CN107480897A - A kind of Ecological Project Construction performance evaluation method - Google Patents

A kind of Ecological Project Construction performance evaluation method Download PDF

Info

Publication number
CN107480897A
CN107480897A CN201710718339.9A CN201710718339A CN107480897A CN 107480897 A CN107480897 A CN 107480897A CN 201710718339 A CN201710718339 A CN 201710718339A CN 107480897 A CN107480897 A CN 107480897A
Authority
CN
China
Prior art keywords
engineering
ecological
mrow
project
performance evaluation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710718339.9A
Other languages
Chinese (zh)
Inventor
单森华
陈宝珠
张火炬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN STRONG SOFTWARE Co Ltd
Original Assignee
FUJIAN STRONG SOFTWARE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN STRONG SOFTWARE Co Ltd filed Critical FUJIAN STRONG SOFTWARE Co Ltd
Priority to CN201710718339.9A priority Critical patent/CN107480897A/en
Publication of CN107480897A publication Critical patent/CN107480897A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/152Water filtration

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Educational Administration (AREA)
  • Economics (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Primary Health Care (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of Ecological Project Construction performance evaluation method.This method includes:Project data is collected:Collect the project data information and Around basin relevant information in basin;Engineering evaluation models:Project data based on collection, calculating is modeled to ecological engineering performance evaluation, including performance evaluation Index Establishment, performance evaluation computational methods and comprehensive benefit are assessed and calculated;Engineering evaluation is inquired about:User oriented uses, the ecological engineering performance evaluation model based on foundation, carries out ecological engineering assessment, facilitates policymaker's analysis project returns of investment, foundation is provided for the optimization of investment of engineering.The inventive method facilitates user to understand and assess the environmental benefit of basin keypoint treatment engineering, the keypoint treatment project library that basin need to increase newly or be lifted is planned and formed to science in advance, with data supporting, its pollutional load is cut down and water correction effect, the water pollution control decision-making in basin is set to move towards scientific and intelligent, the cost saving amount of money.

Description

A kind of Ecological Project Construction performance evaluation method
Technical field
It is specially a kind of that the life improved with quality in watershed is cut down based on engineering load the present invention relates to water environment protection field State engineering construction performance evaluation method.
Background technology
In ecological protection field, to protect water ecological setting, it is often necessary to put into substantial amounts of manpower and materials construction life State engineering, but be all difficult to assess whether the engineering project built can reach effect before and after construction.
To improve engineering investment benefits, before and after project construction, it is required for assessing engineering, can realizes at present Appraisal procedure is mainly that artificial experience is assessed:The water ecological environment situation before and after engineering construction is recorded, is analyzed, according to Comparative analysis result, judge the construct effects of biology of engineering;According to the project inputs amount of money, compare engineering construction effect, manually to engineering Constructing benefits are scored, and judge engineering bottom line.
Prior art relies on artificial experience to judge, quantitatively can not carry out evaluation analysis to ecological engineering benefit;By existing There is the Efficiency that technological means is only capable of simply considering single aspect, performance evaluation can not be carried out from different aspect, also can not Relevance between different benefits is taken into full account.
It is contemplated that carrying out objective, quantitative assessment to Ecological Project Construction effect, and realize and given birth to from multiple dimensions State project benefit comprehensive assessment, facilitate user to understand and assess the environmental benefit of basin keypoint treatment engineering, science is planned in advance And the keypoint treatment project library that basin need to increase newly or be lifted is formed, with data supporting, its pollutional load is cut down and water correction effect Fruit, the water pollution control decision-making in basin is set to move towards scientific and intelligent, the cost saving amount of money.
The content of the invention
It is an object of the invention to provide a kind of Ecological Project Construction performance evaluation method, this method passes through to ecological engineering Effect on construction carries out objective, quantitative assessment, and realizes from multiple dimensions and carry out ecological engineering benefit comprehensive assessment, facilitates user Solution and the environmental benefit for assessing basin keypoint treatment engineering, the emphasis that science is planned and forms basin and need to increase newly or be lifted in advance are controlled Project library is managed, with the reduction of its pollutional load of data supporting and water correction effect, the water pollution control decision-making in basin is moved towards section Huas and intellectuality, the cost saving amount of money.
To achieve the above object, the technical scheme is that:A kind of Ecological Project Construction performance evaluation method, including with Lower step,
S1, project data are collected:Collect the project data information and Around basin relevant information in basin;
S2, engineering evaluation modeling:The project data collected based on step S1, meter is modeled to ecological engineering performance evaluation Calculate, including performance evaluation Index Establishment, performance evaluation computational methods and comprehensive benefit are assessed and calculated;
S3, engineering evaluation inquiry:User oriented uses, and the ecological engineering performance evaluation model established based on step S2, enters Row ecological engineering is assessed, and facilitates policymaker's analysis project returns of investment, foundation is provided for the optimization of investment of engineering.
In an embodiment of the present invention, in step sl, the project data information and Around collected in basin Basin relevant information, including engineering foundation information, engineering economy information, change of water quality information, valley environment information.
In an embodiment of the present invention, engineering construction time, engineering situation, work by stages are included in the engineering foundation information Journey longitude and latitude, engineering construction data, engineering picture, engineering type information;The engineering economy information include construction investment situation, Invest accounting, funds source information;The change of water quality information includes the real-time monitoring information of water quality, water quality assessment information, evaluation The factor;The valley environment information includes basin surrounding enviroment information, industry, agricultural, service trade information.
In an embodiment of the present invention, in step s 2, the performance evaluation Index Establishment, i.e., from ecological benefits, pass through Ji three performance evaluation indexs of benefit and social benefit are considered, based on ecological benefits, economic benefit and society Supplemented by benefit, the performance of three benefits of basin water environment ecological engineering adjust and monetizes calculating, specific formula is as follows:
X=sin (a0+a1k+a2e+a3s);a0=(a1+a2+a3)/3
Wherein, x is project benefit multi-stress, a1、a2、a3Respectively ecological benefits, economic benefit and social benefit because Subparameter, a0It is the comprehensive parameters of three factors;K, e, s represent the effect of ecological benefits, economic benefit and social benefit respectively Benefit value.
In an embodiment of the present invention, in step s 2, the performance evaluation computational methods, including to Ecological Changes The assessment for assessing calculating, the assessment calculating of economic input and social influence calculates, specific as follows,
(1) assessment of Ecological Changes calculates:Ecological Changes situation before and after engineering construction is calculated, ecology is built and becomes Change and assess calculation formula:
Wherein:T is the time, and x is the water quality assessment factor, and x obtains according to the water quality data monitored in real time, x0For water quality assessment The initial value of the factor;K (t) is that ecological benefit value calculates function, represents the change of t over time, and the change of ecological benefits value is closed It is formula;F (x, t) calculates function for ecology, recognizes based on the real-time water quality assessment of water monitoring data ecology obtained in real time, The Ecology assessed value of generation;
(2) assessment of economic input calculates:Ecological benefits and engineering funds input situation are analyzed, structure warp Ji input assesses calculation formula:
Wherein:T is the time, and y is Practical Project infusion of financial resources number;E (t) is economic benefit value function, and comprehensive ecological is imitated Benefit and engineering funds input situation, calculate economic benefit value;F (y) is economic input function, is represented based on Practical Project input gold Volume, the project inputs value calculated, wherein a and b is engineering calculation parameter;
(3) assessment of social influence calculates:Build Social influence assessment calculation formula:
S (t)=(t+e (t))2+mt3+n
Wherein:T is the time, and m is social development factor of influence, and n is the initial social factor, and s (t) is social influence function, Influence degree of the ecological engineering to society is represented, wherein m and n is calculating parameter.
In an embodiment of the present invention, in step s 2, the comprehensive benefit assesses calculating, i.e., is commented based on Ecological Changes Estimation is calculated, economic input assesses calculating, Social influence assessment calculates, and establishes ecological engineering performance evaluation relation relational expression:
Z=∫ ∫ ∫ xk (t) e (t) s (t)+(xy+y2)。
In an embodiment of the present invention, in step s3, the engineering evaluation inquiry includes engineering information displaying, engineering Performance analysis, construction investment suggest three parts.
Compared to prior art, the invention has the advantages that:
1st, it is fixed in the case of consideration is multifactor by the present invention compared to the pattern of traditional qualitative human's micro-judgment Amount ground carries out evaluation analysis to ecological engineering benefit, and aid decision making person preferably carries out ecological engineering investment, improves building for engineering If benefit;
2nd, traditional mode, it is only capable of simply considering the Efficiency of single aspect, benefit can not be carried out from different aspect and commented Estimate, the relevance between different benefits can not also be taken into full account.The present invention is comprehensive from multiple dimensions progress ecological engineering benefit Close and assess, in practical work guidance, be more of practical significance.
Brief description of the drawings
Fig. 1 is the inventive method flow chart.
Fig. 2 is that engineering evaluation of the present invention models schematic diagram.
Fig. 3 is that engineering evaluation of the present invention inquires about schematic diagram.
Embodiment
1-3 below in conjunction with the accompanying drawings, technical scheme is specifically described.
As shown in figure 1, a kind of Ecological Project Construction performance evaluation method of the present invention, comprises the following steps,
S1, project data are collected:Collect the project data information and Around basin relevant information in basin;
S2, engineering evaluation modeling:The project data collected based on step S1, meter is modeled to ecological engineering performance evaluation Calculate, including performance evaluation Index Establishment, performance evaluation computational methods and comprehensive benefit are assessed and calculated;
S3, engineering evaluation inquiry:User oriented uses, and the ecological engineering performance evaluation model established based on step S2, enters Row ecological engineering is assessed, and facilitates policymaker's analysis project returns of investment, foundation is provided for the optimization of investment of engineering.
In step sl, the project data information and Around basin relevant information collected in basin, including work Journey Back ground Information, engineering economy information, change of water quality information, valley environment information.Include engineering in the engineering foundation information Building time, engineering situation, engineering longitude and latitude, engineering construction data, engineering picture, engineering type information by stages;The engineering Economic information includes construction investment situation, investment accounting, funds source information;The change of water quality information is supervised in real time including water quality Measurement information, water quality assessment information, evaluation points;The valley environment information include basin surrounding enviroment information, industry, agricultural, Service trade information.
In step s 2, the performance evaluation Index Establishment, i.e., from ecological benefits, economic benefit and social benefit three Individual performance evaluation index is considered, based on ecological benefits, supplemented by economic benefit and social benefit, by basin water environment The performance of three benefits of ecological engineering adjust and monetizes calculating, and specific formula is as follows:
X=sin (a0+a1k+a2e+a3s);a0=(a1+a2+a3)/3
Wherein, x is project benefit multi-stress, a1、a2、a3Respectively ecological benefits, economic benefit and social benefit because Subparameter, a0It is the comprehensive parameters of three factors;K, e, s represent the effect of ecological benefits, economic benefit and social benefit respectively Benefit value.
In step s 2, the performance evaluation computational methods, including assessment to Ecological Changes calculates, economic input The assessment for assessing calculating and social influence calculates, specific as follows,
(1) assessment of Ecological Changes calculates:Ecological Changes situation before and after engineering construction is calculated, ecology is built and becomes Change and assess calculation formula:
Wherein:T is the time, and x is the water quality assessment factor, and x obtains according to the water quality data monitored in real time, x0For water quality assessment The initial value of the factor;K (t) is that ecological benefit value calculates function, represents the change of t over time, and the change of ecological benefits value is closed It is formula;F (x, t) calculates function for ecology, recognizes based on the real-time water quality assessment of water monitoring data ecology obtained in real time, The Ecology assessed value of generation;
(2) assessment of economic input calculates:Ecological benefits and engineering funds input situation are analyzed, structure warp Ji input assesses calculation formula:
Wherein:T is the time, and y is Practical Project infusion of financial resources number;E (t) is economic benefit value function, and comprehensive ecological is imitated Benefit and engineering funds input situation, calculate economic benefit value;F (y) is economic input function, is represented based on Practical Project input gold Volume, the project inputs value calculated, wherein a and b is engineering calculation parameter;
(3) assessment of social influence calculates:Build Social influence assessment calculation formula:
S (t)=(t+e (t))2+mt3+n
Wherein:T is the time, and m is social development factor of influence, and n is the initial social factor, and s (t) is social influence function, Influence degree of the ecological engineering to society is represented, wherein m and n is calculating parameter.
In step s 2, the comprehensive benefit assesses calculating, i.e., assesses calculating based on Ecological Changes, economic input is assessed Calculate, Social influence assessment calculating, establish ecological engineering performance evaluation relation relational expression:
Z=∫ ∫ ∫ xk (t) e (t) s (t)+(xy+y2)。
In step s3, the engineering evaluation inquiry includes engineering information displaying, project benefit is analyzed, construction investment is built Discuss three parts.
It is below the specific implementation process of the present invention.
As shown in figure 1, it is contemplated that realize a kind of ecological engineering cut down based on engineering load and improved with quality in watershed Constructing benefits appraisal procedure, specific implementation step are as follows:
Step S1, project data are collected:According to the business needs of administrative department, the key project number in basin is compiled It is believed that breath, forms major project storehouse inventory;Collect Around basin relevant information simultaneously.
Step S2, engineering evaluation modeling:Carry out the mathematical modeling for engineering operation, obtaining it may be to pollutional load Relevant parameter and the functions such as efficiency, and the econometric function of each key project, social function are cut down, forms major project Inventory, using the decision support template system of research and development as instrument, every construction brigade's quality in watershed or main for entering engineering storehouse Benefit caused by ingoing river water quality carries out qualitative assessment;
Step S3, engineering evaluation inquiry:User oriented uses, and based on the ecological engineering assessment models established, is given birth to State engineering evaluation, facilitates policymaker's analysis project returns of investment, and foundation is provided for the optimization of investment of engineering.
Above technical scheme is described further:
In step sl:
The key project data message in basin is compiled, forms major project inventory, while collects engineering week Side basin relevant information.The data content of collection includes:Engineering foundation information, engineering economy information, change of water quality information, basin Environmental information.
Engineering foundation information:Including engineering construction time, engineering situation, engineering longitude and latitude, engineering construction data, work by stages Journey picture, engineering type etc..
Engineering economy information:Construction investment situation, investment accounting, funds source etc..
Change of water quality information:The real-time monitoring information of water quality, water quality assessment information, evaluation points.
Valley environment information:Basin surrounding enviroment information, industry, agricultural, service trade information.
As shown in Fig. 2 in step s 2:
Based on engineering related data, calculating is modeled to ecological engineering performance evaluation, mainly includes performance evaluation index Establish, performance evaluation computational methods and comprehensive benefit are assessed and calculated.
1st, performance evaluation Index Establishment
Ecological engineering performance evaluation mainly accounts for from three dimensions, including ecological benefits, economic benefit and society Benefit.Ecological benefits are primarily referred to as by engineering construction, and the benefit improved to water environment treatment, is the main of ecological engineering benefit The benefit factor;Economic benefit is the comprehensive economic sexual valence drawn on the basis of relatively engineering ecology benefit and engineering funds input Specific factor;After social benefit refers to engineering construction, factor of influence that surrounding enviroment or periphery socio-economic development are brought.To three Individual performance evaluation index is considered, and ecological benefits should be located at the 1st in its Three benefits, while need to take into account ecology The economic benefit and social benefit of engineering.The performance of basin water environment ecological engineering Three benefits adjust and monetizes meter Amount, specific formula are as follows:
X=sin (a0+a1k+a2e+a3s);a0=(a1+a2+a3)/3;
Wherein, x is project benefit multi-stress, a1、a2、a3Respectively ecological benefits, economic benefit and social benefit because Subparameter, a0It is the comprehensive parameters of three factors;K, e, s represent the effect of ecological benefits, economic benefit and social benefit respectively Benefit value.
2nd, performance evaluation computational methods
The assessment that performance evaluation computational methods are mainly included to Ecological Changes calculates, the assessment of economic input calculates, society The assessment of influence calculates.
The assessment of Ecological Changes calculates:Ecological Changes situation before and after engineering construction is calculated, builds Ecological Changes Calculation formula is assessed, it is specific as follows:
Wherein:T is the time, and x is the water quality assessment factor, and x obtains according to the water quality data monitored in real time, x0For water quality assessment The initial value of the factor;K (t) is that ecological benefit value calculates function, represents the change of t over time, and the change of ecological benefits value is closed It is formula;F (x, t) calculates function for ecology, recognizes based on the real-time water quality assessment of water monitoring data ecology obtained in real time, The Ecology assessed value of generation;
The assessment of economic input calculates:Ecological benefits and engineering funds input situation are analyzed, structure is economical Input assesses calculation formula, specific as follows:
Wherein:T is the time, and y is Practical Project infusion of financial resources number;E (t) is economic benefit value function, and comprehensive ecological is imitated Benefit and engineering funds input situation, calculate economic benefit value;F (y) is economic input function, is represented based on Practical Project input gold Volume, the project inputs value calculated, wherein a and b is engineering calculation parameter, according to different engineering types, artificial setting.
The assessment of social influence calculates:Build Social influence assessment calculation formula:
S (t)=(t+e (t))2+mt3+n
Wherein:T is the time, and m is social development factor of influence, and n is the initial social factor, and s (t) is social influence function, Influence degree of the ecological engineering to society is represented, wherein m and n is calculating parameter, according to different engineering types, artificial setting.
3rd, comprehensive benefit, which is assessed, calculates:
Calculating, economic input assessment calculating, Social influence assessment calculating are assessed based on Ecological Changes, establishes ecological engineering effect Beneficial evaluation relationses relational expression, it is specific as follows;
Z=∫ ∫ ∫ xk (t) e (t) s (t)+(xy+y2)。
Based on the engineering related data compiled in step, the weight factor in company is set, carries out model Parameter typing.In the case of boundary condition is set, the operation for carrying out model calculates.
In step s3:
As shown in figure 3, engineering evaluation inquiry includes engineering information display module, project benefit analysis module, construction investment Three parts of suggestion module.
Engineering information display module:Visual key project distribution situation is provided, shows engineering essential information, allows management Person intuitively understands engineering distribution situation on basin, construction situation, capital investment situation etc.;
Project benefit analysis module:Based on computation model, every engineering watershed water quality or master for entering engineering storehouse Want benefit caused by ingoing river water quality to carry out qualitative assessment, provide assessed value z.Compare the assessed value of different engineerings, go forward side by side The sequence of row value from high to low;
Construction investment suggestion module:Analyzed based on project benefit, realize and various possible engineering measure scenes are carried out in fact When analyse and compare, provide scientific basis to formulate the quantitative Reduced measure of pollutional load and optimization harnessing project.
Above is presently preferred embodiments of the present invention, all changes made according to technical solution of the present invention, caused function are made During with scope without departing from technical solution of the present invention, protection scope of the present invention is belonged to.

Claims (7)

  1. A kind of 1. Ecological Project Construction performance evaluation method, it is characterised in that:Comprise the following steps,
    S1, project data are collected:Collect the project data information and Around basin relevant information in basin;
    S2, engineering evaluation modeling:The project data collected based on step S1, calculating is modeled to ecological engineering performance evaluation, Assess and calculate including performance evaluation Index Establishment, performance evaluation computational methods and comprehensive benefit;
    S3, engineering evaluation inquiry:User oriented uses, and the ecological engineering performance evaluation model established based on step S2, is given birth to State engineering evaluation, facilitates policymaker's analysis project returns of investment, and foundation is provided for the optimization of investment of engineering.
  2. A kind of 2. Ecological Project Construction performance evaluation method according to claim 1, it is characterised in that:In step sl, Project data information and Around basin relevant information in the collection basin, including engineering foundation information, engineering economy Information, change of water quality information, valley environment information.
  3. A kind of 3. Ecological Project Construction performance evaluation method according to claim 2, it is characterised in that:The engineering foundation Information includes engineering construction time, engineering situation, engineering longitude and latitude, engineering construction data, engineering picture, engineering type letter by stages Breath;The engineering economy information includes construction investment situation, investment accounting, funds source information;The change of water quality packet Include the real-time monitoring information of water quality, water quality assessment information, evaluation points;The valley environment information is believed including basin surrounding enviroment Breath, industry, agricultural, service trade information.
  4. A kind of 4. Ecological Project Construction performance evaluation method according to claim 1, it is characterised in that:In step s 2, The performance evaluation Index Establishment, i.e., carried out from three ecological benefits, economic benefit and social benefit performance evaluation indexs comprehensive Close and consider, based on ecological benefits, supplemented by economic benefit and social benefit, by the hair of three benefits of basin water environment ecological engineering Wave and adjust and monetize calculating, specific formula is as follows:
    X=sin (a0+a1k+a2e+a3s);a0=(a1+a2+a3)/3
    Wherein, x is project benefit multi-stress, a1、a2、a3The respectively factor ginseng of ecological benefits, economic benefit and social benefit Number, a0It is the comprehensive parameters of three factors;K, e, s represent the benefit value of ecological benefits, economic benefit and social benefit respectively.
  5. A kind of 5. Ecological Project Construction performance evaluation method according to claim 1, it is characterised in that:In step s 2, The performance evaluation computational methods, including assessment to Ecological Changes calculates, the assessment of economic input calculates and social influence Assess and calculate, it is specific as follows,
    (1) assessment of Ecological Changes calculates:Ecological Changes situation before and after engineering construction is calculated, structure Ecological Changes are commented Estimate calculation formula:
    <mrow> <mi>k</mi> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>=</mo> <msubsup> <mi>&amp;Sigma;</mi> <mrow> <mi>n</mi> <mo>=</mo> <mn>0</mn> </mrow> <mi>&amp;infin;</mi> </msubsup> <mfrac> <mrow> <msup> <mi>f</mi> <mrow> <mo>(</mo> <mi>n</mi> <mo>)</mo> </mrow> </msup> <mrow> <mo>(</mo> <mi>x</mi> <mo>,</mo> <mi>t</mi> <mo>)</mo> </mrow> </mrow> <mrow> <mi>n</mi> <mo>!</mo> </mrow> </mfrac> <msup> <mrow> <mo>(</mo> <mi>t</mi> <mo>-</mo> <mi>n</mi> <mo>)</mo> </mrow> <mi>n</mi> </msup> <mo>;</mo> <mi>f</mi> <mrow> <mo>(</mo> <mi>x</mi> <mo>,</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>=</mo> <msub> <mi>x</mi> <mn>0</mn> </msub> <mo>+</mo> <msubsup> <mi>&amp;Sigma;</mi> <mrow> <mi>n</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>&amp;infin;</mi> </msubsup> <mrow> <mo>(</mo> <mi>c</mi> <mi>o</mi> <mi>s</mi> <mfrac> <mrow> <mi>n</mi> <mi>&amp;pi;</mi> <mi>x</mi> </mrow> <mi>t</mi> </mfrac> <mo>+</mo> <mi>s</mi> <mi>i</mi> <mi>n</mi> <mfrac> <mrow> <mi>n</mi> <mi>&amp;pi;</mi> <mi>x</mi> </mrow> <mi>t</mi> </mfrac> <mo>)</mo> </mrow> </mrow>
    Wherein:T is the time, and x is the water quality assessment factor, and x obtains according to the water quality data monitored in real time, x0For the water quality assessment factor Initial value;K (t) is that ecological benefit value calculates function, represents the change of t over time, the variation relation public affairs of ecological benefits value Formula;F (x, t) calculates function for ecology, recognizes based on the real-time water quality assessment of water monitoring data ecology obtained in real time, generation Ecology assessed value;
    (2) assessment of economic input calculates:Ecological benefits and engineering funds input situation are analyzed, build economic throw Enter to assess calculation formula:
    Wherein:T is the time, and y is Practical Project infusion of financial resources number;E (t) is economic benefit value function, comprehensive ecological benefit with Engineering funds put into situation, calculate economic benefit value;F (y) is economic input function, is represented based on the Practical Project input amount of money, The project inputs value calculated, wherein a and b is engineering calculation parameter;
    (3) assessment of social influence calculates:Build Social influence assessment calculation formula:
    S (t)=(t+e (t))2+mt3+n
    Wherein:T is the time, and m is social development factor of influence, and n is the initial social factor, and s (t) is social influence function, is represented For ecological engineering to the influence degree of society, wherein m and n is calculating parameter.
  6. A kind of 6. Ecological Project Construction performance evaluation method according to claim 5, it is characterised in that:In step s 2, The comprehensive benefit, which is assessed, to be calculated, i.e., assesses calculating based on Ecological Changes, economic input assessment calculates, Social influence assessment meter Calculate, establish ecological engineering performance evaluation relation relational expression:
    Z=∫ ∫ ∫ xk (t) e (t) s (t)+(xy+y2)。
  7. A kind of 7. Ecological Project Construction performance evaluation method according to claim 1, it is characterised in that:In step s3, The engineering evaluation inquiry includes three engineering information displaying, project benefit analysis, construction investment suggestion parts.
CN201710718339.9A 2017-08-21 2017-08-21 A kind of Ecological Project Construction performance evaluation method Pending CN107480897A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710718339.9A CN107480897A (en) 2017-08-21 2017-08-21 A kind of Ecological Project Construction performance evaluation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710718339.9A CN107480897A (en) 2017-08-21 2017-08-21 A kind of Ecological Project Construction performance evaluation method

Publications (1)

Publication Number Publication Date
CN107480897A true CN107480897A (en) 2017-12-15

Family

ID=60600942

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710718339.9A Pending CN107480897A (en) 2017-08-21 2017-08-21 A kind of Ecological Project Construction performance evaluation method

Country Status (1)

Country Link
CN (1) CN107480897A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108305018A (en) * 2018-03-16 2018-07-20 肖鑫茹 A kind of accurate clean manufacturing benefit evaluation system of evaluation
CN108764703A (en) * 2018-05-24 2018-11-06 北京建筑大学 Sponge City Construction Project performance evaluation method and device
CN116227747A (en) * 2023-05-08 2023-06-06 生态环境部华南环境科学研究所(生态环境部生态环境应急研究所) Service function evaluation method for specific area ecosystem of river basin

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108305018A (en) * 2018-03-16 2018-07-20 肖鑫茹 A kind of accurate clean manufacturing benefit evaluation system of evaluation
CN108764703A (en) * 2018-05-24 2018-11-06 北京建筑大学 Sponge City Construction Project performance evaluation method and device
CN116227747A (en) * 2023-05-08 2023-06-06 生态环境部华南环境科学研究所(生态环境部生态环境应急研究所) Service function evaluation method for specific area ecosystem of river basin

Similar Documents

Publication Publication Date Title
Feng et al. A novel multi-criteria decision-making method for selecting the site of an electric-vehicle charging station from a sustainable perspective
Sun et al. A Mamdani fuzzy inference approach for assessing ecological security in the Pearl River Delta urban agglomeration, China
CN108877223A (en) A kind of Short-time Traffic Flow Forecasting Methods based on temporal correlation
Wu et al. A cloud decision framework in pure 2-tuple linguistic setting and its application for low-speed wind farm site selection
Jin et al. Impact of cost–benefit analysis on financial benefit evaluation of investment projects under back propagation neural network
CN107480897A (en) A kind of Ecological Project Construction performance evaluation method
CN104123680A (en) Post-evaluation method for comprehensively evaluating power grid science and technology projects
CN106327072A (en) Budget cost management system for project node controlling
CN104050319B (en) A kind of method of the complicated traffic control algorithm of real-time online checking
CN106067079A (en) A kind of system and method for gray haze based on BP neutral net prediction
CN106056290A (en) Power transmission network operating efficiency and benefit detection method considering new energy access
CN108647823A (en) Stock certificate data analysis method based on deep learning and device
CN103226751A (en) Post-evaluation method for science and technology projects of grid enterprise
CN108345995A (en) A kind of enterprises economic management cost control system
Salam et al. Energy consumption prediction model with deep inception residual network inspiration and LSTM
Zeng et al. A hybrid land-water-environment model for identification of ecological effect and risk under uncertain meteorological precipitation in an agroforestry ecosystem
CN110445939A (en) The prediction technique and device of capacity resource
Yang et al. Exploring the dilemma and influencing factors of ecological transformation of resource-based cities in China: Perspective on a tripartite evolutionary game
CN114498634B (en) Electric automobile charging load prediction method based on ammeter data
CN107423854A (en) Building population of the one kind based on GM (1,1) season trend prediction changes monitoring method
CN116541755A (en) Financial behavior pattern analysis and prediction method based on time sequence diagram representation learning
Cheng et al. An expert system for decision support of municipal water pollution control
CN112348352B (en) Big data analysis-based automatic generation method for electric power budget proposal scheme
Di et al. Digital empowerment and win-win co-operation for green and low-carbon industrial development: analysis of regional differences based on GMM-ANN intelligence models
Wang et al. A fuzzy DEA–Neural approach to measuring design service performance in PCM projects

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 350001 unit 6, 4 building, 245 Xiu Shan Road, Xin Dian Town, Jinan District, Fuzhou, Fujian, 608

Applicant after: Four creation technology limited company

Address before: 350108, 10 tower, Chuang Chuang, hi tech Zone, 8 east science and technology road, Minhou street, Minhou, Fuzhou.

Applicant before: Fujian Strong Software Co., Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171215