CN107476334A - Prefabricated tube coupling assembly equipment and its construction method - Google Patents

Prefabricated tube coupling assembly equipment and its construction method Download PDF

Info

Publication number
CN107476334A
CN107476334A CN201710662166.3A CN201710662166A CN107476334A CN 107476334 A CN107476334 A CN 107476334A CN 201710662166 A CN201710662166 A CN 201710662166A CN 107476334 A CN107476334 A CN 107476334A
Authority
CN
China
Prior art keywords
tube coupling
prefabricated tube
support
prefabricated
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710662166.3A
Other languages
Chinese (zh)
Other versions
CN107476334B (en
Inventor
游大江
王利民
马云新
范家勐
赵洪岩
卞正涛
王浩
李玉超
郭超
李松林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BCEG Civil Engineering Co Ltd
Original Assignee
BCEG Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BCEG Civil Engineering Co Ltd filed Critical BCEG Civil Engineering Co Ltd
Priority to CN201710662166.3A priority Critical patent/CN107476334B/en
Publication of CN107476334A publication Critical patent/CN107476334A/en
Application granted granted Critical
Publication of CN107476334B publication Critical patent/CN107476334B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention discloses prefabricated tube coupling assembly equipment and its construction method, including support connection mechanism, detent mechanism, tensioning mechanism and dynamical system, the support connection mechanism includes lifting device and support connects frame, and the lifting device is made up of elevating ram and steel supporting plate;The detent mechanism includes square rear locating rack, positional cylinder and fastener, and the positional cylinder is separately positioned on the square rear locating rack angle, and the fastener is fixedly connected with positional cylinder piston rod front end;The tensioning mechanism includes telescopic oil cylinder and rail plate;The dynamical system includes hydraulic pump, control valve group, fuel tank.Prefabricated assembled pipe gallery disposal molding assembly process can be achieved in the present invention, including the support of tube coupling connects, adjusts the steps such as alignment, tension, has simple to operate, work efficiency is fast, short time limit, and mechanization degree is high, labor intensity is low, cost of labor is reduced, reduces environmental pollution.

Description

Prefabricated tube coupling assembly equipment and its construction method
Technical field
The present invention relates to hypogee construction field, particularly prefabricated tube coupling assembly equipment and its construction method.
Background technology
Urban construction high speed development, all kinds of pipelines gather in Urban Underground, piping lane be it is a kind of be used to accommodating two classes and more than The structures and affiliated facility of municipal engineering pipeline, also referred to as " pipeline corridor ", " pipe gallery ", " common trench ", " common pipe Road ", i.e. underground urban duct integrate corridor.Urban Underground build a tunnel space, by electric power, communication, combustion gas, heat supply, The various utilities pipelines such as plumbing are integrated in one, provided with special access hole, hoisting port and monitoring system, implement unified planning, Uniting, the unified important infrastructure and " lifeline " built and managed, be guarantee city operations.It is to implement unified rule Draw, design, construct and safeguard, be built in the public utility that Urban Underground is used to lay municipal public use pipeline.
The planning construction of China's pipe gallery is just leading the spring tide of new round civilian infrastructure construction.State Council's height Pay attention to promoting Urban Underground pipe gallery construction, successively printed and distributed since 2013《State Council is on strengthening urban infrastructure The opinion of construction》、《Instruction of the General Office of the State Council on strengthening City Buried Pipeline implementation management》, deployment development city Underground pipe gallery builds pilot work.In addition to living and building portion, including the relevant departments such as the Committee of Development and Reform, Ministry of Finance have all issued Relevant document, support underground pipe gallery construction.In January, 2015, firmly build department of portion etc. five and issue notice jointly, it is desirable in national model Interior development Underground Pipeline General Survey is enclosed, hereafter determines that carrying out state revenue supports underground pipe gallery pilot work, and to pilot city Give special fund subsidy in city.35,100,000,000 yuan of 10 city gross investments of pilot, wherein state revenue put into 10,200,000,000 yuan, local political affairs Mansion puts into 5,600,000,000 yuan, pulls about 19,300,000,000 yuan of social investment." our thinking is comprehensive with pilot demonstration whole nation construction underground Close the enthusiasm of piping lane ".The whole nation shares 69 cities and is building about 1000 kilometers of underground pipe gallery, about 88,000,000,000 yuan of gross investment.
During prefabricated assembled pipe gallery is built, prefabricated tube coupling is integrally put into groove, and each prefabricated pipe internode is not connected with into One entirety, without water-proof function.At present, domestic pipe gallery construction method mainly takes cast-in-place construction, prefabricated dress It is relatively fewer with formula pipe gallery engineering.Cast-in-place construction is traditional construction mode, compared to prefabricated assembled construction, its efficiency of construction Relatively low, structure construction quality control difficulty is greatly, Green civilization construction management difficulty is big, material consumption amount is higher.It is prefabricated assembled Form of construction work has been increasingly becoming the innovation construction method praised highly by building trade.Existing prefabricated assembled pipe gallery is assembled Equipment can only realize that support such as connects, alignd, tensing at one or the partial function in function.Assembled equipment also moved by more be used as using fuel oil Power source, caused waste gas are big to environmental effects.
To sum up, prefabricated tube coupling support there is no to connect, align, tensing one step completed construction equipment and construction method at present.
The content of the invention
It is an object of the invention to provide prefabricated tube coupling assembly equipment and its construction method, to solve prefabricated tube coupling support and connect, looks for Positive centering, alignment, tension, the one step completed technical problem of shaping.
To achieve the above object, the present invention adopts the following technical scheme that:
One aspect of the present invention provides tubulation section assembly equipment, including support connection mechanism, detent mechanism 4, tensioning mechanism and power System 10, the support connection mechanism includes lifting device 1 and support connects frame 2, and the lifting device 1 is by elevating ram 3 and steel supporting plate group Into;
The detent mechanism 4 includes square rear locating rack 5, positional cylinder 6 and fastener 7, and the positional cylinder 6 is separately positioned on institute On 4 angles for stating square rear locating rack 5, the fastener 7 is fixedly connected with the piston rod front end of positional cylinder 6;
The tensioning mechanism includes telescopic oil cylinder 8 and rail plate 9, and the both ends of rail plate 9 connect the both ends of frame 2 and fixed with support to be connected Connect, the telescopic oil cylinder 8 is horizontally set on rail plate 9;
The dynamical system 10 includes hydraulic pump, control valve group, fuel tank.
Further, the assembled equipment also includes walking mechanism, and the walking mechanism includes road wheel and directive wheel 12.
Further, the assembled equipment also includes You Xian radio double-control systems, the You Xian radio double-controls system and dynamic Force system 10 is arranged on assembled equipment head.
Further, the support connects frame 2 and is welded quadra by I-steel, and I-steel width is 2300mm, is highly 2000mm。
Further, the lifting device 1 is arranged on support and connects frame point midway of the frame 2 close to assembled equipment afterbody side.
Further, the support connects 24 angles of frame and is respectively arranged with positional cylinder 6.
Further, the rail plate 9 is square slide rail.
Further, the fastener 7 in the detent mechanism 4 is box fastener 7, size 180mm * 50mm.
Further, the square rear locating rack 5 connects frame 2 with support and forms three-back-shaped framework, and square rear locating rack 5 is arranged on support Connect outside frame 2, square rear locating rack 5 is fixedly connected between connecing frame 2 with support by I-steel.
Another aspect of the present invention provides the construction method using above-mentioned prefabricated tube coupling assembly equipment, and specific steps are such as Under:
Step 1:By the prefabricated tube coupling 13 of hanging device handling, transferred to groove;
Step 2:By in assembled equipment hoisting to prefabricated tube coupling 13, equipment line is adjusted by the directive wheel 12 at left and right sides of equipment Road;Assembled equipment runs to the front end of piping lane 14, and support is connect into frame 2 stretches into prefabricated tube coupling 13;
Step 3:Start and support connection mechanism, the steel supporting plate support on lifting device 1 connects prefabricated tube coupling 13, hanging device decoupling device;
Step 4:The aerial statue that prefabricated tube coupling 13 is carried out by support connection mechanism adjusts, it is ensured that prefabricated tube coupling 13 and assembled piping lane 14 Axis overlaps;
Step 5:Stretch out positional cylinder 6 and block prefabricated tube coupling 13, so as to tense the armpit angle neck of prefabricated tube coupling 13;
Step 6:Start tensioning mechanism, telescopic oil cylinder 8 is run on rail plate 9, tenses prefabricated tube coupling 13, workmen wears curved Bolt, complete positioning;
Step 7:Oil cylinder is forced into setup pressure value, compresses sealing, tightens up curved bolt;
Step 8:Oil cylinder pressure release, positional cylinder 6 is withdrawn, it is assembled to complete prefabricated tube coupling 13.
Beneficial effects of the present invention are embodied in:
1, prefabricated assembled pipe gallery disposal molding assembly process can be achieved in the present invention, including the support of tube coupling connects, adjusted pair The step such as together, tense, have simple to operate, work efficiency is fast, short time limit, and mechanization degree is high, labor intensity is low, reduce manually into This, reduces environmental pollution.Be advantageous to quality control on construction and Green civilization construction management.
2, by hanging device just align, it is possible to achieve move at any time, improve assembled efficiency;
3, assembled equipment is walked in prefabricated tube coupling, and deadweight is little, will not damage prefabricated tube coupling;
4, multiple positional cylinder linkages can accurately control prefabricated tube coupling position, and realize fine setting;
5, sealing strip pressure can be surveyed at take-up device, and the prefabricated tube coupling junction of sealing is further compressed by starting telescopic oil cylinder;
6, prefabricated tube coupling assembly equipment disclosed by the invention is to provide power source using electric power, belongs to the environmentally friendly energy, no Waste gas can be produced and energy supply is reliable and stable.
Other features and advantages of the present invention will be illustrated in the following description, and partly becomes from specification It is clear that or understood by implementing the present invention.The main object of the present invention and further advantage can be by specification, power Specifically noted scheme is realized and obtained in sharp claim.
Brief description of the drawings
The present invention will be further described in detail below in conjunction with the accompanying drawings.
Fig. 1 is schematic diagram before assembled next prefabricated tube coupling;
Fig. 2 is assembled prefabricated tube coupling construction schematic diagram of the invention;
Side view when Fig. 3 is assembled prefabricated tube coupling construction of the invention;
Fig. 4 is splicing prefabricated components equipment top view of the present invention;
Fig. 5 is splicing prefabricated components equipment side view of the present invention;
Fig. 6 is that the square rear locating rack of the present invention connects frame top view with support;
Fig. 7 is telescopic oil cylinder structural representation of the present invention.
Reference:1- lifting devices, 2- supports meet locating rack, 6- after frame, 3- elevating rams, 4- detent mechanisms, 5- Positional cylinder, 7- fasteners, 8- telescopic oil cylinders, 9- rail plates, 10- dynamical systems, 11- wheels, 12- directive wheels, 13- are prefabricated Tube coupling, 14- piping lanes.
Embodiment
Based on above-described embodiment, the invention provides a kind of prefabricated 13 assembled equipment of tube coupling and its construction method, is prefabricated The support of tube coupling 13 connects, centering centering, alignment, tension, the one step completed offer of shaping may.
The prefabricated assembled disposal molding assembly process of pipe gallery 14 can be achieved in the present invention, includes the support of prefabricated tube coupling 13 Connect, adjust the steps such as alignment, tension.Specifically, a kind of prefabricated 13 assembled equipment of tube coupling of present invention offer, including support connection mechanism, Detent mechanism 4, tensioning mechanism and dynamical system 10.
As shown in figure 4, the support connection mechanism includes lifting device 1 and support connects frame 2, the lifting device 1 is by elevating ram 3 Formed with steel supporting plate, lifting device 1 is arranged on support and connects frame point midway of the frame 2 close to assembled equipment afterbody side;Support picks Structure is the main device for carrying prefabricated components, and support connects frame 2 and is welded by 200 I-steel, width 2300mm, is highly 2000mm.Lifting device 1 uses three hydraulic jacks and steel supporting plate, and steel pallet size is 500 × 500, and oil cylinder specification is 120/ 80-260, fixed hydraulic oil cylinder for 200 I-steel.
As shown in figure 5, the detent mechanism 4 includes square rear locating rack 5, positional cylinder 6 and box fastener 7, it is described fixed Position oil cylinder 6 is separately positioned on 4 angles of the square rear locating rack 5, the box fastener 7(As shown in Figure 7)With positioning oil The piston rod front end of cylinder 6 is fixedly connected;Prefabricated 13 assembled equipment of tube coupling is walked inside the piping lane 14 that assembly is completed, and is to be assembled pre- Component processed and assembled tension offer application point between completing piping lane 14.Assembled 4 angles of frame set positional cylinder 6 and 180*50mm box-shapeds Structure be can be inserted into the neck of tube coupling armpit angle, and positional cylinder 6 and 180*50mm are set equally on 4 angles on square rear locating rack 5 Box structure can be inserted into the neck of tube coupling armpit angle, and 8 positioners tense for piping lane 14 provides effect fulcrum.
As shown in fig. 6, the square rear locating rack 5 connects frame 2 with support forms three-back-shaped framework, square rear locating rack 5 is set Connect in support outside frame 2, square rear locating rack 5 is fixedly connected between connecing frame 2 with support by I-steel.
The tensioning mechanism includes telescopic oil cylinder 8 and rail plate 9, and the both ends of rail plate 9 connect the both ends of frame 2 with support and consolidated Fixed connection, the telescopic oil cylinder 8 are horizontally set on rail plate 9;Hydraulic jack specification is 200/120-850, rail plate 9 For square cylinder barrel pattern, the movable of support connection device is realized, while is also the main force part of support connection device.
The dynamical system 10 includes hydraulic pump, control valve group, fuel tank.Specifically, assembled equipment uses power supply, supply Piezoelectric voltage 380V, IP55.Dynamical system 10 need to be equipped with 1.5m3Hydraulic oil container one, operating cylinder 14, hydraulic pump(Assembled pump, Tense pump etc.)And relevant control valve group.
13 assembled equipment of prefabricated tube coupling of the present invention can also include walking mechanism, and the walking mechanism includes walking Wheel and directive wheel 12.Walking mechanism is driven using variable-frequency motor, passes through Frequency Converter Control gait of march.Road wheel uses four Φ 700mm nylon wheels, prefabricated 13 assembled equipment of tube coupling can walk inside prefabricated components, in order that equipment is pressed in piping lane 14 Walked according to the track of assembly shaping, two directive wheels 12 are each side set in equipment, prevent that equipment from wandering off circuit.
13 assembled equipment of prefabricated tube coupling of the present invention can also include You Xian radio double-control systems, the You Xian without Line double-control system and dynamical system 10 are arranged on assembled equipment head, and one operating desk of setting is in prefabricated 13 assembled equipment of tube coupling It can be operated, and carry out data monitoring, while match somebody with somebody HBC remote controls, radio operation can be carried out.
The present invention also provides a kind of assembling construction side of prefabricated tube coupling 13 carried out using above-mentioned prefabricated 13 assembled equipment of tube coupling Method, comprise the following steps that:
Step 1:By hanging device(Such as crawler crane, straddle truck, car are hung, and component is hung into assembly in groove from transport vehicle On equipment support connection device just align, it is possible to achieve move at any time, improve assembled efficiency)The prefabricated tube coupling 13 of handling, by under it Put to groove(As shown in Figure 2);
Step 2:By in assembled equipment hoisting to prefabricated tube coupling 13(As shown in Figure 1), pass through the directive wheel 12 at left and right sides of equipment Adjust device line;Assembled equipment runs to the front end of piping lane 14.
Step 3:As shown in figure 3, when assembled, start support connection mechanism, lifting device 1 rises, and the support of steel supporting plate connects and support is lived Prefabricated tube coupling 13.Now, prefabricated components are carried alone by support connection mechanism completely.1 three elevating rams 3 of lifting device can individually rise Drop to adjust the level angle of prefabricated components, realize the centering of prefabricated components bolt hole.
Between prefabricated tube coupling 13 after range difference 5-10cm, after hanging device decoupling device, support is connect into frame 2 and stretches into prefabricated tube coupling 13 It is interior;Positional cylinder 6 stretches out, and inserts in component preformed hole;The support of stretching connects frame 2 and withdrawn together with prefabricated tube coupling 13, realizes and waits to piece together Part(Prefabricated tube coupling 13)Piping lane 14 is completed with assembly(Or the prefabricated tube coupling 13 of single-unit)Connection.
Step 4:The aerial statue that prefabricated tube coupling 13 is carried out by support connection mechanism is adjusted, it is ensured that prefabricated tube coupling 13 is managed with assembled The axis of corridor 14 overlaps;
Step 5:Stretch out positional cylinder 6 and block prefabricated tube coupling 13, so as to tense the armpit angle neck of prefabricated tube coupling 13;
Step 6:Start tensioning mechanism, telescopic oil cylinder 8 is run on rail plate 9, tenses prefabricated tube coupling 13, workmen wears curved Bolt, pretension, complete positioning;
Step 7:Oil cylinder is forced into setup pressure value, until interannular sealing strip reaches pre- pressure request, compresses sealing, tightens up curved spiral shell Bolt;
Step 8:Oil cylinder pressure release, positional cylinder 6 is withdrawn, it is assembled to complete prefabricated tube coupling 13.After the completion of assembly, assembled equipment is to reach Dynamic 2000mm, left and right sides directive wheel 12 realize that equipment is walked by scheduled circuit.
Wherein, in step 3, when crane transfers prefabricated components, the square positional cylinder 6 stretched out afterwards on 4 angles of locating rack 5 The overhanging of support connection device is realized, positional cylinder 6 is withdrawn after the completion of prefabricated components positioning, and prefabricated structure is realized after reaching setting pulling force Sealing effectiveness between part.Plus the work of telescopic oil cylinder in step 68, finally realize that the support to prefabricated components connects, is aligned, tenses one The operation of secondary shaping.
Wherein, step 7 compresses filleting on the inside of sealing section of jurisdiction and carries out filleting operation using two-component polysulfide sealant;To base The requirement in face is:1)Filleting groove must not have the position of percolating water, otherwise should first carry out leak stopping processing;2)Filleting groove should if any defect First repaired;3)Must not there are ponding and dirt in filleting groove, otherwise should first be cleared up.The internal diameter of bolt hole sealing ring is 25mm, external diameter 39mm.The thickness of the disconnected section of jurisdiction ring butyronitrile cork-rubber of standard is 1mm.
To sum up, the present invention can be achieved prefabricated assembled pipe gallery disposal molding assembly process, including the support of tube coupling connect, Adjustment alignment, the step such as tense, have simple to operate, work efficiency is fast, short time limit, and mechanization degree is high, labor intensity is low, reduces people Work cost, reduce environmental pollution.Be advantageous to quality control on construction and Green civilization construction management.It can be widely applied to buried pipe In corridor work progress.
The preferable embodiment of the present invention is the foregoing is only, but protection scope of the present invention is not limited thereto, Any one skilled in the art the invention discloses technical scope in the change or replacement expected, should all contain Cover within protection scope of the present invention.

Claims (10)

1. prefabricated tube coupling assembly equipment, it is characterised in that including support connection mechanism, detent mechanism(4), tensioning mechanism and dynamical system (10), it is described support connection mechanism include lifting device(1)Frame is connect with support(2), the lifting device(1)By elevating ram(3)And steel Supporting plate forms;
The detent mechanism(4)Including square rear locating rack(5), positional cylinder(6)And fastener(7), the positional cylinder(6)Point The square rear locating rack is not arranged on(5)On 4 angles, the fastener(7)With positional cylinder(6)Piston rod front end, which is fixed, to be connected Connect;
The tensioning mechanism includes telescopic oil cylinder(8)And rail plate(9), the rail plate(9)Both ends connect frame with support(2)Two End is fixedly connected, the telescopic oil cylinder(8)It is horizontally set on rail plate(9)On;
The dynamical system(10)Including hydraulic pump, control valve group, fuel tank.
2. the prefabricated tube coupling assembly equipment described in claim 1, it is characterised in that the assembled equipment also includes walking mechanism, The walking mechanism includes road wheel and directive wheel(12).
3. the prefabricated tube coupling assembly equipment as described in claim 1~2 any one, it is characterised in that the assembled equipment is also Including You Xian radio double-control systems, the You Xian radio double-controls system and dynamical system(10)It is arranged on assembled equipment head.
4. the prefabricated tube coupling assembly equipment as described in claim 1~2 any one, it is characterised in that the support connects frame(2)By I-steel is welded into quadra, and I-steel width is 2300mm, is highly 2000mm.
5. the prefabricated tube coupling assembly equipment as described in claim 1~2 any one, it is characterised in that the lifting device(1) It is arranged on support and connects frame(2)Frame point midway close to assembled equipment afterbody side.
6. the prefabricated tube coupling assembly equipment as described in claim 1~2 any one, it is characterised in that the support connects frame(2)4 Individual angle is respectively arranged with positional cylinder(6).
7. the prefabricated tube coupling assembly equipment as described in claim 1~2 any one, it is characterised in that the rail plate(9) For square slide rail.
8. the prefabricated tube coupling assembly equipment as described in claim 1~2 any one, it is characterised in that the detent mechanism(4) In fastener(7)For box fastener(7), size 180mm * 50mm.
9. the prefabricated tube coupling assembly equipment as described in claim 1~2 any one, it is characterised in that the square rear positioning Frame(5)Frame is connect with support(2)Form three-back-shaped framework, square rear locating rack(5)It is arranged on support and connects frame(2)Outside, positioned after square Frame(5)Frame is connect with support(2)Between be fixedly connected by I-steel.
10. using the construction method of the prefabricated tube coupling assembly equipment as described in any one in claim 1~9, its feature exists In comprising the following steps that:
Step 1:By the prefabricated tube coupling of hanging device handling(13), transferred to groove;
Step 2:By assembled equipment hoisting to prefabricated tube coupling(13)It is interior, pass through the directive wheel at left and right sides of equipment(12)Adjust and set Reserve line;Assembled equipment runs to piping lane(14)Front end, support is connect into frame(2)Stretch into prefabricated tube coupling(13)It is interior;
Step 3:Start support connection mechanism, lifting device(1)On steel supporting plate support connect prefabricated tube coupling(13), hanging device decoupling device;
Step 4:Prefabricated tube coupling is carried out by support connection mechanism(13)Aerial statue adjustment, it is ensured that prefabricated tube coupling(13)Managed with assembled Corridor(14)Axis overlaps;
Step 5:Stretch out positional cylinder(6)Block prefabricated tube coupling(13), so as to tense prefabricated tube coupling(13)Armpit angle neck;
Step 6:Start tensioning mechanism, telescopic oil cylinder(8)In rail plate(9)Upper operation, tense prefabricated tube coupling(13), constructor Member wears curved bolt, completes positioning;
Step 7:Oil cylinder is forced into setup pressure value, compresses sealing, tightens up curved bolt;
Step 8:Oil cylinder pressure release, withdraw positional cylinder(6), complete prefabricated tube coupling(13)It is assembled.
CN201710662166.3A 2017-08-04 2017-08-04 Prefabricated pipe joint assembling equipment and construction method thereof Active CN107476334B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710662166.3A CN107476334B (en) 2017-08-04 2017-08-04 Prefabricated pipe joint assembling equipment and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710662166.3A CN107476334B (en) 2017-08-04 2017-08-04 Prefabricated pipe joint assembling equipment and construction method thereof

Publications (2)

Publication Number Publication Date
CN107476334A true CN107476334A (en) 2017-12-15
CN107476334B CN107476334B (en) 2023-06-02

Family

ID=60597707

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710662166.3A Active CN107476334B (en) 2017-08-04 2017-08-04 Prefabricated pipe joint assembling equipment and construction method thereof

Country Status (1)

Country Link
CN (1) CN107476334B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108343087A (en) * 2018-04-26 2018-07-31 北京建工土木工程有限公司 A kind of the transport assembly equipment system and its construction method of prefabricated components
CN111424708A (en) * 2020-04-09 2020-07-17 中国十九冶集团有限公司 Assembly type pipe gallery, assembly type pipe gallery assembling rack and assembling method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160004710A (en) * 2014-07-04 2016-01-13 한국철도기술연구원 Joint apparatus of upper and bottom precast segment for precast box culvert, and construction method for the same
CN105625469A (en) * 2016-02-06 2016-06-01 青岛润国生态科技发展有限公司 Construction method for assembly type prefabricated comprehensive pipe gallery
CN106193117A (en) * 2016-08-04 2016-12-07 中国冶集团有限公司 A kind of assembling and construction method of the prefabricated pipe gallery in underground
CN106638687A (en) * 2016-11-16 2017-05-10 吉林省天祥建筑材料有限公司 Foundation-aid accurate and quick assembly technique for prefabricated assembly of comprehensive pipe rack
CN206245344U (en) * 2016-11-16 2017-06-13 吉林省天祥建筑材料有限公司 A kind of installation car assembled for precast assembly pipe gallery
CN207244658U (en) * 2017-08-04 2018-04-17 北京建工土木工程有限公司 Prefabricated tube coupling assembly equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160004710A (en) * 2014-07-04 2016-01-13 한국철도기술연구원 Joint apparatus of upper and bottom precast segment for precast box culvert, and construction method for the same
CN105625469A (en) * 2016-02-06 2016-06-01 青岛润国生态科技发展有限公司 Construction method for assembly type prefabricated comprehensive pipe gallery
CN106193117A (en) * 2016-08-04 2016-12-07 中国冶集团有限公司 A kind of assembling and construction method of the prefabricated pipe gallery in underground
CN106638687A (en) * 2016-11-16 2017-05-10 吉林省天祥建筑材料有限公司 Foundation-aid accurate and quick assembly technique for prefabricated assembly of comprehensive pipe rack
CN206245344U (en) * 2016-11-16 2017-06-13 吉林省天祥建筑材料有限公司 A kind of installation car assembled for precast assembly pipe gallery
CN207244658U (en) * 2017-08-04 2018-04-17 北京建工土木工程有限公司 Prefabricated tube coupling assembly equipment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108343087A (en) * 2018-04-26 2018-07-31 北京建工土木工程有限公司 A kind of the transport assembly equipment system and its construction method of prefabricated components
CN108343087B (en) * 2018-04-26 2024-04-12 北京建工土木工程有限公司 Prefabricated part transportation and assembly equipment system and construction method thereof
CN111424708A (en) * 2020-04-09 2020-07-17 中国十九冶集团有限公司 Assembly type pipe gallery, assembly type pipe gallery assembling rack and assembling method
CN111424708B (en) * 2020-04-09 2021-09-14 中国十九冶集团有限公司 Assembly type pipe gallery, assembly type pipe gallery assembling rack and assembling method

Also Published As

Publication number Publication date
CN107476334B (en) 2023-06-02

Similar Documents

Publication Publication Date Title
CN207244658U (en) Prefabricated tube coupling assembly equipment
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN103195450B (en) Hydraulic pressure tunnel invert operation trolley and inverted arch construction method
CN109184189B (en) Construction method for conical shell silo top structure of large-diameter silo
CN103195439B (en) For the Multifunctional performing machine of tunnel construction
WO2017045625A1 (en) Pile frame and method of using and mounting same
CN107476334A (en) Prefabricated tube coupling assembly equipment and its construction method
CN103278394B (en) Comprehensive test device for joint sealing and hydraulic circulating of pipe body
CN204491640U (en) A kind of circular single-arm steel hanging box being applicable to strong tidal bore district
CN102444144A (en) Device preventing concrete from streaming for I-shaped steel joint of diaphragm wall
CN207920632U (en) Formwork jumbo for pipe gallery of constructing
CN110306396A (en) A kind of assembly concrete road surface and construction method
CN109252682A (en) A kind of rope bearing structure hound installation method
CN203270608U (en) Prefabricated combined pipe rack
CN203298939U (en) Comprehensive test device for pipe interface sealing and hydraulic circulation
CN208072491U (en) Internal and external cycle combined type load box
CN203907009U (en) Detachable steel structure intermediate jacking station for jacking pipe
CN208501549U (en) A kind of cable tubing construction warning signs
CN206987816U (en) A kind of integrated form slurry pipe-jacking machine pushing tow system
CN206753038U (en) It is a kind of to wear joist steel sleeve pipe applied in aluminum dipping form
CN105221166A (en) Upstriker large span contains tunnel outer mould liner platform building cart
CN206981473U (en) A kind of hand hydraulic I-steel trimmer
CN110700277A (en) Freely telescopic inner support for covering and digging station construction
CN203018172U (en) Modular screening machine
CN207501023U (en) A kind of mobile solar street lamp

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant