CN107476334A - Prefabricated tube coupling assembly equipment and its construction method - Google Patents
Prefabricated tube coupling assembly equipment and its construction method Download PDFInfo
- Publication number
- CN107476334A CN107476334A CN201710662166.3A CN201710662166A CN107476334A CN 107476334 A CN107476334 A CN 107476334A CN 201710662166 A CN201710662166 A CN 201710662166A CN 107476334 A CN107476334 A CN 107476334A
- Authority
- CN
- China
- Prior art keywords
- tube coupling
- prefabricated tube
- support
- prefabricated
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/10—Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Environmental & Geological Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
The invention discloses prefabricated tube coupling assembly equipment and its construction method, including support connection mechanism, detent mechanism, tensioning mechanism and dynamical system, the support connection mechanism includes lifting device and support connects frame, and the lifting device is made up of elevating ram and steel supporting plate;The detent mechanism includes square rear locating rack, positional cylinder and fastener, and the positional cylinder is separately positioned on the square rear locating rack angle, and the fastener is fixedly connected with positional cylinder piston rod front end;The tensioning mechanism includes telescopic oil cylinder and rail plate;The dynamical system includes hydraulic pump, control valve group, fuel tank.Prefabricated assembled pipe gallery disposal molding assembly process can be achieved in the present invention, including the support of tube coupling connects, adjusts the steps such as alignment, tension, has simple to operate, work efficiency is fast, short time limit, and mechanization degree is high, labor intensity is low, cost of labor is reduced, reduces environmental pollution.
Description
Technical field
The present invention relates to hypogee construction field, particularly prefabricated tube coupling assembly equipment and its construction method.
Background technology
Urban construction high speed development, all kinds of pipelines gather in Urban Underground, piping lane be it is a kind of be used to accommodating two classes and more than
The structures and affiliated facility of municipal engineering pipeline, also referred to as " pipeline corridor ", " pipe gallery ", " common trench ", " common pipe
Road ", i.e. underground urban duct integrate corridor.Urban Underground build a tunnel space, by electric power, communication, combustion gas, heat supply,
The various utilities pipelines such as plumbing are integrated in one, provided with special access hole, hoisting port and monitoring system, implement unified planning,
Uniting, the unified important infrastructure and " lifeline " built and managed, be guarantee city operations.It is to implement unified rule
Draw, design, construct and safeguard, be built in the public utility that Urban Underground is used to lay municipal public use pipeline.
The planning construction of China's pipe gallery is just leading the spring tide of new round civilian infrastructure construction.State Council's height
Pay attention to promoting Urban Underground pipe gallery construction, successively printed and distributed since 2013《State Council is on strengthening urban infrastructure
The opinion of construction》、《Instruction of the General Office of the State Council on strengthening City Buried Pipeline implementation management》, deployment development city
Underground pipe gallery builds pilot work.In addition to living and building portion, including the relevant departments such as the Committee of Development and Reform, Ministry of Finance have all issued
Relevant document, support underground pipe gallery construction.In January, 2015, firmly build department of portion etc. five and issue notice jointly, it is desirable in national model
Interior development Underground Pipeline General Survey is enclosed, hereafter determines that carrying out state revenue supports underground pipe gallery pilot work, and to pilot city
Give special fund subsidy in city.35,100,000,000 yuan of 10 city gross investments of pilot, wherein state revenue put into 10,200,000,000 yuan, local political affairs
Mansion puts into 5,600,000,000 yuan, pulls about 19,300,000,000 yuan of social investment." our thinking is comprehensive with pilot demonstration whole nation construction underground
Close the enthusiasm of piping lane ".The whole nation shares 69 cities and is building about 1000 kilometers of underground pipe gallery, about 88,000,000,000 yuan of gross investment.
During prefabricated assembled pipe gallery is built, prefabricated tube coupling is integrally put into groove, and each prefabricated pipe internode is not connected with into
One entirety, without water-proof function.At present, domestic pipe gallery construction method mainly takes cast-in-place construction, prefabricated dress
It is relatively fewer with formula pipe gallery engineering.Cast-in-place construction is traditional construction mode, compared to prefabricated assembled construction, its efficiency of construction
Relatively low, structure construction quality control difficulty is greatly, Green civilization construction management difficulty is big, material consumption amount is higher.It is prefabricated assembled
Form of construction work has been increasingly becoming the innovation construction method praised highly by building trade.Existing prefabricated assembled pipe gallery is assembled
Equipment can only realize that support such as connects, alignd, tensing at one or the partial function in function.Assembled equipment also moved by more be used as using fuel oil
Power source, caused waste gas are big to environmental effects.
To sum up, prefabricated tube coupling support there is no to connect, align, tensing one step completed construction equipment and construction method at present.
The content of the invention
It is an object of the invention to provide prefabricated tube coupling assembly equipment and its construction method, to solve prefabricated tube coupling support and connect, looks for
Positive centering, alignment, tension, the one step completed technical problem of shaping.
To achieve the above object, the present invention adopts the following technical scheme that:
One aspect of the present invention provides tubulation section assembly equipment, including support connection mechanism, detent mechanism 4, tensioning mechanism and power
System 10, the support connection mechanism includes lifting device 1 and support connects frame 2, and the lifting device 1 is by elevating ram 3 and steel supporting plate group
Into;
The detent mechanism 4 includes square rear locating rack 5, positional cylinder 6 and fastener 7, and the positional cylinder 6 is separately positioned on institute
On 4 angles for stating square rear locating rack 5, the fastener 7 is fixedly connected with the piston rod front end of positional cylinder 6;
The tensioning mechanism includes telescopic oil cylinder 8 and rail plate 9, and the both ends of rail plate 9 connect the both ends of frame 2 and fixed with support to be connected
Connect, the telescopic oil cylinder 8 is horizontally set on rail plate 9;
The dynamical system 10 includes hydraulic pump, control valve group, fuel tank.
Further, the assembled equipment also includes walking mechanism, and the walking mechanism includes road wheel and directive wheel 12.
Further, the assembled equipment also includes You Xian radio double-control systems, the You Xian radio double-controls system and dynamic
Force system 10 is arranged on assembled equipment head.
Further, the support connects frame 2 and is welded quadra by I-steel, and I-steel width is 2300mm, is highly
2000mm。
Further, the lifting device 1 is arranged on support and connects frame point midway of the frame 2 close to assembled equipment afterbody side.
Further, the support connects 24 angles of frame and is respectively arranged with positional cylinder 6.
Further, the rail plate 9 is square slide rail.
Further, the fastener 7 in the detent mechanism 4 is box fastener 7, size 180mm * 50mm.
Further, the square rear locating rack 5 connects frame 2 with support and forms three-back-shaped framework, and square rear locating rack 5 is arranged on support
Connect outside frame 2, square rear locating rack 5 is fixedly connected between connecing frame 2 with support by I-steel.
Another aspect of the present invention provides the construction method using above-mentioned prefabricated tube coupling assembly equipment, and specific steps are such as
Under:
Step 1:By the prefabricated tube coupling 13 of hanging device handling, transferred to groove;
Step 2:By in assembled equipment hoisting to prefabricated tube coupling 13, equipment line is adjusted by the directive wheel 12 at left and right sides of equipment
Road;Assembled equipment runs to the front end of piping lane 14, and support is connect into frame 2 stretches into prefabricated tube coupling 13;
Step 3:Start and support connection mechanism, the steel supporting plate support on lifting device 1 connects prefabricated tube coupling 13, hanging device decoupling device;
Step 4:The aerial statue that prefabricated tube coupling 13 is carried out by support connection mechanism adjusts, it is ensured that prefabricated tube coupling 13 and assembled piping lane 14
Axis overlaps;
Step 5:Stretch out positional cylinder 6 and block prefabricated tube coupling 13, so as to tense the armpit angle neck of prefabricated tube coupling 13;
Step 6:Start tensioning mechanism, telescopic oil cylinder 8 is run on rail plate 9, tenses prefabricated tube coupling 13, workmen wears curved
Bolt, complete positioning;
Step 7:Oil cylinder is forced into setup pressure value, compresses sealing, tightens up curved bolt;
Step 8:Oil cylinder pressure release, positional cylinder 6 is withdrawn, it is assembled to complete prefabricated tube coupling 13.
Beneficial effects of the present invention are embodied in:
1, prefabricated assembled pipe gallery disposal molding assembly process can be achieved in the present invention, including the support of tube coupling connects, adjusted pair
The step such as together, tense, have simple to operate, work efficiency is fast, short time limit, and mechanization degree is high, labor intensity is low, reduce manually into
This, reduces environmental pollution.Be advantageous to quality control on construction and Green civilization construction management.
2, by hanging device just align, it is possible to achieve move at any time, improve assembled efficiency;
3, assembled equipment is walked in prefabricated tube coupling, and deadweight is little, will not damage prefabricated tube coupling;
4, multiple positional cylinder linkages can accurately control prefabricated tube coupling position, and realize fine setting;
5, sealing strip pressure can be surveyed at take-up device, and the prefabricated tube coupling junction of sealing is further compressed by starting telescopic oil cylinder;
6, prefabricated tube coupling assembly equipment disclosed by the invention is to provide power source using electric power, belongs to the environmentally friendly energy, no
Waste gas can be produced and energy supply is reliable and stable.
Other features and advantages of the present invention will be illustrated in the following description, and partly becomes from specification
It is clear that or understood by implementing the present invention.The main object of the present invention and further advantage can be by specification, power
Specifically noted scheme is realized and obtained in sharp claim.
Brief description of the drawings
The present invention will be further described in detail below in conjunction with the accompanying drawings.
Fig. 1 is schematic diagram before assembled next prefabricated tube coupling;
Fig. 2 is assembled prefabricated tube coupling construction schematic diagram of the invention;
Side view when Fig. 3 is assembled prefabricated tube coupling construction of the invention;
Fig. 4 is splicing prefabricated components equipment top view of the present invention;
Fig. 5 is splicing prefabricated components equipment side view of the present invention;
Fig. 6 is that the square rear locating rack of the present invention connects frame top view with support;
Fig. 7 is telescopic oil cylinder structural representation of the present invention.
Reference:1- lifting devices, 2- supports meet locating rack, 6- after frame, 3- elevating rams, 4- detent mechanisms, 5-
Positional cylinder, 7- fasteners, 8- telescopic oil cylinders, 9- rail plates, 10- dynamical systems, 11- wheels, 12- directive wheels, 13- are prefabricated
Tube coupling, 14- piping lanes.
Embodiment
Based on above-described embodiment, the invention provides a kind of prefabricated 13 assembled equipment of tube coupling and its construction method, is prefabricated
The support of tube coupling 13 connects, centering centering, alignment, tension, the one step completed offer of shaping may.
The prefabricated assembled disposal molding assembly process of pipe gallery 14 can be achieved in the present invention, includes the support of prefabricated tube coupling 13
Connect, adjust the steps such as alignment, tension.Specifically, a kind of prefabricated 13 assembled equipment of tube coupling of present invention offer, including support connection mechanism,
Detent mechanism 4, tensioning mechanism and dynamical system 10.
As shown in figure 4, the support connection mechanism includes lifting device 1 and support connects frame 2, the lifting device 1 is by elevating ram 3
Formed with steel supporting plate, lifting device 1 is arranged on support and connects frame point midway of the frame 2 close to assembled equipment afterbody side;Support picks
Structure is the main device for carrying prefabricated components, and support connects frame 2 and is welded by 200 I-steel, width 2300mm, is highly
2000mm.Lifting device 1 uses three hydraulic jacks and steel supporting plate, and steel pallet size is 500 × 500, and oil cylinder specification is 120/
80-260, fixed hydraulic oil cylinder for 200 I-steel.
As shown in figure 5, the detent mechanism 4 includes square rear locating rack 5, positional cylinder 6 and box fastener 7, it is described fixed
Position oil cylinder 6 is separately positioned on 4 angles of the square rear locating rack 5, the box fastener 7(As shown in Figure 7)With positioning oil
The piston rod front end of cylinder 6 is fixedly connected;Prefabricated 13 assembled equipment of tube coupling is walked inside the piping lane 14 that assembly is completed, and is to be assembled pre-
Component processed and assembled tension offer application point between completing piping lane 14.Assembled 4 angles of frame set positional cylinder 6 and 180*50mm box-shapeds
Structure be can be inserted into the neck of tube coupling armpit angle, and positional cylinder 6 and 180*50mm are set equally on 4 angles on square rear locating rack 5
Box structure can be inserted into the neck of tube coupling armpit angle, and 8 positioners tense for piping lane 14 provides effect fulcrum.
As shown in fig. 6, the square rear locating rack 5 connects frame 2 with support forms three-back-shaped framework, square rear locating rack 5 is set
Connect in support outside frame 2, square rear locating rack 5 is fixedly connected between connecing frame 2 with support by I-steel.
The tensioning mechanism includes telescopic oil cylinder 8 and rail plate 9, and the both ends of rail plate 9 connect the both ends of frame 2 with support and consolidated
Fixed connection, the telescopic oil cylinder 8 are horizontally set on rail plate 9;Hydraulic jack specification is 200/120-850, rail plate 9
For square cylinder barrel pattern, the movable of support connection device is realized, while is also the main force part of support connection device.
The dynamical system 10 includes hydraulic pump, control valve group, fuel tank.Specifically, assembled equipment uses power supply, supply
Piezoelectric voltage 380V, IP55.Dynamical system 10 need to be equipped with 1.5m3Hydraulic oil container one, operating cylinder 14, hydraulic pump(Assembled pump,
Tense pump etc.)And relevant control valve group.
13 assembled equipment of prefabricated tube coupling of the present invention can also include walking mechanism, and the walking mechanism includes walking
Wheel and directive wheel 12.Walking mechanism is driven using variable-frequency motor, passes through Frequency Converter Control gait of march.Road wheel uses four Φ
700mm nylon wheels, prefabricated 13 assembled equipment of tube coupling can walk inside prefabricated components, in order that equipment is pressed in piping lane 14
Walked according to the track of assembly shaping, two directive wheels 12 are each side set in equipment, prevent that equipment from wandering off circuit.
13 assembled equipment of prefabricated tube coupling of the present invention can also include You Xian radio double-control systems, the You Xian without
Line double-control system and dynamical system 10 are arranged on assembled equipment head, and one operating desk of setting is in prefabricated 13 assembled equipment of tube coupling
It can be operated, and carry out data monitoring, while match somebody with somebody HBC remote controls, radio operation can be carried out.
The present invention also provides a kind of assembling construction side of prefabricated tube coupling 13 carried out using above-mentioned prefabricated 13 assembled equipment of tube coupling
Method, comprise the following steps that:
Step 1:By hanging device(Such as crawler crane, straddle truck, car are hung, and component is hung into assembly in groove from transport vehicle
On equipment support connection device just align, it is possible to achieve move at any time, improve assembled efficiency)The prefabricated tube coupling 13 of handling, by under it
Put to groove(As shown in Figure 2);
Step 2:By in assembled equipment hoisting to prefabricated tube coupling 13(As shown in Figure 1), pass through the directive wheel 12 at left and right sides of equipment
Adjust device line;Assembled equipment runs to the front end of piping lane 14.
Step 3:As shown in figure 3, when assembled, start support connection mechanism, lifting device 1 rises, and the support of steel supporting plate connects and support is lived
Prefabricated tube coupling 13.Now, prefabricated components are carried alone by support connection mechanism completely.1 three elevating rams 3 of lifting device can individually rise
Drop to adjust the level angle of prefabricated components, realize the centering of prefabricated components bolt hole.
Between prefabricated tube coupling 13 after range difference 5-10cm, after hanging device decoupling device, support is connect into frame 2 and stretches into prefabricated tube coupling 13
It is interior;Positional cylinder 6 stretches out, and inserts in component preformed hole;The support of stretching connects frame 2 and withdrawn together with prefabricated tube coupling 13, realizes and waits to piece together
Part(Prefabricated tube coupling 13)Piping lane 14 is completed with assembly(Or the prefabricated tube coupling 13 of single-unit)Connection.
Step 4:The aerial statue that prefabricated tube coupling 13 is carried out by support connection mechanism is adjusted, it is ensured that prefabricated tube coupling 13 is managed with assembled
The axis of corridor 14 overlaps;
Step 5:Stretch out positional cylinder 6 and block prefabricated tube coupling 13, so as to tense the armpit angle neck of prefabricated tube coupling 13;
Step 6:Start tensioning mechanism, telescopic oil cylinder 8 is run on rail plate 9, tenses prefabricated tube coupling 13, workmen wears curved
Bolt, pretension, complete positioning;
Step 7:Oil cylinder is forced into setup pressure value, until interannular sealing strip reaches pre- pressure request, compresses sealing, tightens up curved spiral shell
Bolt;
Step 8:Oil cylinder pressure release, positional cylinder 6 is withdrawn, it is assembled to complete prefabricated tube coupling 13.After the completion of assembly, assembled equipment is to reach
Dynamic 2000mm, left and right sides directive wheel 12 realize that equipment is walked by scheduled circuit.
Wherein, in step 3, when crane transfers prefabricated components, the square positional cylinder 6 stretched out afterwards on 4 angles of locating rack 5
The overhanging of support connection device is realized, positional cylinder 6 is withdrawn after the completion of prefabricated components positioning, and prefabricated structure is realized after reaching setting pulling force
Sealing effectiveness between part.Plus the work of telescopic oil cylinder in step 68, finally realize that the support to prefabricated components connects, is aligned, tenses one
The operation of secondary shaping.
Wherein, step 7 compresses filleting on the inside of sealing section of jurisdiction and carries out filleting operation using two-component polysulfide sealant;To base
The requirement in face is:1)Filleting groove must not have the position of percolating water, otherwise should first carry out leak stopping processing;2)Filleting groove should if any defect
First repaired;3)Must not there are ponding and dirt in filleting groove, otherwise should first be cleared up.The internal diameter of bolt hole sealing ring is
25mm, external diameter 39mm.The thickness of the disconnected section of jurisdiction ring butyronitrile cork-rubber of standard is 1mm.
To sum up, the present invention can be achieved prefabricated assembled pipe gallery disposal molding assembly process, including the support of tube coupling connect,
Adjustment alignment, the step such as tense, have simple to operate, work efficiency is fast, short time limit, and mechanization degree is high, labor intensity is low, reduces people
Work cost, reduce environmental pollution.Be advantageous to quality control on construction and Green civilization construction management.It can be widely applied to buried pipe
In corridor work progress.
The preferable embodiment of the present invention is the foregoing is only, but protection scope of the present invention is not limited thereto,
Any one skilled in the art the invention discloses technical scope in the change or replacement expected, should all contain
Cover within protection scope of the present invention.
Claims (10)
1. prefabricated tube coupling assembly equipment, it is characterised in that including support connection mechanism, detent mechanism(4), tensioning mechanism and dynamical system
(10), it is described support connection mechanism include lifting device(1)Frame is connect with support(2), the lifting device(1)By elevating ram(3)And steel
Supporting plate forms;
The detent mechanism(4)Including square rear locating rack(5), positional cylinder(6)And fastener(7), the positional cylinder(6)Point
The square rear locating rack is not arranged on(5)On 4 angles, the fastener(7)With positional cylinder(6)Piston rod front end, which is fixed, to be connected
Connect;
The tensioning mechanism includes telescopic oil cylinder(8)And rail plate(9), the rail plate(9)Both ends connect frame with support(2)Two
End is fixedly connected, the telescopic oil cylinder(8)It is horizontally set on rail plate(9)On;
The dynamical system(10)Including hydraulic pump, control valve group, fuel tank.
2. the prefabricated tube coupling assembly equipment described in claim 1, it is characterised in that the assembled equipment also includes walking mechanism,
The walking mechanism includes road wheel and directive wheel(12).
3. the prefabricated tube coupling assembly equipment as described in claim 1~2 any one, it is characterised in that the assembled equipment is also
Including You Xian radio double-control systems, the You Xian radio double-controls system and dynamical system(10)It is arranged on assembled equipment head.
4. the prefabricated tube coupling assembly equipment as described in claim 1~2 any one, it is characterised in that the support connects frame(2)By
I-steel is welded into quadra, and I-steel width is 2300mm, is highly 2000mm.
5. the prefabricated tube coupling assembly equipment as described in claim 1~2 any one, it is characterised in that the lifting device(1)
It is arranged on support and connects frame(2)Frame point midway close to assembled equipment afterbody side.
6. the prefabricated tube coupling assembly equipment as described in claim 1~2 any one, it is characterised in that the support connects frame(2)4
Individual angle is respectively arranged with positional cylinder(6).
7. the prefabricated tube coupling assembly equipment as described in claim 1~2 any one, it is characterised in that the rail plate(9)
For square slide rail.
8. the prefabricated tube coupling assembly equipment as described in claim 1~2 any one, it is characterised in that the detent mechanism(4)
In fastener(7)For box fastener(7), size 180mm * 50mm.
9. the prefabricated tube coupling assembly equipment as described in claim 1~2 any one, it is characterised in that the square rear positioning
Frame(5)Frame is connect with support(2)Form three-back-shaped framework, square rear locating rack(5)It is arranged on support and connects frame(2)Outside, positioned after square
Frame(5)Frame is connect with support(2)Between be fixedly connected by I-steel.
10. using the construction method of the prefabricated tube coupling assembly equipment as described in any one in claim 1~9, its feature exists
In comprising the following steps that:
Step 1:By the prefabricated tube coupling of hanging device handling(13), transferred to groove;
Step 2:By assembled equipment hoisting to prefabricated tube coupling(13)It is interior, pass through the directive wheel at left and right sides of equipment(12)Adjust and set
Reserve line;Assembled equipment runs to piping lane(14)Front end, support is connect into frame(2)Stretch into prefabricated tube coupling(13)It is interior;
Step 3:Start support connection mechanism, lifting device(1)On steel supporting plate support connect prefabricated tube coupling(13), hanging device decoupling device;
Step 4:Prefabricated tube coupling is carried out by support connection mechanism(13)Aerial statue adjustment, it is ensured that prefabricated tube coupling(13)Managed with assembled
Corridor(14)Axis overlaps;
Step 5:Stretch out positional cylinder(6)Block prefabricated tube coupling(13), so as to tense prefabricated tube coupling(13)Armpit angle neck;
Step 6:Start tensioning mechanism, telescopic oil cylinder(8)In rail plate(9)Upper operation, tense prefabricated tube coupling(13), constructor
Member wears curved bolt, completes positioning;
Step 7:Oil cylinder is forced into setup pressure value, compresses sealing, tightens up curved bolt;
Step 8:Oil cylinder pressure release, withdraw positional cylinder(6), complete prefabricated tube coupling(13)It is assembled.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710662166.3A CN107476334B (en) | 2017-08-04 | 2017-08-04 | Prefabricated pipe joint assembling equipment and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710662166.3A CN107476334B (en) | 2017-08-04 | 2017-08-04 | Prefabricated pipe joint assembling equipment and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107476334A true CN107476334A (en) | 2017-12-15 |
CN107476334B CN107476334B (en) | 2023-06-02 |
Family
ID=60597707
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710662166.3A Active CN107476334B (en) | 2017-08-04 | 2017-08-04 | Prefabricated pipe joint assembling equipment and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107476334B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108343087A (en) * | 2018-04-26 | 2018-07-31 | 北京建工土木工程有限公司 | A kind of the transport assembly equipment system and its construction method of prefabricated components |
CN111424708A (en) * | 2020-04-09 | 2020-07-17 | 中国十九冶集团有限公司 | Assembly type pipe gallery, assembly type pipe gallery assembling rack and assembling method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20160004710A (en) * | 2014-07-04 | 2016-01-13 | 한국철도기술연구원 | Joint apparatus of upper and bottom precast segment for precast box culvert, and construction method for the same |
CN105625469A (en) * | 2016-02-06 | 2016-06-01 | 青岛润国生态科技发展有限公司 | Construction method for assembly type prefabricated comprehensive pipe gallery |
CN106193117A (en) * | 2016-08-04 | 2016-12-07 | 中国冶集团有限公司 | A kind of assembling and construction method of the prefabricated pipe gallery in underground |
CN106638687A (en) * | 2016-11-16 | 2017-05-10 | 吉林省天祥建筑材料有限公司 | Foundation-aid accurate and quick assembly technique for prefabricated assembly of comprehensive pipe rack |
CN206245344U (en) * | 2016-11-16 | 2017-06-13 | 吉林省天祥建筑材料有限公司 | A kind of installation car assembled for precast assembly pipe gallery |
CN207244658U (en) * | 2017-08-04 | 2018-04-17 | 北京建工土木工程有限公司 | Prefabricated tube coupling assembly equipment |
-
2017
- 2017-08-04 CN CN201710662166.3A patent/CN107476334B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20160004710A (en) * | 2014-07-04 | 2016-01-13 | 한국철도기술연구원 | Joint apparatus of upper and bottom precast segment for precast box culvert, and construction method for the same |
CN105625469A (en) * | 2016-02-06 | 2016-06-01 | 青岛润国生态科技发展有限公司 | Construction method for assembly type prefabricated comprehensive pipe gallery |
CN106193117A (en) * | 2016-08-04 | 2016-12-07 | 中国冶集团有限公司 | A kind of assembling and construction method of the prefabricated pipe gallery in underground |
CN106638687A (en) * | 2016-11-16 | 2017-05-10 | 吉林省天祥建筑材料有限公司 | Foundation-aid accurate and quick assembly technique for prefabricated assembly of comprehensive pipe rack |
CN206245344U (en) * | 2016-11-16 | 2017-06-13 | 吉林省天祥建筑材料有限公司 | A kind of installation car assembled for precast assembly pipe gallery |
CN207244658U (en) * | 2017-08-04 | 2018-04-17 | 北京建工土木工程有限公司 | Prefabricated tube coupling assembly equipment |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108343087A (en) * | 2018-04-26 | 2018-07-31 | 北京建工土木工程有限公司 | A kind of the transport assembly equipment system and its construction method of prefabricated components |
CN108343087B (en) * | 2018-04-26 | 2024-04-12 | 北京建工土木工程有限公司 | Prefabricated part transportation and assembly equipment system and construction method thereof |
CN111424708A (en) * | 2020-04-09 | 2020-07-17 | 中国十九冶集团有限公司 | Assembly type pipe gallery, assembly type pipe gallery assembling rack and assembling method |
CN111424708B (en) * | 2020-04-09 | 2021-09-14 | 中国十九冶集团有限公司 | Assembly type pipe gallery, assembly type pipe gallery assembling rack and assembling method |
Also Published As
Publication number | Publication date |
---|---|
CN107476334B (en) | 2023-06-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207244658U (en) | Prefabricated tube coupling assembly equipment | |
CN103215894B (en) | Portable interim prestressed stretch-draw anchor block | |
CN103195450B (en) | Hydraulic pressure tunnel invert operation trolley and inverted arch construction method | |
CN109184189B (en) | Construction method for conical shell silo top structure of large-diameter silo | |
CN103195439B (en) | For the Multifunctional performing machine of tunnel construction | |
WO2017045625A1 (en) | Pile frame and method of using and mounting same | |
CN107476334A (en) | Prefabricated tube coupling assembly equipment and its construction method | |
CN103278394B (en) | Comprehensive test device for joint sealing and hydraulic circulating of pipe body | |
CN204491640U (en) | A kind of circular single-arm steel hanging box being applicable to strong tidal bore district | |
CN102444144A (en) | Device preventing concrete from streaming for I-shaped steel joint of diaphragm wall | |
CN207920632U (en) | Formwork jumbo for pipe gallery of constructing | |
CN110306396A (en) | A kind of assembly concrete road surface and construction method | |
CN109252682A (en) | A kind of rope bearing structure hound installation method | |
CN203270608U (en) | Prefabricated combined pipe rack | |
CN203298939U (en) | Comprehensive test device for pipe interface sealing and hydraulic circulation | |
CN208072491U (en) | Internal and external cycle combined type load box | |
CN203907009U (en) | Detachable steel structure intermediate jacking station for jacking pipe | |
CN208501549U (en) | A kind of cable tubing construction warning signs | |
CN206987816U (en) | A kind of integrated form slurry pipe-jacking machine pushing tow system | |
CN206753038U (en) | It is a kind of to wear joist steel sleeve pipe applied in aluminum dipping form | |
CN105221166A (en) | Upstriker large span contains tunnel outer mould liner platform building cart | |
CN206981473U (en) | A kind of hand hydraulic I-steel trimmer | |
CN110700277A (en) | Freely telescopic inner support for covering and digging station construction | |
CN203018172U (en) | Modular screening machine | |
CN207501023U (en) | A kind of mobile solar street lamp |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |