Water supply system for construction sites Download PDF

Info

Publication number
CN104131602A
CN104131602A CN201410227009.6A CN201410227009A CN104131602A CN 104131602 A CN104131602 A CN 104131602A CN 201410227009 A CN201410227009 A CN 201410227009A CN 104131602 A CN104131602 A CN 104131602A
Authority
CN
China
Prior art keywords
water
road
butt
way
water supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410227009.6A
Other languages
Chinese (zh)
Inventor
李启涛
梁成佳
李书元
尹川
向武化
石辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201410227009.6A priority Critical patent/CN104131602A/en
Publication of CN104131602A publication Critical patent/CN104131602A/en
Pending legal-status Critical Current

Links

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The invention discloses a water supply system for construction sites. The water supply system comprises two sets of water supply devices, one set is an engineering water supply device, and the other set is a life water supply device; the engineering water supply device comprises a large water storage barrel, feedwater of the large water storage barrel comes from a drain pipe of a basement water-collecting well, the large water storage barrel is provided with three ways of output, one way is connected with a fire-water pond, another way is connected with a spraying device, and the other way is connected with a cleaning chamber; the life water supply device comprises a small water storage barrel which is provided with two-way feedwater, one way comprises a water pipe, the other way comes from an automatic water suction pump in a water-collecting pit, the small water storage barrel is provided with two ways of output, one way is connected with a toilet, a bathroom and a washing trough, and the other way is connected with a sewer. By the water supply system, water consumption of construction engineering projects is lowered, waste of water resources is reduced, and effect of green construction with cost decreasing and benefit increasing is achieved; collecting and recycling of project and domestic water, basement catchment and rainwater can be realized, so that cost can be saved and economic performance can be improved on the basis of meeting requirements of normal production and construction of projects.

Description

A kind of building site water system
Technical field
the present invention relates to a kind of building site water system, belong to hydrotechny field, building site.
Background technology
the construction of building site needs water, and the maintenance after concreting needs water, and the cleaning of equipment needs water, and personnel's life also needs water, in order to prevent fire, also needs fire-fighting deposit water.The water system in existing building building site is mainly to rely on tap water.Water supply volume is very large, does not meet energy-conservation principle.In its tangible building operations, having many places is not need to use pure tap water, can use recycle-water.
Summary of the invention
the object of the invention is to, a kind of building site water system is provided.Used tap water can be recycled fully, to solve the excessive problem of engineering water supply volume.
technical scheme of the present invention:
a kind of building site water system, comprises two cover water supply installations, and a set of is engineering water supply device, and another set of is life water supply installation; Engineering water supply device comprises large water butt, and the water inlet of large water butt is from basement collecting well gutter, and large water butt is provided with three tunnel outputs, and a road is connected with fire cistern, and another road is connected with spray equipment, also has a road to be connected with cleaning room; Living water device comprises little water butt, and little water butt has two-way water inlet, comes from running water pipe, another road is from the automatic water pump in sump, little water butt has two-way output, and a road is connected with washroom, bathroom and Wash tub, and another road is connected with blowdown canal.
in aforementioned water system, in described basement collecting well, be provided with automatic water pump, automatic pumping pump discharge is divided into two-way, and a road is connected with the water inlet of large water butt through screwing valve, and another road is connected with dredge pump through screwing valve.
in aforementioned water system, the output of described large water butt San road lays respectively at the upper, middle and lower of large water butt; The output of Yi road, large water butt bottom is connected through screwing valve, booster pump and flap valve with spray equipment and cleaning room; The Yi road output of large water butt middle part is connected with top fire cistern with ball valve through screwing valve; The output of Yi road, large water butt top is connected with sump through bleed off pipe.
in aforementioned water system, the outlet of described flap valve is connected with running water pipe through screwing valve.
in aforementioned water system, described fire cistern bottom is connected with running water pipe through ball valve.
in aforementioned water system, the two-way output of described little water butt lays respectively at the upper and lower of little water butt; The Yi road output of little water butt bottom is connected with washroom, bathroom and Wash tub, the draining of washroom is directly connected with blowdown canal, the lower water of bathroom and Wash tub is connected with sedimentation basin, the water of sedimentation basin overflows into sump from dividing plate top, in sump, be provided with automatic water pump, automatic pumping delivery side of pump is connected with little water butt top through drinking-water pipe; Little water butt top is connected with blowdown canal.
compared with prior art, the present invention has reduced construction-engineering project water supply volume, has reduced water resource waste, has reached cost efficiency green construction effect.Can realize that project living water use, basement catchment, the collection of rainwater recycling, thereby meet under the normal production and construction prerequisite of project cost-saving increasing the benefit.
Brief description of the drawings
fig. 1 is schematic diagram of the present invention.
Detailed description of the invention
below in conjunction with drawings and Examples, the present invention is described in further detail, but not as any limitation of the invention.
a kind of building site water system, as shown in Figure 1, comprises two cover water supply installations, and a set of is engineering water supply device, and another set of is life water supply installation; Engineering water supply device comprises large water butt, and the water inlet of large water butt is from basement collecting well gutter, and large water butt is provided with three tunnel outputs, and a road is connected with fire cistern, and another road is connected with spray equipment, also has a road to be connected with cleaning room; Living water device comprises little water butt, and little water butt has two-way water inlet, comes from running water pipe, another road is from the automatic water pump in sump, little water butt has two-way output, and a road is connected with washroom, bathroom and Wash tub, and another road is connected with blowdown canal.In basement collecting well, be provided with automatic water pump, automatic pumping pump discharge is divided into two-way, and a road is connected with the water inlet of large water butt through screwing valve, and another road is connected with dredge pump through screwing valve.The output of large water butt San road lays respectively at the upper, middle and lower of large water butt; The output of Yi road, large water butt bottom is connected through screwing valve, booster pump and flap valve with spray equipment and cleaning room; The Yi road output of large water butt middle part is connected with top fire cistern with ball valve through screwing valve; The output of Yi road, large water butt top is connected with sump through bleed off pipe.The outlet of flap valve is connected with running water pipe through screwing valve.Fire cistern bottom is connected with running water pipe through ball valve.The two-way output of little water butt lays respectively at the upper and lower of little water butt; The Yi road output of little water butt bottom is connected with washroom, bathroom and Wash tub, the draining of washroom is directly connected with blowdown canal, the lower water of bathroom and Wash tub is connected with sedimentation basin, the water of sedimentation basin overflows into sump from dividing plate top, in sump, be provided with automatic water pump, automatic pumping delivery side of pump is connected with little water butt top through drinking-water pipe; Little water butt top is connected with blowdown canal.
in the specific implementation, large water butt can adopt 5 tons of plastic water buckets in the present invention, and little water butt can adopt 2 tons of plastic water buckets.Spray equipment is mainly used in chemical cleaning project vehicle and equipment, and for cleaning safety net etc., also can be used for concrete curing and vegetation pouring etc.In the present invention, 5 tons of water butt spilling waters answer water level higher than fire cistern upper limit water level.The effect of flap valve is to prevent that the water of running water pipe is back to little water butt.The water level of fire cistern should often remain on upper limit water level, after the water level of fire cistern is lower than early warning water level, just opens the ball valve being connected with fire cistern in time, and fire cistern is carried out to moisturizing.

Claims (6)

1. a building site water system, is characterized in that: comprise two cover water supply installations, a set of is engineering water supply device, and another set of is life water supply installation; Engineering water supply device comprises large water butt, and the water inlet of large water butt is from basement collecting well gutter, and large water butt is provided with three tunnel outputs, and a road is connected with fire cistern, and another road is connected with spray equipment, also has a road to be connected with cleaning room; Living water device comprises little water butt, and little water butt has two-way water inlet, comes from running water pipe, another road is from the automatic water pump in sump, little water butt has two-way output, and a road is connected with washroom, bathroom and Wash tub, and another road is connected with blowdown canal.
2. water system according to claim 1, is characterized in that: in described basement collecting well, be provided with automatic water pump, automatic pumping pump discharge is divided into two-way, and a road is connected with the water inlet of large water butt through screwing valve, and another road is connected with dredge pump through screwing valve.
3. water system according to claim 2, is characterized in that: the output of described large water butt San road lays respectively at the upper, middle and lower of large water butt; The output of Yi road, large water butt bottom is connected through screwing valve, booster pump and flap valve with spray equipment and cleaning room; The Yi road output of large water butt middle part is connected with top fire cistern with ball valve through screwing valve; The output of Yi road, large water butt top is connected with sump through bleed off pipe.
4. water system according to claim 3, is characterized in that: the outlet of described flap valve is connected with running water pipe through screwing valve.
5. water system according to claim 4, is characterized in that: described fire cistern bottom is connected with running water pipe through ball valve.
6. water system according to claim 5, is characterized in that: the two-way output of described little water butt lays respectively at the upper and lower of little water butt; The Yi road output of little water butt bottom is connected with washroom, bathroom and Wash tub, the draining of washroom is directly connected with blowdown canal, the lower water of bathroom and Wash tub is connected with sedimentation basin, the water of sedimentation basin overflows into sump from dividing plate top, in sump, be provided with automatic water pump, automatic pumping delivery side of pump is connected with little water butt top through drinking-water pipe; Little water butt top is connected with blowdown canal.
CN201410227009.6A 2014-05-27 2014-05-27 Water supply system for construction sites Pending CN104131602A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410227009.6A CN104131602A (en) 2014-05-27 2014-05-27 Water supply system for construction sites

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410227009.6A CN104131602A (en) 2014-05-27 2014-05-27 Water supply system for construction sites

Publications (1)

Publication Number Publication Date
CN104131602A true CN104131602A (en) 2014-11-05

Family

ID=51804442

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410227009.6A Pending CN104131602A (en) 2014-05-27 2014-05-27 Water supply system for construction sites

Country Status (1)

Country Link
CN (1) CN104131602A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104499537A (en) * 2014-11-20 2015-04-08 中国建筑第八工程局有限公司 Construction wastewater collection and reuse system and construction wastewater collection and reuse method
CN110359535A (en) * 2019-07-24 2019-10-22 华神建设集团有限公司 Construction site recycling of water resource comprehensively utilizes system and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2467594Y (en) * 2001-03-15 2001-12-26 姚建明 Toilet sewage reusing apparatus
CN2538855Y (en) * 2002-05-16 2003-03-05 刘安明 Domestic water saver
CA2496892A1 (en) * 2002-08-30 2004-03-11 Urban Rainwater Systems Pty Ltd. Supplying water to a reticulation system from different sources
CN201826321U (en) * 2010-07-23 2011-05-11 中国建筑股份有限公司 Engineering precipitation water cyclic utilization system
CN202108105U (en) * 2011-03-31 2012-01-11 重庆建工第二建设有限公司 Water-saving device for construction
CN202214764U (en) * 2011-09-27 2012-05-09 深圳市建筑设计研究总院有限公司 Intelligent water supply system for ultra-high-rise building

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2467594Y (en) * 2001-03-15 2001-12-26 姚建明 Toilet sewage reusing apparatus
CN2538855Y (en) * 2002-05-16 2003-03-05 刘安明 Domestic water saver
CA2496892A1 (en) * 2002-08-30 2004-03-11 Urban Rainwater Systems Pty Ltd. Supplying water to a reticulation system from different sources
CN201826321U (en) * 2010-07-23 2011-05-11 中国建筑股份有限公司 Engineering precipitation water cyclic utilization system
CN202108105U (en) * 2011-03-31 2012-01-11 重庆建工第二建设有限公司 Water-saving device for construction
CN202214764U (en) * 2011-09-27 2012-05-09 深圳市建筑设计研究总院有限公司 Intelligent water supply system for ultra-high-rise building

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104499537A (en) * 2014-11-20 2015-04-08 中国建筑第八工程局有限公司 Construction wastewater collection and reuse system and construction wastewater collection and reuse method
CN110359535A (en) * 2019-07-24 2019-10-22 华神建设集团有限公司 Construction site recycling of water resource comprehensively utilizes system and construction method
CN110359535B (en) * 2019-07-24 2020-09-22 华神建设集团有限公司 Construction site water resource comprehensive utilization system and construction method

Similar Documents

Publication Publication Date Title
CN201276718Y (en) Rainwater collecting and recycling system on building roofing
CN204023750U (en) Municipal drainage system
CN204689755U (en) The comprehensive treating pond of construction site Water Sproading cyclic utilization system and construction site Water Sproading cyclic utilization system
CN103953068A (en) Underground integrated pipe gallery structure
CN203878608U (en) Underground utility tunnel structure
CN202596175U (en) Building construction site water recovery system
CN206368389U (en) One kind backwash and sewage sucking system
CN104131602A (en) Water supply system for construction sites
CN104909482A (en) Construction site water recovery and recycling system comprehensive purification tank and manufacturing method thereof
CN201406711Y (en) Reclaimed water recycling device
CN202227391U (en) Waste water utilization device for construction site
CN203795512U (en) Rainwater recycling device
CN104047329A (en) Device for recycling rainwater and domestic water in whole building
CN203160338U (en) Gravity flow and vacuum combined vacuum drainage system
CN208395921U (en) Toilet drainage system
CN203684334U (en) Water cycling system
CN203654439U (en) Integrated-type rainwater discarding system
CN203296162U (en) Buried prefabricated pump station
CN106759763A (en) A kind of urban rainwater accumulates and utilization system naturally
CN204626551U (en) A kind of job site worker's shower water reclaims and flushing unit
CN204645144U (en) A kind of construction site water-saving device
CN205134450U (en) Waste water cyclic utilization device between shower
CN205954739U (en) Sanitary wastewater cyclic utilization device
CN207331946U (en) Construction site rainwater comprehensive utilization intelligence dust prevention system
CN204401687U (en) A kind of rainwater and living water use recycle device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20141105

RJ01 Rejection of invention patent application after publication