipment monitoring system, video monitoring system, environmental monitoring system, security protection system composition, for pipe gallery field data Collection and to management and control center carry out data report push;
The piping lane network link that the Internet is formed by being wirelessly transferred with wire transmission, is divided into Access Layer and core layer, Its core layer and the core switch of management and control central core link, according to the trend and feature in each section of pipe gallery, its Access Layer It is connected with the respective switch of field regions controller layer, is divided into several Subnetwork connections by section, forms kilomega optic fiber subring Net network;
The management and control central core includes management and control center, core switch, fire wall, router, and the management and control center is whole The core of individual system, it is responsible for the work of each system of coordination, control and management field regions controller layer, realizes comprehensive in each region Close piping lane data focus on and application service;The management and control center by server, engineer station, monitoring of tools work station, Video management work station, security protection work station, environmental monitoring work station, administration of the prevention and control work station, the network printer, giant-screen Show wall composition;Wherein core switch is provided with two core switch, the using and the reserved, the ring for forming core is interconnected with optical fiber Net network;Other higher level department is pipe gallery operation management unit, governmental agency, enters corridor pipeline unit and city inhabitant Unified user is provided and accesses interface.
The core switch respectively with server, engineer station, monitoring of tools work station, video management work station, peace Full protection work station, environmental monitoring work station administration of the prevention and control work station, the network printer, large screen display wall, fire wall are electrical Connection, the fire wall are electrically connected with router and pass through router wireless connection higher level department;The core switch leads to Cross fire-fighting interchanger of the piping lane network link respectively with fire-fighting system, the field exchange machine of equipment monitoring system, video monitoring system The video switch of system, the environment interchanger of environmental monitoring system, the security protection interchanger of safety and protection system are electrically connected with.
The fire-fighting system, including fire-fighting interchanger, fire-fighting control main frame, multiple fire compartments, temperature sensing sensor, sense cigarette Detector, gas sensor harmful gas detector, manual pull station, emergent traffic terminal, by wanting for every 200m one fire compartment of setting Ask, whole piping lane is provided with multiple fire compartments according to zoning requirements, and temperature sensing optical fiber, temperature-sensitive sensing are being arranged in piping lane Temperature conditions in device monitoring cabin, in air inlet, air draft computer room and setup of entrances and exits point type intelligence smoke-temperature sensing detector, once Detect that alarm signal reports rapidly incoming fire-fighting control main frame, and report administration of the prevention and control work station to enter by piping lane network link Row disposal, manual pull station, and emergent traffic terminal are also set up in piping lane, makes its alarm signal, information access region Automatic fire alarm system.
The kilomega optic fiber subring net network cochain of the equipment monitoring system composition is connected to multiple field exchange machines, each Field exchange machine is respectively connected with a field control cabinet, is provided with redundant PLC system, personnel positioning in switch board at the scene PFID, PLC system be connected with ventilating drainage monitoring, cable temperature monitoring, gate control system, manhole cover anti-theft invasion, electrical distribution and lighting, its Its instrument, the hand to the equipment such as exhaust blower, draining pump and power, illumination/auto state monitoring is realized, start-up and shut-down control, runs shape State shows, log, fault alarm and realizes various related logic control relations, statistical analysis, energy consumption measure, electric power Monitoring etc., it is ensured that it is various kinds of equipment system run all right, safe and reliable and efficient, and reach the management requirement of energy-conservation and environmental protection.
The kilomega optic fiber subring net network cochain of the video monitoring system composition is connected to multiple video switch, each Video switch is respectively connected with a video monitor unit, and multiple setting high definition intelligence are respectively connected with the front end of video monitor unit Energy IP Camera, signal are transmitted using optical fiber, powered by the small bus concentrated supply in video monitor unit;Video and control Signal accesses video switch, management and control center is uploaded to by piping lane network link after the processing of optical fiber transceiving opto-electronic conversion, The video management work station at management and control center can be with the real-time pictures in each place in any switching laws, display piping lane, in combination with it His subsystem, realizes the efficient management to piping lane.
The kilomega optic fiber subring net network cochain of the environmental monitoring system composition is connected to multiple environment interchangers, each Environment interchanger is respectively connected with an environment PLC device, and multiple setting multichannel gas are respectively connected with the front end of environment PLC device Body monitoring device so that multiple multi-channel gas monitoring devices are provided with whole piping lane, monitor air quality, temperature in piping lane Humidity, to ensure Environmental security in piping lane, environmental information is uploaded to environment PLC dresses by the detector of multi-channel gas monitoring device Put, and management and control center be uploaded to by piping lane network link, sent at the Environmental Management Work station at management and control center control command to Environment PLC device, it is run according to environmental safety requirements linkage fan, ensure air quality in piping lane.
The kilomega optic fiber subring net network cochain of the security protection system composition is connected to multiple security protection interchangers, each Security protection interchanger is respectively connected with a security protection PLC, and multiple infrared acquisitions are respectively connected with the front end of security protection PLC Device so that each gateway, dog-house in whole piping lane are provided with multiple infrared detectors, monitor people at each gateway Member enters artificial situation, once detecting that alarm signal reports rapidly incoming security protection PLC, and is reported by piping lane network link Security protection work station is disposed, and linkage illuminator and video monitoring system carry out live confirmation and video recording.
In addition, telephone socket, emergent traffic terminal are also set up in each gateway of whole piping lane and fire compartment, with Pass through telephone socket, emergent traffic terminal communication with the outside world when in case of emergency or personnel safeguard.
As shown in Fig. 2 it is the functional structure Organization Chart of the present invention, the present invention is based on technology of Internet of things, to integrated pipe Data during corridor operation are acquired, transmit, store, analyze and applied, and whole functional structure framework is divided into sensing layer, net Network layers, information resources layer, service application layer and door layer;
The sensing layer is realized to pipe gallery running status using the various sensors at the scene that is installed on, enters corridor operation people The real-time collection of member's positional information;
The reliable delivery that the Internet is realized to pipe gallery field data using being wirelessly transferred with wire transmission technology;
Described information resource layer is stored and managed using the unified of database technique pipe gallery service data;
The service application layer integrates BIM technology, GIS technology and cloud computing, to field data and pipe gallery other Information is classified, assessed, and decision support is provided for the safe operation of pipe gallery;
The door layer is pipe gallery operation management unit, governmental agency, enters corridor pipeline unit and city inhabitant Unified user is provided and accesses interface.
It is field data and pipe gallery other information as shown in figure 3, for the data staging evaluation system block diagram of the present invention The operation management offer supporting that data staging is evaluated as pipe gallery is provided,
The data staging evaluation system by the data of sensing layer collection and is showed by means of the server platform at management and control center The data of field personal monitoring carry out layering arrangement, and the data in the database of combining information resource layer, by by set strategy Profound analysis, data are handled and judged from global angle, draw piping lane real-time architecture health score assigning, are proposed corresponding Maintenance and maintenance measure.
The data staging and processing are the layerings of data target, and the division of data target level is needed into integrated structure, row The specialty such as water is common to be formulated, the problem of also needing to exist in terms of collecting existing Project in Operation maintenance as far as possible in formulation process.For example, will It is designed into piping lane agent structure and threatens the environmental index of attendant's safety, CO, SO2 gas etc. and is divided into first class index; Catch pit liquid level in piping lane is divided into two-level index etc..
The processing data information is expert judging and weight analysis, and to being layered index combination expertise, construction judges Matrix, rational threshold value is set to index parameter.
The evaluation index collection and processing, are that service data in piping lane is entered by management and control center and artificial regular visit Row is compiled, and data storage carries out nondimensionalization processing in the database platform of information resources layer, and to data, establishes subitem Index scores.
The data message is judged, and is to carry out layering judgement to data in piping lane by management and control center, is generated different reports Table, rational suggest is proposed to piping lane operation maintenance management.
The foregoing is only presently preferred embodiments of the present invention, be not intended to limit the invention, it is all the present invention spirit and Within principle, any modification, equivalent substitution and improvements made etc., it should be included in the scope of the protection.

Claims (1)

1. city integrated piping lane operation management system, including field regions controller layer, Internet and management and control central core;Its feature It is:
The field regions controller layer is by fire-fighting system, equipment monitoring system, video monitoring system, environmental monitoring system, peace Full protection system is formed, and push is reported for the collection of pipe gallery field data and to management and control center progress data;
The piping lane network link that the Internet is formed by being wirelessly transferred with wire transmission;
The management and control central core includes management and control center, core switch, fire wall, router,
The management and control center is the core of whole system, is responsible for each system of coordination, control and management field regions controller layer Work, realize pipe gallery data in each region focus on and application service;
The management and control center is worked by server, engineer station, monitoring of tools work station, video management work station, security protection Stand, environmental monitoring work station, administration of the prevention and control work station, the network printer, large screen display wall composition;
The core switch is anti-with server, engineer station, monitoring of tools work station, video management work station, safety respectively Work station, environmental monitoring work station administration of the prevention and control work station, the network printer, large screen display wall, fire wall is protected to be electrically connected with, The fire wall is electrically connected with router;
By piping lane network link, fire-fighting interchanger with fire-fighting system, equipment monitoring system show the core switch respectively Interchanger, the video switch of video monitoring system, environmental monitoring system environment interchanger, safety and protection system security protection Interchanger is electrically connected with.
CN201710594296.8A 2017-07-20 2017-07-20 City integrated piping lane operation management system Pending CN107483229A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710594296.8A CN107483229A (en) 2017-07-20 2017-07-20 City integrated piping lane operation management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710594296.8A CN107483229A (en) 2017-07-20 2017-07-20 City integrated piping lane operation management system

Publications (1)

Publication Number Publication Date
CN107483229A true CN107483229A (en) 2017-12-15

Family

ID=60596737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710594296.8A Pending CN107483229A (en) 2017-07-20 2017-07-20 City integrated piping lane operation management system

Country Status (1)

Country Link
CN (1) CN107483229A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108111529A (en) * 2017-12-29 2018-06-01 中国铁路设计集团有限公司 A kind of new gauze urban track traffic access control system
CN108507612A (en) * 2018-03-05 2018-09-07 中国市政工程华北设计研究总院有限公司 A kind of pipe gallery gas pipeline confidence level quantitative evaluating method and assessment system
CN109958142A (en) * 2017-12-22 2019-07-02 大唐移动通信设备有限公司 A kind of piping lane system
CN110187665A (en) * 2018-07-02 2019-08-30 青岛华高物联网科技有限公司 A kind of intelligent managing and control system of underground pipe gallery
CN110428135A (en) * 2019-07-03 2019-11-08 上海电器科学研究所(集团)有限公司 A kind of pipe gallery equipment condition monitoring management system
CN110865579A (en) * 2019-11-26 2020-03-06 张家港宏昌钢板有限公司 Factory energy and power configuration management and control system
WO2020062171A1 (en) * 2018-09-29 2020-04-02 西门子(中国)有限公司 Method, device and equipment for urban utility tunnel platform management
CN112422622A (en) * 2020-09-29 2021-02-26 四川九门科技股份有限公司 Comprehensive management system and method for intelligent pipe gallery pipelines applied to chemical industry park
CN112862188A (en) * 2021-02-06 2021-05-28 罗普特科技集团股份有限公司 Multi-sensor environment prediction method and system
CN112926883A (en) * 2021-03-29 2021-06-08 中国人民解放军总医院 Illumination effect detection method and system for shelter hospital
CN113141586A (en) * 2021-04-14 2021-07-20 通号通信信息集团有限公司 Communication system and method for comprehensive pipe gallery
CN113950089A (en) * 2021-09-27 2022-01-18 中电科思仪科技(安徽)有限公司 Building mobile cellular network quality real-time monitoring cloud platform

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109958142A (en) * 2017-12-22 2019-07-02 大唐移动通信设备有限公司 A kind of piping lane system
CN108111529A (en) * 2017-12-29 2018-06-01 中国铁路设计集团有限公司 A kind of new gauze urban track traffic access control system
CN108507612A (en) * 2018-03-05 2018-09-07 中国市政工程华北设计研究总院有限公司 A kind of pipe gallery gas pipeline confidence level quantitative evaluating method and assessment system
CN110187665A (en) * 2018-07-02 2019-08-30 青岛华高物联网科技有限公司 A kind of intelligent managing and control system of underground pipe gallery
WO2020062171A1 (en) * 2018-09-29 2020-04-02 西门子(中国)有限公司 Method, device and equipment for urban utility tunnel platform management
CN110428135A (en) * 2019-07-03 2019-11-08 上海电器科学研究所(集团)有限公司 A kind of pipe gallery equipment condition monitoring management system
CN110865579A (en) * 2019-11-26 2020-03-06 张家港宏昌钢板有限公司 Factory energy and power configuration management and control system
CN112422622A (en) * 2020-09-29 2021-02-26 四川九门科技股份有限公司 Comprehensive management system and method for intelligent pipe gallery pipelines applied to chemical industry park
CN112862188A (en) * 2021-02-06 2021-05-28 罗普特科技集团股份有限公司 Multi-sensor environment prediction method and system
CN112926883A (en) * 2021-03-29 2021-06-08 中国人民解放军总医院 Illumination effect detection method and system for shelter hospital
CN112926883B (en) * 2021-03-29 2023-10-13 中国人民解放军总医院 Lighting effect detection method and system for shelter hospital
CN113141586A (en) * 2021-04-14 2021-07-20 通号通信信息集团有限公司 Communication system and method for comprehensive pipe gallery
CN113141586B (en) * 2021-04-14 2023-01-13 通号通信信息集团有限公司 Communication system and method of comprehensive pipe rack
CN113950089A (en) * 2021-09-27 2022-01-18 中电科思仪科技(安徽)有限公司 Building mobile cellular network quality real-time monitoring cloud platform

Similar Documents

Publication Publication Date Title
CN107483229A (en) City integrated piping lane operation management system
CN107632581B (en) Underground pipe gallery's control management system
CN110707810B (en) Auxiliary comprehensive monitoring system for transformer substation
US7965178B1 (en) System and method for integrated facility and fireground management
CN204652570U (en) The long-range cruising inspection system of fire protection equipment
CN107991999A (en) Power cable tunnel comprehensive monitoring system and method
CN112072798B (en) Intelligent substation fire control auxiliary control integrated monitoring system and monitoring method
CN102681518B (en) Cable network running integrated management system and intelligent control platform
CN206649329U (en) A kind of power distribution room intelligent environment monitoring equipment
CN201527696U (en) Fire hazard linkage control system applied to urban rail transit
CN107947362A (en) Electric railway traction supply intelligent auxiliary system
CN101634852A (en) Fire linking control system applied to urban rail transit and method
CN102566519A (en) Setting method for power tunnel monitoring system
CN103809570A (en) Underground shaftway multi-data collecting and controlling system
CN109211313A (en) Electric power piping lane fire behavior based on Internet of Things monitors disposal system
CN206557586U (en) Distribution monitoring system based on Intelligent internet of things
CN208820537U (en) A kind of box-type substation integrated information monitoring system based on Internet of Things
CN104699057A (en) Intelligent control system for substation facilities
CN213690892U (en) Utility tunnel intelligent monitoring and operation and maintenance system
CN212543451U (en) Fire-fighting auxiliary control integrated monitoring system for intelligent substation
CN207397051U (en) A kind of intelligent distribution network integrates auxiliary system
CN112233368A (en) Comprehensive security management platform
CN108170079A (en) Building site intelligent container comprehensive management platform
CN202758215U (en) Cable network running integrated management system and intelligent control platform
CN207612125U (en) Electric railway traction supply intelligent auxiliary system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171215