CN107460856A - A kind of manufacture method of construction of hydro project automatic drain system - Google Patents

A kind of manufacture method of construction of hydro project automatic drain system Download PDF

Info

Publication number
CN107460856A
CN107460856A CN201710668232.8A CN201710668232A CN107460856A CN 107460856 A CN107460856 A CN 107460856A CN 201710668232 A CN201710668232 A CN 201710668232A CN 107460856 A CN107460856 A CN 107460856A
Authority
CN
China
Prior art keywords
water
pipe
pump
water pump
collector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710668232.8A
Other languages
Chinese (zh)
Inventor
张朝峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Huicheng Zhizao Industrial Design Co Ltd
Original Assignee
Suzhou Huicheng Zhizao Industrial Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Huicheng Zhizao Industrial Design Co Ltd filed Critical Suzhou Huicheng Zhizao Industrial Design Co Ltd
Priority to CN201710668232.8A priority Critical patent/CN107460856A/en
Publication of CN107460856A publication Critical patent/CN107460856A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B11/00Drainage of soil, e.g. for agricultural purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B1/00Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B11/00Drainage of soil, e.g. for agricultural purposes
    • E02B11/005Drainage conduits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B11/00Drainage of soil, e.g. for agricultural purposes
    • E02B11/02Drainage device- laying apparatus, e.g. drainage ploughs
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B8/00Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
    • E02B8/06Spillways; Devices for dissipation of energy, e.g. for reducing eddies also for lock or dry-dock gates
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/05Programmable logic controllers, e.g. simulating logic interconnections of signals according to ladder diagrams or function charts

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Agronomy & Crop Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Control Of Positive-Displacement Pumps (AREA)

Abstract

The application is related to a kind of manufacture method of construction of hydro project automatic drain system, including water pump and collector pipe, water pump is provided with PLC control panels and water inlet pipe, outlet pipe, PLC control panels are provided with wireless receiving module, water inlet pipe is provided with multiple points of water inlet pipes, water inlet pipe is divided to connect drinking-water pipe respectively, each drinking-water pipe is connected on corresponding collector pipe, and collector pipe is arranged on rises;Grid and floating body are provided with inside collector pipe, collector pipe upper oral part is provided with inductor, floating body raises the inductor close to top, inductor sends opening water pump signal, detected positioned at the detector of outlet pipe and stop water outlet in outlet pipe or less than setting value, detector sends the signal that switches off the pump, therefore Auto-drainage can be achieved in engineering;Engineering time can be saved using the present invention, and be not required to be vented upstream inpoundment, reduce water resource loss.

Description

A kind of manufacture method of construction of hydro project automatic drain system
Technical field
The application is related to drainage equipment in construction of hydro project, more particularly to a kind of construction of hydro project Auto-drainage system The manufacture method of system.
Background technology
In construction of hydro project, often less than water level place construction, such engineering ground will because of infiltration or Leak produces ponding, so as to influence dry work;Such as the big-and-middle-sized sluice for water drainage, stiling basin is designed with, stiling basin is The important component of sluice, the hidden safety for whether determining to directly influence lock body of its structure, and then threaten the downstream people The person and property safety of the masses, because stiling basin bears sluicing for a long time, stiling basin basal surface causes fiber crops after certain time Muscle is showed, in the past this kind of stiling basin patient's condition maintenance, it is more using upstream inpoundment is vented, stiling basin infiltration intensity and water percolating capacity are reduced, Then monoblock stiling basin, which is removed, rebuilds, however, emptying upstream inpoundment can then cause huge water resource waste, does not discharge water and because of the power that disappears Pond is in low-lying place and produces upward infiltration, therefore difficulty of construction is very big in initial construction or maintenance and reinforcement.
The content of the invention
In order to solve the above problems, the present invention provides a kind of manufacture method of construction of hydro project automatic drain system, Using by oozing in construction site, it is permeable be derived automatically from, solve the water percolating capacity considerable influence construction in construction/maintenance/construction and ask Topic, by creating dry ground environment, built or maintenance and reinforcement;And use present system, then upstream inpoundment need not be vented, can To reduce water resource loss, to reach the purpose to economize on resources.
The technical solution adopted by the present invention is as follows:
A kind of construction of hydro project automatic drain system, including water pump and collector pipe, described water pump control provided with PLC Plate and water inlet pipe, outlet pipe, described PLC control panels are provided with wireless receiving module, and described water inlet pipe is provided with multiple points of water inlets Pipe, water inlet pipe is divided to connect drinking-water pipe respectively, each drinking-water pipe is connected on corresponding collector pipe, and described collector pipe is arranged on infiltration Place.
Further, described collector pipe is longitudinally disposed, and middle part is provided with the joint that laterally draws water, and the joint that draws water connects with drinking-water pipe Connect, be provided with grid below the joint that drawn water inside collector pipe, grid top is provided with floating body, and the external diameter of floating body is slightly less than in collector pipe Footpath, floating body can be moved up and down in collector pipe by the buoyancy of water, and floating body stops when dropping to grid, and its side wall is blocked to draw water and connect The endoporus of head.
Further, described collector pipe upper oral part is provided with inductor, and described inductor is provided with magnet controlled or light-operated Switch and wireless transmitter module, close to inductor, switch opens wireless transmitter module to water pump after detecting signal for floating body rise Sending and open water pump order, water pump is opened and drawn water, and water pump draws the water in collector pipe by each point of water inlet pipe, each drinking-water pipe, from Outlet pipe is discharged.
Further, described outlet pipe is provided with detector, and detector is provided with wireless transmitter module, and detector detects out Stop water outlet in water pipe or send the signal that switches off the pump less than setting value, detector.
The invention also discloses a kind of manufacture method of construction of hydro project automatic drain system, including following technique and Step:
1) water pump selects self priming pump, and water pump sets water inlet pipe, outlet pipe and PLC control panels, PLC control panels to be additionally provided with wirelessly Receiving module;
2) water inlet pipe is set:Multiple points of water inlet pipes are fixedly installed in the water inlet pipe both sides of water pump, divide the termination of water inlet pipe to set There are external screw thread or internal thread, cover drinking-water pipe respectively on water inlet pipe is divided or screw on nut or screw, drinking-water pipe connection collector pipe On the joint that draws water;
3) collector pipe is set:Collector pipe is diameter 10-15cm, height 50-100cm PVC pipeline, is set laterally at middle part Drawn water joint, and joint outer end of drawing water is connected with drinking-water pipe, sets grid below the coupler bore that drawn water inside collector pipe, grid with Catchment inside pipe wall close-fitting, sets floating body on grid top, the external diameter of floating body is slightly less than the bore that catchments, and floating body can be in collector pipe Moved up and down by the buoyancy of water, floating body stops when dropping to grid, and its side wall blocks the endoporus for the joint that draws water;
4) inductor is set in collector pipe upper oral part, inductor is provided with magnet controlled or light-operated switch and wireless transmission mould Block, floating body rise is close to inductor, and opening wireless transmitter module sends unlatching water pump order to water pump after switch detects signal, Water pump is opened and drawn water, and water pump draws the water in collector pipe by each point of water inlet pipe, each drinking-water pipe, is discharged from outlet pipe;
5) detector is set in the outlet pipe of water pump, detector is provided with wireless transmitter module, and detector detects outlet pipe Interior to stop water outlet or less than setting value, detector sends the signal that switches off the pump, and water pump stops pumping.
The invention also discloses the application method of above-mentioned construction of hydro project automatic drain system, including following technique and Step:
1) water pump is set:Water pump setting is peripheral on construction ground, and water pump is provided with water inlet pipe, outlet pipe and PLC control panels;Cut The PU pipes of suitable length are taken to divide water inlet pipe to be connected with water inlet pipe as drinking-water pipe, one end, the other end and taking out on collector pipe Water swivel connects;
2) seep water/emit on construction ground at water and punch downwards, the pvc pipe collector pipe of corresponding size is inserted, outside collector pipe Portion, which is set, to be fixed, and is provided with grid and floating body in collector pipe, and collector pipe upper oral part is provided with inductor, and collector pipe draws water and connected on joint Drinking-water pipe;Multiple collector pipes are can be set in construction site, and water level rise floating body is sent close to inductor, inductor in any collector pipe Open water pump signal start to draw water, floating body with water level decreasing to grid when stop, its side wall blocks the endoporus for the joint that draws water;Water pump Outlet pipe be provided with detector, detector, which detects, stops water outlet or less than setting value in outlet pipe, detector sends closing water Pump signal stops pumping;
3) Auto-drainage in constructing, collector pipe is extracted after the completion of construction or blocks collector pipe.
Beneficial effects of the present invention
The present invention has following technique effect after using above technical scheme:1st, engineering drainage system of the invention, structure Simply, it is easy for installation, automatic running in engineering, it is not required to special messenger guard;2nd, it is not required to be vented upstream inpoundment, reduces water resource loss.
Brief description of the drawings
Fig. 1 is the automatic drain system structural representation of the present invention, and the one end of drinking-water pipe 6 that draws only illustrated in figure connects Point water inlet pipe 5 is connect, the other end connects the joint 7 that draws water of collector pipe 8;
Fig. 2 is the plan structure signal that the automatic drain system of the present invention is applied in the construction of force reduction pool bottom reinforcing engineering Scheme, be state before non-casting concrete in figure, it is seen that construction site 9 is provided with bar-mat reinforcement 10, and multiple collection are provided with bar-mat reinforcement 10 Water pipe 8, water pump and drinking-water pipe are connected on collector pipe not shown in figure;
Fig. 3 is Fig. 2 A-A cross-section structure enlarged diagrams, it is seen that grid 13, floating body 12 and sensing are provided with collector pipe 8 Device 11.
In figure, 1- water pumps, 2- water inlet pipes, 3- outlet pipes, 4- detectors, 5- divides water inlet pipe, and 6- drinking-water pipes, 7-, which draws water, to be connect Head, 8- collector pipes, 9- construction sites, 10- bar-mat reinforcements, 11- inductors, 12- floating bodies, 13- grids.
Embodiment
The present invention will be further described with reference to the accompanying drawings and examples.
Embodiment, refer to the attached drawing:A kind of construction of hydro project automatic drain system, including water pump 1 and collector pipe 8, institute The water pump 1 stated is provided with PLC control panels and water inlet pipe 2, outlet pipe 3, and described PLC control panels are provided with wireless receiving module, described Water inlet pipe 2 be provided with multiple points of water inlet pipes 5, divide water inlet pipe 5 to connect drinking-water pipe 6 respectively, each drinking-water pipe 6 be connected to corresponding to catchment Pipe 8 draws water on joint 7, and described collector pipe 8 is arranged on rises.
Further, described collector pipe 8 is longitudinally disposed, is provided with the joint 7 that laterally draws water at middle part, the joint 7 that draws water is with taking out Water pipe 6 connects, and is provided with grid 13 below the endoporus of joint 7 that drawn water inside collector pipe 8, the top of grid 13 is provided with floating body 12, floating body 12 External diameter be slightly less than the internal diameter of collector pipe 8, floating body 12 can be moved up and down in collector pipe 8 by the buoyancy of water, and floating body 12 drop to Stop during grid 13, its side wall blocks the endoporus for the joint 7 that draws water.
Further, the described upper oral part of collector pipe 8 is provided with inductor 11, and described inductor 11 is provided with magnet controlled or light Control formula switchs and wireless transmitter module, and floating body 12 is raised close to inductor 11, and switch opens wireless transmission mould after detecting signal Block is sent to water pump 1 opens water pump order, and water pump 1 is opened and drawn water, and water pump 1 draws collection by each point of water inlet pipe 5, each drinking-water pipe 6 Water in water pipe 8, discharged from outlet pipe 3.
Further, described outlet pipe 3 is provided with detector 4, and detector 4 is provided with wireless transmitter module, and detector 4 detects Stop water outlet in outlet pipe 3 or send 1 signal that switches off the pump less than setting value, detector 4.
The present embodiment also discloses a kind of manufacture method of construction of hydro project automatic drain system, including following technique And step:
1) water pump 1 selects self priming pump, and water pump 1 sets water inlet pipe 2, outlet pipe 3 and PLC control panels, PLC control panels to be additionally provided with Wireless receiving module;
2) water inlet pipe is set:Multiple points of water inlet pipes 5 are fixedly installed in the both sides of water inlet pipe 2 of water pump 1, divide the end of water inlet pipe 5 Head is provided with external screw thread or internal thread, covers drinking-water pipe 6 respectively on water inlet pipe 5 is divided or screws on nut or screw, drinking-water pipe 6 connects The joint 7 that draws water on collector pipe 8;
3) collector pipe is set:Collector pipe 8 is diameter 10-15cm, height 50-100cm PVC pipeline, is set at middle part horizontal To the joint 7 that draws water, the outer end of joint 7 of drawing water is connected with drinking-water pipe 6, and grid is set below the endoporus of joint 7 that drawn water inside collector pipe 8 13, grid 13 and the inwall close-fitting of collector pipe 8, floating body 12 is set on the top of grid 13, the external diameter of floating body 12 is slightly less than in collector pipe 8 Footpath, floating body 12 can be moved up and down in collector pipe 8 by the buoyancy of water, and floating body 12 stops when dropping to grid 13, and its side wall is blocked up Firmly draw water the endoporus of joint 7;
4) inductor 11 is set in the upper oral part of collector pipe 8, inductor 11 is provided with magnet controlled or light-operated switch and wireless hair Module is penetrated, floating body 12 is raised close to inductor 11, and opening wireless transmitter module sends unlatching to water pump 1 after switch detects signal Water pump order, water pump 1 are opened and drawn water, and water pump 1 draws the water in collector pipe 8 by each point of water inlet pipe 5, each drinking-water pipe 6, from water outlet Pipe 3 is discharged;
5) detector 4 is set in the outlet pipe 3 of water pump 1, detector 4 is provided with wireless transmitter module, and detector 4 detects out Stop water outlet in water pipe 3 or less than setting value, detector 4 sends 1 signal that switches off the pump, and water pump 1 stops pumping.
The present embodiment also discloses the application method of above-mentioned construction of hydro project automatic drain system, including following technique And step:
1) water pump is set:Water pump 1 sets 9 periphery on construction ground, and water pump 1 is provided with water inlet pipe 2, outlet pipe 3 and PLC controls Plate;The PU pipes of interception suitable length divide water inlet pipe 5 to be connected as drinking-water pipe 6, its one end with water inlet pipe 2, the other end and collection The joint 7 that draws water on water pipe 8 connects;
2) 9 seep water/emit at water and punch downwards on construction ground, the pvc pipe collector pipe 8 of corresponding size is inserted, in collector pipe 8 Outside, which is set, to be fixed, and is provided with grid 13 and floating body 12 in collector pipe 8, the upper oral part of collector pipe 8 is provided with inductor 11, and collector pipe 8 is taken out Drinking-water pipe 6 is connected on water swivel 7;Multiple collector pipes 8 can be set in construction site 9, and water level rise floating body 12 connects in any collector pipe 8 Near-induction device 11, inductor 11 send the unlatching signal of water pump 1 and start to draw water, and floating body 12 stops with water level decreasing to during grid 13, The endoporus that its side wall blocks the joint 7 that draws water stops water inlet;The outlet pipe 3 of water pump 1 is provided with detector 4, and detector 4 detects water outlet Stop water outlet in pipe 1 or less than setting value, detector 4 sends 1 signal that switches off the pump and stopped pumping, on construction ground 9 interior setting Bar-mat reinforcement 10, then casting concrete;
3) Auto-drainage in constructing, collector pipe 8 is extracted after the completion of construction or blocks collector pipe 8.
The construction of hydro project automatic drain system operation principle of the present invention:Multiple collector pipes 8 are distinguished by drinking-water pipe 6 Water inlet pipe 5 is divided to be connected with water pump 1, any water level of collector pipe 8 rise, internal floating body 12 raises the inductor 11 close to top, Inductor 11, which is sent, opens the signal of water pump 1, and the internal water of collector pipe 8 is extracted, water level decreasing, and floating body 12, which declines, blocks the joint that draws water Apopore inside 7, avoid air inlet herein from influenceing other drainings of collector pipe 8, until the water in all collector pipes 8 exhausts, be located at The detector 4 of outlet pipe 3, which detects, to be stopped water outlet or sends 1 signal that switches off the pump less than setting value, detector 4 in outlet pipe, Therefore Auto-drainage can be achieved in engineering.
Those skilled in the art of the present technique are appreciated that unless otherwise defined, all terms used herein, including technology art Language and scientific terminology, there is the general understanding identical meaning with the those of ordinary skill in the application art.Should also Understand, those terms defined in such as general dictionary, which should be understood that, to be had and the meaning in the context of prior art The consistent meaning of justice, and unless defined as here, will not be with idealizing or the implication of overly formal be explained.
The implication of " inside and outside " described herein referred to relative to equipment itself, the side inside sensing equipment To be interior, on the contrary is outer.
The implication of " connection " described herein can be between part to be directly connected to can also pass through between part Other parts are indirectly connected with.
It is complete by above-mentioned description, relevant staff using the above-mentioned desirable embodiment according to the application as enlightenment Various changes and amendments can be carried out in the range of without departing from present techniques thought entirely.This item application it is technical Scope is not limited to the content on specification, it is necessary to determines its technical scope according to right.

Claims (1)

1. a kind of manufacture method of construction of hydro project automatic drain system, including water pump and collector pipe, described water pump are set There are PLC control panels and water inlet pipe, outlet pipe, described PLC control panels are provided with wireless receiving module, and described water inlet pipe is provided with more It is individual to divide water inlet pipe, divide water inlet pipe to connect drinking-water pipe respectively, each drinking-water pipe is connected on corresponding collector pipe, and described collector pipe is set Put in rises, collector pipe is longitudinally disposed, and middle part is provided with the joint that laterally draws water, and the joint that draws water is connected with drinking-water pipe, in collector pipe Portion draws water and is provided with grid below joint, and grid top is provided with floating body, and the external diameter of floating body is slightly less than the bore that catchments, and floating body can collect Moved up and down in water pipe by the buoyancy of water, floating body stops when dropping to grid, and its side wall blocks the endoporus for the joint that draws water;It is described Collector pipe upper oral part be provided with inductor, described inductor is provided with magnet controlled or light-operated switch and wireless transmitter module, floats Body rise is close to inductor, and opening wireless transmitter module sends unlatching water pump order, water pump to water pump after switch detects signal Opening is drawn water, and water pump draws the water in collector pipe by each point of water inlet pipe, each drinking-water pipe, is discharged from outlet pipe;Described water outlet Pipe is provided with detector, and detector is provided with wireless transmitter module, and detector detects the interior stopping water outlet of outlet pipe or less than setting value, Detector sends the signal that switches off the pump;
The specific manufacture method of described construction of hydro project automatic drain system, it is characterised in that comprise the following steps:
1) water pump selects self priming pump, and water pump sets water inlet pipe, outlet pipe and PLC control panels, PLC control panels to be provided with wireless receiving mould Block;
2) water inlet pipe is set:Multiple points of water inlet pipes are fixedly installed in the water inlet pipe both sides of water pump, divide the termination of water inlet pipe provided with outer Screw thread or internal thread, cover drinking-water pipe respectively on water inlet pipe is divided or screw on nut or screw, on drinking-water pipe connection collector pipe Draw water joint;
3) collector pipe is set:Collector pipe is diameter 10-15cm, height 50-100cm PVC pipeline, sets at middle part and laterally draws water Joint, joint outer end of drawing water are connected with drinking-water pipe, set grid below the coupler bore that drawn water inside collector pipe, grid is with catchmenting Inside pipe wall close-fitting, floating body is set on grid top, the external diameter of floating body is slightly less than the bore that catchments, and floating body can pass through in collector pipe The buoyancy of water moves up and down, and floating body stops when dropping to grid, and its side wall blocks the endoporus for the joint that draws water;
4) inductor is set in collector pipe upper oral part, inductor is provided with magnet controlled or light-operated switch and wireless transmitter module, floated Body rise is close to inductor, and opening wireless transmitter module sends unlatching water pump order, water pump to water pump after switch detects signal Opening is drawn water, and water pump draws the water in collector pipe by each point of water inlet pipe, each drinking-water pipe, is discharged from outlet pipe;
5) detector is set in the outlet pipe of water pump, detector is provided with wireless transmitter module, and detector, which is detected in outlet pipe, to stop Only water outlet or less than setting value, detector sends the signal that switches off the pump, and water pump stops pumping.
CN201710668232.8A 2015-07-07 2015-07-07 A kind of manufacture method of construction of hydro project automatic drain system Pending CN107460856A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710668232.8A CN107460856A (en) 2015-07-07 2015-07-07 A kind of manufacture method of construction of hydro project automatic drain system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201710668232.8A CN107460856A (en) 2015-07-07 2015-07-07 A kind of manufacture method of construction of hydro project automatic drain system
CN201510393692.5A CN104929085B (en) 2015-07-07 2015-07-07 The manufacture method of construction of hydro project automatic drain system

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201510393692.5A Division CN104929085B (en) 2015-07-07 2015-07-07 The manufacture method of construction of hydro project automatic drain system

Publications (1)

Publication Number Publication Date
CN107460856A true CN107460856A (en) 2017-12-12

Family

ID=54116494

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201710668233.2A Active CN107268515B (en) 2015-07-07 2015-07-07 The application method of construction of hydro project automatic drain system
CN201510393692.5A Active CN104929085B (en) 2015-07-07 2015-07-07 The manufacture method of construction of hydro project automatic drain system
CN201710668232.8A Pending CN107460856A (en) 2015-07-07 2015-07-07 A kind of manufacture method of construction of hydro project automatic drain system

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN201710668233.2A Active CN107268515B (en) 2015-07-07 2015-07-07 The application method of construction of hydro project automatic drain system
CN201510393692.5A Active CN104929085B (en) 2015-07-07 2015-07-07 The manufacture method of construction of hydro project automatic drain system

Country Status (1)

Country Link
CN (3) CN107268515B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109607804A (en) * 2019-01-11 2019-04-12 广州市广建市政建设工程有限公司 A kind of Water Ecological Recovery system

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107268515B (en) * 2015-07-07 2018-08-24 宿迁峰驰安防有限公司 The application method of construction of hydro project automatic drain system
CN106759159B (en) * 2015-07-07 2018-11-06 泗洪仁益自来水有限公司 A kind of manufacturing method of force reduction pool bottom construction or strengthening construction automatic drain system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005344397A (en) * 2004-06-03 2005-12-15 Takahashi Kanri:Kk Underground water control method for basement construction
CN102304923A (en) * 2011-06-22 2012-01-04 天津华津制药有限公司 Automatic discharging system for underground water
CN202196301U (en) * 2011-08-30 2012-04-18 成都锐达自动控制有限公司 Seepage draining intelligence control system of water power station
CN102535489A (en) * 2012-02-17 2012-07-04 河北建设勘察研究院有限公司 Method for dewatering large-area foundation pit on silt stratum
CN103382722A (en) * 2013-07-15 2013-11-06 广西建工集团第三建筑工程有限责任公司 Concrete foundation slab restoring method for preformed water collecting well for higher underground hydraulic pressure
CN103774624A (en) * 2012-10-23 2014-05-07 中国葛洲坝集团股份有限公司 Concentration guiding drainage device of corridor drain hole
CN203684179U (en) * 2014-01-10 2014-07-02 中国水电顾问集团昆明勘测设计研究院有限公司 Hidden drainage system in pipe network of power station stilling pool
CN104929085B (en) * 2015-07-07 2017-12-15 山东水利建设集团有限公司 The manufacture method of construction of hydro project automatic drain system

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6712553B1 (en) * 2002-02-22 2004-03-30 Karl O. Niedermeyer Grid drain system
CN201473984U (en) * 2009-05-21 2010-05-19 王大卫 Automatic desilting system of leakage water-collecting well of hydropower station
CN203129109U (en) * 2013-03-20 2013-08-14 吴英剑 Retaining wall backflow-preventing water drain pipe
CN204849707U (en) * 2015-07-07 2015-12-09 泗洪县水利工程处 Automatic drainage system is used in hydraulic engineering construction

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005344397A (en) * 2004-06-03 2005-12-15 Takahashi Kanri:Kk Underground water control method for basement construction
CN102304923A (en) * 2011-06-22 2012-01-04 天津华津制药有限公司 Automatic discharging system for underground water
CN202196301U (en) * 2011-08-30 2012-04-18 成都锐达自动控制有限公司 Seepage draining intelligence control system of water power station
CN102535489A (en) * 2012-02-17 2012-07-04 河北建设勘察研究院有限公司 Method for dewatering large-area foundation pit on silt stratum
CN103774624A (en) * 2012-10-23 2014-05-07 中国葛洲坝集团股份有限公司 Concentration guiding drainage device of corridor drain hole
CN103382722A (en) * 2013-07-15 2013-11-06 广西建工集团第三建筑工程有限责任公司 Concrete foundation slab restoring method for preformed water collecting well for higher underground hydraulic pressure
CN203684179U (en) * 2014-01-10 2014-07-02 中国水电顾问集团昆明勘测设计研究院有限公司 Hidden drainage system in pipe network of power station stilling pool
CN104929085B (en) * 2015-07-07 2017-12-15 山东水利建设集团有限公司 The manufacture method of construction of hydro project automatic drain system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
江苏水利: "塔山闸消力池干地维修加固的施工技术", 《江苏水利》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109607804A (en) * 2019-01-11 2019-04-12 广州市广建市政建设工程有限公司 A kind of Water Ecological Recovery system

Also Published As

Publication number Publication date
CN104929085B (en) 2017-12-15
CN107268515B (en) 2018-08-24
CN104929085A (en) 2015-09-23
CN107268515A (en) 2017-10-20

Similar Documents

Publication Publication Date Title
CN104929085B (en) The manufacture method of construction of hydro project automatic drain system
CN102121271A (en) Sump well for vacuum drainage system
CN207110015U (en) A kind of integrated prefabricated pumping plant with automatic crushing function
CN106284362A (en) A kind of construction method of single catheter perfusion Large Underwater bottom concrete
CN105201070A (en) Intelligent integrated prefabrication pump station
CN106498910B (en) A kind of force reduction pool bottom construction or strengthening construction automatic drain system
CN209941630U (en) Pump valve pipeline type fish passing facility
CN204982853U (en) Aqueous vapor separation frequency conversion vacuum pre -compaction device
CN204849707U (en) Automatic drainage system is used in hydraulic engineering construction
CN206015856U (en) Rotating flow is from the integrated pumping plant in clear pond
CN204919577U (en) Automatic drainage system is used in construction of absorption basin bottom plate or reinforcement construction
CN109853493B (en) Pump valve pipeline type fish passing method
CN205895309U (en) Prevention of seepage water system for pitshaft driving
CN202000379U (en) Blocking device for reserved port on bottom plate of basement
CN104947636B (en) Stilling pool bottom plate reinforcing composition
CN209323544U (en) A kind of construction site drainage system
CN205954822U (en) A automatic pumping system for electric stove pit
CN214940904U (en) Integration pump station liquid level regulating device
CN206769016U (en) Integrated sewage water Boosting pumping station
CN206110310U (en) Bury intelligent sewage lifting pump station of formula integration
CN104131602A (en) Water supply system for construction sites
CN109930568A (en) Pump valve duct type fish pass structure
CN218786902U (en) Integrated pump station structure
CN220486555U (en) Be used for anti integrated equipment that draws water that floats of basement
CN220431992U (en) Escalator for underground pool

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171212