CN107460847B - 减少水土流失、适于平原河网地区水土保持的方法 - Google Patents
减少水土流失、适于平原河网地区水土保持的方法 Download PDFInfo
- Publication number
- CN107460847B CN107460847B CN201710733077.3A CN201710733077A CN107460847B CN 107460847 B CN107460847 B CN 107460847B CN 201710733077 A CN201710733077 A CN 201710733077A CN 107460847 B CN107460847 B CN 107460847B
- Authority
- CN
- China
- Prior art keywords
- river
- silt
- mud
- slope
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/02—Stream regulation, e.g. breaking up subaqueous rock, cleaning the beds of waterways, directing the water flow
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/02—Stream regulation, e.g. breaking up subaqueous rock, cleaning the beds of waterways, directing the water flow
- E02B3/023—Removing sediments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/12—Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
- Cultivation Of Plants (AREA)
Abstract
本发明公开了一种减少水土流失、适于平原河网地区水土保持的方法,沿河道坡顶顺水流横向、河道坡面迎水体纵向设置“导流沟”;在导流沟纵、横向交汇点设置“预沉池”;在河道边岸水体中设置“沉淤井”;使用潜水泥桨泵将沉淤井中的淤泥吸送到压电移动式淤泥脱水装置中进行脱水干化处理;脱水干化后的淤泥通过带式传送装置输送至河道护坡作业面;对输送至植草模、混凝土格埂、自锁生态工字砖中的淤泥平整后,在淤泥上层布设种植土,在种植土上铺设生态草毯或在种植土中掺拌生态草籽,完成生态护坡施工。本发明可以避免河道断流清淤、破坏河床生态系统;实现淤泥原位还坡,淤泥资源得到再生利用;河道坡面通过生态护坡处理,减少水土流失。
Description
本申请是申请号:201610266994.0 申请日:2016-04-27、名称“一种适于平原河网地区水土保持的方法”的分案申请。
技术领域
本发明涉及一种平原河网地区水土保持的生态工程技术方法。
技术背景
平原河网地区水土流失的主要方式是降雨径流携带地表泥质,汇流进入河道;平原河网地区的河道多为中小型河道,其特点是坡缓、窄浅,河底极易产生面上淤积;平原河网地区的河道坡面一般是自然植被型,涵养水土能力较低,随着河坡径流加快,边坡水土流失是河底产生沉淤的主要来源。
河道清淤一般采用断流挖淤、外运的作业方式;平原河网地区由于河道断面小,产淤量少,使得传统的断流挖淤、外运的作业方式存在较高的工程投资;小型河道生态系统脆弱,相对稳定的生态系统易受断流挖淤作业方式的干扰、破坏。
平原河网地区水土保持的技术目标体现在:河底沉淤能够实现原位还坡,淤泥资源得到再生利用;河道坡面通过生态护坡处理,能够减轻水土流失;避免断流清淤,实施常态清淤,维持河道生态系统稳定。
一种适于平原河网地区水土保持的技术方法能够实现以上目标。
发明内容
本发明的目的在于提供一种适于平原河网地区水土保持的方法,避免河道断流清淤,破坏河床生态系统;实现淤泥原位还坡,淤泥资源得到再生利用;河道坡面通过生态护坡处理,减少水土流失。
本发明的技术解决方案是:
一种适于平原河网地区水土保持的方法,其特征是:
(1)沿河道坡顶顺水流横向、河道坡面迎水体纵向设置相互连通的“导流沟”;横向导流沟底部向预沉池方向呈降坡形式,坡度在5°~9°之间;纵向导流沟沿河道坡面迎水体方向设置,下端连接沉淤井;
(2)在坡顶横向导流沟与坡面纵向导流沟结合处设置正方体预沉池,预沉池相邻两个面连接汇流沟,上部与导流沟顶部水平;预沉池容积与沉淤井容积比在1︰20~1︰30之间;预沉池呈井式结构,便于形成吞吐流提高泥砂携带能力;
(3)在河道边岸水体中设置“沉淤井”;
(4)护坡作业面施工:通过清杂、平整工序处理后,设置植草模、现浇混凝土格埂或铺设自锁生态工字砖,完成护坡作业面施工;
(5)吸淤、干化施工:使用潜水泥浆泵将沉淤井中的淤泥吸送到压电移动式淤泥脱水装置中进行脱水干化处理;脱水干化后的淤泥通过带式传送装置输送至河道坡面预先施工完成的护坡作业面;
(6)生态护坡施工:对输送至植草模、混凝土格埂或自锁生态工字砖中的淤泥平整后,在淤泥上层布设种植土,在种植土上铺设生态草毯或在种植土中掺拌生态草籽,完成生态护坡施工。
横向导流沟沿坡顶顺水流方向按线性布局,导流沟底部向沉淤井方向设计成降坡,提升汇流携带效果;在横向导流沟与坡面纵向导流沟结合处设置预沉池;依靠预沉池形成的环流提高泥砂携带能力。
所述沉淤井包括底座,底座上安装束淤沉淀段,束淤沉淀段上安装溢水调节段;
底座为混凝土预制圆台;束淤沉淀段、溢水调节段均为混凝土预制圆柱形管状结构;在溢水调节段的壁上设置溢水孔,溢水孔为内向斜孔,即斜孔的上端位于壁的外侧,斜孔的下端位于壁的内侧;底座、束淤沉淀段、溢水调节段通过结合端的凹凸槽结构进行连接。
沉淤井底座高度低于河道死水位以下15cm-20cm,束淤沉淀段高度低于河道常水位以下35cm-45cm,溢水调节段高度低于河道最高水位以下20cm-25cm。
沉淤井中的淤泥使用潜水泥桨泵吸淤直接送入移动式淤泥脱水装置进行干化处理,干化脱水后的淤泥直接输送至河道坡面作为护坡土质基础,实现淤泥资源原位再生利用。
本发明可以避免河道断流清淤、破坏河床生态系统;实现淤泥原位还坡,淤泥资源得到再生利用;河道坡面通过生态护坡处理,减少水土流失。
下面结合附图和实施例对本发明作进一步说明。
图1是本发明一个实施例的施工平面示意图。
图2是本发明流程图。
图3是沉淤井的结构示意图。
图4是沉淤井的立体分解图。
具体实施方式
一种适于平原河网地区水土保持的方法,
(1)沿河道坡顶顺水流横向、河道坡面迎水体纵向设置相互连通的“导流沟”;横向导流沟1底部向预沉池方向呈降坡形式,坡度在5°~9°之间;纵向导流沟2沿河道坡面迎水体方向设置,下端连接沉淤井4;
(2)在坡顶横向导流沟与坡面纵向导流沟结合处设置正方体预沉池3,预沉池相邻两个面连接汇流沟,上部与导流沟顶部水平;预沉池容积与沉淤井容积比在1︰20~1︰30之间;预沉池呈井式结构,便于形成吞吐流提高泥砂携带能力;
(3)在河道边岸水体中设置“沉淤井”;
(4)护坡作业面5施工:通过清杂、平整工序处理后,设置植草模、现浇混凝土格埂或铺设自锁生态工字砖,完成护坡作业面5施工;
(5)吸淤、干化施工:使用潜水泥浆泵6将沉淤井中的淤泥吸送到压电移动式淤泥脱水装置中进行脱水干化处理;脱水干化后的淤泥通过带式传送装置输送至河道坡面预先施工完成的护坡作业面;
(6)生态护坡8施工:对输送至植草模、混凝土格埂或自锁生态工字砖中的淤泥平整后,在淤泥上层布设种植土,在种植土上铺设生态草毯或在种植土中掺拌生态草籽,完成生态护坡施工。
横向导流沟沿坡顶顺水流方向按线性布局,导流沟底部向预沉池方向设计成降坡,提升汇流携带效果;在横向导流沟与坡面纵向导流沟结合处设置预沉池;依靠预沉池形成的环流提高泥砂携带能力。
所述沉淤井包括底座9,底座上安装束淤沉淀段10,束淤沉淀段上安装溢水调节段11;
底座为混凝土预制圆台;束淤沉淀段、溢水调节段均为混凝土预制圆柱形管状结构;在溢水调节段的壁上设置溢水孔12,溢水孔为内向斜孔,即斜孔的上端位于壁的外侧,斜孔的下端位于壁的内侧;底座、束淤沉淀段、溢水调节段通过结合端的凹凸槽13结构进行连接。
沉淤井底座高度低于河道死水位以下15cm-20cm,束淤沉淀段高度低于河道常水位以下35cm-45cm,溢水调节段高度低于河道最高水位以下20cm-25cm。
沉淤井中的淤泥使用潜水泥桨泵吸淤直接送入移动式淤泥脱水装置7进行干化处理,干化脱水后的淤泥直接输送至河道坡面作为护坡土质基础,实现淤泥资源原位再生利用。
沉淤井容积选择与水土流失量、布局密度、河道水位等因素相关,选择原则是先按200m-300m确定井距,然后根据河道水位确定沉淤井高度,再根据水土流失量确定沉淤井容积。
淤泥原位再生利用方式是通过设置植草模或现浇混凝土格埂,形成生态植物生长的营养基,营造生态植物生长环境。
Claims (4)
1.一种减少水土流失、适于平原河网地区水土保持的方法,其特征是:
(1)沿河道坡顶顺水流横向、河道坡面迎水体纵向设置相互连通的“导流沟”;横向导流沟底部向预沉池方向呈降坡形式,坡度在5°~9°之间;纵向导流沟沿河道坡面迎水体方向设置,下端连接沉淤井;
(2)在坡顶横向导流沟与坡面纵向导流沟结合处设置正方体预沉池,预沉池相邻两个面连接导流沟,上部与导流沟顶部水平;预沉池容积与沉淤井容积比在1︰20~1︰30之间;预沉池呈井式结构,便于形成吞吐流提高泥砂携带能力;
(3)在河道边岸水体中设置“沉淤井”;
(4)护坡作业面施工:通过清杂、平整工序处理后,设置植草模、现浇混凝土格埂或铺设自锁生态工字砖,完成护坡作业面施工;
(5)吸淤、干化施工:使用潜水泥浆泵将沉淤井中的淤泥吸送到压电移动式淤泥脱水装置中进行脱水干化处理;脱水干化后的淤泥通过带式传送装置输送至河道坡面预先施工完成的护坡作业面;
(6)生态护坡施工:对输送至植草模、混凝土格埂或自锁生态工字砖中的淤泥平整后,在淤泥上层布设种植土,在种植土上铺设生态草毯或在种植土中掺拌生态草籽,完成生态护坡施工;
沉淤井中的淤泥使用潜水泥桨泵吸淤直接送入移动式淤泥脱水装置(7)进行干化处理,干化脱水后的淤泥直接输送至河道坡面作为护坡土质基础,实现淤泥资源原位再生利用;
淤泥原位再生利用方式是通过设置植草模或现浇混凝土格埂,形成生态植物生长的营养基,营造生态植物生长环境。
2.根据权利要求1所述的一种减少水土流失、适于平原河网地区水土保持的方法,其特征是:所述沉淤井包括底座,底座上安装束淤沉淀段,束淤沉淀段上安装溢水调节段;
底座为混凝土预制圆台;束淤沉淀段、溢水调节段均为混凝土预制圆柱形管状结构;在溢水调节段的壁上设置溢水孔,溢水孔为内向斜孔,即斜孔的上端位于壁的外侧,斜孔的下端位于壁的内侧;底座、束淤沉淀段、溢水调节段通过结合端的凹凸槽结构进行连接。
3.根据权利要求2所述的一种减少水土流失、适于平原河网地区水土保持的方法,其特征是:沉淤井底座高度低于河道死水位以下15cm-20cm,束淤沉淀段高度低于河道常水位以下35cm-45cm,溢水调节段高度低于河道最高水位以下20cm-25cm。
4.根据权利要求1、2或3所述的一种减少水土流失、适于平原河网地区水土保持的方法,其特征是:沉淤井容积选择是先按200m-300m确定井距,然后根据河道水位确定沉淤井高度,再根据水土流失量确定沉淤井容积。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710733077.3A CN107460847B (zh) | 2016-04-27 | 2016-04-27 | 减少水土流失、适于平原河网地区水土保持的方法 |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710733077.3A CN107460847B (zh) | 2016-04-27 | 2016-04-27 | 减少水土流失、适于平原河网地区水土保持的方法 |
CN201610266994.0A CN105862656B (zh) | 2016-04-27 | 2016-04-27 | 一种适于平原河网地区水土保持的方法 |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610266994.0A Division CN105862656B (zh) | 2016-04-27 | 2016-04-27 | 一种适于平原河网地区水土保持的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107460847A CN107460847A (zh) | 2017-12-12 |
CN107460847B true CN107460847B (zh) | 2019-03-05 |
Family
ID=56629429
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710733077.3A Active CN107460847B (zh) | 2016-04-27 | 2016-04-27 | 减少水土流失、适于平原河网地区水土保持的方法 |
CN201610266994.0A Expired - Fee Related CN105862656B (zh) | 2016-04-27 | 2016-04-27 | 一种适于平原河网地区水土保持的方法 |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610266994.0A Expired - Fee Related CN105862656B (zh) | 2016-04-27 | 2016-04-27 | 一种适于平原河网地区水土保持的方法 |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN107460847B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107524112A (zh) * | 2017-09-04 | 2017-12-29 | 江苏艺凯环保科技有限公司 | 一种污泥资源化制成环保海绵构件构建河道生态的系统 |
CN110984074B (zh) * | 2019-12-27 | 2021-06-29 | 四川省水利科学研究院 | 一种边坡生态防护装置 |
CN114349292B (zh) * | 2021-11-23 | 2023-03-24 | 河海大学 | 一种河道治理综合资源化方法 |
CN116362162B (zh) * | 2023-05-30 | 2023-08-01 | 湖南百舸水利建设股份有限公司 | 水下高浓度淤泥输送方法、系统、计算机设备及存储介质 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203960929U (zh) * | 2014-05-18 | 2014-11-26 | 王春华 | 河道电动疏淤机 |
CN104452656A (zh) * | 2014-11-26 | 2015-03-25 | 禹顺生态建设有限公司 | 一种河道分段清淤施工方法 |
CN204510137U (zh) * | 2015-03-20 | 2015-07-29 | 浙江海洋学院 | 一种固淤清淤发电防波堤 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3539832A1 (de) * | 1985-08-23 | 1987-05-14 | Gerd Drespa | Oekologisches schutzdeckwerk fuer fliessende gewaesser |
CN101870546B (zh) * | 2010-06-01 | 2011-12-28 | 广州市保明莱环保科技有限公司 | 河涌淤泥无害化资源化处理方法 |
CN102491610A (zh) * | 2011-12-12 | 2012-06-13 | 上海寰保渣业处置有限公司 | 一种淤泥的固化方法及作为种植土种植植物的应用 |
CN103866774B (zh) * | 2014-03-31 | 2016-11-23 | 张锦宇 | 用于护坡与崩岗排水固土的沟管网防护体 |
CN104452704B (zh) * | 2014-10-22 | 2016-11-16 | 中国科学院水利部水土保持研究所 | 一种波型坡耕地水土流失的防治方法及其装置 |
CN104591506B (zh) * | 2015-02-01 | 2016-05-04 | 武汉中科水生环境工程股份有限公司 | 黑臭型平原河网整体生态修复系统 |
-
2016
- 2016-04-27 CN CN201710733077.3A patent/CN107460847B/zh active Active
- 2016-04-27 CN CN201610266994.0A patent/CN105862656B/zh not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203960929U (zh) * | 2014-05-18 | 2014-11-26 | 王春华 | 河道电动疏淤机 |
CN104452656A (zh) * | 2014-11-26 | 2015-03-25 | 禹顺生态建设有限公司 | 一种河道分段清淤施工方法 |
CN204510137U (zh) * | 2015-03-20 | 2015-07-29 | 浙江海洋学院 | 一种固淤清淤发电防波堤 |
Also Published As
Publication number | Publication date |
---|---|
CN107460847A (zh) | 2017-12-12 |
CN105862656A (zh) | 2016-08-17 |
CN105862656B (zh) | 2017-09-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207671771U (zh) | 一种污水处理厂尾水分散式处理排放系统 | |
CN107460847B (zh) | 减少水土流失、适于平原河网地区水土保持的方法 | |
CN203603105U (zh) | 一种壁板式生态挡墙护岸结构 | |
KR101360271B1 (ko) | 멀티셀 및 멀티레인의 습지와 연못 및 침전지 구조를 활용한 생태적 수질정화 비오톱 시스템 | |
CN100577918C (zh) | 一种治理水土流失的流域堰系及其构筑方法 | |
CN102733349B (zh) | 湖泊清淤及湖心岛建造方法 | |
CN101336593B (zh) | 改良盐渍土壤建造生态园林景观复合结构的方法 | |
Theriault et al. | Surface disposal of past tailings at the Bulyanhulu gold mine, Tanzania | |
CN110761271A (zh) | 一种抛石挤淤法处理路基软土的施工工艺 | |
CN103232149B (zh) | 一种环保疏浚堆场底泥原位快速脱水系统 | |
CN202595725U (zh) | 真空预压软土地基处理用的排水结构 | |
CN104711968A (zh) | 一种负压立体导流扰动冲击固结吹填土方法 | |
CN208105449U (zh) | 一种生态滞留池 | |
CN201785743U (zh) | 砂井和排水板相结合的真空预压加固软土地基结构 | |
CN207633496U (zh) | 一种超大广场海绵城市一体化雨水回收利用系统 | |
RU2384669C1 (ru) | Способ поярусного складирования зернистых отходов в гидроотвал | |
CN218263878U (zh) | 一种用于海堤背水坡的淤泥固化应用系统 | |
CN205576843U (zh) | 一种适于平原河网地区水土保持的构造 | |
CN114855762A (zh) | 一种用于尾矿库闭库封场的装置与方法 | |
CN109736331B (zh) | 一种利用淤泥与农林废弃物堆筑景观山的施工方法 | |
CN105064264A (zh) | 一套超大规模水利工程及其建设技术 | |
Xin et al. | Application of Vacuum Preloading in Foundation Treatment of River | |
CN214177981U (zh) | 盐碱地生态改良的土方结构 | |
CN117344692B (zh) | 一种人工岛考虑地下淡水储存的淤泥包布局方法 | |
CN214881044U (zh) | 湖泊河流环保疏浚淤泥快速脱水装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211018 Address after: 322001 first floor, No. 5, Jinger Road, Beiyuan street, Yiwu City, Jinhua City, Zhejiang Province Patentee after: Yiwu Guoxin termite control Co.,Ltd. Address before: 226019 Jiangsu city of Nantong province sik Road No. 9 Patentee before: NANTONG University |
|
TR01 | Transfer of patent right |