CN107475499A - A kind of preparation method of sledge runner shaped steel - Google Patents

A kind of preparation method of sledge runner shaped steel Download PDF

Info

Publication number
CN107475499A
CN107475499A CN201710663103.XA CN201710663103A CN107475499A CN 107475499 A CN107475499 A CN 107475499A CN 201710663103 A CN201710663103 A CN 201710663103A CN 107475499 A CN107475499 A CN 107475499A
Authority
CN
China
Prior art keywords
shaped steel
water
preparation
workpiece
cooled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710663103.XA
Other languages
Chinese (zh)
Other versions
CN107475499B (en
Inventor
周君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fengyang Precision Mold Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710663103.XA priority Critical patent/CN107475499B/en
Publication of CN107475499A publication Critical patent/CN107475499A/en
Application granted granted Critical
Publication of CN107475499B publication Critical patent/CN107475499B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/0068Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for particular articles not mentioned below
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/18Hardening; Quenching with or without subsequent tempering
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/26Methods of annealing
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/34Methods of heating
    • C21D1/42Induction heating
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/02Ferrous alloys, e.g. steel alloys containing silicon
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/04Ferrous alloys, e.g. steel alloys containing manganese
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/40Ferrous alloys, e.g. steel alloys containing chromium with nickel
    • C22C38/52Ferrous alloys, e.g. steel alloys containing chromium with nickel with cobalt
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/25Process efficiency

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Heat Treatment Of Articles (AREA)

Abstract

The invention provides a kind of preparation method of sledge runner shaped steel, using the mode of first integrally annealed, then differential annealing, sledge runner shaped steel is also ensure that the elastic performance in fore wing portion while enough intensity and hardness is obtained.By heating up and cooling stage by stage in heat treatment process, it is ensured that the overall uniformity of slide plate shaped steel, avoid and the problems such as surface defect and stress concentration occur.The shaped steel of the present invention employs specific alloying element and proportioning, on the basis of conventional skates steel, Mn, Ni, Cr, Co content are all adjusted, especially for strong hardness and the relation of elasticity, the content of Cr elements is reduced, so that final shaped steel product obtains good combination property.

Description

A kind of preparation method of sledge runner shaped steel
Technical field
The present invention relates to winter sports instrument field, is to be related to a kind of preparation method of sledge runner shaped steel specifically.
Background technology
Modern bobsleighing is as seven big event of Winter Olympic Games(Ice hockey, curling stone, biathlon, skating, skiing and snow Car, sled)One of, its species can much be divided into no rudder and have rudder, single sledge and wide sledge, striding type and horizontal, also traction, it is electronic and Sail etc..The bottom surface slide plate of sled is usually shaped steel material, and the slide plate be arranged in parallel for a pair or so, and length must not exceed 45 lis Rice, the fore wing portion of slide plate needs to keep certain elasticity, in favor of turning and manipulating.
In order to reach the requirement of bobsleighing, shaped steel used in sledge runner needs have good mechanical performance and table Face quality.Shaped steel surface can not have the defects of crackle, bubble, field trash, can have during application certain intensity, wearability and Elasticity.In the prior art, using the heat treatment of routine, forging, the technique such as cutting, frequently can lead to the wearability of shaped steel product compared with Low or intensity and elasticity deficiency, it is difficult to while meet composite request of the slide plate to performance.Intensity and the caused slide plate that wears no resistance Blade deforms, and the elasticity deficiency in slide plate fore wing portion, can all directly affect the service life and performance of sledge runner finished product, also unfavorable In horizontal performance of the sportsman in event.
The content of the invention
In order to solve the problems, such as the combination property of sledge runner shaped steel, the invention provides a kind of preparation of sledge runner shaped steel Method, while enabling sledge runner that there is higher anti-wear performance and intensity, it can also obtain enough local elasticities.
A kind of preparation method of sledge runner shaped steel, it is characterised in that:The C content of the sledge runner shaped steel is 0.35% ~0.40%;Its preparation method comprises the following steps:
A. integrally annealed:The shaped steel workpiece of machine-shaping is fitted into heating furnace, 800~850 DEG C of soaking times be 0.5~ 1.5h, integrally annealed is carried out, is air-cooled to room temperature afterwards;
B. differential annealing:By the way of sensing heating, to the one end of shaped steel workpiece as product fore wing portion after integrally annealed Local heating is carried out, then this locally carries out water quenching;
C. water quenching:The part of shaped steel workpiece differential annealing is immersed in the water, water stirred during quenching;
D. it is tempered:Shaped steel workpiece after water quenching is again loaded into heating furnace, 1 ~ 2h is incubated at 500 ~ 600 DEG C, is then air-cooled to Room temperature, you can obtain sledge runner shaped steel finished product.
The tensile strength of the sledge runner shaped steel finished product reaches 200 ~ 220MPa, and hardness is up to 55 ~ 60HRC.
The sledge runner shaped steel forms comprising following element:C:0.35-0.40%, Si:0.80-1.20%, Mn:0.50- 1.50%, Ni:0.50-1.00%, Cr:2.50-3.50%, Co:0.10-0.50%, surplus are Fe and inevitable impurity.
In the step a, the shaped steel workpiece of machine-shaping is fitted into heating furnace, at the uniform velocity it is warming up to 350 in 3~5h~ 450 DEG C, it is incubated 1~2h;800~850 DEG C are warming up to 30~50 DEG C/h again, soaking time is 0.5~1.5h, then first with 10 ~20 DEG C/h cools to 400~500 DEG C with the furnace, is incubated 2~3h;Again 150~200 DEG C are cooled to the furnace with 50~80 DEG C/h, it After be air-cooled to room temperature.
In the step b, by the way of sensing heating, to the shaped steel workpiece after integrally annealed as product fore wing portion One end carries out local heating, and heating-up temperature is 600~650 DEG C, and soaking time is 2.5~3.0h, and then this locally carries out water quenching.
In the step c, the part of shaped steel workpiece differential annealing is immersed in the water, water temperature is 25~30 DEG C before immersion, and Water temperature is no more than 50 DEG C after workpiece takes out, and water is stirred during quenching, be cooled to when workpiece takes out from water 150 DEG C with Under.
In the step d, the shaped steel workpiece after water quenching is again loaded into heating furnace, is first warming up to 200 ~ 300 through 1~2h DEG C, it is incubated 2 ~ 4h;500 ~ 600 DEG C are warming up to 30 ~ 50 DEG C/h again, 1 ~ 2h is incubated, is then air-cooled to room temperature, you can obtain sled Slide plate shaped steel finished product.
The present invention uses first integrally annealed, then the mode of differential annealing, sledge runner shaped steel is being obtained enough While intensity and hardness, the elastic performance in fore wing portion also ensure that.By heating up and cooling stage by stage in heat treatment process, really The overall uniformity of slide plate shaped steel has been protected, has avoided and the problems such as surface defect and stress concentration occurs.The shaped steel of the present invention uses Specific alloying element and proportioning, on the basis of conventional skates steel, are all adjusted to Mn, Ni, Cr, Co content, Especially for strong hardness and the relation of elasticity, the contents of Cr elements is reduced, so that final shaped steel product obtains well Combination property.
Embodiment
With reference to embodiment and comparative example, the present invention is described in more detail.
Embodiment 1:
A kind of preparation method of sledge runner shaped steel, it is characterised in that:The sledge runner shaped steel forms comprising following element:C: 0.35%, Si:0.80%, Mn:0.50%, Ni:0.50%, Cr:2.50%, Co:0.10%, surplus is Fe and inevitable impurity; Its preparation method comprises the following steps:
A. integrally annealed:The shaped steel workpiece of machine-shaping is fitted into heating furnace, 450 DEG C are at the uniform velocity warming up in 3h, is incubated 2h; 800 DEG C, soaking time 0.5h are warming up to 50 DEG C/h again, then first cools to 400 DEG C with the furnace with 20 DEG C/h, is incubated 3h;Again 150 DEG C are cooled to the furnace with 50 DEG C/h, are air-cooled to room temperature afterwards;
B. differential annealing:By the way of sensing heating, to the one end of shaped steel workpiece as product fore wing portion after integrally annealed Local heating is carried out, heating-up temperature is 650 DEG C, soaking time 2.5h, and then this locally carries out water quenching;
C. water quenching:The part of shaped steel workpiece differential annealing is immersed in the water, water temperature is 30 DEG C before immersion, and water temperature after workpiece taking-up Water is stirred no more than 50 DEG C, during quenching, less than 150 DEG C are cooled to when workpiece takes out from water;
D. it is tempered:Shaped steel workpiece after water quenching is again loaded into heating furnace, is first warming up to 300 DEG C through 1h, is incubated 4h;Again with 30 DEG C/h is warming up to 500 DEG C, 2h is incubated, is then air-cooled to room temperature, you can obtain sledge runner shaped steel finished product.
The tensile strength of the sledge runner shaped steel finished product reaches 220MPa, and hardness reaches 60HRC.
Embodiment 2:
A kind of preparation method of sledge runner shaped steel, it is characterised in that:The sledge runner shaped steel forms comprising following element:C: 0.40%, Si:0.80%, Mn:1.50%, Ni:1.00%, Cr:2.50%, Co:0.50%, surplus is Fe and inevitable impurity; Its preparation method comprises the following steps:
A. integrally annealed:The shaped steel workpiece of machine-shaping is fitted into heating furnace, 350 DEG C are at the uniform velocity warming up in 3h, is incubated 1h; 850 DEG C, soaking time 0.5h are warming up to 30 DEG C/h again, then first cools to 500 DEG C with the furnace with 10 DEG C/h, is incubated 3h;Again 200 DEG C are cooled to the furnace with 80 DEG C/h, are air-cooled to room temperature afterwards;
B. differential annealing:By the way of sensing heating, to the one end of shaped steel workpiece as product fore wing portion after integrally annealed Local heating is carried out, heating-up temperature is 600 DEG C, soaking time 3.0h, and then this locally carries out water quenching;
C. water quenching:The part of shaped steel workpiece differential annealing is immersed in the water, water temperature is 30 DEG C before immersion, and water temperature after workpiece taking-up Water is stirred no more than 50 DEG C, during quenching, less than 150 DEG C are cooled to when workpiece takes out from water;
D. it is tempered:Shaped steel workpiece after water quenching is again loaded into heating furnace, is first warming up to 200 DEG C through 2h, is incubated 3h;Again with 40 DEG C/h is warming up to 500 DEG C, 2h is incubated, is then air-cooled to room temperature, you can obtain sledge runner shaped steel finished product.
The tensile strength of the sledge runner shaped steel finished product reaches 220MPa, and hardness reaches 55HRC.
Embodiment 3:
A kind of preparation method of sledge runner shaped steel, it is characterised in that:The sledge runner shaped steel forms comprising following element:C: 0.35%, Si:0.90%, Mn:1.00%, Ni:0.80%, Cr:3.00%, Co:0.70%, surplus is Fe and inevitable impurity; Its preparation method comprises the following steps:
A. integrally annealed:The shaped steel workpiece of machine-shaping is fitted into heating furnace, 380 DEG C are at the uniform velocity warming up in 4h, is incubated 2h; 820 DEG C, soaking time 0.5h are warming up to 40 DEG C/h again, then first cools to 450 DEG C with the furnace with 15 DEG C/h, is incubated 2h;Again 180 DEG C are cooled to the furnace with 60 DEG C/h, are air-cooled to room temperature afterwards;
B. differential annealing:By the way of sensing heating, to the one end of shaped steel workpiece as product fore wing portion after integrally annealed Local heating is carried out, heating-up temperature is 600 DEG C, soaking time 2.5h, and then this locally carries out water quenching;
C. water quenching:The part of shaped steel workpiece differential annealing is immersed in the water, water temperature is 25 DEG C before immersion, and water temperature after workpiece taking-up Water is stirred no more than 50 DEG C, during quenching, less than 150 DEG C are cooled to when workpiece takes out from water;
D. it is tempered:Shaped steel workpiece after water quenching is again loaded into heating furnace, is first warming up to 250 DEG C through 1h, is incubated 2h;Again with 40 DEG C/h is warming up to 550 DEG C, 1h is incubated, is then air-cooled to room temperature, you can obtain sledge runner shaped steel finished product.
The tensile strength of the sledge runner shaped steel finished product reaches 200MPa, and hardness reaches 58HRC.
Comparative example 1:
By the shaped steel with same elemental composition of the invention and content, without double annealing, or other processing steps change Afterwards, the tensile strength of resulting sledge runner shaped steel is significantly lower than 180MPa, and local elasticity is poor.
Comparative example 2:
The shaped steel of elemental composition and content of the present invention is will differ from, after being prepared using processing step same as the present application, gained To the strong hardness of sledge runner shaped steel be difficult to meet the requirements, also, 60 HRC can also be reached even if hardness, its local elasticity It is obvious poor.
Comparative example 3:
By elemental composition and content shaped steel workpiece same as Example 1, obtained using the heat treatment different from the application During local elasticity's performance, the tensile strength and hardness of the sledge runner shaped steel obtained by it are difficult to meet combination property requirement, and And the surface quality of shaped steel is poor, hence it is evident that reduces the service life of product.
At the elemental composition selection of sledge runner shaped steel of the present invention it can be seen from embodiment 1-3 and comparative example 1-3 and heat Science and engineering sequence, it is that applicant verifies by repeated tests.Wherein, the elemental composition proportioning of shaped steel is in conventional skates steel On the basis of material, Mn, Ni, Cr, Co content are all adjusted, especially for strong hardness and the relation of elasticity, reduced The content of Cr elements, so that final shaped steel product obtains good combination property.In technique, using first integrally annealed, then The mode of differential annealing, sledge runner shaped steel is set to also ensure that fore wing portion while enough intensity and hardness is obtained Elastic performance.By heating up and cooling stage by stage in heat treatment process, it is ensured that the overall uniformity of slide plate shaped steel, avoid There is the problems such as surface defect and stress concentration.
Although an embodiment of the present invention has been shown and described, it will be understood by those skilled in the art that:Not In the case of departing from the principle and objective of the present invention a variety of change, modification, replacement and modification can be carried out to these embodiments, this The scope of invention is limited by claim and its equivalent.

Claims (6)

  1. A kind of 1. preparation method of sledge runner shaped steel, it is characterised in that:The C content of the sledge runner shaped steel 0.35%~ 0.40%;Its preparation method comprises the following steps:
    A. integrally annealed:The shaped steel workpiece of machine-shaping is fitted into heating furnace, 800~850 DEG C of soaking times be 0.5~ 1.5h, integrally annealed is carried out, is air-cooled to room temperature afterwards;
    B. differential annealing:By the way of sensing heating, to the one end of shaped steel workpiece as product fore wing portion after integrally annealed Local heating is carried out, then this locally carries out water quenching;
    C. water quenching:The part of shaped steel workpiece differential annealing is immersed in the water, water stirred during quenching;
    D. it is tempered:Shaped steel workpiece after water quenching is again loaded into heating furnace, 1 ~ 2h is incubated at 500 ~ 600 DEG C, is then air-cooled to Room temperature, you can obtain sledge runner shaped steel finished product;
    The tensile strength of the sledge runner shaped steel finished product reaches 200 ~ 220MPa, and hardness is up to 55 ~ 60HRC.
  2. 2. preparation method according to claim 1, it is characterised in that:The sledge runner shaped steel includes following element group Into:C:0.35-0.40%, Si:0.80-1.20%, Mn:0.50-1.50%, Ni:0.50-1.00%, Cr:2.50-3.50%, Co: 0.10-0.50%, surplus are Fe and inevitable impurity.
  3. 3. preparation technology according to claim 1, it is characterised in that:In the step a, by the shaped steel workpiece of machine-shaping It is fitted into heating furnace, 350~450 DEG C is at the uniform velocity warming up in 3~5h, is incubated 1~2h;Again 800 are warming up to 30~50 DEG C/h ~850 DEG C, soaking time is 0.5~1.5h, then first cools to 400~500 DEG C with the furnace with 10~20 DEG C/h, is incubated 2~3h; 150~200 DEG C are cooled to the furnace with 50~80 DEG C/h, be air-cooled to room temperature afterwards again.
  4. 4. preparation method according to claim 1, it is characterised in that:In the step b, by the way of sensing heating, Local heating is carried out as the one end in product fore wing portion to the shaped steel workpiece after integrally annealed, heating-up temperature is 600~650 DEG C, Soaking time is 2.5~3.0h, and then this locally carries out water quenching.
  5. 5. the preparation method according to Claims 1-4, it is characterised in that:In the step c, shaped steel workpiece is locally moved back The part of fire is immersed in the water, and water temperature is 25~30 DEG C before immersion, and workpiece take out after water temperature be no more than 50 DEG C, water is entered during quenching Row agitation, less than 150 DEG C are cooled to when workpiece takes out from water.
  6. 6. the preparation method according to claim 1 to 6, it is characterised in that:In the step d, by the shaped steel work after water quenching Part is again loaded into heating furnace, is first warming up to 200 ~ 300 DEG C through 1~2h, is incubated 2 ~ 4h;500 are warming up to 30 ~ 50 DEG C/h again ~ 600 DEG C, 1 ~ 2h is incubated, is then air-cooled to room temperature, you can obtain sledge runner shaped steel finished product.
CN201710663103.XA 2017-08-05 2017-08-05 A kind of preparation method of sledge runner shaped steel Active CN107475499B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710663103.XA CN107475499B (en) 2017-08-05 2017-08-05 A kind of preparation method of sledge runner shaped steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710663103.XA CN107475499B (en) 2017-08-05 2017-08-05 A kind of preparation method of sledge runner shaped steel

Publications (2)

Publication Number Publication Date
CN107475499A true CN107475499A (en) 2017-12-15
CN107475499B CN107475499B (en) 2018-10-09

Family

ID=60596926

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710663103.XA Active CN107475499B (en) 2017-08-05 2017-08-05 A kind of preparation method of sledge runner shaped steel

Country Status (1)

Country Link
CN (1) CN107475499B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111283204A (en) * 2020-02-18 2020-06-16 北京科技大学 Preparation method of chromium-molybdenum-vanadium type quick-skating skates material

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0031399A2 (en) * 1979-07-30 1981-07-08 Consultronic (Int.)Ltd. Material for the production of stainless Alpine ski edges
CN1299722A (en) * 2000-12-26 2001-06-20 常州市钢筘厂 Production process of metal rack
CN101380712A (en) * 2008-10-16 2009-03-11 朱晓明 Production method of steel edge

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0031399A2 (en) * 1979-07-30 1981-07-08 Consultronic (Int.)Ltd. Material for the production of stainless Alpine ski edges
CN1299722A (en) * 2000-12-26 2001-06-20 常州市钢筘厂 Production process of metal rack
CN101380712A (en) * 2008-10-16 2009-03-11 朱晓明 Production method of steel edge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111283204A (en) * 2020-02-18 2020-06-16 北京科技大学 Preparation method of chromium-molybdenum-vanadium type quick-skating skates material

Also Published As

Publication number Publication date
CN107475499B (en) 2018-10-09

Similar Documents

Publication Publication Date Title
CN102363859B (en) Method for producing wear-resisting steel plate
KR101248317B1 (en) Steel sheet for brake disc, and brake disc
US20170191149A1 (en) Railway vehicle wheel and method for manufacturing railway vehicle wheel
WO2022068856A1 (en) High-carbon bearing steel having high isotropy and long contact fatigue life and manufacturing method
CN104032221A (en) Niobium microalloying high-carbon chromium bearing steel and hot rolling production method thereof
CN105112774A (en) Air cooling hardened spring steel with high obdurability, low-medium-carbon and microalloy and forming and heat treatment process thereof
US10662492B2 (en) Abrasion-resistant steel material excellent in fatigue characteristics and method for manufacturing same
CN110791717B (en) High-quality hypoeutectoid alloy tool steel wire rod and production method thereof
CN113637889B (en) Preparation method of boron-containing high-chromium wear-resistant steel ball
CN106521361A (en) High-performance wear resisting steel plate and production method thereof
EP3091098B1 (en) High-carbon hot-rolled steel sheet and method for producing same
EP3091097B1 (en) High-carbon hot-rolled steel sheet and method for producing same
JP5226083B2 (en) High alloy cold die steel
CN111850412A (en) Steel material for carburized gear and preparation method thereof
WO2016107517A1 (en) High wear-resistant alloy steel for railway frog and manufacturing method therefor
CN101864546A (en) High heat-resistance abrasion-resistance alloy roller
CN113088813A (en) Steel for hot-rolled saw blade and production method thereof
CN109457184A (en) High-wear-resistance steel plate and production method thereof
CN105177430A (en) Alloy tool steel and production method thereof
CN113151742B (en) Corrosion-resistant high-strength high-toughness alloy tool steel and heat treatment method and production method thereof
CN107475499B (en) A kind of preparation method of sledge runner shaped steel
CN107699671B (en) A kind of sled alloy slide plate fashioned iron
CN108315658A (en) A kind of steel alloy and its preparation process
JP3999727B2 (en) Hypereutectoid steel
CN113789477A (en) Cast steel shot with low-carbon martensite structure and preparation process thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180831

Address after: 350200 501, room 22, Hong hang new town, 108 Wu Hang Middle Road, Changle City, Fuzhou, Fujian, China

Applicant after: Ni Chenhui

Address before: 075100 unit 1, unit 4, Wanliu District, Xuanhua District, Zhangjiakou, Hebei 202

Applicant before: Zhou Jun

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200508

Address after: Room 1609, Jian'an building, No. 3, Section 1, Wanjiali Middle Road, Martian street, Furong district, Changsha City, Hunan Province

Patentee after: Changsha liuteng Technology Co., Ltd

Address before: 350200 501, room 22, Hong hang new town, 108 Wu Hang Middle Road, Changle, Fuzhou, Fujian, China

Patentee before: Ni Chenhui

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200915

Address after: 239000 Fengyang Economic Development Zone, Fengyang County, Chuzhou City, Anhui Province

Patentee after: Fengyang Precision Mold Co., Ltd

Address before: Room 1609, Jian'an building, No. 3, Section 1, Wanjiali Middle Road, Martian street, Furong district, Changsha City, Hunan Province

Patentee before: Changsha liuteng Technology Co.,Ltd.