CN107479437B - A kind of hydroelectric facility based on communication platform reports processing system for repairment - Google Patents
A kind of hydroelectric facility based on communication platform reports processing system for repairment Download PDFInfo
- Publication number
- CN107479437B CN107479437B CN201710692111.7A CN201710692111A CN107479437B CN 107479437 B CN107479437 B CN 107479437B CN 201710692111 A CN201710692111 A CN 201710692111A CN 107479437 B CN107479437 B CN 107479437B
- Authority
- CN
- China
- Prior art keywords
- actuator
- repairment
- data
- processing
- arbiter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
- G05B19/042—Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
- G05B19/0423—Input/output
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/20—Education
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/12—Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/24—Pc safety
- G05B2219/24215—Scada supervisory control and data acquisition
Abstract
The present invention provides a kind of hydroelectric facilities based on communication platform to report processing system for repairment, including externally backstage, reception processing, transmission processing, arbiter, actuator, card reader, coded card;The external backstage, reception processing, arbiter, actuator, transmission processing successively communicate to connect, and send processing output and are communicatively connected to external backstage;The actuator is connected with card reader, and multiple coded cards are plugged in card reader, store function code in coded card, and function code includes at least identification head and processing unit.The present invention by using card reader and coded card mode, upgrading can be greatly facilitated, as long as function upgrading replaces coded card, as long as while the code upgrade of coded card also meet basic format, for participating in upgrading especially for school student, fallibility is greatly reduced;Cost is extremely low simultaneously, is easy to be received by school.
Description
Technical field
The present invention relates to a kind of hydroelectric facilities based on communication platform to report processing system for repairment.
Background technique
As the continuous development in my school is grown, student at school and teaching and administrative staff's number, campus infrastructure sum are all quickly increasing
Add, the hydroelectric facility maintenance mode for making logistics traditional is encountered huge challenge and pressure by these.Currently, my school logistics water
It is to react to report situation for repairment by the way of reporting step by step that electric equipment, which reports mode for repairment, and the personnel and link being related to due to centre are too many,
It is expended when situation information reporting is to rear-service department mouthful and the time of feedback is long, it is impossible to meet real-time, interactives to send a characteristic, former
Some information interaction approach oneself through being difficult to meet the needs of users, many students, teacher users oneself proposed this problem.This
Also result in the problems such as teachers and students discontented to the logistics service of reporting for repairment, misunderstanding and security risk.
The fast development of mobile communication technology, communication modes produce huge variation.Wechat public platform is in communication side
Advantage in formula gradually appears, and becomes one of common communication modes of people.Exploitation wechat public platform is a kind of extremely reasonable
Mode, however in the prior art, the exploitation of wechat public platform is usually to be integrated into a backstage, and the degree of coupling is high, after
Need to be modified entire backstage code when phase upgrades, be very easy to cause after upgrading system can not normal use the problem of.
Summary of the invention
In order to solve the above technical problems, the present invention provides a kind of hydroelectric facilities based on communication platform to report processing system for repairment
System is somebody's turn to do the hydroelectric facility based on communication platform and reports processing system for repairment by using the mode of card reader and coded card, and energy is greatly
Facilitate upgrading, and cost is extremely low, is easy to be received by school.
The present invention is achieved by the following technical programs.
A kind of hydroelectric facility based on communication platform provided by the invention reports processing system for repairment, including externally backstage, reception
Processing, transmission processing, arbiter, actuator, card reader, coded card;The external backstage, reception processing, arbiter, execution
Device, transmission processing successively communicate to connect, and send processing output and are communicatively connected to external backstage;The actuator is connected with card reading
Device is plugged with multiple coded cards in card reader, and store function code in coded card, function code includes at least identification head and place
Reason portion;
The actuator will identify head in increased coded card when the coded card of grafting on detecting card reader increases
Code read and be sent in arbiter, and processing unit in increased coded card read etc. pending, and actuator is being examined
Processing unit is removed from memory and is sent to arbiter when measuring the coded card reduction of grafting in card reader and deletes instruction;
The arbiter registers on the identification head received from actuator into memory parameters table, and identification head includes comparing
Condition and tag entry, arbiter are compared to the current data that processing is sent is received with memory parameters table according to comparison condition,
And the corresponding tag entry in identification head that meets will be compared be added to after current data and be sent to actuator, actuator is with corresponding
Processing unit handles received data;
The data packet that external backstage is sent is converted to inter-process Data Concurrent and sent to arbiter, institute by the reception processing
Transmission processing is stated the data received are converted to network packet and are sent to external backstage.
The deletion instruction is predetermined identification head.
The arbiter and actuator are ARM system.
The actuator is also connected with interchanger, and interchanger is wirelessly connected with hydraulic pressure sensor group or power sensor group,
Hydraulic pressure sensor group and power sensor group are made of wireless communication module, controller and sensor, and hydraulic pressure sensor group,
Power sensor group is installed on hydroelectric facility and is monitored to hydroelectric facility.
It is connected with wrapper between the actuator and transmission processing, wrapper is connected with database;Wrapper will receive
Database is sent to from the data of actuator to save, while will receive to be converted to user feedback data transmission from the data of actuator
It is handled to transmission.
The database is connected with middle control, internal operation is set or be circumscribed in middle control, when there is newly-increased data in database
Middle control is handled according to data are increased newly, and processing result is sent by internal operation.
The database and middle control are computer.
The wrapper is ARM system.
The coded card is flash card.
Present invention is mainly applied to the wechats of campus hydroelectric facility to report for repairment.
The beneficial effects of the present invention are: by using the mode of card reader and coded card, upgrading, function can be greatly facilitated
As long as replacement coded card can be upgraded, as long as while the code upgrade of coded card also meet basic format, it is especially right
For school student participates in upgrading, fallibility is greatly reduced;Cost is extremely low simultaneously, is easy to be received by school.
Detailed description of the invention
Fig. 1 is connection schematic diagram of the invention.
In figure: the external backstage 101-, 102- reception processing, 103- transmission processing, 201- arbiter, 202- actuator,
203- wrapper, 204- database are controlled in 205-, operation inside 206-, 301- card reader, 302- coded card, 303- interchanger,
304- hydraulic pressure sensor group, 305- power sensor group.
Specific embodiment
Be described further below technical solution of the present invention, but claimed range be not limited to it is described.
A kind of hydroelectric facility based on communication platform as shown in Figure 1 reports processing system for repairment, including externally backstage 101, connect
It receives processing 102, send processing 103, arbiter 201, actuator 202, card reader 301, coded card 302;The external backstage
101, reception processing 102, arbiter 201, actuator 202, transmission processing 103 successively communicate to connect, and transmission handles 103 outputs and leads to
Letter is connected to externally backstage 101;The actuator 202 is connected with card reader 301, and multiple coded cards are plugged in card reader 301
302, store function code in coded card 302, function code includes at least identification head and processing unit;
The actuator 202 is when the coded card 302 of grafting on detecting card reader 301 increases by increased coded card
In 302 identify head code reads and is sent in arbiter 201, and by increased coded card 302 processing unit reading etc.
It is pending, and actuator 202 is clear from memory by processing unit when the coded card 302 of grafting on detecting card reader 301 is reduced
It removes and is sent to arbiter 201 and delete instruction;
The arbiter 201 registers on the identification head received from actuator 202 into memory parameters table, identification head packet
Comparison condition and tag entry are included, arbiter 201 is according to comparison condition to the current data and memory parameters for receiving 102 transmission of processing
Table is compared, and will compare the corresponding tag entry in identification head that meets and be added to after current data and be sent to actuator 202,
Actuator 202 is handled received data with corresponding processing unit;
The data packet that external backstage 101 is sent is converted to inter-process Data Concurrent and sent to sentencing by reception processing 102
Other device 201, the data that the transmission processing 103 will receive are converted to network packet and are sent to externally backstage 101.
Externally backstage 101 is attached to wechat backstage, reports terminal for repairment or report website for repairment as a result, and user reports message for repairment from external
101 access from the background receives processing 102 and handles message, such as deletes the XML format label of wechat back-end data, and will
The label of token id therein, timestamp etc is also deleted, and arbiter 201, class of the arbiter 201 to data are then forwarded to
Type is judged that judging result is attached in data packet as identifier, after actuator 202 receives data packet, first reads mark
Know symbol, corresponding processing unit code is then chosen according to identifier and is executed to handle packet content.Based on this, when need
When processing code being replaced or be upgraded, directly replacement or newly-increased coded card 302 can.
Further, arbiter 201 identifies head from the received main contents of actuator 202, therefore to ensure to differentiate
Device 201 receives the uniform format of instruction, and the deletion instruction is predetermined identification head.
Cost to ensure arbiter 201 and actuator 202 is lower, especially upgrades required upgrade cost, described to sentence
Other device 201 and actuator 202 are ARM system, i.e., using ARM chip as the circuit board of core, and programming has system in ARM chip
(predominantly RTOS, but may be SoC).
Further, to avoid the case where disorderly reporting for repairment appearance, the actuator 202 is also connected with interchanger 303, interchanger
303 are wirelessly connected with hydraulic pressure sensor group 304 or power sensor group 305, hydraulic pressure sensor group 304 and power sensor group
305 are made of wireless communication module, controller and sensor, and hydraulic pressure sensor group 304, power sensor group 305 are pacified
Hydroelectric facility is monitored on hydroelectric facility.The monitored condition of equipment can be read in actuator 202 as a result, thus to report
The verifying of repair row.
Furthermore actuator 202 generally uses ARM system, although cost is relatively low, its computing capability is then relatively more limited, soft
Its computing capability, which may be not sufficient to ensure that, after part upgrading timely and effectively packs processing result, while when treating capacity is larger
When, it sends processing 103 and is also possible to handle too late, and processing result is generally tables of data, and needs to return to client's
Content is generally text, and intermediate conversion process is handled more preferably by dedicated module, therefore for processing result is preferably presented to visitor
Family is connected with wrapper 203 between the actuator 202 and transmission processing 103, and wrapper 203 is connected with database 204;Packet
Data received from actuator 202 are sent to database 204 and save by dress device 203, while will receive data from actuator 202
It is converted to user feedback data and is sent to transmission processing 103.Not only data processing is more smooth as a result, and can also history of forming
Record, facilitates analysis.
Further, to make good use of historical record, meanwhile, as the setting to reporting message for repairment and handling in time, the data
Library 204 is connected with middle control 205, sets or be circumscribed with internal operation 206 in middle control 205, when having newly-increased data in database 204 in
Control 205 is handled according to data are increased newly, and processing result is sent by internal operation 206.
Specifically, the database 204 and middle control 205 are computer.
The wrapper 203 is ARM system.
The coded card 302 is flash card.
Disclosure is particularly well suited to be applied to the wechat of campus hydroelectric facility to report for repairment.
It, can be by more for the processing mode reported for repairment based on above-mentioned as it can be seen that present invention can be suitably applied to use lasting for a long time
The mode for changing coded card 302 is constantly upgraded, as at present for utilizing hydraulic pressure sensor group 304, power sensor group 305
The algorithm that data are verified still lacks effective achievement, therefore relatively simple processing mode can be used, and the later period is for utilizing
The algorithm that hydraulic pressure sensor group 304, the data of power sensor group 305 are verified, which has will then examine when further progress, to be led to
In the realization code write-in coded card 302 crossed, upgraded in a manner of replacing or increasing newly coded card 302;On the other hand, for
Different data recording fashions can also be used which and be upgraded, such as middle control 205 finds data record in use
When insufficient, upgraded by way of replacing coded card 302, can easily be solved.
Meanwhile the cost of ARM system is far below computer, also below network server is rented, such as BeagleBone Black
Less than 400 yuan, arbiter 201, actuator 202 and wrapper 203 are added up less than 1500 yuan one piece of cost, and are more had instantly
Only 200 yuan of one block cost of raspberry pie, arbiter 201, actuator 202 and wrapper 203 add up count in again it is matched heat dissipation and
Power supply unit is also less than 1000 yuan.
Claims (10)
1. a kind of hydroelectric facility based on communication platform reports processing system for repairment, including externally backstage (101), reception processing (102),
Transmission handles (103), arbiter (201), actuator (202), card reader (301), coded card (302), it is characterised in that: described
Externally backstage (101), reception processing (102), arbiter (201), actuator (202), transmission handle (103) successively communication link
It connects, transmission processing (103) output is communicatively connected to externally backstage (101);The actuator (202) is connected with card reader (301),
It is plugged in card reader (301) multiple coded cards (302), store function code in coded card (302), function code includes at least
Identify head and processing unit;
The actuator (202) is when the coded card (302) of grafting on detecting card reader (301) increases by increased coded card
(302) code on identification head reads and is sent in arbiter (201) in, and by processing unit in increased coded card (302)
Reading etc. is pending, and actuator (202) will processing when the coded card (302) of grafting on detecting card reader (301) is reduced
Portion, which removes from memory and sends to arbiter (201), deletes instruction;
The arbiter (201) registers on the identification head received from actuator (202) into memory parameters table, identification head packet
Comparison condition and tag entry are included, arbiter (201) is according to comparison condition to the current data and memory of reception processing (102) transmission
Parameter list is compared, and will compare after the corresponding tag entry in identification head met is added to current data and be sent to actuator
(202), actuator (202) is handled received data with corresponding processing unit;
The data packet that externally backstage (101) is sent is converted to inter-process Data Concurrent and sent to sentencing by reception processing (102)
The data received are converted to network packet and are sent to external backstage by other device (201), the transmission processing (103)
(101);
The reception processing (102) handles message, is then forwarded to arbiter (201), arbiter (201) is to data
Type is judged that judging result is attached in data packet as identifier, after actuator (202) receives data packet, is first read
Identifier is taken, corresponding processing unit code is then chosen according to identifier and is executed to handle packet content.
2. the hydroelectric facility based on communication platform reports processing system for repairment as described in claim 1, it is characterised in that: the deletion
Instruction is predetermined identification head.
3. the hydroelectric facility based on communication platform reports processing system for repairment as described in claim 1, it is characterised in that: the differentiation
Device (201) and actuator (202) are ARM system.
4. the hydroelectric facility based on communication platform reports processing system for repairment as described in claim 1, it is characterised in that: the execution
Device (202) is also connected with interchanger (303), and interchanger (303) is wirelessly connected with hydraulic pressure sensor group (304) or power sensor
Group (305), hydraulic pressure sensor group (304) and power sensor group (305) are by wireless communication module, controller and sensor group
At, and hydraulic pressure sensor group (304), power sensor group (305) are installed on hydroelectric facility and are monitored to hydroelectric facility.
5. the hydroelectric facility based on communication platform reports processing system for repairment as described in claim 1, it is characterised in that: the execution
It is connected with wrapper (203) between device (202) and transmission processing (103), wrapper (203) is connected with database (204);Packaging
Data received from actuator (202) are sent to database (204) and saved by device (203), while will be received from actuator (202)
Data be converted to user feedback data be sent to transmission processing (103).
6. the hydroelectric facility based on communication platform reports processing system for repairment as claimed in claim 5, it is characterised in that: the data
Library (204) is connected with middle control (205), sets or be circumscribed with internal operation (206) in middle control (205), new when having in database (204)
Control (205) is handled according to data are increased newly in when increasing data, and processing result is sent by internal operate (206).
7. the hydroelectric facility based on communication platform reports processing system for repairment as claimed in claim 6, it is characterised in that: the data
Library (204) and middle control (205) are computer.
8. the hydroelectric facility based on communication platform reports processing system for repairment as claimed in claim 5, it is characterised in that: the packaging
Device (203) is ARM system.
9. the hydroelectric facility based on communication platform reports processing system for repairment as described in claim 1, it is characterised in that: the code
Blocking (302) is flash card.
10. the hydroelectric facility based on communication platform reports processing system for repairment as described in claim 1, it is characterised in that: be applied to
The wechat of campus hydroelectric facility is reported for repairment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710692111.7A CN107479437B (en) | 2017-08-14 | 2017-08-14 | A kind of hydroelectric facility based on communication platform reports processing system for repairment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710692111.7A CN107479437B (en) | 2017-08-14 | 2017-08-14 | A kind of hydroelectric facility based on communication platform reports processing system for repairment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107479437A CN107479437A (en) | 2017-12-15 |
CN107479437B true CN107479437B (en) | 2019-09-13 |
Family
ID=60599443
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710692111.7A Active CN107479437B (en) | 2017-08-14 | 2017-08-14 | A kind of hydroelectric facility based on communication platform reports processing system for repairment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107479437B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104182819A (en) * | 2014-07-31 | 2014-12-03 | 心触动(武汉)文化传媒有限公司 | Intelligent repair reporting method and system |
CN105785852A (en) * | 2015-12-10 | 2016-07-20 | 青岛工学院 | Dormitory water and electricity detecting apparatus and system for receiving information repair |
CN105915441A (en) * | 2016-05-20 | 2016-08-31 | 国家电网公司 | WeChat repair method based on distribution network emergency repair command system |
CN106586753A (en) * | 2017-01-24 | 2017-04-26 | 南京新蓝摩显示技术有限公司 | Intelligent handling system and method for elevator failure repair |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5219665B2 (en) * | 2008-07-23 | 2013-06-26 | 三菱電機株式会社 | Equipment maintenance management equipment |
-
2017
- 2017-08-14 CN CN201710692111.7A patent/CN107479437B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104182819A (en) * | 2014-07-31 | 2014-12-03 | 心触动(武汉)文化传媒有限公司 | Intelligent repair reporting method and system |
CN105785852A (en) * | 2015-12-10 | 2016-07-20 | 青岛工学院 | Dormitory water and electricity detecting apparatus and system for receiving information repair |
CN105915441A (en) * | 2016-05-20 | 2016-08-31 | 国家电网公司 | WeChat repair method based on distribution network emergency repair command system |
CN106586753A (en) * | 2017-01-24 | 2017-04-26 | 南京新蓝摩显示技术有限公司 | Intelligent handling system and method for elevator failure repair |
Also Published As
Publication number | Publication date |
---|---|
CN107479437A (en) | 2017-12-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105491038B (en) | A kind of intelligent equipment protocol analytic method | |
CN202210296U (en) | Power transformation intelligent tour inspection integrated device and monitoring system | |
CN107153858A (en) | A kind of intelligent substation optical cable tag system based on NFC technique | |
CN205540894U (en) | Financial affairs archive management system | |
CN103576632A (en) | Live pig growth environment monitoring and control system based on internet of things technology | |
CN110503170A (en) | A kind of data center machine room intellectual capital management system | |
CN106874974A (en) | A kind of Work tool Mobile solution implementation method based on technology of Internet of things | |
CN104123674A (en) | Intelligent ammeter management system and method | |
CN105610612A (en) | Intelligent digital distributing frame system and application method thereof | |
CN202584171U (en) | Intelligent management system of laboratory appliance and based on Internet of Things | |
CN110909830A (en) | Transformer substation secondary equipment information maintenance system based on RFID | |
CN108985118A (en) | The mobile cruising inspection system of electric power interactive mode based on the close module of RFID and state | |
CN106886738A (en) | Substation equipment intelligent management system based on Quick Response Code identification | |
CN107612592A (en) | A kind of efficiency interactive system based on power line transmission | |
CN107479437B (en) | A kind of hydroelectric facility based on communication platform reports processing system for repairment | |
CN205910525U (en) | Controlgear intelligence control system based on RFID | |
CN106572174A (en) | Zigbee based intelligent RFID induction bookmark | |
CN106780817A (en) | Campus Security supervisory systems and monitoring and managing method based on RFID technique | |
CN112104088A (en) | Intelligent substation protection and secondary circuit handheld type patrol instrument and working method thereof | |
CN206181089U (en) | Many two take place ofs ID card network coding and decoding system based on bus technique | |
Lin | IoT Experimental Classroom Project under the Mode of Industry-University-Research Collaboration | |
CN105337173A (en) | Processing method, processing apparatus and processing system for overhead line electric pole, and overhead line electric pole | |
CN207051911U (en) | A kind of Intelligent Recognition checking terminal with a variety of automatic identification functions | |
CN205621035U (en) | Power transmission and distribution technology card management system | |
CN101847001A (en) | Power-getting management system of apparatus based on RFID (Radio Frequency Identification Devices) and CAN (Controller Area Network) bus technology as well as method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||