CN107471417A - Fixed hidden precast beam fully-automatic sprinkling maintenance construction engineering method - Google Patents
Fixed hidden precast beam fully-automatic sprinkling maintenance construction engineering method Download PDFInfo
- Publication number
- CN107471417A CN107471417A CN201710719156.9A CN201710719156A CN107471417A CN 107471417 A CN107471417 A CN 107471417A CN 201710719156 A CN201710719156 A CN 201710719156A CN 107471417 A CN107471417 A CN 107471417A
- Authority
- CN
- China
- Prior art keywords
- automatic
- maintenance
- water
- precast beam
- spray
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B11/00—Apparatus or processes for treating or working the shaped or preshaped articles
- B28B11/24—Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
- B28B11/245—Curing concrete articles
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Sewage (AREA)
Abstract
The invention discloses fixed hidden precast beam fully-automatic sprinkling maintenance construction engineering method, including automatic control system, non-tower water supply system, sprinkling curing system and water circulation utilization system, the automatic control system is made up of the circuit with SECO, the spray curing time and order of beam slab on one group of pedestal in specified quantity can be controlled, whole system maintenance efficiency is reached maximization;The non-tower water supply system is made up of non-tower water feeder and control system, is responsible for providing the metastable maintenance water of pressure to sprinkling curing system;It is made up of in the sprinkling curing system magnetic valve and automatic telescopic spray head.The fixation hidden precast beam fully-automatic sprinkling maintenance construction engineering method, pass through the spray head for installing fixed automatically retractable under precast beam pedestal and 180 degree rotates automatically, and prefabricated web and the automatic spray of top plate bottom are conserved by the automatic control system timing of SECO, so as to ensure that precast beam concrete strength.
Description
Technical field
The present invention relates to precast beam maintenance of equipment technical field, specially fixed hidden precast beam fully-automatic sprinkling maintenance
Construction.
Background technology
Precast beam maintenance not in place is all a weak link in precast beam production process all the time, in recent years
With requirement more and more higher of all parts of the country to construction standardization, traditional beam slab has been abandoned in many places, and manually watering is supported
Generation method, relatively advanced automatic spray curing system is employed, but so-called often only show and can spray automatically automatically
It is waterborne, and move spray piping or adjustment nozzle position mostly be by being accomplished manually, and fail carry out beam slab maintenance sequential control
System, excessively cause hydraulic pressure insufficient because some period conserves beam slab quantity simultaneously frequently;Simultaneously because maintenance shower nozzle is large number of, shower nozzle
Easily cause damage or block.Also influenceed in addition by the quality mind and sense of responsibility of operator, often maintenance effect is not up to
To original design requirement, causing beam slab, locally maintenance is not in place, so as to influence beam slab maintenance quality.
The needs to be become more meticulous for the current requirement for creating quality engineering of satisfaction and precast beam production plant, construction, lead to
Cross on the basis of fully analyzing, test and proving before beam fabricating yard construction, we improve original automatic spray curing system not
Foot, have developed the fixation hidden automatic spray curing system of a set of brand-new SECO, and by repeatedly improving and summarizing, enter
And form this engineering method.
The content of the invention
It is existing to solve it is an object of the invention to provide fixed hidden precast beam fully-automatic sprinkling maintenance construction engineering method
Technological deficiency and inaccessiable technical requirements.
To achieve the above object, the present invention provides following technical scheme:Fixed hidden precast beam fully-automatic sprinkling maintenance
Construction, including automatic control system, non-tower water supply system, sprinkling curing system and water circulation utilization system, it is described automatic
Control system is made up of the circuit with SECO, can control the spray curing time of beam slab on one group of pedestal in specified quantity
And order, whole system maintenance efficiency is reached maximization;The non-tower water supply system is by non-tower water feeder and control system group
Into, be responsible for sprinkling curing system provide the metastable maintenance water of pressure;In the sprinkling curing system by magnetic valve with
And automatic telescopic spray head composition, rotated by the automatic left and right 180 degree of spray head, realize the spray maintenance to beam slab;The water
The circulatory system is that the sewage after precast beam spray maintenance is re-entered into three-level sedimentation basin by collecting gutter, gutter, is sunk
Maintenance water is continued to serve as behind shallow lake;Immersible pump is provided with the three-level sedimentation basin, immersible pump passes through inlet channel and non-tower water supply
System connects.
Preferably, the automatic spray curing system by magnetic valve, automatic telescopic spray head, water main, branching pipe and when
Between relay group into being provided with stainless steel screw, the range of the adjustable automatic telescopic spray head of screw in, automatic telescopic spray head;Work
Push And Release when making by control circuit by every group of 1~No. 10 sequential control its pedestal feed pipe magnetic valve, so as to realize this
Beam slab carries out automatic spray maintenance by the timesharing of setting order on seat.
Preferably, the water power circuit all passes through spiral shell using underground preburied mode, automatic telescopic spray head with branching pipe
Line is detachably connected, and automatic telescopic spray head is designed using fixed hidden, is hidden automatically during use non-, is saved beam
Between space, move back and forth or install without artificial, it is horizontal greatly to improve beam field construction standardization.
Preferably, the maintenance water imports both sides gutter through the collecting gutter between two pedestals, then is led to through gutter
Three-level precipitates curing pool, after precipitation, the water source of water system is re-used as, so as to accomplish recycling for maintenance water.
Compared with prior art, beneficial effects of the present invention are as follows:
1. fixing, hidden precast beam fully-automatic sprinkling maintenance construction engineering method maintenance effect is more preferable, and stability is higher, service life
It is longer, accomplish manpower-free's maintenance substantially, influenceed by operating personnel small, more save cost of labor, and SECO is employed,
Maintenance efficiency, which has, to be increased substantially, while is greatly improved the Standardization Construction and construction standardization level of the Liang Chang, tool
There are good economic benefit and social benefit, can be promoted the use of in follow-up newly-built beam field.
2. fixing hidden precast beam fully-automatic sprinkling maintenance construction engineering method uses self-loopa SECO, by 10 pedestals
Conserved during one component, the phenomenon for causing hydraulic pressure deficiency because conserving concentration can be substantially reduced, greatly improve system stability in use
And high efficiency, and maintenance quality is fully ensured that, and maintenance cost is low, and curing system in the beam fabricating yard construction phase, disposably build by input
If water power circuit is all using underground preburied mode so that water pipe position is fixed and with disguise, so that Liang Chang is marked
Standardization builds image more preferably.
Brief description of the drawings
Fig. 1 is the fixed hidden precast beam fully-automatic sprinkling maintenance construction engineering method structural representation of the present invention;
Fig. 2 is the fixed hidden precast beam fully-automatic sprinkling maintenance construction engineering method automatic shower nozzle operating diagram of the present invention;
Fig. 3 is the fixed hidden precast beam fully-automatic sprinkling maintenance construction engineering method automatic control system schematic diagram of the present invention;
Fig. 4 is the fixed hidden precast beam fully-automatic sprinkling maintenance construction engineering method water system structural representation of the present invention.
In figure:1- non-tower water feeders, 2- pressure gauges, 3- controllers, 4- outlet conduits, 5- magnetic valves, 6- three-level sedimentation basins, 7- dive
Water pump, 8- inlet channels, 9- blowoff valves, 10- stretch spray head, 11- stainless steel screws.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made
Embodiment, belong to the scope of protection of the invention.
Fig. 1-4 are referred to, the present invention provides a kind of technical scheme:Fixed hidden precast beam fully-automatic sprinkling maintenance construction
Engineering method, including automatic spray curing system, three-level sedimentation basin 6, non-tower water supply system and water circulation utilization system, the automatic spray
Leaching curing system is made up of caging system and spray system, and automatic telescopic spray head, the automatic spray are provided with spray system
Curing system is re-entered into three-level sedimentation basin 6 to the sewage after precast beam spray maintenance by water circulation utilization system, water
Cyclic utilization system includes collecting gutter, gutter and precipitation purification pond, immersible pump 7, immersible pump being provided with the three-level sedimentation basin 6
7 are connected by inlet channel 8 with non-tower water supply system, and the non-tower water supply system includes non-tower water feeder 1, pressure gauge 2, control
Device 3, outlet conduit 4, magnetic valve 5 and blowoff valve 9, the non-tower water supply system are controlled by automatic spray curing system, no tower
Connected between water system and automatic spray curing system by conduit.
Automatic spray curing system is by magnetic valve, automatic telescopic spray head, water main, branching pipe and time relay group
Into automatic telescopic spray head 10 is interior to be provided with stainless steel screw 11, and screw can adjust the range of automatic telescopic spray head.Lead to during work
Push And Release of the control circuit by every group of 1~No. 10 sequential control its pedestal feed pipe magnetic valve is crossed, so as to realize this pedestal upper beam
Plate carries out automatic spray maintenance by the timesharing of setting order.
During maintenance, K is first turned on the power switch, needs are conserved according to actual beam slab, opening need to conserve corresponding to pedestal at any time
Switch(K1~K10), represent that beam slab needs to conserve on this pedestal when being closed to inductive switch, represent that beam slab is not on this pedestal during disconnection
Need to conserve.This example sets 30 minutes one and circulated, and is 3 minutes per pedestal beam slab curing time.To control when now with regard to K1~K10 complete closures
System processed illustrates:
After power supply opening, time relay KT2 obtains electric, while magnetic valve F1 is opened, and 1# beam slabs start to conserve, and KT2 is delayed 3 minutes
Afterwards, two timing closing switch closures, the time relay KT1, KT3 and auxiliary reclay J obtain electric, J normally closed switch disconnection simultaneously,
F1 is closed, and 1# beam slabs stop maintenance.J normal open switch closes, KT1 triggers(27min).Magnetic valve F2 is opened simultaneously, 2# beams
Plate starts to conserve.
After KT3 is delayed 3 minutes, KT3 delay disconnections are switched off, and F2 is closed, and 2# beam slabs stop maintenance, while KT3 is delayed
Closure switch close, and time relay KT4 obtains electric, and magnetic valve F3 is opened, and 3# beam slabs start to conserve.Similarly, every 3 minutes it is complete successively
Into the maintenance work of 4~9# beam slabs.
After KT10 is delayed 3 minutes, KT10 delay disconnections are switched off, and F9 is closed, and 9# beam slabs stop maintenance, while KT10 prolongs
When closure switch close, magnetic valve F10 is opened, and 10# beam slabs start to conserve.
After beam slab on pedestal 10 conserves 3 minutes, KT1 delay times arrive, and two delay disconnections of KT1 switch off, KT2 and
Dead electricity, KT1~KT10 timing closings switch, F10 dead electricity fully open with J normal open switch, 10# beam slabs to auxiliary reclay J simultaneously
Stop maintenance, while KT1~KT10 delays disconnect switch and J normally closed switch all closes, system restPoses, and KT2 is again
Repeat electric, F1 is opened, and 1# beam slabs start again at maintenance.
So go round and begin again and expire until conserving, close the corresponding power switch of beam slab(K1~K10)Untill.
Water power circuit is all detachably connected using underground preburied mode, automatic telescopic spray head with branching pipe by screw thread
Connect, and automatic telescopic spray head is designed using fixed hidden, is hidden automatically during use non-, is saved space between beam, nothing
Manually it need to move back and forth or install, it is horizontal greatly to improve beam field construction standardization.
Maintenance water imports both sides gutter through the collecting gutter between two pedestals, then leads to three-level precipitation maintenance through gutter
Pond, after precipitation, the water source of water system is re-used as, so as to accomplish recycling for maintenance water.
The fixed hidden precast beam fully-automatic sprinkling maintenance construction engineering method of the present invention will have enough source ensurings, external water source
Flow should meet 5m3, it is necessary to should open non-tower water supply system power supply when conserving in advance, startup water pump gives accumulator to supply for/h requirement
Water, to have pressure lasting enough when ensureing and spraying, the curing system of each pedestal is first in use, answer careful adjustment to stretch automatically
Contracting spray head direction of rotation and angle, ensure can be achieved it is comprehensive conserved, beam slab both ends termination and top plate use tripod
Portable shower nozzle and dropper shower nozzle is conserved, and water pipe is directly led out by reserved delivery port below pedestal, applying after spray
Work is collected to gutter with water through collecting gutter between beam slab, flows into three-level sedimentation basin through gutter, is flowed after sedimentation basin precipitates
Return curing pool to be recycled, to ensure that collecting gutter and gutter flowing water are unobstructed during use, periodic cleaning avoids blocking.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (4)
1. hidden precast beam fully-automatic sprinkling maintenance construction engineering method is fixed, including automatic control system, non-tower water supply system, spray
Leaching curing system and water circulation utilization system, the automatic control system are made up of the circuit with SECO, can control rule
In fixed number amount on one group of pedestal beam slab spray curing time and order, make whole system maintenance efficiency reach maximization;It is described
Non-tower water supply system is made up of non-tower water feeder and control system, is responsible for supporting to sprinkling curing system offer pressure is metastable
Shield water;It is made up of in the sprinkling curing system magnetic valve and automatic telescopic spray head, passes through the automatic left and right 180 of spray head
Degree rotation, realize the spray maintenance to beam slab;The water circulation system is by catchmenting to the sewage after precast beam spray maintenance
Ditch, gutter are re-entered into three-level sedimentation basin, and maintenance water is continued to serve as after precipitation;It is provided with the three-level sedimentation basin latent
Water pump, immersible pump are connected by inlet channel with non-tower water supply system.
2. fixed hidden precast beam fully-automatic sprinkling maintenance construction engineering method according to claim 1, it is characterised in that:Institute
State automatic spray curing system to be made up of magnetic valve, automatic telescopic spray head, water main, branching pipe and the time relay, automatically
Stainless steel screw is provided with flexible spray head, screw can adjust the range of automatic telescopic spray head;Pass through control circuit during work
Press the Push And Release of every group of 1~No. 10 sequential control its pedestal feed pipe magnetic valve, so as to realize beam slab on this pedestal by setting
Order timesharing carries out automatic spray maintenance.
3. fixed hidden precast beam fully-automatic sprinkling maintenance construction engineering method according to claim 1, it is characterised in that:Institute
Water power circuit is stated all to be detachably connected by screw thread with branching pipe using underground preburied mode, automatic telescopic spray head, and
Automatic telescopic spray head is hidden using fixed hidden design, space between beam is saved, without artificial next automatically during use non-
Return is dynamic or installs, and it is horizontal greatly to improve beam field construction standardization.
4. fixed hidden precast beam fully-automatic sprinkling maintenance construction engineering method according to claim 1, it is characterised in that:Institute
State maintenance water and import both sides gutter through the collecting gutter between two pedestals, then three-level precipitation curing pool, warp are led to through gutter
After precipitation, the water source of water system is re-used as, so as to accomplish recycling for maintenance water.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710719156.9A CN107471417A (en) | 2017-08-21 | 2017-08-21 | Fixed hidden precast beam fully-automatic sprinkling maintenance construction engineering method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710719156.9A CN107471417A (en) | 2017-08-21 | 2017-08-21 | Fixed hidden precast beam fully-automatic sprinkling maintenance construction engineering method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107471417A true CN107471417A (en) | 2017-12-15 |
Family
ID=60601129
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710719156.9A Pending CN107471417A (en) | 2017-08-21 | 2017-08-21 | Fixed hidden precast beam fully-automatic sprinkling maintenance construction engineering method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107471417A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109958290A (en) * | 2019-04-19 | 2019-07-02 | 辽宁工程技术大学 | A kind of full-automatic autotrophy protecting system of building green |
CN111775295A (en) * | 2020-07-22 | 2020-10-16 | 中电建路桥集团有限公司 | Automatic maintenance system for precast beam field |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103660021A (en) * | 2013-12-20 | 2014-03-26 | 广西捷佳润农业科技有限公司 | Automatic spraying maintenance system of precast beams |
CN203994187U (en) * | 2014-07-25 | 2014-12-10 | 中国建筑第六工程局有限公司 | A kind of precast beam automatic spray health preserving equipment |
CN204163000U (en) * | 2014-10-16 | 2015-02-18 | 中交二航局第四工程有限公司 | The automatic pier stud of SECO or king-post sprinkling curing system |
CN104972554A (en) * | 2015-07-27 | 2015-10-14 | 周勇 | Automatic spray and maintenance system for T-shaped prefabricated beam |
CN106738264A (en) * | 2016-11-09 | 2017-05-31 | 中铁三局集团有限公司 | The intelligent spray maintenance process of concrete prefabricated bridge |
-
2017
- 2017-08-21 CN CN201710719156.9A patent/CN107471417A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103660021A (en) * | 2013-12-20 | 2014-03-26 | 广西捷佳润农业科技有限公司 | Automatic spraying maintenance system of precast beams |
CN203994187U (en) * | 2014-07-25 | 2014-12-10 | 中国建筑第六工程局有限公司 | A kind of precast beam automatic spray health preserving equipment |
CN204163000U (en) * | 2014-10-16 | 2015-02-18 | 中交二航局第四工程有限公司 | The automatic pier stud of SECO or king-post sprinkling curing system |
CN104972554A (en) * | 2015-07-27 | 2015-10-14 | 周勇 | Automatic spray and maintenance system for T-shaped prefabricated beam |
CN106738264A (en) * | 2016-11-09 | 2017-05-31 | 中铁三局集团有限公司 | The intelligent spray maintenance process of concrete prefabricated bridge |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109958290A (en) * | 2019-04-19 | 2019-07-02 | 辽宁工程技术大学 | A kind of full-automatic autotrophy protecting system of building green |
CN111775295A (en) * | 2020-07-22 | 2020-10-16 | 中电建路桥集团有限公司 | Automatic maintenance system for precast beam field |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102172202B (en) | Device for automatically controlling irrigation and water draining of paddy field | |
CN203919328U (en) | The circulating automatic spray curing system in bridge prefabrication field | |
CN105951689B (en) | A kind of reservoir let out in advance and ecological flow under let out structure | |
CN107471417A (en) | Fixed hidden precast beam fully-automatic sprinkling maintenance construction engineering method | |
CN110158482A (en) | A kind of automatic spray maintenance process of oblique pull Surveillance of Continuous Beam concrete | |
CN205009378U (en) | A intelligence sprays health preserving system for roof beam, board precasting yard | |
CN203197017U (en) | Water supply and water return system of bar water-cooling device | |
CN107775786B (en) | Automatic spraying health preserving system and spraying method | |
CN202626838U (en) | Automatic spraying and preserving system device for high-pier blind spot-free plastic film | |
CN105890434B (en) | A kind of power plant cycle water cooling system, cooling means and application | |
CN219748428U (en) | Bridge prefabrication field circulation type automatic spraying maintenance system | |
CN203407345U (en) | Combined structure of water feeding and discharging pipes of fish pond | |
CN210969335U (en) | A curing means for concrete member prefabrication field | |
CN206066676U (en) | Caisson automatic spray curing system | |
CN210173861U (en) | Steam health preserving system is controlled to precast beam intelligence | |
CN106514846A (en) | Novel pipe piece water maintenance pool | |
CN105822068A (en) | Ultra-long thin wall concrete wall pouring and maintenance method under high temperature environment | |
CN101716797A (en) | Spraying health promotion system of precast beam slab | |
CN203266893U (en) | Automatic maintenance device for precast concrete unit | |
CN207210041U (en) | A kind of modular construction of sludge circulation clarification cell system | |
CN206106067U (en) | Precast box girder automatic spray maintenance system | |
CN110734125B (en) | Water level adjustable efficient filter tank back flushing method and structure | |
CN205822146U (en) | A kind of reservoir is let out in advance and is let out structure under double ecological flow | |
CN207841692U (en) | A kind of precast beam automatic spray curing system | |
CN204278203U (en) | A kind of automatic spray concrete curing system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20171215 |
|
WD01 | Invention patent application deemed withdrawn after publication |