CN107460951A - A kind of basement bottom board and its construction method - Google Patents

A kind of basement bottom board and its construction method Download PDF

Info

Publication number
CN107460951A
CN107460951A CN201710891452.7A CN201710891452A CN107460951A CN 107460951 A CN107460951 A CN 107460951A CN 201710891452 A CN201710891452 A CN 201710891452A CN 107460951 A CN107460951 A CN 107460951A
Authority
CN
China
Prior art keywords
plate
core
waterproof
concrete
girt strip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710891452.7A
Other languages
Chinese (zh)
Inventor
谢孟
谢琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUIZHOU JIEYI TECHNOLOGY DEVELOPMENT Co Ltd
Original Assignee
GUIZHOU JIEYI TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUIZHOU JIEYI TECHNOLOGY DEVELOPMENT Co Ltd filed Critical GUIZHOU JIEYI TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN201710891452.7A priority Critical patent/CN107460951A/en
Publication of CN107460951A publication Critical patent/CN107460951A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0007Base structures; Cellars
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a kind of ground lower shoe and its construction method, belong to building waterproofing technique field.It includes reinforced concrete girt strip, and one layer of flexible waterproof layer is additionally provided with reinforced concrete girt strip, and the flexible waterproof layer is some independent waterproof unit compositions, and the periphery of the waterproof unit is also associated with a circle waterstop, and waterstop is embedded in the reinforced concrete girt strip of surrounding.The present invention can make the flexible waterproof layer of concrete dense-rib plate move to multi-ribbed plate top board undersurface from basement top, reduce buoyancy, the core being filled in multi-ribbed plate is connected and extended in ground with ground, so as to resist buoyancy using " earth-grasping force " of core and with the collateral resistance of ground, so as to reduce basement bottom board cost, improve the anti-floating bearing capacity of basement, waterproof unit connects with the insertion of close finned surface plate, waterproof unit and close finned surface plate collective effect can be made, enhance the cracking resistance of close finned surface plate, so that concrete impermeable structure performance is lifted, obtain more preferable waterproof effect.

Description

A kind of basement bottom board and its construction method
Technical field
The present invention relates to a kind of basement bottom board, more particularly to a kind of concrete dense-rib plate flexible water unit, core and its Construction method, belong to building waterproofing technique field.
Background technology
Basement bottom board has the requirement such as anti-floating, waterproof, and especially a-hundred-year buoyancy load and waterproof requirement make ground The cost of lower room bottom plate is high.Existing demand of technical standard is entered using the waterproof coiled material of rigid concrete impermeable structure and flexibility The dual waterproof of row.Concrete can be greatlyd save by increasing depth of section using concrete Hollow Slab Structure, reduce steel using amount.However, pass The waterproofing process of system is that waterproof roll is layed in into substrate, and shortcoming is that seam leaves hidden danger, construction bottom die and assembling reinforcement too much When easily cause coiled material destruction, set mortar cover to take a lot of work time-consuming increase cost, in addition, the increase of hollow slab depth of section makes to float The acting surface of power, which moves down, is directed at buoyancy increase.
Therefore, it is meaningful that a kind of construction is simple, reliability height, short time limit, the Novel underground room bottom plate of low cost are developed.
The content of the invention
The technical problem to be solved in the present invention is:A kind of basement bottom board and its construction method are provided, it is a kind of construction Simply, reliability height, short time limit, the Novel underground room bottom plate of low cost, solve above mentioned problem existing for basement bottom board.
The technical scheme is that:A kind of basement bottom board, it includes reinforced concrete girt strip, in reinforced concrete girt strip also Provided with one layer of flexible waterproof layer, the flexible waterproof layer forms for some independent waterproof units, the periphery of the waterproof unit A circle waterstop is also associated with, waterstop is embedded in the reinforced concrete girt strip of surrounding.
One layer of flexible water connect band is also accompanied in the reinforced concrete girt strip, the flexible water connection band connection is adjacent anti- The waterstop of water unit.
The flexible water connect band is cast-in-place structure glue mortar(Or fine-stone concrete)Or cast-in-place epoxy resin mortar (Or fine-stone concrete)Or cast-in-place fibre mortar(Or fine-stone concrete)Or prefabricated structure film.
It comprises at least two kinds of depth of sections, and the depth of section of column base plate block is more than intercolumniation plate, the section of intercolumniation plate Highly it is not less than center plate.The division principle of plate is:Center plate refers generally to the span scope of two side of plate center line 1/4;Post Bottom plate block refers generally to the span scope of two side of mast axis 1/4;Intercolumniation plate refers to remaining plate.
The center plate is solid slab or multi-ribbed plate or is inverted multi-ribbed plate structure, and intercolumniation plate is multi-ribbed plate structure, post Bottom plate block is solid slab or multi-ribbed plate structure.
Core is filled with the cavity of the multi-ribbed plate.
A kind of construction method of basement bottom board, it is characterised in that:Construction procedure is:First, first by core ground in the original location On arranged by the preset clearance of design requirement;2nd, waterproof unit is covered above core;3rd, pressed above core Design requirement installation plate muscle, by design requirement arrangement beam muscle in the gap of core;4th, poured into a mould in the top surface of core and gap Reinforced concrete, waterproof connect band be cast and be clipped in girt strip and build-in waterstop in the inner, core is cast in the beam of reinforced concrete In plate, waterproof unit is between the top surface of core and reinforced concrete top board undersurface, the waterstop free end insertion week of waterproof unit In the waterproof connect band in reinforced concrete girt strip enclosed.
The core in the following ways in a kind of mode be made:A, using ground sun-dried mud brick in situ cut finishing shaping and Bottom surface keeps nature globality with ground;B, filling forming behind periphery and bottom surface is piled up using block, adopted in the block of bottom With the gelling thing grouting such as cement mortar or fine-stone concrete and penetrating into ground makes it be condensed into entirety with ground;C, using there is filler Casing;D, the block made using anti-floating weight.
The beneficial effects of the invention are as follows:
Compared with prior art, the method have the advantages that:
1st, using the elastomeric material batch production that a kind of price of waste or used plastics, reclaimed rubber is low, tensile property is good, water resistance is good Waterproof unit is manufactured in batch production, substitutes traditional coiled material waterproofing process of basement bottom board, not only reliable in quality but also has eliminated scene The time of construction, the top surface that waterproof unit is placed in core are protected by surface layer concrete bottom plate, effectively prevent artificially with external force Destroy, it also avoid coil waterproof layer and substantially increase durability under rugged environment, while also eliminate scene Bottom surface bed course, screed-coat, the mortar cover above of construction waterproof coiled material, so as to reach the mesh for reducing cost, shortening the duration 's.In addition, the waterstop of waterproof unit connects with the insertion of basement girt strip, it can effectively make waterproof unit common with basement bottom board Work, enhances the bearing capacity of concrete structure, the cracking resistance of bottom plate significantly improves, so that impermeable structure performance obtains With lifting, good waterproof effect is achieved.
2nd, each waterproof unit is connected as entirety by the flexible water connection sandwich in reinforced concrete girt strip, makes flexible waterproof layer Globality and continuity are provided with, its link position carries in concrete girt strip therefore improves the reliability of connection.
3rd, traditional concrete base arrangement is made by concrete hollow slab or multi-ribbed plate structure using core, utilizes less concrete dosage Its section is had larger increase, reach the purpose for greatly improving its bearing capacity or steel using amount being greatly reduced.
4th, weight is filled in hollow slab or multi-ribbed plate, and is attached in hollow slab or multi-ribbed plate girt strip, one can be offset Part buoyancy.
5th, it is by flexible waterproof layer(Generally waterproof coiled material, coating water-proof, spraying waterproof etc.)It is empty from foundation surface or concrete The bottom plate bottom surface of web moves to top board undersurface, and porous or the heavier filling that can be absorbed water will be filled in basement concrete empty stomach bottom plate Thing(Such as cobble, mud horsestone, sandstone, brickbat, concrete fragment, clay, phosphorus slag, slag), so that the effect of underground water uplift pressure Face moves to hollow slab top board undersurface from substrate, so as to reduce the buoyancy that basement bottom board is born.
6th, gelling thing is poured in core underfill(Such as cement mortar, fine-stone concrete)Can condense bottom block Extended to for overall and infiltration in substrate, or carry out cutting using ground in-situ soil and be trimmed to up big and down small cone sun-dried mud brick, no The deadweight of filler is only set to be attached on basement empty stomach base arrangement, and the ground adhesion strength or binder materials of sun-dried mud brick in situ are oozed Thoroughly in making filler or original soil base extend in ground in ground, so as to obtain bigger heavier filler or original soil base, from And obtain " earth-grasping force " and be used to resist buoyancy caused by pour concrete in work progress with the collateral resistance of ground, and using rank Section is used to balance all or part of buoyancy force of underground water.
7th, using different structure form and different cross section height optimization basement bottom board, drawn by 1/4 post away from line institute coaming plate block Point, can be plate, intercolumniation plate and center plate under post by Plate division.Center plate stress is minimum, typically using 200~ The solid slab section of 300 millimeters thicks can not only lack earth excavation but also construction is simple, or using the high inversion multi-ribbed plate of 200 thicknesss of slab, 400 ribs Structure, banketed neutral buoyancy using intercostal;Intercolumniation plate stress is larger, is typically cut using 500~900 millimeters of high multi-ribbed plates Face, substantially reduce steel using amount;Capital plate is stress maximum, typically using 600~1200 millimeters high of multi-ribbed plate or reality Core section, substantially reduces steel using amount.
Brief description of the drawings
Fig. 1:A kind of waterproof unit cross-sectional view of basement bottom board;
Fig. 2:A kind of cross-sectional view of basement bottom board;
Fig. 3:A kind of Plate division schematic diagram of basement bottom board.
Embodiment
To make the object, technical solutions and advantages of the present invention clearer, below with reference to this specification accompanying drawing to this hair It is bright to be described in further detail.
Embodiment 1:As shown in Figures 1 to 3, a kind of waterproof unit 2, comprising sealing frame and waterproof web, sealing frame is Rectangle, length and width are 2.1 meters, and internal cavities length and width is 1.9 meters, and frame is wide 0.1 meter, and section form is in-line, thickness 5 Millimeter, the upper and lower surface in free end have that the sealing convex tendon of a loop is wide 20 millimeters, and thick 10 millimeters, there is a ring connection end One wide 20 millimeter of the water stop slot of shape, deep 10 millimeters, the length and width of waterproof web is 2 meters, and panel is thick 5 millimeters, panel periphery bottom There is the connection fin that a loop is closed in face, and size is corresponding with water stop slot one, using regenerating waste used plastics hot forming, Batch production is produced in batches.
Further, basement bottom board is with the preparation method of core 9:Made using foundation soil in situ:In earthen foundation On, according to design requirement, 250 millimeters of girt strip width, 250 millimeters of groove width is excavated, it is deep 1.2 meters, each 1.8 meters of length and width, formed The matrix sun-dried mud brick of 2.05 meters of middle-range, waterproof unit 2 is installed on sun-dried mud brick top surface.
Further, the preparation method of flexible water connect band 5 is:Use mortar or microlith of the structure glue for active material Concrete.
Further, described basement bottom board, 8.4 meters of post net, using waterproof unit, flexible water stop, different structure The construction method and construction procedure of form and different cross section height be:
First, waterproof unit prefabricated transports job site in factory's batch;
2nd, core takes 200 millimeters to be arranged on ground by the preset clearance of design requirement in the original location, the length and width of anti-floating core 1200 millimeters are taken, rib height(Gap depth)Value:Center plate(The span scope of two side of plate center line 1/4:4200x4200 millis Rice plate)Take 600 millimeters;Column base plate block(The span scope of two side of mast axis 1/4:4200x4200 millimeter plates)Take 1200 millimeters; Intercolumniation plate(Remaining plate)Take 900 millimeters.Close 200 millimeters of finned surface thickness value.
3rd, a circle 100x100 millimeter concave stations are dug within one week in core top surface(Concrete girt strip is embedded in for waterstop);
4th, waterproof unit is covered above core, waterstop stretches into girt strip 50 millimeters;
5th, design requirement installation plate muscle is pressed above waterproof unit, by design requirement arrangement beam muscle in the gap of core;
6th, in the gap of core under pour concrete to plate at 100 millimeters(Waterproof unit waterstop is stretched at girt strip);
7th, in the gap of core under pour concrete waterproof connect band to plate, waterstop is cast in embedded waterproof connect band, is prevented Water connect band uses epoxy resin fine-stone concrete;
8th, top plate concrete is poured into a mould in the top surface of waterproof unit, core, which is cast, to be embedded in reinforced concrete girt strip and top plate, waterproof unit Between the top surface of core and concrete top board undersurface, in the concrete of the waterstop free end insertion girt strip of waterproof unit.
Embodiment 2:As shown in Figures 1 to 3, a kind of waterproof unit, the section form of sealing frame are inverted L-shaped, free limb outer surface On have a two circle water stop slots two, connection outlimb has the connecting groove one of a loop, and waterproof web surface has latticed fin, Rib is high 3 millimeters, and 3 millimeters of rib width, rib is away from 50 millimeters.Remaining is same as Example 1.
Further, basement bottom board is with the preparation method of core 9:High 250 millimeters, depth 200 is dug in the lower end of sun-dried mud brick One circle groove of millimeter, remaining is same as Example 1.
Further, the preparation method of flexible water connect band 5 is:Epoxy resin is used as the mortar of active material or thin Shi Tong.
Further, described basement bottom board, 8.4 meters of post net, using waterproof unit, flexible water stop, different structure The construction method and construction procedure of form and different cross section height be:
First, waterproof unit prefabricated transports job site in factory's batch;
2nd, core takes 200 millimeters to be arranged on ground by the preset clearance of design requirement in the original location, the length and width of anti-floating core 1200 millimeters are taken, rib height(Gap depth)Value:Center plate(The span scope of two side of plate center line 1/4:4200x4200 millis Rice plate)Take 600 millimeters;Column base plate block(The span scope of two side of mast axis 1/4:4200x4200 millimeter plates)Take 1200 millimeters; Intercolumniation plate(Remaining plate)Take 900 millimeters.Close 200 millimeters of finned surface thickness value.
3rd, a circle 100x100 millimeter concave stations are dug within one week in core top surface(Concrete girt strip is embedded in for waterstop);
4th, waterproof unit is covered above core, waterstop stretches into girt strip 50 millimeters;
5th, design requirement installation plate muscle is pressed above waterproof unit, by design requirement arrangement beam muscle in the gap of core;
6th, in the gap of core under pour concrete to plate at 100 millimeters(Waterproof unit waterstop is stretched at girt strip);
7th, in the gap of core under pour concrete waterproof connect band to plate, waterstop is cast in embedded waterproof connect band, is prevented Water connect band uses epoxy resin fine-stone concrete;
8th, top plate concrete is poured into a mould in the top surface of waterproof unit, core, which is cast, to be embedded in reinforced concrete girt strip and top plate, waterproof unit Between the top surface of core and concrete top board undersurface, in the concrete of the waterstop free end insertion girt strip of waterproof unit.
Embodiment 3:As shown in Figures 1 to 3, a kind of waterproof unit, waterproof web surface have lattice-like projection, high 3 milli of projection Rice, 3 millimeters of length and width, 50 millimeters of spacing.Sealing frame is L-shaped section, and there are two circle spacing 10 horizontal limb upper surface and lower surface The ring-type sealing convex tendon of millimeter, remaining is same as Example 1.
A kind of basement bottom board is with the preparation method of core 9:On rock or pebble ground, according to the internal model chi of design It is very little:It is high 1.2 meters, each 1.8 meters of length and width, wall is safeguarded using block stone or the circle of brick masonry one around, one layer of 300 milli of place mat in bottom Meter Hou Du rubble or cobble and with cement mortar or microlith concrete pouring, make cement mortar or fine-stone concrete penetrate into rock or ovum Certain depth connects as one with bed course in stone ground, then by block weight such as:Rubble, cobble, brickbat, concrete fragment, slag, Phosphorus slag, soil block etc. are filled in the cavity for safeguarding wall, and top is bound using waterproof unit 2.
Further, the preparation method of flexible water connect band 5 is:Swelling agent is added in common fine-stone concrete(Such as:AEA、 UEA etc.)And chopped fiber(Such as:Glass fibre, Carbon fiber plum, steel fibre etc.).
Further, described basement bottom board, 8.4 meters of post net, using waterproof unit, flexible water stop, different structure The construction method and construction procedure of form and different cross section height be:
First, waterproof unit prefabricated transports job site in factory's batch;
2nd, core takes 200 millimeters to be arranged on ground by the preset clearance of design requirement in the original location, the length and width of anti-floating core 1200 millimeters are taken, rib height(Gap depth)Value:Center plate(The span scope of two side of plate center line 1/4:4200x4200 millis Rice plate)Take 600 millimeters;Column base plate block(The span scope of two side of mast axis 1/4:4200x4200 millimeter plates)Take 1200 millimeters; Intercolumniation plate(Remaining plate)Take 900 millimeters.Close 200 millimeters of finned surface thickness value.
3rd, a circle 100x100 millimeter concave stations are dug within one week in core top surface(Concrete girt strip is embedded in for waterstop);
4th, waterproof unit is covered above core, waterstop stretches into girt strip 50 millimeters;
5th, design requirement installation plate muscle is pressed above waterproof unit, by design requirement arrangement beam muscle in the gap of core;
6th, in the gap of core under pour concrete to plate at 100 millimeters(Waterproof unit waterstop is stretched at girt strip);
7th, in the gap of core under pour concrete waterproof connect band to plate, waterstop is cast in embedded waterproof connect band, is prevented Water connect band uses epoxy resin fine-stone concrete;
8th, top plate concrete is poured into a mould in the top surface of waterproof unit, core, which is cast, to be embedded in reinforced concrete girt strip and top plate, waterproof unit Between the top surface of core and concrete top board undersurface, in the concrete of the waterstop free end insertion girt strip of waterproof unit.
Embodiment 4:As shown in Figures 1 to 3, a kind of waterproof unit, waterproof web surface have lattice-like projection, high 3 milli of projection Rice, 3 millimeters of length and width, 50 millimeters of spacing.Sealing frame is L-shaped section, and there are two circle spacing 10 horizontal limb upper surface and lower surface The ring-type sealing convex tendon of millimeter, remaining is same as Example 1.
A kind of basement bottom board is with the preparation method of core 9:Using latticed prefabricated side form be installed on rock foundation or Wall is safeguarded in substitution on pebble ground, and remaining is same as Example 3.During pour concrete girt strip, concrete slurry pours into periphery by side form mesh Block filler in concrete girt strip, side form and periphery bulk filler is condensed into entirety.
Further, the preparation method of flexible water connect band 5 is:Swelling agent is added in common fine-stone concrete(Such as:AEA、 UEA etc.)And chopped fiber(Such as:Glass fibre, Carbon fiber plum, steel fibre etc.).
Further, described basement bottom board, 8.4 meters of post net, using waterproof unit, flexible water stop, different structure The construction method and construction procedure of form and different cross section height be:
First, waterproof unit prefabricated transports job site in factory's batch;
2nd, core takes 200 millimeters to be arranged on ground by the preset clearance of design requirement in the original location, the length and width of anti-floating core 1200 millimeters are taken, rib height(Gap depth)Value:Center plate(The span scope of two side of plate center line 1/4:4200x4200 millis Rice plate)Take 600 millimeters;Column base plate block(The span scope of two side of mast axis 1/4:4200x4200 millimeter plates)Take 1200 millimeters; Intercolumniation plate(Remaining plate)Take 900 millimeters.Close 200 millimeters of finned surface thickness value.
3rd, a circle 100x100 millimeter concave stations are dug within one week in core top surface(Concrete girt strip is embedded in for waterstop);
4th, waterproof unit is covered above core, waterstop stretches into girt strip 50 millimeters;
5th, design requirement installation plate muscle is pressed above waterproof unit, by design requirement arrangement beam muscle in the gap of core;
6th, in the gap of core under pour concrete to plate at 100 millimeters(Waterproof unit waterstop is stretched at girt strip);
7th, in the gap of core under pour concrete waterproof connect band to plate, waterstop is cast in embedded waterproof connect band, is prevented Water connect band uses epoxy resin fine-stone concrete;
8th, top plate concrete is poured into a mould in the top surface of waterproof unit, core, which is cast, to be embedded in reinforced concrete girt strip and top plate, waterproof unit Between the top surface of core and concrete top board undersurface, in the concrete of the waterstop free end insertion girt strip of waterproof unit.
Embodiment 5:As shown in Figures 1 to 3, a kind of waterproof unit, waterproof web surface have lattice-like projection, high 3 milli of projection Rice, 3 millimeters of length and width, 50 millimeters of spacing.Sealing frame is L-shaped section, and there are two circle spacing 10 horizontal limb upper surface and lower surface The ring-type sealing convex tendon of millimeter, remaining is same as Example 1.
A kind of basement bottom board is with the preparation method of core 9:The position of design requirement is pressed on basement foundation ditch bottom surface Diaphragm capsule or casing are installed, filling anti-floating filling weight in it(Such as foundation ditch spoir, rubble, cobble, discarded concrete block).
Further, the preparation method of flexible water connect band 5 is:Swelling agent is added in common fine-stone concrete(Such as:AEA、 UEA etc.)And chopped fiber(Such as:Glass fibre, Carbon fiber plum, steel fibre etc.).
Further, described basement bottom board, 8.4 meters of post net, using waterproof unit, flexible water stop, different structure The construction method and construction procedure of form and different cross section height be:
First, waterproof unit prefabricated transports job site in factory's batch;
2nd, core takes 200 millimeters to be arranged on ground by the preset clearance of design requirement in the original location, the length and width of anti-floating core 1200 millimeters are taken, rib height(Gap depth)Value:Center plate(The span scope of two side of plate center line 1/4:4200x4200 millis Rice plate)Take 600 millimeters;Column base plate block(The span scope of two side of mast axis 1/4:4200x4200 millimeter plates)Take 1200 millimeters; Intercolumniation plate(Remaining plate)Take 900 millimeters.Close 200 millimeters of finned surface thickness value.
3rd, a circle 100x100 millimeter concave stations are dug within one week in core top surface(Concrete girt strip is embedded in for waterstop);
4th, waterproof unit is covered above core, waterstop stretches into girt strip 50 millimeters;
5th, design requirement installation plate muscle is pressed above waterproof unit, by design requirement arrangement beam muscle in the gap of core;
6th, in the gap of core under pour concrete to plate at 100 millimeters(Waterproof unit waterstop is stretched at girt strip);
7th, in the gap of core under pour concrete waterproof connect band to plate, waterstop is cast in embedded waterproof connect band, is prevented Water connect band uses epoxy resin fine-stone concrete;
8th, top plate concrete is poured into a mould in the top surface of waterproof unit, core, which is cast, to be embedded in reinforced concrete girt strip and top plate, waterproof unit Between the top surface of core and concrete top board undersurface, in the concrete of the waterstop free end insertion girt strip of waterproof unit.
Embodiment 6:As shown in Figures 1 to 3, a kind of waterproof unit, waterproof web surface have lattice-like projection, high 3 milli of projection Rice, 3 millimeters of length and width, 50 millimeters of spacing.Sealing frame is L-shaped section, and there are two circle spacing 10 horizontal limb upper surface and lower surface The ring-type sealing convex tendon of millimeter, remaining is same as Example 1.
A kind of basement bottom board is with the preparation method of core 9:The position of design requirement is pressed on basement foundation ditch bottom surface Low-intensity precast concrete block or high water absorbing capacity block are installed(Such as gypsum block, case-hardened sponge block).
Further, the preparation method of flexible water connect band 5 is:Swelling agent is added in common fine-stone concrete(Such as:AEA、 UEA etc.)And chopped fiber(Such as:Glass fibre, Carbon fiber plum, steel fibre etc.).
Further, described basement bottom board, 8.4 meters of post net, using waterproof unit, flexible water stop, different structure The construction method and construction procedure of form and different cross section height be:
First, waterproof unit prefabricated transports job site in factory's batch;
2nd, core takes 200 millimeters to be arranged on ground by the preset clearance of design requirement in the original location, the length and width of anti-floating core 1200 millimeters are taken, rib height(Gap depth)Value:Center plate(The span scope of two side of plate center line 1/4:4200x4200 millis Rice plate)Take 600 millimeters;Column base plate block(The span scope of two side of mast axis 1/4:4200x4200 millimeter plates)Take 1200 millimeters; Intercolumniation plate(Remaining plate)Take 900 millimeters.Close 200 millimeters of finned surface thickness value.
3rd, a circle 100x100 millimeter concave stations are dug within one week in core top surface(Concrete girt strip is embedded in for waterstop);
4th, waterproof unit is covered above core, waterstop stretches into girt strip 50 millimeters;
5th, design requirement installation plate muscle is pressed above waterproof unit, by design requirement arrangement beam muscle in the gap of core;
6th, in the gap of core under pour concrete to plate at 100 millimeters(Waterproof unit waterstop is stretched at girt strip);
7th, in the gap of core under pour concrete waterproof connect band to plate, waterstop is cast in embedded waterproof connect band, is prevented Water connect band uses epoxy resin fine-stone concrete;
8th, top plate concrete is poured into a mould in the top surface of waterproof unit, core, which is cast, to be embedded in reinforced concrete girt strip and top plate, waterproof unit Between the top surface of core and concrete top board undersurface, in the concrete of the waterstop free end insertion girt strip of waterproof unit.

Claims (8)

1. a kind of basement bottom board, it includes reinforced concrete girt strip(4), it is characterised in that:In reinforced concrete girt strip(4)Inside it is additionally provided with One layer of flexible waterproof layer(1), the flexible waterproof layer(1)For some independent waterproof units(2)Composition, the waterproof unit (2)Periphery be also associated with a circle waterstop(3), waterstop(3)Reinforced concrete girt strip around embedded(4)It is interior.
A kind of 2. basement bottom board according to claim 1, it is characterised in that:The reinforced concrete girt strip(4)Inside also accompany One layer of flexible water connect band(5), the flexible water connect band(5)Connect adjacent waterproof unit(2)Waterstop(3).
A kind of 3. basement bottom board according to claim 2, it is characterised in that:The flexible water connect band(5)It is existing The structure glue mortar poured(Or fine-stone concrete)Or cast-in-place epoxy resin mortar(Or fine-stone concrete)Or cast-in-place fibre mortar(It is or thin Shi Tong)Or prefabricated structure film.
A kind of 4. basement bottom board according to claim 1, it is characterised in that:It comprises at least two kinds of depth of sections, post Bottom plate block(6)Depth of section be more than intercolumniation plate(7), intercolumniation plate(7)Depth of section be not less than center plate(8).
A kind of 5. basement bottom board according to claim 4, it is characterised in that:The center plate(8)For solid slab or Multi-ribbed plate is inverted multi-ribbed plate structure, intercolumniation plate(7)For multi-ribbed plate structure, column base plate block(6)For solid slab or multi-ribbed plate knot Structure.
A kind of 6. basement bottom board according to claim 5, it is characterised in that:Core is filled with the cavity of the multi-ribbed plate Mould(9).
A kind of 7. construction method of basement bottom board according to claim 1~6 any one, it is characterised in that:Construction Step is:First, first by core(9)Arranged in the original location on ground by the preset clearance of design requirement;2nd, in core(9)'s Waterproof unit is covered above(2);3rd, in core(9)Above press design requirement installation plate muscle, in core(9)Gap in press Design requirement arranges beam muscle;4th, in core(9)Top surface and gap in casting reinforced concrete, waterproof connect band(5)It is cast and presss from both sides In girt strip and build-in waterstop(4)In the inner, core(9)It is cast in the beam slab of reinforced concrete, waterproof unit(2)Embedded in core Mould(9)Top surface and reinforced concrete top board undersurface between, waterproof unit(2)Waterstop(3)Reinforced concrete around the insertion of free end Girt strip(4)Interior waterproof connect band(5)It is interior.
A kind of 8. construction method of basement bottom board according to claim 7, it is characterised in that:The core(9)Using A kind of mode in the following manner is made:A, finishing shaping is cut using ground sun-dried mud brick in situ and bottom surface keeps nature whole with ground Body;B, filling forming behind periphery and bottom surface is piled up using block, using cement mortar or fine-stone concrete etc. in the block of bottom It is set to be condensed into entirety with ground in the grouting of gelling thing and infiltration ground;C, using the casing for having filler;D, using anti-floating weight The block that thing makes.
CN201710891452.7A 2017-09-27 2017-09-27 A kind of basement bottom board and its construction method Pending CN107460951A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710891452.7A CN107460951A (en) 2017-09-27 2017-09-27 A kind of basement bottom board and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710891452.7A CN107460951A (en) 2017-09-27 2017-09-27 A kind of basement bottom board and its construction method

Publications (1)

Publication Number Publication Date
CN107460951A true CN107460951A (en) 2017-12-12

Family

ID=60553315

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710891452.7A Pending CN107460951A (en) 2017-09-27 2017-09-27 A kind of basement bottom board and its construction method

Country Status (1)

Country Link
CN (1) CN107460951A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110904971A (en) * 2019-10-28 2020-03-24 中国一冶集团有限公司 Prefabricated backfill adobe conveying device and construction method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201165709Y (en) * 2007-08-13 2008-12-17 李树林 Water-proof structure between underground penetrating structures
CN103469953A (en) * 2013-09-23 2013-12-25 吴方伯 Reinforced concrete hollow floor slab for building
CN203834698U (en) * 2014-02-17 2014-09-17 袁石江 Waterproof structure of expansion joint of building structure
CN104264717A (en) * 2014-09-05 2015-01-07 李影 Basement rigid material and flexible material combined waterproof construction method
US20150211230A1 (en) * 2011-12-20 2015-07-30 Margarita Jimenez Horwitz Module for building facades and method of use in construction
CN105926869A (en) * 2016-05-26 2016-09-07 青岛海川建设集团有限公司 Roof deformation joint structure and construction method thereof
CN205676931U (en) * 2016-06-01 2016-11-09 新疆可耐金新材料科技有限责任公司 A kind of basement waterproofing base plate
CN106193410A (en) * 2016-08-31 2016-12-07 赤峰市建筑科学研究院有限公司 A kind of precast concrete small-sized self waterproofing heat insulation house surface system
CN106948502A (en) * 2017-05-20 2017-07-14 谢孟 A kind of water-proof top cover and its construction method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201165709Y (en) * 2007-08-13 2008-12-17 李树林 Water-proof structure between underground penetrating structures
US20150211230A1 (en) * 2011-12-20 2015-07-30 Margarita Jimenez Horwitz Module for building facades and method of use in construction
CN103469953A (en) * 2013-09-23 2013-12-25 吴方伯 Reinforced concrete hollow floor slab for building
CN203834698U (en) * 2014-02-17 2014-09-17 袁石江 Waterproof structure of expansion joint of building structure
CN104264717A (en) * 2014-09-05 2015-01-07 李影 Basement rigid material and flexible material combined waterproof construction method
CN105926869A (en) * 2016-05-26 2016-09-07 青岛海川建设集团有限公司 Roof deformation joint structure and construction method thereof
CN205676931U (en) * 2016-06-01 2016-11-09 新疆可耐金新材料科技有限责任公司 A kind of basement waterproofing base plate
CN106193410A (en) * 2016-08-31 2016-12-07 赤峰市建筑科学研究院有限公司 A kind of precast concrete small-sized self waterproofing heat insulation house surface system
CN106948502A (en) * 2017-05-20 2017-07-14 谢孟 A kind of water-proof top cover and its construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110904971A (en) * 2019-10-28 2020-03-24 中国一冶集团有限公司 Prefabricated backfill adobe conveying device and construction method thereof
CN110904971B (en) * 2019-10-28 2021-08-13 中国一冶集团有限公司 Prefabricated backfill adobe conveying device and construction method thereof

Similar Documents

Publication Publication Date Title
CN103643656B (en) High rock-fill dam membrane anti-seepage body on deep coverage layer and construction method of high rock-fill dam membrane anti-seepage body
CN101914925B (en) Basement by using optimized composite prefabricated arch wall as external wall
CN105926802B (en) A kind of reinforcement structure of 3D printing reinforced masonry shear wall structure
CN111395267A (en) Core wall rock-fill dam
CN104846841B (en) Anti-floating construction method for basements without uplift piles
CN206090638U (en) Underground side wall post -cast strip waterproof construction
CN108755319A (en) A kind of road construction method and the road built using the engineering method
CN101418569A (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN107119695A (en) A kind of operation support body and construction method for cancelling outer wall of basement backfill
CN106948502A (en) A kind of water-proof top cover and its construction method
CN108193648A (en) Plasticity panel homogeneous dam
CN105756100B (en) Basement post-pouring zone system and preparation method thereof
CN115198781A (en) Construction method of super-large-area concrete anti-cracking and anti-floating structure
CN212248108U (en) Core wall rock-fill dam
CN110424556A (en) A kind of basement bottom board water draining plate waterproof construction method
CN110106915A (en) One kind exempts from that support is inverse to make underground engineering construction method and underground construction structure
CN206956949U (en) Overlap wall and intermediate layer laminated floor slab connecting node
CN109706925A (en) A kind of tencel muscle anti-float anchor rod anchoring process
CN107460951A (en) A kind of basement bottom board and its construction method
CN205669211U (en) A kind of prefabricated Gravity Retaining Wall
CN106245546A (en) A kind of corrugated steel Pipe rack
CN212533930U (en) Slope protection for antiseep water conservancy flood control
CN208996030U (en) One kind entering lithotype fixing anchor bar attachment device
CN212000674U (en) Novel reverse construction method assembly type non-pressure culvert
CN207419749U (en) A kind of waterproof exterior wall of new high shock resistance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171212