CN206888996U - A kind of shield sky pushes through the section of jurisdiction float Structure of Tunneling by mining method - Google Patents

A kind of shield sky pushes through the section of jurisdiction float Structure of Tunneling by mining method Download PDF

Info

Publication number
CN206888996U
CN206888996U CN201720624997.7U CN201720624997U CN206888996U CN 206888996 U CN206888996 U CN 206888996U CN 201720624997 U CN201720624997 U CN 201720624997U CN 206888996 U CN206888996 U CN 206888996U
Authority
CN
China
Prior art keywords
tunneling
duct piece
mining method
float structure
shield
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720624997.7U
Other languages
Chinese (zh)
Inventor
尹涛
石玉华
苏卜坤
关森明
刘天祥
潘波
黄永健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Municipal Engineering Design & Research Institute Co Ltd
Original Assignee
Guangzhou City Engineering Design Studies Total Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou City Engineering Design Studies Total Institute filed Critical Guangzhou City Engineering Design Studies Total Institute
Priority to CN201720624997.7U priority Critical patent/CN206888996U/en
Application granted granted Critical
Publication of CN206888996U publication Critical patent/CN206888996U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of shield sky pushes through the section of jurisdiction float Structure of Tunneling by mining method, including being arranged on slip casting bag body of the Tunneling by mining method just between lining and shield duct piece, the opening end of slip casting bag body stretches out from the injected hole of shield duct piece, threaded two fluid grouting pipe component can be screwed at the injected hole of shield duct piece, cement mortar and waterglass are injected by two fluid grouting pipe component simultaneously to slip casting bag body, cloth bag can constrain the scope of float Structure body formation, bulk can be effectively formed fills the float Structure body just served as a contrast in Tunneling by mining method space between shield duct piece with some strength, it just serves as a contrast the space between shield duct piece with block face way of contact filling in Tunneling by mining method, it can effectively prevent stress raisers from causing cracking and the deformation of section of jurisdiction;Moreover, three spaced apart float Structure body scopes on shield duct piece top are larger, there is preferably parcel and lock ring to tunnel, be entirely limited the displacement and deformation of shield duct piece.

Description

A kind of shield sky pushes through the section of jurisdiction float Structure of Tunneling by mining method
Technical field
The present invention relates to shield tunnel construction technology field, more particularly to a kind of shield sky pushes through the section of jurisdiction of Tunneling by mining method Float Structure.
Background technology
To ensure that shield makes smooth advances, tunnel trunk need to be passed through typically first using Mining Method when extremely hard rock and longer length Row excavates, and after having performed the first lining structure of Tunneling by mining method, shield sky pushes away segment assembly by being commonly called as shield sky and pushing away.Shield sky pushes away Cross after the completion of Tunneling by mining method construction, 200mm or so space between just serving as a contrast be present in usual shield duct piece and Tunneling by mining method, when When slip casting is carried out after the gradual water-filling in this space or section of jurisdiction, section of jurisdiction top does not constrain, therefore section of jurisdiction can float, due to assembly Shield duct piece is to be connected by screw bolts composition by different lining segments, when buoyancy is larger, during duct piece float upward, section of jurisdiction and section of jurisdiction it Between joint and bolt hole at stress it is larger, often lead to segment damage, burst apart, faulting of slab ends etc. so that tunnel segment structure damages, simultaneously Excessive deformation will cause Tunnel Design center line that deviation occurs, and no small difficulty is caused to follow-up track laying and operation etc., Even resulting in tunnel segment section structure transfinites, and causes greater loss.
Prior art often utilizes a kind of anti-duct piece float upward bolt of grouting borehole design of shield duct piece to solve duct piece float upward, As shown in figure 1 and 2, the front end of bolt 1 has a steel column 2, and length is about 200mm, after empty ejector sleeve sheetmolding, by bolt 1 is screwed into the injected hole 4 of section of jurisdiction 3, and arriving Tunneling by mining method until the front end of steel column 2 top of bolt 1 just serves as a contrast 5, and section of jurisdiction is prevented so as to reach The effect of floating and limitation Segment displacement.
However, prevent duct piece float upward from following defect be present by the bolt:
1st, because steel column is a facings at the beginning of pushing against Tunneling by mining method with the way of contact, with the progressively release of surrouding rock stress, Under the buoyancy of section of jurisdiction and the dual superposition of surrouding rock stress, the concentrated force at injected hole is often larger, usually causes shield pipe There is ring shake in piece bolt hole surrounding concrete;The mixed intensity of just lining spray is relatively low simultaneously, just serves as a contrast thinner thickness and crisp, Easily first lining structure is damaged under excessive steel column concentrated force so that with the easy unstability of the point-supported tunnel segment structure of steel column, Duct piece float upward displacement increases, tunnel segment structure damage;
2nd, by clock and watch orientation 10 o'clock direction, 12 o'clock direction, 2 o'clock direction arrange the bolt to reach constraint The effect of section of jurisdiction position is limited, and obligatory point is less, due to being that point contacts between steel column and facings at the beginning of Tunneling by mining method, each contact point Deformation it is asynchronous, uncoordinated, the position of section of jurisdiction can not be preferably fixed, at the faulting of slab ends and bolt hole between section of jurisdiction and section of jurisdiction Concrete phenomenon of bursting apart still exist;
3rd, error during construction is just served as a contrast due to Tunneling by mining method, just the distance between lining is impossible with Tunneling by mining method for section of jurisdiction It is just 200mm, accordingly, there exist the possibility for not having abutting to contact between steel column front end and facings at the beginning of Tunneling by mining method, actually applies Man-hour usually needs the actual range of facings at the beginning of by measuring section of jurisdiction and Tunneling by mining method to adjust the length of steel column, is made to construction Into larger inconvenience, therefore bolt not can manufacture, and influence construction speed.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of safe and reliable, easy for construction shield sky and push through Mining Method The section of jurisdiction float Structure in tunnel.
Technical scheme used by solve above-mentioned technical problem:A kind of shield sky pushes through the section of jurisdiction anti-floating of Tunneling by mining method Structure, the section of jurisdiction float Structure are in the upper half-turn part of shield duct piece, including are arranged on Tunneling by mining method just lining and shield Slip casting bag body between section of jurisdiction, the injected hole that the opening end of the slip casting bag body is stretched out on shield duct piece, the shield duct piece Threaded two fluid grouting pipe component can be screwed at injected hole, is injected simultaneously to slip casting bag body by the two fluid grouting pipe component Cement mortar and waterglass slurry, until the quick initial set of the internal slurries of slip casting bag forms float Structure body, the float Structure body with Block face way of contact filling just serves as a contrast the space between shield duct piece in Tunneling by mining method.
Further, the two fluid grouting pipe component outer wall has one section of external screw thread, and the injected hole inwall has interior spiral shell Line, it is connected by screw thread and realizes that two fluid grouting pipe component is screwed into injected hole.
Further, the two fluid grouting pipe component, which has, stretches into internal first Grouting Pipe arranged side by side of slip casting bag and the second note Slurry pipe.
Further, between the shield duct piece and Tunneling by mining method just serve as a contrast in the clock and watch orientation 10 o'clock direction, 12 o'clock direction, 2 o'clock direction form three float Structure bodies respectively.Certainly, according to practice of construction situation float Structure body Orientation and quantity can adjust accordingly.
Further, the slip casting bag body is cloth bag, and the fabric number of the cloth bag is 40-80 branch, and cloth bag can constrain anti- The scope that floating structure is formed, and cloth bag has certain gas permeability and compactness, slurries can full filling when may be such that slip casting Bag body will not cause big slurries to be lost in again, can effectively form bulk the filling with some strength be in lining at the beginning of tunnel and The grouting and reinforcing body in space between shield duct piece, the radius of cloth bag can be 0.2~0.5m, and depth can be 1.0~1.5m, also can root Cloth bag size is determined according to actual requirement of engineering, when necessary the superposition of two or more sacks can be used to use.
Beneficial effect:In this section of jurisdiction float Structure, by slip casting bag body and two fluid grouting pipe component at the beginning of Tunneling by mining method Quick between lining and shield duct piece to form block float Structure body, it is in Tunneling by mining method with block face way of contact filling The just space between lining and shield duct piece, can effectively prevent stress raisers from causing cracking and the deformation of section of jurisdiction;Moreover, shield Three spaced apart float Structure bodies on structure section of jurisdiction top form large range of block filling, have preferably parcel and Lock ring, the displacement and deformation of shield duct piece have been entirely limited it.Shield sky of the present invention pushes through the section of jurisdiction float Structure of Tunneling by mining method And construction method can efficiently solve shield sky push through Tunneling by mining method duct piece float upward cause Segment cracking, breakage, faulting of slab ends and The problems such as tunnel disalignment is excessive, while solve using phase caused by the stresses in segments concentration for setting steel column anti-floating to bring Pass problem, ensure the construction quality in tunnel, reduce the cracking seepage of section of jurisdiction and the damaged expense for deforming, reducing later stage operation maintenance With.
Brief description of the drawings
The present invention is described further with reference to the accompanying drawings and examples;
Fig. 1 is that prior art prevents duct piece float upward structural representation;
Fig. 2 is the structural representation for preventing duct piece float upward bolt in the prior art;
Fig. 3 is section of jurisdiction of embodiment of the present invention float Structure schematic diagram;
Fig. 4 is the structural representation of two fluid grouting pipe in the embodiment of the present invention.
Embodiment
Reference picture 3 and Fig. 4, a kind of shield sky of the utility model pushes through the section of jurisdiction float Structure of Tunneling by mining method, including sets It is three to put the float Structure body 41 between lining 20 and shield duct piece 10, its quantity at the beginning of Tunneling by mining method, is respectively at clock and watch In orientation 10 o'clock direction, 12 o'clock direction, 2 o'clock direction, certainly, according to the orientation of practice of construction situation float Structure body It can be adjusted accordingly with quantity.Float Structure body 41 is by just serving as a contrast the slip casting between 20 to shield duct piece 10 and Tunneling by mining method The slip casting of bag body 42 is formed, and specifically, the opening end of slip casting bag body 42 stretches out from the injected hole 11 of shield duct piece 10, shield duct piece 10 Injected hole 11 at can be screwed into threaded two fluid grouting pipe component 30, the outer wall of two fluid grouting pipe component 30 has one section of outer spiral shell Line, the inwall of injected hole 11 on shield duct piece 10 have internal thread, pass through screw thread and are connected and threaded biliquid can be achieved note Slurry pipe component 30 is screwed into injected hole 11.
Wherein, threaded two fluid grouting pipe component 30, which has, stretches into slip casting bag the first Grouting Pipe 31 arranged side by side and the in vivo Two Grouting Pipes 32, it is connected respectively with cement mortar flexible pipe and waterglass slurry flexible pipe, passes through the first Grouting Pipe 31 and the second Grouting Pipe 32, respectively by cement mortar and waterglass slurry injection slip casting bag body, inject cement mortar and waterglass simultaneously because slip casting bag body 42 is interior Slurry, and waterglass slurry has a fast freezing action, and the slurries in slip casting bag body 42 can quickly solidify sizing, and reach necessarily by force Degree, slip casting bag body 42 provide a quick resolidified region for slurries, prevent slurries from fleeing.
Slip casting bag body 42 uses a kind of frivolous cloth bag, and cloth bag can constrain the scope of float Structure body formation, and cloth bag has Certain gas permeability and compactness, the full filling baggy fabric body of slurries energy will not cause big slurries to be lost in again when may be such that slip casting, can The filling with some strength for effectively forming bulk is in Tunneling by mining method just space 40 between lining 20 and shield duct piece 10 Float Structure body 41, the fabric number of cloth bag can be 40~80, and cloth bag radius can be 0.2~0.5m, depth can for 1.0~ 1.5m, cloth bag size can be also determined according to actual requirement of engineering, when necessary the superposition of two or more sacks can be used to use.
The float Structure body 41 of bulk is formed to the slip casting of slip casting bag body 42, it fills Mining Method tunnel with the block face way of contact Road just serves as a contrast the space between shield duct piece, can effectively prevent stress raisers from causing cracking and the deformation of section of jurisdiction;Moreover, Three spaced apart scopes of float Structure body 41 on shield duct piece top are larger, have preferably parcel and lock ring to tunnel, It has been entirely limited the displacement and deformation of shield duct piece.
Embodiments of the present invention are explained in detail above in conjunction with accompanying drawing, but the invention is not restricted to above-mentioned embodiment party Formula, can also be before present inventive concept not be departed from the technical field those of ordinary skill possessed knowledge Put that various changes can be made.

Claims (5)

1. a kind of shield sky pushes through the section of jurisdiction float Structure of Tunneling by mining method, the section of jurisdiction float Structure is in the upper of shield duct piece Half-turn part, it is characterised in that:Including being arranged on slip casting bag body of the Tunneling by mining method just between lining and shield duct piece, the slip casting The injected hole that the opening end of bag body is stretched out on shield duct piece, threaded biliquid note can be screwed at the injected hole of the shield duct piece Pipe component is starched, cement mortar is injected to slip casting bag body by the two fluid grouting pipe component simultaneously and waterglass is starched, until slip casting bag The quick initial set of internal slurries forms float Structure body, and the float Structure body is in Mining Method with block face way of contact filling Tunnel just serves as a contrast the space between shield duct piece.
2. shield sky according to claim 1 pushes through the section of jurisdiction float Structure of Tunneling by mining method, it is characterised in that:It is described double Liquid grout pipe component outer wall has one section of external screw thread, and the injected hole inwall has internal thread, is connected and realized by screw thread Two fluid grouting pipe component is screwed into injected hole.
3. shield sky according to claim 1 or 2 pushes through the section of jurisdiction float Structure of Tunneling by mining method, it is characterised in that:Institute State two fluid grouting pipe component and have and stretch into slip casting bag the first Grouting Pipe and the second Grouting Pipe arranged side by side in vivo.
4. shield sky according to claim 1 or 2 pushes through the section of jurisdiction float Structure of Tunneling by mining method, it is characterised in that:Institute State shield duct piece and Tunneling by mining method just serve as a contrast between in clock and watch orientation 10 o'clock direction, 12 o'clock direction, 2 o'clock direction Three float Structure bodies are formed respectively.
5. shield sky according to claim 1 or 2 pushes through the section of jurisdiction float Structure of Tunneling by mining method, it is characterised in that:Institute It is cloth bag to state slip casting bag body, and the fabric number of the cloth bag is 40-80 branch.
CN201720624997.7U 2017-05-31 2017-05-31 A kind of shield sky pushes through the section of jurisdiction float Structure of Tunneling by mining method Active CN206888996U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720624997.7U CN206888996U (en) 2017-05-31 2017-05-31 A kind of shield sky pushes through the section of jurisdiction float Structure of Tunneling by mining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720624997.7U CN206888996U (en) 2017-05-31 2017-05-31 A kind of shield sky pushes through the section of jurisdiction float Structure of Tunneling by mining method

Publications (1)

Publication Number Publication Date
CN206888996U true CN206888996U (en) 2018-01-16

Family

ID=61320003

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720624997.7U Active CN206888996U (en) 2017-05-31 2017-05-31 A kind of shield sky pushes through the section of jurisdiction float Structure of Tunneling by mining method

Country Status (1)

Country Link
CN (1) CN206888996U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107130979A (en) * 2017-05-31 2017-09-05 广州市市政工程设计研究总院 A kind of shield sky pushes through the section of jurisdiction float Structure and construction method of Tunneling by mining method
CN109653767A (en) * 2018-11-12 2019-04-19 西南交通大学 For the anti-floating type section of jurisdiction of shield tunnel and its processing method and application method
CN109723465A (en) * 2019-03-19 2019-05-07 成都理工大学 TBM rock tunnel(ling) machine section of jurisdiction righting method
CN109973116A (en) * 2019-03-11 2019-07-05 中铁十二局集团第二工程有限公司 A kind of tunnel segment structure and its construction method of the anti-floating of shield tunnel
CN110242331A (en) * 2019-07-29 2019-09-17 西南交通大学 A method of pipe-plate lining ring anti-floating is assisted for the anti-floating system in shield tunnel and using it
CN111779495A (en) * 2020-08-13 2020-10-16 中建八局轨道交通建设有限公司 Construction method for restraining floating amount of shield tunnel segment
CN113958343A (en) * 2021-05-10 2022-01-21 南昌轨道交通集团有限公司 Structure and method for restraining upward floating of duct piece in full-section rock stratum shield tunnel

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107130979A (en) * 2017-05-31 2017-09-05 广州市市政工程设计研究总院 A kind of shield sky pushes through the section of jurisdiction float Structure and construction method of Tunneling by mining method
CN109653767A (en) * 2018-11-12 2019-04-19 西南交通大学 For the anti-floating type section of jurisdiction of shield tunnel and its processing method and application method
CN109653767B (en) * 2018-11-12 2023-09-15 西南交通大学 Anti-floating duct piece for shield tunnel, and processing method and using method thereof
CN109973116A (en) * 2019-03-11 2019-07-05 中铁十二局集团第二工程有限公司 A kind of tunnel segment structure and its construction method of the anti-floating of shield tunnel
CN109973116B (en) * 2019-03-11 2020-09-22 中铁十二局集团第二工程有限公司 Shield tunnel floating-up prevention segment structure and construction method thereof
CN109723465A (en) * 2019-03-19 2019-05-07 成都理工大学 TBM rock tunnel(ling) machine section of jurisdiction righting method
CN110242331A (en) * 2019-07-29 2019-09-17 西南交通大学 A method of pipe-plate lining ring anti-floating is assisted for the anti-floating system in shield tunnel and using it
CN110242331B (en) * 2019-07-29 2024-03-26 西南交通大学 Anti-floating device for shield tunnel and method for assisting segment lining ring anti-floating by adopting anti-floating device
CN111779495A (en) * 2020-08-13 2020-10-16 中建八局轨道交通建设有限公司 Construction method for restraining floating amount of shield tunnel segment
CN113958343A (en) * 2021-05-10 2022-01-21 南昌轨道交通集团有限公司 Structure and method for restraining upward floating of duct piece in full-section rock stratum shield tunnel
CN113958343B (en) * 2021-05-10 2024-04-02 南昌轨道交通集团有限公司 Structure and method for restraining floating of segment of full-section stratum shield tunnel

Similar Documents

Publication Publication Date Title
CN206888996U (en) A kind of shield sky pushes through the section of jurisdiction float Structure of Tunneling by mining method
CN107130979A (en) A kind of shield sky pushes through the section of jurisdiction float Structure and construction method of Tunneling by mining method
WO2015176614A1 (en) Construction method and structure of pressure dispersing expansion head anchor rod
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN103133026A (en) Novel expansion shell inverted wedge type grouting anchor rod
CN205297600U (en) Shield constructs empty ejector sleeve piece dual-purpose pipe of slip casting and section of jurisdiction top supporting, slip casting structure thereof
CN109610693A (en) Shear wall connection structure and its construction technology
CN206554832U (en) Component and the grouting cable anchor and anchor pole using the component are only starched in a kind of hole
CN111119935A (en) Multi-layer grouting reinforcement method for surrounding rock of soft and broken roadway structure
CN106884651A (en) A kind of slopes wall concrete bottom board prestress loading device
CN105484753B (en) The Supporting Method for Drifting of high hydraulic pressure big flow crushed zone
CN104711987B (en) A kind of deep covering layer sleeving valve tube method controllable grouting method
CN107201909B (en) Expansive soil tunnel supporting structure and method
CN107165661A (en) A kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction method
CN103089276A (en) Deep-shallow hole and high-low pressure coupling grouting technology
CN205329689U (en) Lower part enlarges compound stock of section pressure type
CN103696787A (en) Deformed steel bar high-pressure grouting anchor rod and support method for reinforcing roadway by deformed steel bar high-pressure grouting anchor rod
CN109184742B (en) Advanced pre-grouting method for high-pressure water-rich soft surrounding rock mountain tunnel
CN105156137B (en) Tunnel side wall preliminary bracing method in V~VI grade of country rock
CN206784327U (en) A kind of stone masonry dam poor quality dam grouting reinforcing structure
CN102606173B (en) Construction method for treating tunnel deformation segment and accelerating tunneling
CN103437787A (en) Special device for deep hole grouting at surrounding rock breaking section and grouting method
CN206845195U (en) A kind of tunnel grouting device
CN104328781A (en) Unfavorable geologic body controlling infiltration chemical grouting method
CN209557025U (en) Suitable for the locking angle ductule on steel bracket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 510060 East seat, No. 348 East Ring Road, Guangzhou, Guangdong, Yuexiu District

Patentee after: Guangzhou municipal engineering design and Research Institute Co., Ltd.

Address before: 510060, No. 95, Guangzhou Avenue, Tianhe District, Guangdong, Guangzhou

Patentee before: Guangzhou City Engineering Design studies total institute

CP03 Change of name, title or address