CN107461201A - The damping protection system and its construction method of hard rock subway station in a kind of middle hole method Blasting Excavation - Google Patents
The damping protection system and its construction method of hard rock subway station in a kind of middle hole method Blasting Excavation Download PDFInfo
- Publication number
- CN107461201A CN107461201A CN201710932535.6A CN201710932535A CN107461201A CN 107461201 A CN107461201 A CN 107461201A CN 201710932535 A CN201710932535 A CN 201710932535A CN 107461201 A CN107461201 A CN 107461201A
- Authority
- CN
- China
- Prior art keywords
- inverted arch
- benzene plate
- protection system
- subway station
- excavation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/006—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
Abstract
Description
Claims (9)
- A kind of 1. damping protection system of hard rock subway station in middle hole method Blasting Excavation, it is characterised in that be included in side wall and The benzene plate (3) laid respectively on inverted arch, concrete layer (2) is provided with the benzene plate (3), is distinguished in adjacent cavern excavation In the thick explosion buffering dikes (4) of the reserved 0.8m-1m of side wall and inverted arch.
- 2. the damping protection system of hard rock subway station in a kind of middle hole method Blasting Excavation according to claim 1, it is special Sign is, rubble separation layer (5) is additionally provided between the concrete layer (2) and the benzene plate (3) that are laid on inverted arch.
- 3. the damping protection system of hard rock subway station in a kind of middle hole method Blasting Excavation according to claim 1, it is special Sign is that the thickness of the benzene plate (3) is 3cm-8cm.
- 4. the damping protection system of hard rock subway station in a kind of middle hole method Blasting Excavation according to claim 1, it is special Sign is that the thickness of the concrete layer (2) is 10cm-15cm.
- 5. according to the damping protection system of hard rock subway station in a kind of any described middle hole method Blasting Excavations of claim 1-4 System, it is characterised in that the benzene plate (3) is fixed on the dike (4) by nailing gun.
- A kind of 6. construction method of the damping protection system of hard rock subway station in middle hole method Blasting Excavation, it is characterised in that bag The damping protection system of hard rock subway station in a kind of middle hole method Blasting Excavation as described in claim 1-5 is any is included, it is applied Work method is:Step 1:Hole in excavation, Zhong Dong two sides are backbreak 10cm-15cm depth during excavation, and inverted arch is backbreak 15cm-20cm depth;Step 2:Benzene plate (3) is laid respectively in the rock stratum face of side wall and inverted arch and concrete layer (2) filling-in is set, as interim The isolation buffer structure of supporting (1);Step 3:The shaped steel of gib (1) is installed, and shotcrete with steel bar nets is to design thickness;Step 4:After the safe step pitch of first layer reaches requirement, after the thick dikes (4) of 0.8m-1.0m are reserved at the top of the second layer Explosion is carried out again;Step 5:During the wide open digging in side, explosion is carried out again after median septum reserves the thick dikes (4) of 0.8m-1.0m.
- 7. the construction of the damping protection system of hard rock subway station in a kind of middle hole method Blasting Excavation according to claim 6 Method, it is characterised in that in the step 2, rubble separation layer (5) is first laid in the benzene plate (3) when inverted arch is constructed, Concrete layer (2) is laid on the rubble separation layer (5) again.
- 8. the construction of the damping protection system of hard rock subway station in a kind of middle hole method Blasting Excavation according to claim 6 Method, it is characterised in that the dike (4) reserved in the step 4 and step 5 is excavated using digging machine, and to interim inverted arch bottom Portion and interim median septum fill spray concrete.
- 9. according to the damping protection system of hard rock subway station in a kind of any described middle hole method Blasting Excavations of claim 6-8 Construction method, it is characterised in that benzene plate (3) described in the step 2 is fixed on the dike (4) by nailing gun, then The shotcrete layer (2) in the benzene plate (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710932535.6A CN107461201B (en) | 2017-09-30 | 2017-09-30 | The construction method of the damping protection system of hard rock subway station in a kind of middle hole method Blasting Excavation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710932535.6A CN107461201B (en) | 2017-09-30 | 2017-09-30 | The construction method of the damping protection system of hard rock subway station in a kind of middle hole method Blasting Excavation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107461201A true CN107461201A (en) | 2017-12-12 |
CN107461201B CN107461201B (en) | 2019-06-25 |
Family
ID=60554125
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710932535.6A Active CN107461201B (en) | 2017-09-30 | 2017-09-30 | The construction method of the damping protection system of hard rock subway station in a kind of middle hole method Blasting Excavation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107461201B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106089216A (en) * | 2016-07-19 | 2016-11-09 | 北京交通大学 | Rock tunnel breaks rock construction method |
CN106499417A (en) * | 2016-10-25 | 2017-03-15 | 中铁隧道集团二处有限公司 | The reserved T word rock beam rock pillar constructions of extra-large cross-section resistant Capacity of Shallow-buried Subway Station |
CN106761778A (en) * | 2017-01-24 | 2017-05-31 | 山东大学 | A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground |
CN107201913A (en) * | 2016-03-16 | 2017-09-26 | 中交公局厦门工程有限公司 | A kind of fine vibration-reducing blasting construction method of cross-over tunnel |
-
2017
- 2017-09-30 CN CN201710932535.6A patent/CN107461201B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107201913A (en) * | 2016-03-16 | 2017-09-26 | 中交公局厦门工程有限公司 | A kind of fine vibration-reducing blasting construction method of cross-over tunnel |
CN106089216A (en) * | 2016-07-19 | 2016-11-09 | 北京交通大学 | Rock tunnel breaks rock construction method |
CN106499417A (en) * | 2016-10-25 | 2017-03-15 | 中铁隧道集团二处有限公司 | The reserved T word rock beam rock pillar constructions of extra-large cross-section resistant Capacity of Shallow-buried Subway Station |
CN106761778A (en) * | 2017-01-24 | 2017-05-31 | 山东大学 | A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground |
Non-Patent Citations (1)
Title |
---|
刘维林等: "白山抽水蓄能泵站施工期间二期厂房安装间防护工程", 《东北水利水电》 * |
Also Published As
Publication number | Publication date |
---|---|
CN107461201B (en) | 2019-06-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103821558B (en) | Coal mine gob filling mining and gob side entry retaining filling process | |
US10989051B2 (en) | Multi-section non-pillar staggered protected roadway for deep inclined thick coal seam and method for coal pillar filling between sections | |
CN103470261B (en) | The method of gob side entry driving under the former back in mining goaf | |
CN112031775B (en) | Novel coal mine rock burst treatment method | |
CA2929663C (en) | Mining method | |
CN105317459B (en) | A kind of subregion placement method for being used to control tight roof large area caving disaster | |
CN104131829B (en) | A kind of solid filling coal mining hydraulic supporting building and withdrawing frame method | |
CN110206542A (en) | Suitable for mining in combined mining thick coal seam Sub-Level Caving without coal column self-contained lane recovery method | |
Han et al. | Multiple and long-term disturbance of gob-side entry retaining by grouped roof collapse and an innovative adaptive technology | |
KR101391218B1 (en) | Construction methods of close-twin tunnel by blast shock-controlling and rebar reinforced shotcrete | |
US11339658B2 (en) | Method for recovering room-type coal pillars by cemented filling of reserved roadways | |
UA123770C2 (en) | Anti-collapse structure beside roadway based on 110 construction method for breaking roof | |
CN205013013U (en) | Secretly dig station supporting construction suitable for last soft hard formation down | |
CN105604576A (en) | Soft rock stratum underground excavation large-section tunnel construction method and supporting system | |
CN107881995A (en) | Underground workshop palisades crane beam excavating construction method under unfavorable geological condition | |
CN101638989B (en) | Milling and supporting construction method of fault crushed zone of subbottom tunnel | |
CN103016027B (en) | Tunnel or roadway excavating method under weak and broken complicated geological conditions | |
CN107905798A (en) | The method that flat top wall boring construction is carried out using central drift method | |
CN113187486A (en) | Gob-side entry driving method for deep well without coal pillar and formed entry | |
CN110905536A (en) | Construction method for receiving complex stratum earth pressure shield in underground excavation tunnel | |
CN109252877A (en) | Bilayer two lining in proximity tunnel combines contignation multi-step construction method | |
CN107461201A (en) | The damping protection system and its construction method of hard rock subway station in a kind of middle hole method Blasting Excavation | |
CN110030001A (en) | A kind of construction method that mountain tunnel is appeared | |
CN111335896B (en) | Coal-pillar-free anti-impact method for wide narrow excavation of rock burst coal seam mining roadway | |
JP2015081807A (en) | Radioactive waste disposal tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16 Co-patentee after: CHINA RAILWAY ERJU SECOND ENGINEERING CO.,LTD. Patentee after: China Railway Second Bureau Construction Co.,Ltd. Address before: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16 Co-patentee before: CHINA RAILWAY ERJU SECOND ENGINEERING CO.,LTD. Patentee before: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190815 Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16 Co-patentee after: CHINA RAILWAY ERJU SECOND ENGINEERING CO.,LTD. Patentee after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd. Address before: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16 Co-patentee before: CHINA RAILWAY ERJU SECOND ENGINEERING CO.,LTD. Patentee before: China Railway Second Bureau Construction Co.,Ltd. |
|
TR01 | Transfer of patent right |