CN107460874A - A kind of slip casting anchors utricule - Google Patents

A kind of slip casting anchors utricule Download PDF

Info

Publication number
CN107460874A
CN107460874A CN201710831385.XA CN201710831385A CN107460874A CN 107460874 A CN107460874 A CN 107460874A CN 201710831385 A CN201710831385 A CN 201710831385A CN 107460874 A CN107460874 A CN 107460874A
Authority
CN
China
Prior art keywords
utricule
positioning head
head protector
slip casting
grouting pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710831385.XA
Other languages
Chinese (zh)
Inventor
贾照会
张顺利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINXIANG JIAHUI TECHNOLOGY Co Ltd
Original Assignee
XINXIANG JIAHUI TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINXIANG JIAHUI TECHNOLOGY Co Ltd filed Critical XINXIANG JIAHUI TECHNOLOGY Co Ltd
Priority to CN201710831385.XA priority Critical patent/CN107460874A/en
Publication of CN107460874A publication Critical patent/CN107460874A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of slip casting to anchor utricule, one Grouting Pipe sequentially passes through upper chuck, utricule and lower dop and reached in positioning head protector from top to bottom, a low-pressure grouting non-return valve is provided with the Grouting Pipe inside utricule, a high-pressure slip-casting non-return valve is provided with the Grouting Pipe inside positioning head protector.At least one plasma discharge hole is provided with positioning head protector outer wall, check valve is installed in plasma discharge hole portion position.There is a round supporting plate with hanger erection in the cavity of positioning head protector.In upper and lower dop central axial direction one or more guide pipe is connected with through utricule.Utricule is made of to use counter-infiltration anti-corrosion cloth.The present invention can not only make cement grout smoothly inject utricule by above-mentioned improvement, and can effectively replace clay slurries around utricule, effectively improve utricule Solidification Quality, improve resistance to plucking dynamics.

Description

A kind of slip casting anchors utricule
Technical field
It is particularly a kind of to be used for foundation stabilization or the slip casting of slope retaining anchoring utricule the present invention relates to architectural engineering.
Background technology
Existing slip casting anchors utricule, is all that a dop is separately installed with the both ends of a utricule, in two dops On a guide pipe is fixed with into bag, positioning head protector is installed on lower dop, pacified on upper chuck from the side of guide pipe Equipped with a Grouting Pipe extending into positioning head protector upper pouch body, in being provided with a grouting valve in bag in Grouting Pipe, this Subject matter existing for kind of structure is, after cement grout 1-1 fills utricule expansion form enlarged footing, hinder outside Grouting Pipe again The bottom of secondary injection utricule, can only fill the utricule top slip casting of cement mortar, because around utricule now and bottom is full of Clay slurries 2-2, utricule top institute cement injection can not effectively displace the clay slurries of surrounding, so as to influence construction quality, Greatly reduce the withdrawal resistance of anchoring.
The content of the invention
It is an object of the present invention to provide a kind of water and gas efficiently separated in cement mortar, replaces the clay around utricule Slurries, improve the slip casting anchoring utricule of withdrawal resistance.
The technical scheme is that complete as follows, it is characterised in that:One Grouting Pipe is from top to bottom successively Reached through upper chuck, utricule and lower dop in positioning head protector, it is inverse that a low-pressure grouting is provided with the Grouting Pipe inside utricule Only valve, a high-pressure slip-casting non-return valve is provided with the Grouting Pipe inside positioning head protector.It is provided with least on positioning head protector outer wall One plasma discharge hole, check valve is installed in plasma discharge hole portion position.There is a round supporting plate with hanger erection in the cavity of positioning head protector. In upper and lower dop central axial direction one or more guide pipe is connected with through utricule.Utricule is to use counter-infiltration anti-corrosion cloth It is made.
The present invention can not only make cement grout smoothly inject utricule, and can effectively replace utricule week by above-mentioned improvement Clay slurries are enclosed, effectively improve utricule Solidification Quality, improve resistance to plucking dynamics.
Brief description of the drawings
Fig. 1 is prior art construction effect figure;Fig. 2 is the construction effect figure of the technical program;Fig. 3 is the structure of the present invention Schematic diagram.
Embodiment
Embodiment is described in detail with reference to accompanying drawing, as shown in figure 3, it includes upper chuck 10, lower dop 8, positioning head protector 6 and Utricule 9, one or more guide pipe 2 is connected with through utricule central axial direction between upper and lower dop, is determined on lower dop Position head protector outer wall is provided with least one plasma discharge hole 5, has a round supporting plate 7 with hanger erection in the cavity of positioning head protector, wears Upper chuck is crossed through reaching in positioning head protector with lower dop in utricule and being provided with a Grouting Pipe 1, in pacifying in utricule in Grouting Pipe Equipped with a low-pressure grouting non-return valve 3, in being provided with a high-pressure check valve 4 in positioning head protector in Grouting Pipe.Utricule is to adopt It is made of counter-infiltration anti-corrosion cloth.Check valve is installed in plasma discharge hole portion position.
The present invention in Grouting Pipe in setting low pressure and high-pressure slip-casting non-return valve respectively in utricule and in positioning head protector, and Position and plasma discharge hole is set in head protector, slurries can be by the low-pressure grouting non-return valve inside utricule rapidly from top to bottom in slip casting Utricule is injected, unnecessary slurries are smoothly discharged from bottom to up by the high-pressure slip-casting non-return valve in positioning head protector by plasma discharge hole, Clay slurries effectively around displacement utricule;Using utricule made of counter-infiltration anti-corrosion cloth, the water in slurries can be efficiently separated And gas, effectively improve anchoring quality;One or more guide pipe is set, penetrating for reinforcing bar or steel hinge line can be facilitated.

Claims (5)

1. a kind of slip casting anchors utricule, it is characterised in that:One Grouting Pipe sequentially passes through upper chuck, utricule and lower card from top to bottom Head is reached in positioning head protector, and a low-pressure grouting non-return valve is provided with the Grouting Pipe inside utricule, inside positioning head protector Grouting Pipe is provided with a high-pressure slip-casting non-return valve.
A kind of 2. slip casting anchoring utricule according to claim 1, it is characterised in that:It is provided with least on positioning head protector outer wall One plasma discharge hole, check valve is installed in plasma discharge hole portion position.
A kind of 3. slip casting anchoring utricule according to claim 1, it is characterised in that:Suspension rod is used in the cavity of positioning head protector One round supporting plate is installed.
A kind of 4. slip casting anchoring utricule according to claim 1, it is characterised in that:In upper and lower dop central axial direction One or more guide pipe is connected with through utricule.
A kind of 5. slip casting anchoring utricule according to claim 1, it is characterised in that:Utricule is to use counter-infiltration anti-corrosion cloth It is made.
CN201710831385.XA 2017-09-15 2017-09-15 A kind of slip casting anchors utricule Pending CN107460874A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710831385.XA CN107460874A (en) 2017-09-15 2017-09-15 A kind of slip casting anchors utricule

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710831385.XA CN107460874A (en) 2017-09-15 2017-09-15 A kind of slip casting anchors utricule

Publications (1)

Publication Number Publication Date
CN107460874A true CN107460874A (en) 2017-12-12

Family

ID=60552403

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710831385.XA Pending CN107460874A (en) 2017-09-15 2017-09-15 A kind of slip casting anchors utricule

Country Status (1)

Country Link
CN (1) CN107460874A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09132910A (en) * 1995-11-08 1997-05-20 Chichibu Onoda Cement Corp Liquefaction preventive construction method of ground
CN201801861U (en) * 2010-06-02 2011-04-20 中国京冶工程技术有限公司 Repeated self-adaptive grouting system
CN103726498A (en) * 2014-01-21 2014-04-16 山东正元建设工程有限责任公司 Grouting expanding pre-stressed anchor rod of fiber bag and using method thereof
CN104912072A (en) * 2015-06-23 2015-09-16 新乡市嘉汇科技有限公司 Integrated double-bag enlarged anchor rod
CN106836217A (en) * 2017-02-15 2017-06-13 常州工学院 A kind of construction method of expansion end formula soil bolt or soil nailing
CN207267984U (en) * 2017-09-15 2018-04-24 新乡市嘉汇科技有限公司 A kind of slip casting anchors utricule

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09132910A (en) * 1995-11-08 1997-05-20 Chichibu Onoda Cement Corp Liquefaction preventive construction method of ground
CN201801861U (en) * 2010-06-02 2011-04-20 中国京冶工程技术有限公司 Repeated self-adaptive grouting system
CN103726498A (en) * 2014-01-21 2014-04-16 山东正元建设工程有限责任公司 Grouting expanding pre-stressed anchor rod of fiber bag and using method thereof
CN104912072A (en) * 2015-06-23 2015-09-16 新乡市嘉汇科技有限公司 Integrated double-bag enlarged anchor rod
CN106836217A (en) * 2017-02-15 2017-06-13 常州工学院 A kind of construction method of expansion end formula soil bolt or soil nailing
CN207267984U (en) * 2017-09-15 2018-04-24 新乡市嘉汇科技有限公司 A kind of slip casting anchors utricule

Similar Documents

Publication Publication Date Title
CN102086645B (en) Socketed pile and construction method thereof
CN201908308U (en) Grouting sleeve valve pipe
CN206888996U (en) A kind of shield sky pushes through the section of jurisdiction float Structure of Tunneling by mining method
CN103114578B (en) Grouting molding pedestal pile and construction method thereof and pedestal expanding device
CN109610693A (en) Shear wall connection structure and its construction technology
CN106121090A (en) 3D prints the method for anchor connection reinforcing bar in filled wall
CN205025479U (en) Administer bottom plate support system of soft rock tunnel pucking
CN111022085A (en) Pre-empty soft rock roadway supporting structure and construction method thereof
CN104358252B (en) The bored pile perforation structure of spillage and construction method in water prevention
CN101324064B (en) Controllable expansion extrusion soil body apparatus for geotechnical engineering and use thereof
CN201241344Y (en) Controllable capsule type expansion device
CN102704497B (en) RPW (ranked position weight) process for treating high fill slope
CN103410144B (en) Prestressed reinforcement piles set into rock and construction method
CN205189918U (en) Intumescent cavity slip casting stock
CN207267984U (en) A kind of slip casting anchors utricule
CN105804403A (en) Rolling ball type concrete pouring structure and method for overground large special-shaped stiff column
CN204401613U (en) The structure of bored pile perforation spillage in water prevention
CN107447747B (en) A kind of construction method of coercion underground continuous wall
CN204385727U (en) Spiral grouting preformed pile
CN101666091A (en) Filling core reinforcement method for fractured tubular piles
CN107460874A (en) A kind of slip casting anchors utricule
CN205577430U (en) Concrete placement structure is managed to big scale of construction composite steel concrete column body swift current ball formula pipe cluster in ground
CN205100993U (en) Ore removal level drift section supporting construction
CN104018499A (en) Grouting method capable of saving grouting amount on pre-stressed anchor cable tension section
CN204125941U (en) Uplift pile structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171212

WD01 Invention patent application deemed withdrawn after publication