CN107476471A - One kind assembling combined type external wall system and its construction method - Google Patents

One kind assembling combined type external wall system and its construction method Download PDF

Info

Publication number
CN107476471A
CN107476471A CN201710694955.5A CN201710694955A CN107476471A CN 107476471 A CN107476471 A CN 107476471A CN 201710694955 A CN201710694955 A CN 201710694955A CN 107476471 A CN107476471 A CN 107476471A
Authority
CN
China
Prior art keywords
heat insulating
decorative board
insulating decorative
steel plate
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710694955.5A
Other languages
Chinese (zh)
Inventor
田军县
吴咩龙
马才永
王纪祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Kodak Building Material Co Ltd
Original Assignee
Zhejiang Kodak Building Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Kodak Building Material Co Ltd filed Critical Zhejiang Kodak Building Material Co Ltd
Priority to CN201710694955.5A priority Critical patent/CN107476471A/en
Publication of CN107476471A publication Critical patent/CN107476471A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • E04B2/7407Removable non-load-bearing partitions; Partitions with a free upper edge assembled using frames with infill panels or coverings only; made-up of panels and a support structure incorporating posts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0832Separate fastening elements without load-supporting elongated furring elements between wall and covering elements
    • E04F13/0833Separate fastening elements without load-supporting elongated furring elements between wall and covering elements not adjustable
    • E04F13/0841Separate fastening elements without load-supporting elongated furring elements between wall and covering elements not adjustable the fastening elements engaging the outer surface of the covering elements, not extending through the covering

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Building Environments (AREA)
  • Finishing Walls (AREA)

Abstract

The invention discloses one kind to assemble combined type external wall system, including fixed system, heat insulating decorative board and ALC battens, fixed system includes fixation steel plate and supporting steel plate, the first link slot is provided with fixation steel plate, the second link slot and the 3rd link slot are provided with supporting steel plate, one end of supporting steel plate is connected with fixation steel plate, the other end of supporting steel plate is provided with clamp, heat insulating decorative board includes decorative paint layer, heat-insulation layer and bonding interface layer, heat insulating decorative board is fixedly connected by fixed system with ALC battens, and the construction method comprises the following steps:(1) early-stage preparations;(2) installation of ALC battens;(3) installation of heat insulating decorative board;(4) detect.Simple in construction, short construction period of the invention, construction is simple, economy attractive in appearance is green, energy-efficient, prevents wall crazing diafiltration, extends the service life of wall, and the fire protecting performance of the wall and anti-seismic performance are good, strengthen the functional characteristic of building just.

Description

One kind assembling combined type external wall system and its construction method
Technical field
The present invention relates to one kind assembling combined type external wall system and its construction method.
Background technology
Assembled architecture:Refer to the component part in plant produced, at the construction field (site) the building by assembling and being formed by connecting. It is exactly partly originally by the component and fitting of cast-in-place shaping relative to still being accounted for now in construction for the cast-in-place building of main flow (such as beam, post, plate) takes factory and goes to produce, and transports to building site assembling after production again, its node is carried out, then using part Cast in situs this two parts is combined, form a complete building, this is just assembled architecture.China's assembled is built The development built still is in the primary stage, and 'bottleneck' restrictions are still quite prominent, and ideas is not unified enough, adaptable system not Mechanism also imperfection, technical system is not yet ripe, and the design of enterprise, production, the phenomenon of construction and ability to supervise deficiency have general All over property.
Mainly there is two large assembly formulas building the country, is PC systems or steel beam concrete system.This two big system effectively increases labor Dynamic production efficiency, avoid producing the pollution of building waste and environment, while can expedite the emergence of some NPD projects again produces economic development Raw new kinetic energy particularly develops steel construction and had certain effect to dissolving current superfluous steel production capacity.But this two big system is deposited again In following shortcoming:1st, in construction, the weight of prefabricated components is big, and transport is difficult, and installation is also difficult;2nd, the junction of beam column and plate stitch Phenomena such as easy cracking seepage;3rd, fake high, 30% or so is higher by than traditional method;4th, the production cycle is grown, floor space Greatly, energy loss is big.
The content of the invention
Present invention aims at provided for the deficiency present in prior art a kind of assembling combined type external wall system and The technical scheme of its construction method, short construction period, construction is simple, economy attractive in appearance is green, energy-efficient, prevents wall Cracking diafiltration, extend the service life of wall, and the fire protecting performance of the wall and anti-seismic performance are good, strengthen the feature of building Feature.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme that:
One kind assembling combined type external wall system, it is characterised in that:Including fixed system, heat insulating decorative board and ALC battens, Gu Determining system includes fixation steel plate and supporting steel plate, is provided with the first link slot on fixation steel plate, second is provided with supporting steel plate Link slot and the 3rd link slot, one end of supporting steel plate are connected with fixation steel plate, and the other end of supporting steel plate is provided with clamp, Clamp includes upper clamp and lower clamp, and heat insulating decorative board includes decorative paint layer, heat-insulation layer and bonding interface layer, decorative paint layer Outward flange be provided with chamfering, heat-insulation layer between dope layer and adhesive interface layer, heat insulating decorative board by fixed system with ALC battens are fixedly connected;Fixed system can be fixed in order to the installation between heat insulating decorative board and ALC battens, the design of chamfering Not only so that the more beautiful solid of heat insulating decorative board, and have can be in order to being brought into close contact between clamp and heat insulating decorative board.
Further, the material of decorative paint layer is stone-like coating or true mineral varnish, can be carried using stone-like coating or true mineral varnish The surface aesthetic performance of high insulation and decoration bag, so as to improve the aesthetics of construction wall, and both moderate costs, cost are low.
Further, heat-insulation layer is hard polyurethane foam warming plate, and the good heat insulating of hard polyurethane foam warming plate is environmentally friendly, weight Amount is light, is easy to the transport and installation of heat insulating decorative board, and the quality of hard polyurethane foam warming plate is good, service life length, extends The service life of heat insulating decorative board, while the fire resistance of hard polyurethane foam warming plate is good, improves the system safety of construction building Performance.
Further, it is arranged in a mutually vertical manner between fixation steel plate and supporting steel plate, and fixation steel plate is integrated with supporting steel plate Molding structure, the design of integrated formed structure can be in order to the machine-shaping of reality, and reasonable in design, installing/dismounting is convenient.
Further, upper clamp and lower clamp are obliquely installed, and are obliquely installed and be may insure that clamp, lower clamp and insulation fill It is brought into close contact between plaque, structure design is more ingenious reasonable.
Using a kind of construction method for assembling combined type external wall system described above, it is characterised in that:Comprise the following steps:
1) early-stage preparations:
(1) construction material is transported to job location, when ALC battens are stacked, it is ensured that it is less than or equal to 2 meters per height of embankment degree, And the lower section of the ALC battens in the bottom lays chock;
(2) base course wall surface is cleared up, knocks out hollowing, levelling metope, clear up debris, it is ensured that base course wall surface Dry, be clean, then review measurement is carried out to the outer profile size of wall, carrying out drawing Deepen Design, determine line setting;
(3) built-in fitting is checked, and post-install is installed;
2) installation of ALC battens:
(1) snap the line setting-out is carried out using laser instrument for marking line, sets horizontal control lines and degree control line, determine door and window hole Mouth position, the horizontal control lines and mounting plane line of each floor are set further according to the bent columns position of design requirement and surrounding;
(2) required according to the size of construction drawing and typesetting figure, to install wallboard planar line and horizontal control lines as foundation, peace Install support member and C-shaped channel is fixed at edge, it is ensured that each skin panel height welding C-shaped channel, every five dermatotomes material are high on bent columns Degree welding support member, weldquality should meet design requirement and job specfication, then brush one layer of priming paint, carry out antirust treatment;
(3) installation of ALC battens is carried out, is first lifted ALC battens in place by lifting machine, workmen is again to ALC Batten is corrected, then high-ranking officers it is just qualified after the surface of wall that is accurately positioned of ALC battens, while adjust the installation of ALC battens Angle, it is ensured that the alignment error control of ALC battens in allowed limits, is ground to the ALC battens more than tolerance with steel-tooth Plate or matte board are modified processing, then ALC battens are welded on the bent columns edge of a wing or support member using gib headed bolt, root The verification of ALC bar plate flatness is carried out according to the horizontal control lines and degree control line of setting;
(4) according to installation drawing and erection sequence by the installation of whole face wall face, then with the special mending mortar pair of ALC battens Losing fangle, perforate depressed area are repaired, then between adjacent ALC battens, installing angle junction and ALC battens with Jointing processing is carried out at gap between bent columns, is uniformly filled into the pointing of preparation in gap using filling device, then Carry out floating processing;
(5) in 24~48 after the completion of constructing, wall construction quality is further checked, finds hollowing, cracking etc. Phenomenon then carries out Repair;
(6) enter the prefabricated processing of Wiring trough to the surface of wall after above-mentioned steps are handled, according to design drawing determine into The installation site of family line and electric device, then snap the line positioning is carried out, it is final to determine optimal installation circuit, exist further according to design drawing Surface of wall carries out slot treatment, and wire casing is got in wall specified location using cutting machine, it is ensured that and the depth of wire casing is 3~4cm, Wire casing width is 4~6cm, and ensures that wire casing is smooth vertical and horizontal in grooving process, and electric wire and water pipe finally are embedded in into wire casing It is interior;
3) installation of heat insulating decorative board:
(1) installation block number, area and the specification of heat insulating decorative board are determined according to wall size first, and ensures list The area of block heat insulating decorative board is less than or equal to 1.2m2, split according still further to drawing in the surface of wall for posting ALC battens, water Flat line;
(2) installation site of heat insulating decorative board is determined according to design drawing, is carried out in the installed position of heat insulating decorative board The installation of fixed system, 1~2 fixed system is installed in the lower section of heat insulating decorative board, and it is following with every piece of heat insulating decorative board Line on the basis of the horizontal direction of line, it is ensured that the upper surface of supporting steel plate is alignd with datum line, then ensures the mounting hole of fixed system Hole position, then removes fixed system, is drilled using drilling machine in installation hole location, then the upper surface by supporting steel plate Overlap with datum line, be then fixedly connected with fixation steel plate with ALC bar plate surfaces by hook screw;
(3) adhesive mortar is uniformly smeared on the surface of the bonding interface layer of heat insulating decorative board, using a bonding or bar bonding, Ensure that effective bonding area is not less than 60%, installed by design drawing, heat insulating decorative board is placed on supporting steel plate, then adjusted Flatness, the perpendicularity of whole heat insulating decorative board, and ensure the wide gaps of reserved 5mm~10mm between adjacent heat insulating decorative board, Compacting heat insulating decorative board is pasted, and the adhesive mortar of heat insulating decorative board surrounding base is cleared up, then will be propped up by hook screw Support steel plate is fixedly connected with heat insulating decorative board bottom surface, while when heat insulating decorative board is installed, for two insulation dresses of two rows Plaque, the top surface of lower row's heat insulating decorative board are further connected by hook screw with the fixed system below upper row's heat insulating decorative board Fixed, that further improves attemperator plate firmly installs performance, and adjacent heat insulating decorative board is ensured in installation process Mutually stagger between gap and the gap of adjacent ALC battens, avoid gap at two relative, cause the low intensity of wall at this, after Phase serious cracking;
(4) after heat insulating decorative board pastes 72h, its surface is cleared up, keeps clear in adjacent heat insulating decorative board gap It is clean, foam encapsulating material is then inserted in gap, and going out 2mm T-me line paper away from slit aperture, then will be weather-proof with silica gel gun Type sealed silicone is squeezed into gap, fills and leads up whole piece gap, then with doctor blade surface, after 24~36h, U.S. line paper is torn Fall, the surface of heat insulating decorative board is cleared up;
4) detect:
After the installation for completing whole combined type external wall system, final detection process is carried out to it.
Further, in the installation process of ALC battens and heat insulating decorative board, it is necessary to from top to bottom, in units of layer, division Operation, and from bottom to top being installed when installing for every layer, so as to form the cross construction of floor gap, and in every block of ALC batten and Classification layering numbering is carried out on heat insulating decorative board, consequently facilitating layering, segmental hoisting and installation, shorten construction period.
Further, in (1), set up reinforced concrete pillar in door and window hole position and carry out reinforcement processing the step 2) the step of.
Further, the step 2) the step of in (4), when carrying out floating processing to jointing, using V-type joint filling spatula from gap Center line presses down so that the both sides uniform-compression of V-type joint filling spatula, so as to reduce the generation rate in crack.
The present invention is by adopting the above-described technical solution, have the advantages that:
Present invention employs the combination of ALC battens and heat insulating decorative board, it is decoration integrated to realize structural thermal insulation, ALC plates Material is inorganic material in itself, reaches national A levels fire-protection standard, and 150mm thick wall bodies fire resistance property can effectively improve more than 4 hours The fire protecting performance of wall, while ALC sheet materials pass through scientific and reasonable installation design of node and installation method from heavy and light so that ALC battens have good trackability, 1:In 1 earthquake simulation test, after 10.5 degree of seismic experiments of earthquake intensity, test is built Building model whole sheet material, none is broken, none damage of installation node, the anti-seismic performance of wall is effectively improved, so as to improve wall Security of system energy, while can solve the shortcomings that heat insulating ability of ALC battens in itself is poor, easily ftractures by heat insulating decorative board, Perfection prevents wall crazing leakage scenarios, while improves the heat-insulating property of wall again, and in the installation process of heat insulating decorative board It is middle by the way of bonding and anchoring are combined, by adhesive mortar and fixed system realize heat insulating decorative board and ALC battens it Between be connected, construction is simple, structure is safe and reliable.
Simple in construction, short construction period of the invention, construction is simple, economy attractive in appearance is green, energy-efficient, prevents wall Body cracking diafiltration, extend the service life of wall, and the fire protecting performance of the wall and anti-seismic performance are good, strengthen the function of building Property feature.
Brief description of the drawings
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is a kind of structural representation for assembling combined type external wall system of the present invention;
Fig. 2 is the structural representation of fixed system in the present invention;
The structural representation of heat insulating decorative board in the present invention of Fig. 3 positions.
In figure:1- fixed systems;2- heat insulating decorative boards;3-ALC battens;4- fixation steel plates;5- supporting steel plates;6- first connects Access slot;The link slots of 7- second;The link slots of 8- the 3rd;The upper clamps of 9-;Clamp under 10-;11- decorative paint layers;12- heat-insulation layers;13- Bonding interface layer;14- chamferings.
Embodiment
As shown in Figure 1 to Figure 3, combined type external wall system, including fixed system 1, insulation and decoration are assembled for the present invention is a kind of Plate 2 and ALC battens 3, fixed system 1 include fixation steel plate 4 and supporting steel plate 5, between fixation steel plate 4 and supporting steel plate 5 mutually It is vertically arranged, and fixation steel plate 4 and supporting steel plate 5 are formed in one structure, the design of integrated formed structure can be in order to reality Machine-shaping, reasonable in design, installing/dismounting is convenient, and the first link slot 6 is provided with fixation steel plate 4, is set on supporting steel plate 5 There are the second link slot 7 and the 3rd link slot 8, one end of supporting steel plate 5 is connected with fixation steel plate 4, the other end of supporting steel plate 5 Clamp is provided with, clamp includes upper clamp 9 and lower clamp 10, and upper clamp 9 and lower clamp 10 are obliquely installed, and being obliquely installed can be with Ensure to be brought into close contact between upper clamp 9, lower clamp 10 and heat insulating decorative board 2, structure design is more ingenious reasonable, fixed system 1 can fix in order to the installation between heat insulating decorative board 2 and ALC battens 3, and overall construction design is more ingenious reasonable, insulation Decorative panel 2 includes decorative paint layer 11, heat-insulation layer 12 and bonding interface layer 13, the material of decorative paint layer 11 for stone-like coating or True mineral varnish, the surface aesthetic performance of insulation and decoration bag can be improved using stone-like coating or true mineral varnish, so as to improve construction wall Aesthetics, and both moderate cost, cost is low, and the outward flange of decorative paint layer 11 is provided with chamfering 14, and chamfering 14 is set Meter not only causes 2 more beautiful solid of heat insulating decorative board, and have can be in order to closely pasting between clamp and heat insulating decorative board 2 Close, while may insure certain gap be present between adjacent heat insulating decorative board 2 again, be easy to the encapsulation process in later stage, heat-insulation layer 12 between dope layer and adhesive interface layer, and heat-insulation layer 12 is hard polyurethane foam warming plate, the guarantor of hard polyurethane foam warming plate Warm nature can be good, environmental protection, in light weight, is easy to the transport and installation of heat insulating decorative board 2, and the quality of hard polyurethane foam warming plate It is good, service life length, the service life of extension heat insulating decorative board 2, while the fire resistance of hard polyurethane foam warming plate is good, improves The security of system energy of construction building, heat insulating decorative board 2 are fixedly connected by fixed system 1 with ALC battens 3.
Using a kind of construction method for assembling combined type external wall system described above, comprise the following steps:
1) early-stage preparations:
(1) construction material is transported to job location, when ALC battens 3 are stacked, it is ensured that it is less than or equal to 2 meters per height of embankment degree, And the lower section of the ALC battens 3 in the bottom lays chock;
(2) base course wall surface is cleared up, knocks out hollowing, levelling metope, clear up debris, it is ensured that base course wall surface Dry, be clean, then review measurement is carried out to the outer profile size of wall, carrying out drawing Deepen Design, determine line setting;
(3) built-in fitting is checked, and post-install is installed;
2) installation of ALC battens 3:
(1) snap the line setting-out is carried out using laser instrument for marking line, sets horizontal control lines and degree control line, determine door and window hole Mouth position, sets up reinforced concrete pillar in door and window hole position and carries out reinforcement processing, further according to the bent columns of design requirement and surrounding Position sets the horizontal control lines and mounting plane line of each floor;
(2) required according to the size of construction drawing and typesetting figure, to install wallboard planar line and horizontal control lines as foundation, peace Install support member and C-shaped channel is fixed at edge, it is ensured that each skin panel height welding C-shaped channel, every five dermatotomes material are high on bent columns Degree welding support member, weldquality should meet design requirement and job specfication, then brush one layer of priming paint, carry out antirust treatment;
(3) installation of ALC battens 3 is carried out, is first lifted ALC battens 3 in place by lifting machine, workmen is right again ALC battens 3 are corrected, then high-ranking officers it is just qualified after the surface of wall that is accurately positioned of ALC battens 3, while adjust ALC battens 3 Setting angle, it is ensured that ALC battens 3 alignment error control in allowed limits, to the ALC battens 3 more than tolerance Processing is modified with steel-tooth nog plate or matte board, ALC battens 3 are then welded in by the bent columns edge of a wing or branch using gib headed bolt In support member, the verification of the flatness of ALC battens 3 is carried out according to the horizontal control lines of setting and degree control line;
(4) according to installation drawing and erection sequence by the installation of whole face wall face, then with 3 special mending mortar of ALC battens Losing fangle, perforate depressed area are repaired, then between adjacent ALC battens 3, installing angle junction and ALC bars Jointing processing is carried out at gap between plate 3 and bent columns, the pointing of preparation is uniformly filled into by gap using filling device It is interior, then floating processing is carried out, when carrying out floating processing to jointing, pressed down using V-type joint filling spatula from slit centers line so that The both sides uniform-compression of V-type joint filling spatula, so as to reduce the generation rate in crack;
(5) in 24~48 after the completion of constructing, wall construction quality is further checked, finds hollowing, cracking etc. Phenomenon then carries out Repair;
(6) enter the prefabricated processing of Wiring trough to the surface of wall after above-mentioned steps are handled, according to design drawing determine into The installation site of family line and electric device, then snap the line positioning is carried out, it is final to determine optimal installation circuit, exist further according to design drawing Surface of wall carries out slot treatment, and wire casing is got in wall specified location using cutting machine, it is ensured that and the depth of wire casing is 3~4cm, Wire casing width is 4~6cm, and ensures that wire casing is smooth vertical and horizontal in grooving process, and electric wire and water pipe finally are embedded in into wire casing It is interior;
3) installation of heat insulating decorative board 2:
(1) installation block number, area and the specification of heat insulating decorative board 2 are determined according to wall size first, and is ensured The area of monolithic heat insulating decorative board 2 is less than or equal to 1.2m2, divided according still further to drawing in the surface of wall for posting ALC battens 3 Cut, horizontal line;
(2) installation site of heat insulating decorative board 2 is determined according to design drawing, is entered in the installed position of heat insulating decorative board 2 The installation of row fixed system 1,1~2 fixed system 1 is installed in the lower section of heat insulating decorative board 2, and with every piece of heat insulating decorative board Line on the basis of the horizontal direction of 2 lower sidelines, it is ensured that the upper surface of supporting steel plate 5 is alignd with datum line, then ensures fixed system 1 Hole location is installed, then removes fixed system 1, is drilled using drilling machine in installation hole location, then by supporting steel plate 5 Upper surface overlapped with datum line, then fixation steel plate 4 is fixedly connected with the surface of ALC battens 3 by hook screw;
(3) adhesive mortar is uniformly smeared on the surface of the bonding interface layer 13 of heat insulating decorative board 2, is glued using a bonding or bar Method, it is ensured that effective bonding area is not less than 60%, is installed by design drawing, heat insulating decorative board 2 is placed in into supporting steel plate 5 On, then the flatness of heat insulating decorative board 2, perpendicularity are adjusted, and ensure reserved 5mm~10mm between adjacent heat insulating decorative board 2 Wide gap, compacting heat insulating decorative board 2 is pasted, and the adhesive mortar of the surrounding base of heat insulating decorative board 2 is cleared up, then pass through hook Supporting steel plate 5 is fixedly connected by head screw with the bottom surface of heat insulating decorative board 2, while when heat insulating decorative board 2 is installed, for upper and lower two Two heat insulating decorative boards 2 are arranged, the top surface of lower row's heat insulating decorative board 2 passes through hook screw and consolidating below upper row's heat insulating decorative board 2 Determine system 1 to be further connected, that further improves attemperator plate firmly installs performance, and in installation process ensures Mutually stagger between the gap of adjacent heat insulating decorative board 2 and the gap of adjacent ALC battens 3, avoid gap at two relative, cause this Locate the low intensity of wall, later stage serious cracking;
(4) after heat insulating decorative board 2 pastes 72h, its surface is cleared up, kept in the adjacent gap of heat insulating decorative board 2 Cleaning, then inserts foam encapsulating material in gap, and is going out 2mm T-me line paper away from slit aperture, then will be resistance to silica gel gun Time type sealed silicone is squeezed into gap, fills and leads up whole piece gap, then with doctor blade surface, after 24~36h, U.S. line paper is torn Fall, the surface of heat insulating decorative board 2 is cleared up, in the installation process of ALC battens 3 and heat insulating decorative board 2, it is necessary to by upper Under, in units of layer, operation is divided, and from bottom to top installed when installing for every layer, so as to form the cross construction of floor gap, and And classification layering numbering is carried out on every block of ALC batten 3 and heat insulating decorative board 2, consequently facilitating layering, segmental hoisting and installation, Shorten construction period;
4) detect:
After the installation for completing whole combined type external wall system, final detection process is carried out to it.
The specific embodiment of the present invention is these are only, but the technical characteristic of the present invention is not limited thereto.It is any with this hair Based on bright, to realize essentially identical technique effect, made ground simple change, equivalent substitution or modification etc., all cover Among protection scope of the present invention.

Claims (9)

1. one kind assembling combined type external wall system, it is characterised in that:It is described including fixed system, heat insulating decorative board and ALC battens Fixed system includes fixation steel plate and supporting steel plate, is provided with the first link slot on the fixation steel plate, on the supporting steel plate The second link slot and the 3rd link slot are provided with, one end of the supporting steel plate is connected with the fixation steel plate, the support The other end of steel plate is provided with clamp, and the clamp includes upper clamp and lower clamp, and the heat insulating decorative board includes decorative paint Layer, heat-insulation layer and bonding interface layer, the outward flange of the decorative paint layer are provided with chamfering, and the heat-insulation layer is located at the coating Between layer and the adhesive interface layer, the heat insulating decorative board is fixedly connected by the fixed system with the ALC battens.
A kind of 2. assembling combined type external wall system according to claim 1, it is characterised in that:The material of the decorative paint layer Expect for stone-like coating or true mineral varnish.
A kind of 3. assembling combined type external wall system according to claim 1, it is characterised in that:The heat-insulation layer is polyurethane Hard bubble warming plate.
A kind of 4. assembling combined type external wall system according to claim 1, it is characterised in that:The fixation steel plate with it is described It is arranged in a mutually vertical manner between supporting steel plate, and the fixation steel plate and the supporting steel plate are formed in one structure.
A kind of 5. assembling combined type external wall system according to claim 1, it is characterised in that:The upper clamp and it is described under Clamp is obliquely installed.
6. using a kind of construction method for assembling combined type external wall system as claimed in claim 1, it is characterised in that:Including such as Lower step:
1) early-stage preparations:
(1) construction material is transported to job location, when ALC battens are stacked, it is ensured that it is less than or equal to 2 meters per height of embankment degree, and Chock is laid in the lower section of the ALC battens of the bottom;
(2) base course wall surface is cleared up, knocks out hollowing, levelling metope, clear up debris, it is ensured that do on base course wall surface It is dry, clean, then review measurement is carried out to the outer profile size of wall, drawing Deepen Design is carried out, determines line setting;
(3) built-in fitting is checked, and post-install is installed;
2) installation of ALC battens:
(1) snap the line setting-out is carried out using laser instrument for marking line, sets horizontal control lines and degree control line, determine door-window opening position Put, the horizontal control lines and mounting plane line of each floor are set further according to the bent columns position of design requirement and surrounding;
(2) required according to the size of construction drawing and typesetting figure, to install wallboard planar line and horizontal control lines as foundation, installed C-shaped channel is fixed at support member and edge, it is ensured that each skin panel height welding C-shaped channel on bent columns, every five skins panel height weldering Support member is connect, weldquality should meet design requirement and job specfication, then brush one layer of priming paint, carry out antirust treatment;
(3) installation of ALC battens is carried out, is first lifted ALC battens in place by lifting machine, workmen is again to ALC battens Be corrected, then high-ranking officers it is just qualified after the surface of wall that is accurately positioned of ALC battens, while adjust the setting angle of ALC battens, Ensure that the alignment error of ALC battens is controlled in allowed limits, to ALC battens steel-tooth nog plate or the mill more than tolerance Sand plate is modified processing, then ALC battens is welded on the bent columns edge of a wing or support member using gib headed bolt, according to setting Horizontal control lines and degree control line carry out ALC bar plate flatness verification;
(4) according to installation drawing and erection sequence by the installation of whole face wall face, then with the special mending mortar of ALC battens to truncation Arrisdefect, perforate depressed area are repaired, then between adjacent ALC battens, installing angle junction and ALC battens and framed bent Jointing processing is carried out at gap between post, is uniformly filled into the pointing of preparation in gap using filling device, then carry out Floating processing;
(5) in 24~48 after the completion of constructing, wall construction quality is further checked, phenomena such as finding hollowing, ftracture Then carry out Repair;
(6) enter the prefabricated processing of Wiring trough to the surface of wall after above-mentioned steps are handled, house lead in is determined according to design drawing With the installation site of electric device, then snap the line positioning is carried out, it is final to determine optimal installation circuit, further according to design drawing in wall Surface carries out slot treatment, and wire casing is got in wall specified location using cutting machine, it is ensured that the depth of wire casing is 3~4cm, wire casing Width is 4~6cm, and ensures that wire casing is smooth vertical and horizontal in grooving process, and finally electric wire and water pipe are embedded in wire casing;
3) installation of heat insulating decorative board:
(1) installation block number, area and the specification of heat insulating decorative board are determined according to wall size first, and ensures that monolithic is protected The area of warm decorative panel is less than or equal to 1.2m2,, split according still further to drawing in the surface of wall for posting ALC battens, horizontal bar Line;
(2) installation site of heat insulating decorative board is determined according to design drawing, is fixed in the installed position of heat insulating decorative board The installation of system, 1~2 fixed system is installed in the lower section of heat insulating decorative board, and with every piece of heat insulating decorative board lower sideline Line on the basis of horizontal direction, it is ensured that the upper surface of supporting steel plate is alignd with datum line, then ensures the installation hole position of fixed system Put, then remove fixed system, drilled using drilling machine in installation hole location, then by the upper surface of supporting steel plate and base Directrix overlaps, and is then fixedly connected with fixation steel plate with ALC bar plate surfaces by hook screw;
(3) adhesive mortar is uniformly smeared on the surface of the bonding interface layer of heat insulating decorative board, using a bonding or bar bonding, it is ensured that Effective bonding area is not less than 60%, is installed by design drawing, heat insulating decorative board is placed on supporting steel plate, then adjust guarantor Flatness, the perpendicularity of warm decorative panel, and ensure the wide gaps of reserved 5mm~10mm between adjacent heat insulating decorative board, paste Heat insulating decorative board is compacted, and the adhesive mortar of heat insulating decorative board surrounding base is cleared up, then by hook screw by supporting steel Plate is fixedly connected with heat insulating decorative board bottom surface, while when heat insulating decorative board is installed, for two heat insulating decorative boards of two rows, The top surface of lower row's heat insulating decorative board is further connected by hook screw and the fixed system below upper row's heat insulating decorative board, Further improve attemperator plate and firmly install performance, and ensure in installation process the gap of adjacent heat insulating decorative board with Mutually stagger between the gap of adjacent ALC battens, avoid gap at two relative, cause the low intensity of wall at this, later stage cracking Seriously;
(4) after heat insulating decorative board pastes 72h, its surface is cleared up, keeps the cleaning in adjacent heat insulating decorative board gap, so Foam encapsulating material is inserted in gap afterwards, and is going out 2mm T-me line paper away from slit aperture, then is sealed weather resistant with silica gel gun Silica gel is squeezed into gap, fills and leads up whole piece gap, then with doctor blade surface, after 24~36h, U.S. line paper is torn, to protecting The surface of warm decorative panel is cleared up;
4) detect:
After the installation for completing whole combined type external wall system, final detection process is carried out to it.
A kind of 7. construction method for assembling combined type external wall system according to claim 8, it is characterised in that:In ALC bars In the installation process of plate and heat insulating decorative board, it is necessary to from top to bottom, in units of layer, divide operation, and every layer install when by Lower and upper installation, so as to form the cross construction of floor gap, and classification point is carried out on every block of ALC batten and heat insulating decorative board Layer numbering, consequently facilitating layering, segmental hoisting and installation, shorten construction period.
A kind of 8. construction method for assembling combined type external wall system according to claim 8, it is characterised in that:In the step It is rapid 2) the step of (1) in, set up reinforced concrete pillar in door and window hole position and carry out reinforcement processing.
A kind of 9. construction method for assembling combined type external wall system according to claim 8, it is characterised in that:In the step It is rapid 2) the step of (4) in, to jointing carry out floating processing when, pressed down using V-type joint filling spatula from slit centers line so that V The both sides uniform-compression of type joint filling spatula, so as to reduce the generation rate in crack.
CN201710694955.5A 2017-08-15 2017-08-15 One kind assembling combined type external wall system and its construction method Pending CN107476471A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710694955.5A CN107476471A (en) 2017-08-15 2017-08-15 One kind assembling combined type external wall system and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710694955.5A CN107476471A (en) 2017-08-15 2017-08-15 One kind assembling combined type external wall system and its construction method

Publications (1)

Publication Number Publication Date
CN107476471A true CN107476471A (en) 2017-12-15

Family

ID=60599482

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710694955.5A Pending CN107476471A (en) 2017-08-15 2017-08-15 One kind assembling combined type external wall system and its construction method

Country Status (1)

Country Link
CN (1) CN107476471A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086618A (en) * 2017-12-28 2018-05-29 成都富思特新材料有限公司 A kind of Node Processing Method of thin-coat plaster thermal insulating composite panel
CN108086617A (en) * 2017-12-28 2018-05-29 成都富思特新材料有限公司 A kind of construction method of thin-coat plaster thermal insulating composite panel
CN108301529A (en) * 2018-01-30 2018-07-20 浙江工业大学 A kind of construction method of building heat preservation wall
CN110359599A (en) * 2019-07-15 2019-10-22 中建钢构有限公司 Connector, ALC batten installation node structure and assembled installation method
CN113969650A (en) * 2021-11-01 2022-01-25 德州欧文斯新型建材有限责任公司 Waterproof and attractive splicing method
CN115961746A (en) * 2023-01-05 2023-04-14 中国十七冶集团有限公司 Installation and construction method of external wall heat insulation decorative plate
US20230383543A1 (en) * 2021-10-07 2023-11-30 Alexander Lorenz Flood Resistant Wall

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1392318A (en) * 2002-08-02 2003-01-22 刘少明 High-strength autoclaved aerated lightweight aggregate composite roof panel and preparation method thereof
KR20120109111A (en) * 2011-03-27 2012-10-08 (주)디오 Alc panel tile pattern insulation wall coating composition and application method thereof
CN202689317U (en) * 2012-05-29 2013-01-23 浙江杭萧钢构股份有限公司 Autoclaved aerated concrete composite wallboard
CN203066269U (en) * 2012-12-25 2013-07-17 天津住宅科学研究院有限公司 Autoclaved sand aerated heat-retaining board connecting part
CN104712074A (en) * 2015-02-05 2015-06-17 山东建筑大学 Autoclaved aerated concrete self-heat-insulation composite slurry wall and construction method thereof
CN204781446U (en) * 2015-02-26 2015-11-18 河南亚鹰钢结构幕墙工程有限公司 Side fascia connection structure and use house of this structure
CN105350713A (en) * 2015-11-19 2016-02-24 李全民 Assembled wall board with integrated function for decoration, fire-proofing, temperature keeping and weight-bearing, and manufacture method thereof
CN205134642U (en) * 2015-11-13 2016-04-06 河南五建建设集团有限公司 Use interior partition wall of ALC panel as main part
CN205242690U (en) * 2015-12-28 2016-05-18 河南兴安新型建筑材料有限公司 Evaporate aerated concrete wall body self preservation temperature system of pressing
CN106499091A (en) * 2016-11-22 2017-03-15 中国建筑第七工程局有限公司 A kind of assembling type partition wall construction method based on ALC plates

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1392318A (en) * 2002-08-02 2003-01-22 刘少明 High-strength autoclaved aerated lightweight aggregate composite roof panel and preparation method thereof
KR20120109111A (en) * 2011-03-27 2012-10-08 (주)디오 Alc panel tile pattern insulation wall coating composition and application method thereof
CN202689317U (en) * 2012-05-29 2013-01-23 浙江杭萧钢构股份有限公司 Autoclaved aerated concrete composite wallboard
CN203066269U (en) * 2012-12-25 2013-07-17 天津住宅科学研究院有限公司 Autoclaved sand aerated heat-retaining board connecting part
CN104712074A (en) * 2015-02-05 2015-06-17 山东建筑大学 Autoclaved aerated concrete self-heat-insulation composite slurry wall and construction method thereof
CN204781446U (en) * 2015-02-26 2015-11-18 河南亚鹰钢结构幕墙工程有限公司 Side fascia connection structure and use house of this structure
CN205134642U (en) * 2015-11-13 2016-04-06 河南五建建设集团有限公司 Use interior partition wall of ALC panel as main part
CN105350713A (en) * 2015-11-19 2016-02-24 李全民 Assembled wall board with integrated function for decoration, fire-proofing, temperature keeping and weight-bearing, and manufacture method thereof
CN205242690U (en) * 2015-12-28 2016-05-18 河南兴安新型建筑材料有限公司 Evaporate aerated concrete wall body self preservation temperature system of pressing
CN106499091A (en) * 2016-11-22 2017-03-15 中国建筑第七工程局有限公司 A kind of assembling type partition wall construction method based on ALC plates

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086618A (en) * 2017-12-28 2018-05-29 成都富思特新材料有限公司 A kind of Node Processing Method of thin-coat plaster thermal insulating composite panel
CN108086617A (en) * 2017-12-28 2018-05-29 成都富思特新材料有限公司 A kind of construction method of thin-coat plaster thermal insulating composite panel
CN108301529A (en) * 2018-01-30 2018-07-20 浙江工业大学 A kind of construction method of building heat preservation wall
CN108301529B (en) * 2018-01-30 2019-11-08 浙江工业大学 A kind of construction method of building heat preservation wall
CN110359599A (en) * 2019-07-15 2019-10-22 中建钢构有限公司 Connector, ALC batten installation node structure and assembled installation method
US20230383543A1 (en) * 2021-10-07 2023-11-30 Alexander Lorenz Flood Resistant Wall
CN113969650A (en) * 2021-11-01 2022-01-25 德州欧文斯新型建材有限责任公司 Waterproof and attractive splicing method
CN115961746A (en) * 2023-01-05 2023-04-14 中国十七冶集团有限公司 Installation and construction method of external wall heat insulation decorative plate
CN115961746B (en) * 2023-01-05 2024-06-25 中国十七冶集团有限公司 Installation and construction method for external wall heat-insulation decorative plate

Similar Documents

Publication Publication Date Title
CN107476471A (en) One kind assembling combined type external wall system and its construction method
CN109853800B (en) Assembled low-energy-consumption curtain wall system and construction method thereof
CN106522407A (en) Fabricated cast-in-place concrete sandwich insulation wall steel frame formwork system and connecting parts
CN104405062A (en) Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment
CN204781446U (en) Side fascia connection structure and use house of this structure
CN208934190U (en) A kind of assembled steel frame wall filled with masonry structural system
CN113668779A (en) Construction method of waterproof photovoltaic integrated roof
CN104631650B (en) Screen plate outer wall with heat insulation layer and construction method
CN204590340U (en) A kind of house and side fascia thereof erect assembling structure
CN209384462U (en) A kind of plug-in connection system of combined wall board
CN205000477U (en) Exterior window structure suitable for passive form low energy consumption building
CN204590316U (en) The perpendicular dress syndeton of a kind of house and side fascia thereof
CN103437440B (en) Building energy conservation heat insulation system and building heat preservation top-down construction method
CN206916990U (en) Assembled cast-in-place concrete sandwiched thermal-insulating wall steel skeleton template system and connector
CN210976847U (en) Assembled antique artistic enclosure wall
CN210178013U (en) Fully-prefabricated assembled house
CN101886470B (en) Construction method of exposed concrete ribbed beams
CN204590326U (en) A kind of wallboard erects dress syndeton and uses the house of this structure
CN206158255U (en) Prefabricated assembled communication machinery room
CN108643394A (en) A kind of assembly of shear wall structure with ribbing and its construction method
CN211775353U (en) Component anchoring structure
CN207405469U (en) Assembled urban architecture bridge sound arrester pedestal
CN208310097U (en) Assembled step
CN204626679U (en) Prefabricated heat-insulation plate for external and the heat-preserving wall formed by its assembling
CN106193685A (en) Prefabricated assembled communications equipment room structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171215