CN107475499B - A kind of preparation method of sledge runner shaped steel - Google Patents

A kind of preparation method of sledge runner shaped steel Download PDF

Info

Publication number
CN107475499B
CN107475499B CN201710663103.XA CN201710663103A CN107475499B CN 107475499 B CN107475499 B CN 107475499B CN 201710663103 A CN201710663103 A CN 201710663103A CN 107475499 B CN107475499 B CN 107475499B
Authority
CN
China
Prior art keywords
shaped steel
water
temperature
cooled
workpiece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710663103.XA
Other languages
Chinese (zh)
Other versions
CN107475499A (en
Inventor
周君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fengyang Precision Mold Co., Ltd
Original Assignee
Ni Chenhui
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ni Chenhui filed Critical Ni Chenhui
Priority to CN201710663103.XA priority Critical patent/CN107475499B/en
Publication of CN107475499A publication Critical patent/CN107475499A/en
Application granted granted Critical
Publication of CN107475499B publication Critical patent/CN107475499B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/0068Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for particular articles not mentioned below
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/18Hardening; Quenching with or without subsequent tempering
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/26Methods of annealing
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/34Methods of heating
    • C21D1/42Induction heating
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/02Ferrous alloys, e.g. steel alloys containing silicon
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/04Ferrous alloys, e.g. steel alloys containing manganese
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/40Ferrous alloys, e.g. steel alloys containing chromium with nickel
    • C22C38/52Ferrous alloys, e.g. steel alloys containing chromium with nickel with cobalt
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/25Process efficiency

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Heat Treatment Of Articles (AREA)

Abstract

The present invention provides a kind of preparation methods of sledge runner shaped steel to be enable sledge runner shaped steel while obtaining enough intensity and hardness, be also ensured the elastic property in fore wing portion using the mode of first integrally annealed, then differential annealing.By heating up and cooling down stage by stage in heat treatment process, it is ensured that the whole uniformity of slide plate shaped steel avoids and the problems such as surface defect and stress concentration occurs.The shaped steel of the present invention uses specific alloying element and proportioning, on the basis of conventional skates steel, the content of Mn, Ni, Cr, Co are all adjusted, especially for the relationship of strong hardness and elasticity, the content for reducing Cr elements, to make final shaped steel product obtain good comprehensive performance.

Description

A kind of preparation method of sledge runner shaped steel
Technical field
The present invention relates to winter sports instrument fields, in particular to a kind of preparation method of sledge runner shaped steel.
Background technology
Modern bobsleighing is as seven big event of Winter Olympic Games(Ice hockey, curling stone, biathlon, skating, skiing and snow Vehicle, sled)One of, type can much be divided into no rudder and have rudder, single sledge and wide sledge, striding type and horizontal, also traction, it is electronic and Sail etc..The bottom surface slide plate of sled is usually shaped steel material, which is that a pair of of left and right is arranged in parallel, and length must not exceed 45 lis Rice, the fore wing portion of slide plate needs to keep certain elasticity, in favor of turning and manipulating.
In order to reach the requirement of bobsleighing, shaped steel needs have good mechanical performance and table used in sledge runner Face quality.Shaped steel surface cannot have the defects of crackle, bubble, field trash, when application can have certain intensity, wearability and Elasticity.In the prior art, using techniques such as conventional heat treatment, forging, cuttings, frequently can lead to the wearability of shaped steel product compared with Low or intensity and elasticity are insufficient, it is difficult to while meeting composite request of the slide plate to performance.Intensity and the caused slide plate that wears no resistance Blade deforms, and the elasticity in slide plate fore wing portion is insufficient, can all directly affect the service life and performance of sledge runner finished product, also unfavorable In horizontal performance of the sportsman in event.
Invention content
In order to solve the problems, such as the comprehensive performance of sledge runner shaped steel, the present invention provides a kind of preparations of sledge runner shaped steel Method can also obtain enough local elasticities while so that sledge runner is had higher wear-resisting property and intensity.
A kind of preparation method of sledge runner shaped steel, it is characterised in that:The C content of the sledge runner shaped steel is 0.35% ~0.40%;Preparation method includes the following steps:
A. integrally annealed:The shaped steel workpiece of machine-shaping is fitted into heating furnace, is 0.5 in 800~850 DEG C of soaking times ~1.5h carries out integrally annealed, is air-cooled to room temperature later;
B. differential annealing:By the way of sensing heating, to the shaped steel workpiece after integrally annealed as product fore wing portion One end carries out local heating, and then this locally carries out water quenching;
C. water quenching:The part of shaped steel workpiece differential annealing is immersed in the water, when quenching stirs water;
D. it is tempered:Shaped steel workpiece after water quenching is again loaded into heating furnace, 1 ~ 2h is kept the temperature at 500 ~ 600 DEG C, it is then empty It is cooled to room temperature, you can obtain sledge runner shaped steel finished product.
The tensile strength of the sledge runner shaped steel finished product reaches 200 ~ 220MPa, and hardness is up to 55 ~ 60HRC.
The sledge runner shaped steel is formed comprising following element:C:0.35-0.40%, Si:0.80-1.20%, Mn:0.50- 1.50%, Ni:0.50-1.00%, Cr:2.50-3.50%, Co:0.10-0.50%, surplus are Fe and inevitable impurity.
In the step a, the shaped steel workpiece of machine-shaping is fitted into heating furnace, at the uniform velocity it is warming up to 350 in 3~5h~ 450 DEG C, keep the temperature 1~2h;800~850 DEG C are warming up to 30~50 DEG C/h again, soaking time is 0.5~1.5h, then first with 10 ~20 DEG C/h cools to 400~500 DEG C with the furnace, keeps the temperature 2~3h;Again 150~200 DEG C are cooled to the furnace with 50~80 DEG C/h, it After be air-cooled to room temperature.
In the step b, by the way of sensing heating, to the shaped steel workpiece after integrally annealed as product fore wing portion One end carries out local heating, and heating temperature is 600~650 DEG C, and soaking time is 2.5~3.0h, and then this locally carries out water quenching.
In the step c, the part of shaped steel workpiece differential annealing is immersed in the water, water temperature is 25~30 DEG C before immersing, and Water temperature is no more than 50 DEG C after workpiece takes out, and when quenching stirs water, be cooled to when workpiece takes out from water 150 DEG C with Under.
In the step d, the shaped steel workpiece after water quenching is again loaded into heating furnace, is first warming up to 200 ~ 300 through 1~2h DEG C, keep the temperature 2 ~ 4h;500 ~ 600 DEG C are warming up to 30 ~ 50 DEG C/h again, 1 ~ 2h is kept the temperature, is then air-cooled to room temperature, you can obtain sled Slide plate shaped steel finished product.
The present invention enables sledge runner shaped steel obtaining enough using the mode of first integrally annealed, then differential annealing While intensity and hardness, the elastic property in fore wing portion is also ensured.By heating up and cooling down stage by stage in heat treatment process, really The whole uniformity for having protected slide plate shaped steel, avoids and the problems such as surface defect and stress concentration occurs.The shaped steel of the present invention uses Specific alloying element and proportioning on the basis of conventional skates steel all adjust the content of Mn, Ni, Cr, Co, Especially for the relationship of strong hardness and elasticity, the content of Cr elements is reduced, to make final shaped steel product obtain well Comprehensive performance.
Specific implementation mode
With reference to embodiment and comparative example, the present invention is described in more detail.
Embodiment 1:
A kind of preparation method of sledge runner shaped steel, it is characterised in that:The sledge runner shaped steel includes following element group At:C:0.35%, Si:0.80%, Mn:0.50%, Ni:0.50%, Cr:2.50%, Co:0.10%, surplus is for Fe and inevitably Impurity;Preparation method includes the following steps:
A. integrally annealed:The shaped steel workpiece of machine-shaping is fitted into heating furnace, 450 DEG C are at the uniform velocity warming up in 3h, is protected Warm 2h;800 DEG C, soaking time 0.5h are warming up to 50 DEG C/h again, then first cools to 400 DEG C with the furnace with 20 DEG C/h, heat preservation 3h;150 DEG C are cooled to the furnace with 50 DEG C/h, be air-cooled to room temperature later again;
B. differential annealing:By the way of sensing heating, to the shaped steel workpiece after integrally annealed as product fore wing portion One end carries out local heating, and heating temperature is 650 DEG C, soaking time 2.5h, and then this locally carries out water quenching;
C. water quenching:The part of shaped steel workpiece differential annealing is immersed in the water, after water temperature is 30 DEG C before immersing, and workpiece takes out Water temperature is no more than 50 DEG C, and when quenching stirs water, and 150 DEG C or less are cooled to when workpiece takes out from water;
D. it is tempered:Shaped steel workpiece after water quenching is again loaded into heating furnace, is first warming up to 300 DEG C through 1h, keeps the temperature 4h;Again 500 DEG C are warming up to 30 DEG C/h, 2h is kept the temperature, is then air-cooled to room temperature, you can obtain sledge runner shaped steel finished product.
The tensile strength of the sledge runner shaped steel finished product reaches 220MPa, and hardness reaches 60HRC.
Embodiment 2:
A kind of preparation method of sledge runner shaped steel, it is characterised in that:The sledge runner shaped steel includes following element group At:C:0.40%, Si:0.80%, Mn:1.50%, Ni:1.00%, Cr:2.50%, Co:0.50%, surplus is for Fe and inevitably Impurity;Preparation method includes the following steps:
A. integrally annealed:The shaped steel workpiece of machine-shaping is fitted into heating furnace, 350 DEG C are at the uniform velocity warming up in 3h, is protected Warm 1h;850 DEG C, soaking time 0.5h are warming up to 30 DEG C/h again, then first cools to 500 DEG C with the furnace with 10 DEG C/h, heat preservation 3h;200 DEG C are cooled to the furnace with 80 DEG C/h, be air-cooled to room temperature later again;
B. differential annealing:By the way of sensing heating, to the shaped steel workpiece after integrally annealed as product fore wing portion One end carries out local heating, and heating temperature is 600 DEG C, soaking time 3.0h, and then this locally carries out water quenching;
C. water quenching:The part of shaped steel workpiece differential annealing is immersed in the water, after water temperature is 30 DEG C before immersing, and workpiece takes out Water temperature is no more than 50 DEG C, and when quenching stirs water, and 150 DEG C or less are cooled to when workpiece takes out from water;
D. it is tempered:Shaped steel workpiece after water quenching is again loaded into heating furnace, is first warming up to 200 DEG C through 2h, keeps the temperature 3h;Again 500 DEG C are warming up to 40 DEG C/h, 2h is kept the temperature, is then air-cooled to room temperature, you can obtain sledge runner shaped steel finished product.
The tensile strength of the sledge runner shaped steel finished product reaches 220MPa, and hardness reaches 55HRC.
Embodiment 3:
A kind of preparation method of sledge runner shaped steel, it is characterised in that:The sledge runner shaped steel includes following element group At:C:0.35%, Si:0.90%, Mn:1.00%, Ni:0.80%, Cr:3.00%, Co:0.70%, surplus is for Fe and inevitably Impurity;Preparation method includes the following steps:
A. integrally annealed:The shaped steel workpiece of machine-shaping is fitted into heating furnace, 380 DEG C are at the uniform velocity warming up in 4h, is protected Warm 2h;820 DEG C, soaking time 0.5h are warming up to 40 DEG C/h again, then first cools to 450 DEG C with the furnace with 15 DEG C/h, heat preservation 2h;180 DEG C are cooled to the furnace with 60 DEG C/h, be air-cooled to room temperature later again;
B. differential annealing:By the way of sensing heating, to the shaped steel workpiece after integrally annealed as product fore wing portion One end carries out local heating, and heating temperature is 600 DEG C, soaking time 2.5h, and then this locally carries out water quenching;
C. water quenching:The part of shaped steel workpiece differential annealing is immersed in the water, after water temperature is 25 DEG C before immersing, and workpiece takes out Water temperature is no more than 50 DEG C, and when quenching stirs water, and 150 DEG C or less are cooled to when workpiece takes out from water;
D. it is tempered:Shaped steel workpiece after water quenching is again loaded into heating furnace, is first warming up to 250 DEG C through 1h, keeps the temperature 2h;Again 550 DEG C are warming up to 40 DEG C/h, 1h is kept the temperature, is then air-cooled to room temperature, you can obtain sledge runner shaped steel finished product.
The tensile strength of the sledge runner shaped steel finished product reaches 200MPa, and hardness reaches 58HRC.
Comparative example 1:
By the shaped steel with same elemental composition of the invention and content, occur without double annealing or other processing steps After change, the tensile strength of obtained sledge runner shaped steel is significantly lower than 180MPa, and local elasticity is poor.
Comparative example 2:
The shaped steel that will differ from elemental composition and content of the present invention, after being prepared using processing step same as the present application, The strong hardness of obtained sledge runner shaped steel is difficult to meet the requirements, also, reaches 60 HRC, part hardness It is elastic apparent poor.
Comparative example 3:
By elemental composition and content shaped steel workpiece same as Example 1, using the heat treatment different from the application When obtaining local elasticity's performance, the tensile strength and hardness of obtained sledge runner shaped steel, which are difficult to meet comprehensive performance, to be wanted It asks, also, the surface quality of shaped steel is poor, hence it is evident that reduce the service life of product.
At the elemental composition selection of sledge runner shaped steel of the present invention it can be seen from embodiment 1-3 and comparative example 1-3 and heat Science and engineering sequence is that applicant verifies by repeated tests.Wherein, the elemental composition proportioning of shaped steel is in conventional skates steel On the basis of material, the content of Mn, Ni, Cr, Co are all adjusted, especially for the relationship of strong hardness and elasticity, reduced The content of Cr elements, to make final shaped steel product obtain good comprehensive performance.In technique, using first integrally annealed, then The mode of differential annealing enables sledge runner shaped steel while obtaining enough intensity and hardness, also ensures fore wing portion Elastic property.By heating up and cooling down stage by stage in heat treatment process, it is ensured that the whole uniformity of slide plate shaped steel avoids There is the problems such as surface defect and stress concentration.
Although an embodiment of the present invention has been shown and described, it will be understood by those skilled in the art that:Not In the case of being detached from the principle of the present invention and objective a variety of change, modification, replacement and modification can be carried out to these embodiments, this The range of invention is limited by claim and its equivalent.

Claims (4)

1. a kind of preparation method of sledge runner shaped steel, it is characterised in that:The C content of the sledge runner shaped steel 0.35%~ 0.40%;Preparation method includes the following steps:
A. integrally annealed:The shaped steel workpiece of machine-shaping is fitted into heating furnace, 800~850 DEG C of soaking times be 0.5~ 1.5h carries out integrally annealed, is air-cooled to room temperature later;
B. differential annealing:By the way of sensing heating, to the one end of shaped steel workpiece as product fore wing portion after integrally annealed Local heating is carried out, heating temperature is 600~650 DEG C, and soaking time is 2.5~3.0h, and then this locally carries out water quenching;
C. water quenching:The part of shaped steel workpiece differential annealing is immersed in the water, when quenching stirs water;
D. it is tempered:Shaped steel workpiece after water quenching is again loaded into heating furnace, 1 ~ 2h is kept the temperature at 500 ~ 600 DEG C, is then air-cooled to Room temperature, you can obtain sledge runner shaped steel finished product;
The tensile strength of the sledge runner shaped steel finished product reaches 200 ~ 220MPa, and hardness is up to 55 ~ 60HRC;
The sledge runner shaped steel is formed comprising following element:C:0.35-0.40%, Si:0.80-1.20%, Mn:0.50- 1.50%, Ni:0.50-1.00%, Cr:2.50-3.50%, Co:0.10-0.50%, surplus are Fe and inevitable impurity.
2. preparation method according to claim 1, it is characterised in that:In the step a, by the shaped steel workpiece of machine-shaping It is fitted into heating furnace, 350~450 DEG C is at the uniform velocity warming up in 3~5h, keep the temperature 1~2h;Again 800 are warming up to 30~50 DEG C/h ~850 DEG C, soaking time is 0.5~1.5h, then first cools to 400~500 DEG C with the furnace with 10~20 DEG C/h, keeps the temperature 2~3h; 150~200 DEG C are cooled to the furnace with 50~80 DEG C/h, be air-cooled to room temperature later again.
3. preparation method according to claim 1 or 2, it is characterised in that:In the step c, shaped steel workpiece is locally moved back The part of fire is immersed in the water, and water temperature is 25~30 DEG C before immersing, and workpiece take out after water temperature be no more than 50 DEG C, when quenching to water into Row agitation, 150 DEG C or less are cooled to when workpiece takes out from water.
4. preparation method according to claim 1 or 2, it is characterised in that:In the step d, by the shaped steel work after water quenching Part is again loaded into heating furnace, is first warming up to 200 ~ 300 DEG C through 1~2h, keeps the temperature 2 ~ 4h;500 are warming up to 30 ~ 50 DEG C/h again ~ 600 DEG C, 1 ~ 2h is kept the temperature, is then air-cooled to room temperature, you can obtain sledge runner shaped steel finished product.
CN201710663103.XA 2017-08-05 2017-08-05 A kind of preparation method of sledge runner shaped steel Active CN107475499B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710663103.XA CN107475499B (en) 2017-08-05 2017-08-05 A kind of preparation method of sledge runner shaped steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710663103.XA CN107475499B (en) 2017-08-05 2017-08-05 A kind of preparation method of sledge runner shaped steel

Publications (2)

Publication Number Publication Date
CN107475499A CN107475499A (en) 2017-12-15
CN107475499B true CN107475499B (en) 2018-10-09

Family

ID=60596926

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710663103.XA Active CN107475499B (en) 2017-08-05 2017-08-05 A kind of preparation method of sledge runner shaped steel

Country Status (1)

Country Link
CN (1) CN107475499B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111283204A (en) * 2020-02-18 2020-06-16 北京科技大学 Preparation method of chromium-molybdenum-vanadium type quick-skating skates material

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0031399A3 (en) * 1979-07-30 1981-11-25 Consultronic (Int.)Ltd. Material for the production of stainless alpine ski edges
CN1119216C (en) * 2000-12-26 2003-08-27 常州市钢筘厂 Production process of metal rack
CN101380712B (en) * 2008-10-16 2010-06-02 朱晓明 Production method of steel edge

Also Published As

Publication number Publication date
CN107475499A (en) 2017-12-15

Similar Documents

Publication Publication Date Title
CN104032221B (en) A kind of Nb-microalloying high-carbon-chromium bearing steel and hot rolling production method thereof
KR101248317B1 (en) Steel sheet for brake disc, and brake disc
US20170191149A1 (en) Railway vehicle wheel and method for manufacturing railway vehicle wheel
CN105112774A (en) Air cooling hardened spring steel with high obdurability, low-medium-carbon and microalloy and forming and heat treatment process thereof
CN106244920B (en) 450 grade wear-resisting steel of Brinell hardness and its manufacturing method
CN109266970A (en) High-nitrogen, high-chromium plastic die steel and its smelting and heat treatment method
CN113637889B (en) Preparation method of boron-containing high-chromium wear-resistant steel ball
EP3091098B1 (en) High-carbon hot-rolled steel sheet and method for producing same
EP3091097B1 (en) High-carbon hot-rolled steel sheet and method for producing same
CN106521361A (en) High-performance wear resisting steel plate and production method thereof
CN109457184A (en) High-wear-resistance steel plate and production method thereof
CN110791717A (en) High-quality hypoeutectoid alloy tool steel wire rod and production method thereof
CN105088081A (en) Bainite and martensite spring steel for stabilizer bar and manufacturing process for stabilizer bar
CN107475499B (en) A kind of preparation method of sledge runner shaped steel
CN113151742B (en) Corrosion-resistant high-strength high-toughness alloy tool steel and heat treatment method and production method thereof
CN107075648B (en) Intensity and the excellent wire rod and its manufacturing method of impact flexibility
CN107699671B (en) A kind of sled alloy slide plate fashioned iron
CN108866442B (en) Heat treatment method for ultra-high carbon steel and product
CN107429345A (en) The manufacture method of cold-working tool materials and cold-working instrument
JP3999727B2 (en) Hypereutectoid steel
CN113789477B (en) Cast steel shot with low-carbon martensite structure and preparation process thereof
CN115404390A (en) Rare earth microalloyed high-temperature carburized bearing steel and preparation method thereof
CN108315658A (en) A kind of steel alloy and its preparation process
CN107904387A (en) A kind of Gear Shaft Heat Treatment
CN104099528B (en) A kind of special-shaped roll and preparation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180831

Address after: 350200 501, room 22, Hong hang new town, 108 Wu Hang Middle Road, Changle City, Fuzhou, Fujian, China

Applicant after: Ni Chenhui

Address before: 075100 unit 1, unit 4, Wanliu District, Xuanhua District, Zhangjiakou, Hebei 202

Applicant before: Zhou Jun

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200508

Address after: Room 1609, Jian'an building, No. 3, Section 1, Wanjiali Middle Road, Martian street, Furong district, Changsha City, Hunan Province

Patentee after: Changsha liuteng Technology Co., Ltd

Address before: 350200 501, room 22, Hong hang new town, 108 Wu Hang Middle Road, Changle, Fuzhou, Fujian, China

Patentee before: Ni Chenhui

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200915

Address after: 239000 Fengyang Economic Development Zone, Fengyang County, Chuzhou City, Anhui Province

Patentee after: Fengyang Precision Mold Co., Ltd

Address before: Room 1609, Jian'an building, No. 3, Section 1, Wanjiali Middle Road, Martian street, Furong district, Changsha City, Hunan Province

Patentee before: Changsha liuteng Technology Co.,Ltd.

TR01 Transfer of patent right