CN107451743A - A kind of active power distribution network islet operation method of consideration source lotus operation characteristic - Google Patents
A kind of active power distribution network islet operation method of consideration source lotus operation characteristic Download PDFInfo
- Publication number
- CN107451743A CN107451743A CN201710664652.9A CN201710664652A CN107451743A CN 107451743 A CN107451743 A CN 107451743A CN 201710664652 A CN201710664652 A CN 201710664652A CN 107451743 A CN107451743 A CN 107451743A
- Authority
- CN
- China
- Prior art keywords
- node
- msub
- mrow
- power source
- distribution network
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 240000002853 Nelumbo nucifera Species 0.000 title claims abstract description 26
- 235000006508 Nelumbo nucifera Nutrition 0.000 title claims abstract description 26
- 235000006510 Nelumbo pentapetala Nutrition 0.000 title claims abstract description 26
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000011084 recovery Methods 0.000 claims abstract description 8
- 230000009977 dual effect Effects 0.000 claims abstract description 6
- 230000005611 electricity Effects 0.000 claims description 5
- 238000000638 solvent extraction Methods 0.000 abstract description 3
- 238000005192 partition Methods 0.000 description 5
- 238000013486 operation strategy Methods 0.000 description 4
- 239000000243 solution Substances 0.000 description 3
- 230000003068 static effect Effects 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 230000001172 regenerating effect Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/04—Circuit arrangements for ac mains or ac distribution networks for connecting networks of the same frequency but supplied from different sources
- H02J3/06—Controlling transfer of power between connected networks; Controlling sharing of load between connected networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/388—Islanding, i.e. disconnection of local power supply from the network
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Educational Administration (AREA)
- Health & Medical Sciences (AREA)
- Entrepreneurship & Innovation (AREA)
- Marketing (AREA)
- Development Economics (AREA)
- Power Engineering (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Public Health (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Water Supply & Treatment (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
A kind of active power distribution network islet operation method of consideration source lotus operation characteristic:According to selected distribution system, distribution system structure and parameter are inputted;The mathematical modeling of the active power distribution network islet operation problem of consideration source lotus operation characteristic is established, including:The burden with power amount for being set in distribution system service restoration in fault time is up to object function, considers isolated island main power source unique constraints, system load flow constraint, working voltage constraint, branch current constraint, uncontrollable distributed power source operation constraint and the operation constraint of controlled distribution formula power supply respectively;Obtained mathematical modeling is solved to obtain using prim al- dual interior point m ethod:Target function value, each node voltage amplitude, each node load recovery coefficient, the operation reserve of distributed power source and block switch cut-off state;Export solving result.The present invention establishes a kind of active power distribution network isolated island partitioning model of consideration source lotus operation characteristic, and its mathematics essence is non-linear programming problem, is solved using prim al- dual interior point m ethod, obtains service restoration scheme.
Description
Technical field
The present invention relates to a kind of active power distribution network islet operation strategy.More particularly to a kind of consideration source lotus operation characteristic
Active power distribution network islet operation method.
Background technology
Self-healing function construction in intelligent grid by be intelligent grid system construction the ring of key one.Wherein, distribution is utilized
Formula power supply realizes the division of electric power isolated island with operating to one of key technology in self-healing control.Power distribution network is direct as power system
A user oriented ring, the closest with contacting for user, the influence to user is the most direct.For power distribution network, due to
The permeability of distributed power source (distributed generator, DG) is more and more stronger, occurs in transmission system or distribution system
, can be by being formed with can because part DG has the ability of actively regulation in the case that failure causes the comprehensive dead electricity of distribution system
Control DG recovers the power supply of a part of important load for the power distribution network electric power islet operation of power supply, substantially increases the confession of power distribution network
Electric reliability.
A kind of emergency mode that active power distribution network islet operation is handled as electric network fault, system confession can be obviously improved
The reliability and security of electricity.Power distribution network is directly connected with user, the target of its islet operation be distribution network failure safety every
From rear, the preferential recovery of important load guarantee in dead electricity region, and recover other insignificant loads as far as possible, recover so as to realize
Power supply Income Maximum, is a problem urgently to be resolved hurrily for intelligent distribution network.
Generally in large scale containing the grid-connected active power distribution network of a large amount of regenerative resources, connection type is extremely complex,
While realizing optimal energy source and distribution, also contain the hidden danger of major accident generation.When major accident occurs, how
Optimal electric power isolated island is fast and effeciently determined, realizes Fault Isolation, reduces power failure range as far as possible, play has independently as far as possible
The effect of the distributed power source of generating capacity is to improve power supply reliability.
On the basis of a certain moment that power distribution network breaks down, using DG power output and load condition as determination amount,
Static isolated island search division is carried out as benchmark, but when the intermittent power supplys such as photovoltaic, wind-powered electricity generation in active power distribution network be present, its
Static isolated island partition strategy is not only difficult to ensure power-balance during whole islet operation, does not also account in fault time such as
What adjusts isolated island scope to ensure the continual and steady power supply of responsible consumer.
In view of the above-mentioned problems, considering the sequential operation characteristic that distributed power source is contributed with load, ensure to greatest extent
The continual and steady operation of important load in active power distribution network.Difference at the time of being broken down according to power distribution network, and failure continue
Time is different, obtains different isolated island partition strategies, to ensure that it is maximum that system recovers load.
Current existing power distribution network isolated island division methods are more on the basis of a certain moment that power distribution network breaks down, by DG's
Power output and load condition carry out static isolated island search division, above-mentioned work have ignored event as determination amount as benchmark
Correlation between moment and source lotus operation characteristic occurs for barrier, and its result is relatively conservative.Therefore, it is necessary to which a kind of consideration source lotus runs
The active power distribution network islet operation strategy of characteristic, after solving failure generation, when being continued according to break down moment and failure
Between difference, obtain the method for different isolated island partition strategies.
The content of the invention
The technical problem to be solved by the invention is to provide a kind of active distribution by establishing consideration source lotus operation characteristic
Net isolated island partitioning model, consider the active power distribution network islet operation of the consideration source lotus operation characteristic of a variety of safe operation constraints
Method.
The technical solution adopted in the present invention is:The technical solution adopted in the present invention is:A kind of lotus operation of consideration source is special
The active power distribution network islet operation method of property, comprises the following steps:
1) according to selected distribution system, incoming line parameter, load level, network topology annexation, system operation
Voltage level and branch current limitation, controllable and uncontrollable distributed power source on-position, capacity and maximum power factor angle, bear
Lotus and uncontrollable distributed power source operation curve, system failure moment and duration, the initial value such as reference voltage and reference power;
2) mathematical modeling of the active power distribution network islet operation problem of consideration source lotus operation characteristic is established, including:It is set in
The burden with power amount of distribution system service restoration is up to object function in fault time, considers isolated island main power source uniqueness about respectively
Beam, system load flow constraint, working voltage constraint, branch current constraint, uncontrollable distributed power source operation constraint and controlled distribution
The operation constraint of formula power supply;
3) mathematical modeling for obtaining step 2) is solved to obtain using prim al- dual interior point m ethod:Target function value, each section
Point voltage magnitude, each node load recovery coefficient, the operation reserve of distributed power source and block switch cut-off state;
4) solving result of step 3) is exported.
The burden with power amount of distribution system service restoration described in step 2) is up to object function and is expressed as
In formula, NTFor the time of system islet operation;tFFor system jam at the time of;NNFor the nodes in system;For the burden with power in t node i;λiFor the recovery coefficient of load in node i, it is 0-1 variables, works as λi=1 represents
The node load recovers, and works as λi=0 represents that the node load does not recover.
Isolated island main power source unique constraints described in step 2), is expressed as
αij=βij+βji,ij∈Ωb
αij∈{0,1}
0≤βij≤1,0≤βji≤1
In formula, ΩbRepresent the set of all branch roads equipped with block switch;NSThe source node of expression system;αijRepresent branch
Road ij upper switch cut-offs state, αij=1 represents switch closure, αij=0 represents to switch off;βijRepresent node i and node j
Relation, βij=1 expression node j be node i father node, βij=0 expression node j is not the father node of node i;βjiRepresent
Node j and node i relation, βji=1 expression node i be node j father node, βji=0 expression node i is not node j father
Node;The operation reserve of controlled distribution formula power supply is selected by isolated island main power source unique constraints, when in node i can
Control distributed power source meets formulaWhen, the distributed power source in node i chooses PQ control modes;When in node i
Controlled distribution formula power supply meet formulaWhen, the distributed power source in node i chooses V/f control modes, meetsThe number of controlled distribution formula power supply be isolated island number in result.
A kind of active power distribution network islet operation method of consideration source lotus operation characteristic of the present invention, match somebody with somebody based on solution is active
Isolated island partition problem in power network, take into full account that distributed power source is contributed and load timing, and moment and event occur for failure
Hinder influence of the duration to active power distribution network isolated island partition problem, establish a kind of active power distribution network of consideration source lotus operation characteristic
Isolated island partitioning model, its mathematics essence is non-linear programming problem, is solved using prim al- dual interior point m ethod, obtains service restoration
Scheme.
Brief description of the drawings
Fig. 1 is a kind of flow chart of the active power distribution network islet operation method of consideration source lotus operation characteristic of the present invention;
Fig. 2 is the improved node example structure charts of IEEE 33;
Fig. 3 is the system jam at 0, the schematic diagram of the isolated island division result of 4 hours fault times;
Fig. 4 is the system jam at 8, the schematic diagram of the isolated island division result of 4 hours fault times;
Fig. 5 is load characteristic curve;
Fig. 6 is photovoltaic power curve.
Embodiment
A kind of active power distribution network isolated island of consideration source lotus operation characteristic of the present invention is transported with reference to embodiment and accompanying drawing
Row method is described in detail.
The active power distribution network islet operation method of a kind of consideration source lotus operation characteristic of the present invention, as shown in figure 1, including such as
Lower step:
1) according to selected distribution system, incoming line parameter, load level, network topology annexation, system operation
Voltage level and branch current limitation, controllable and uncontrollable distributed power source on-position, capacity and maximum power factor angle, bear
Lotus and uncontrollable distributed power source operation curve, system failure moment and duration, the initial value such as reference voltage and reference power;
For the example of the present invention, the impedance value of circuit element first in the input node systems of IEEE 33, load cell
Active power, reactive power, load characteristic curve, distributed electrical source dates, distributed power source operation curve, network topology connection
Relation, example structure is as shown in Fig. 2 detail parameters are shown in Table 1, table 2, table 3, Fig. 5 and Fig. 6;In 0 and 8 between setting branch road 1-2
When permanent three-phase fault occurs respectively, fault time continues 4 hours;The reference voltage of initialization system is 12.66kV, benchmark work(
Rate is 1MVA.
2) mathematical modeling of the active power distribution network islet operation problem of consideration source lotus operation characteristic is established, including:It is set in
The burden with power amount of distribution system service restoration is up to object function in fault time, considers isolated island main power source uniqueness about respectively
Beam, system load flow constraint, working voltage constraint, branch current constraint, uncontrollable distributed power source operation constraint and controlled distribution
The operation constraint of formula power supply;Wherein,
(1) the burden with power amount of the distribution system service restoration described in is up to object function and is expressed as
In formula, NTFor the time of system islet operation;tFFor system jam at the time of;NNFor the nodes in system;For the burden with power in t node i;λiFor the recovery coefficient of load in node i, it is 0-1 variables, works as λi=1 represents
The node load recovers, and works as λi=0 represents that the node load does not recover.
(2) the isolated island main power source unique constraints described in, is expressed as
αij=βij+βji,ij∈Ωb (2)
αij∈{0,1} (5)
0≤βij≤1,0≤βji≤1 (6)
In formula, ΩbRepresent the set of all branch roads equipped with block switch;NSThe source node of expression system;αijRepresent branch
Road ij upper switch cut-offs state, αij=1 represents switch closure, αij=0 represents to switch off;βijRepresent node i and node j
Relation, βij=1 expression node j be node i father node, βij=0 expression node j is not the father node of node i;βjiRepresent
Node j and node i relation, βji=1 expression node i be node j father node, βji=0 expression node i is not node j father
Node;The operation reserve of controlled distribution formula power supply is selected by isolated island main power source unique constraints, when in node i can
Control distributed power source meets formulaWhen, the distributed power source in node i chooses PQ control modes;When in node i
Controlled distribution formula power supply meet formulaWhen, the distributed power source in node i chooses V/f control modes, meetsThe number of controlled distribution formula power supply be isolated island number in result.
(3) trend constraint described in is expressed as
-Mαij≤Pt,ij≤Mαij (14)
-Mαij≤Qt,ij≤Mαij (15)
In formula, rijFor branch road ij resistance, xijFor branch road ij reactance;Pt,ij、Qt,ijRespectively t branch road ij is upper
The active power and reactive power crossed;Pt,i、Qt,iThe active power and reactive power sum respectively injected in t node i;The active power and reactive power of load respectively in t node i;Respectively
For controllable active power and reactive power with the injection of uncontrollable distributed power source in t node i;Parameter M represents a pole
Big constant, generally takes 9999.
(4) the working voltage constraint representation described in is
In formula,WithThe respectively voltage bound of node i.
(5) the branch current constraint representation described in is
In formula,For branch road ij upper current limit.
(6) the uncontrollable distributed power source described in runs constraint representation
In formula,The upper limit of the active power output of uncontrollable distributed power source is connect by t node i;Represent
Node i connects the capacity of uncontrollable distributed power source;For the maximum power factor of the operation of distributed power source in node i
Angle.
(7) the controlled distribution formula power supply described in runs constraint representation
In formula,Represent that node i connects the capacity of controlled distribution formula power supply.
3) mathematical modeling for obtaining step 2) is solved to obtain using prim al- dual interior point m ethod:Target function value, each section
Point voltage magnitude, each node load recovery coefficient, the operation reserve of distributed power source and block switch cut-off state;
4) solving result of step 3) is exported.
The present invention establishes the active power distribution network islet operation strategy of consideration source lotus operation characteristic, and is carried out using interior point method
Solve, obtain optimal islet operation strategy, controlled distribution formula power supply operation reserve is shown in Table 4, recovers load condition and is shown in Table 5.
It is Intel (R) Core (TM) i5-3470CPU to perform the computer hardware environment that optimization calculates, and dominant frequency is
3.20GHz, inside save as 4GB;Software environment is the operating systems of Windows 7.
Distributed power source is considered to contribute and load timing, to greatest extent in guarantee system important load continue it is steady
Fixed operation.It is different at the time of being broken down according to power distribution network, and trouble duration difference, obtain different isolated island division plans
Omit, to ensure that it is maximum that system recovers load.When with the system jam moment being respectively 0 and when 8, the system islet operation time
It it is 4 hours, as shown in Figure 3 and Figure 4, wherein solid node represents load restoration, hollow node represents negative to optimal isolated island result
Lotus does not recover.
The IEEE33 nodes example load on-position of table 1 and power
The IEEE33 node example line parameter circuit values of table 2
The distributed power source configuring condition of table 3
The operation reserve of the controlled distribution formula power supply of table 4
Node | 13 | 20 | 23 | 30 |
When 0 | V/f is controlled | V/f is controlled | V/f is controlled | V/f is controlled |
When 8 | V/f is controlled | PQ is controlled | V/f is controlled | PQ is controlled |
The load restoration situation of table 5
Claims (3)
- A kind of 1. active power distribution network islet operation method of consideration source lotus operation characteristic, it is characterised in that comprise the following steps:1) according to selected distribution system, incoming line parameter, load level, network topology annexation, system operation voltage The limitation of horizontal and branch current, controllable and uncontrollable distributed power source on-position, capacity and maximum power factor angle, load with Uncontrollable distributed power source operation curve, system failure moment and duration, the initial value such as reference voltage and reference power;2) mathematical modeling of the active power distribution network islet operation problem of consideration source lotus operation characteristic is established, including:It is set in failure The burden with power amount of distribution system service restoration is up to object function in time, considers isolated island main power source unique constraints respectively, is Uniting, trend constraint, working voltage constrain, branch current constrains, the operation of uncontrollable distributed power source constrains and controlled distribution formula power supply Operation constraint;3) mathematical modeling for obtaining step 2) is solved to obtain using prim al- dual interior point m ethod:Target function value, each node electricity Pressure amplitude value, each node load recovery coefficient, the operation reserve of distributed power source and block switch cut-off state;4) solving result of step 3) is exported.
- 2. a kind of active power distribution network islet operation method of consideration source lotus operation characteristic according to claim 1, its feature It is, the burden with power amount of the distribution system service restoration described in step 2) is up to object function and is expressed as<mrow> <mi>f</mi> <mo>=</mo> <msubsup> <mi>max&Sigma;</mi> <mrow> <mi>t</mi> <mo>=</mo> <msup> <mi>t</mi> <mi>F</mi> </msup> </mrow> <msub> <mi>N</mi> <mi>T</mi> </msub> </msubsup> <msubsup> <mi>&Sigma;</mi> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>N</mi> </msub> </msubsup> <msub> <mi>&lambda;</mi> <mi>i</mi> </msub> <msubsup> <mi>P</mi> <mrow> <mi>t</mi> <mo>,</mo> <mi>i</mi> </mrow> <mrow> <mi>L</mi> <mi>O</mi> <mi>A</mi> <mi>D</mi> </mrow> </msubsup> </mrow>In formula, NTFor the time of system islet operation;tFFor system jam at the time of;NNFor the nodes in system;For the burden with power in t node i;λiFor the recovery coefficient of load in node i, it is 0-1 variables, works as λi=1 represents The node load recovers, and works as λi=0 represents that the node load does not recover.
- 3. a kind of active power distribution network islet operation method of consideration source lotus operation characteristic according to claim 1, its feature It is, the isolated island main power source unique constraints described in step 2), is expressed asαij=βij+βji,ij∈Ωb<mrow> <msub> <mi>&Sigma;</mi> <mrow> <mi>i</mi> <mi>j</mi> <mo>&Element;</mo> <msub> <mi>&Omega;</mi> <mi>b</mi> </msub> </mrow> </msub> <msub> <mi>&beta;</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <mo>=</mo> <mn>1</mn> <mo>,</mo> <mo>&ForAll;</mo> <mi>i</mi> <mo>&Element;</mo> <mi>N</mi> <mo>\</mo> <msub> <mi>N</mi> <mi>S</mi> </msub> </mrow><mrow> <msub> <mi>&Sigma;</mi> <mrow> <mi>i</mi> <mi>j</mi> <mo>&Element;</mo> <msub> <mi>&Omega;</mi> <mi>b</mi> </msub> </mrow> </msub> <msub> <mi>&beta;</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <mo>=</mo> <mn>0</mn> <mo>,</mo> <mo>&ForAll;</mo> <mi>i</mi> <mo>&Element;</mo> <msub> <mi>N</mi> <mi>S</mi> </msub> </mrow>αij∈{0,1}0≤βij≤1,0≤βji≤1In formula, ΩbRepresent the set of all branch roads equipped with block switch;NSThe source node of expression system;αijRepresent on branch road ij Switch cut-offs state, αij=1 represents switch closure, αij=0 represents to switch off;βijNode i and node j relation are represented, βij=1 expression node j be node i father node, βij=0 expression node j is not the father node of node i;βjiRepresent node j and The relation of node i, βji=1 expression node i be node j father node, βji=0 expression node i is not node j father node;It is logical Cross isolated island main power source unique constraints to select the operation reserve of controlled distribution formula power supply, when the controlled distribution in node i Formula power supply meets formulaWhen, the distributed power source in node i chooses PQ control modes;When controllable in node i Distributed power source meets formulaWhen, the distributed power source in node i chooses V/f control modes, meetsThe number of controlled distribution formula power supply be isolated island number in result.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710664652.9A CN107451743B (en) | 2017-08-04 | 2017-08-04 | Active power distribution network island operation method considering source load operation characteristics |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710664652.9A CN107451743B (en) | 2017-08-04 | 2017-08-04 | Active power distribution network island operation method considering source load operation characteristics |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107451743A true CN107451743A (en) | 2017-12-08 |
CN107451743B CN107451743B (en) | 2021-03-19 |
Family
ID=60490124
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710664652.9A Active CN107451743B (en) | 2017-08-04 | 2017-08-04 | Active power distribution network island operation method considering source load operation characteristics |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107451743B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112598159A (en) * | 2020-12-02 | 2021-04-02 | 广西大学 | Island fusion recovery method based on multi-source network reconstruction |
CN113141023A (en) * | 2021-04-15 | 2021-07-20 | 国网天津市电力公司 | Photovoltaic island power supply range optimization method based on series synchronous machine form grid connection |
CN116780529A (en) * | 2023-06-30 | 2023-09-19 | 国网北京市电力公司 | Power distribution network fault recovery method, device, equipment and medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102868161A (en) * | 2012-10-23 | 2013-01-09 | 四川大学 | Optimization method of network variable structure with distributed type power supply distribution system |
CN104934964A (en) * | 2015-03-18 | 2015-09-23 | 华南理工大学 | Power distribution network reconstruction and island division method containing distributed power supply |
CN105023058A (en) * | 2015-07-07 | 2015-11-04 | 天津大学 | Power distribution network intelligent soft switch operation optimization method with simultaneous consideration of switch motion |
CN105896537A (en) * | 2016-06-21 | 2016-08-24 | 中国南方电网有限责任公司电网技术研究中心 | Power supply restoration method for power distribution network based on intelligent soft switch |
CN105977934A (en) * | 2016-06-21 | 2016-09-28 | 天津大学 | Method for recovering power supply of soft open point of power distribution network in consideration of load importance |
-
2017
- 2017-08-04 CN CN201710664652.9A patent/CN107451743B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102868161A (en) * | 2012-10-23 | 2013-01-09 | 四川大学 | Optimization method of network variable structure with distributed type power supply distribution system |
CN104934964A (en) * | 2015-03-18 | 2015-09-23 | 华南理工大学 | Power distribution network reconstruction and island division method containing distributed power supply |
CN105023058A (en) * | 2015-07-07 | 2015-11-04 | 天津大学 | Power distribution network intelligent soft switch operation optimization method with simultaneous consideration of switch motion |
CN105896537A (en) * | 2016-06-21 | 2016-08-24 | 中国南方电网有限责任公司电网技术研究中心 | Power supply restoration method for power distribution network based on intelligent soft switch |
CN105977934A (en) * | 2016-06-21 | 2016-09-28 | 天津大学 | Method for recovering power supply of soft open point of power distribution network in consideration of load importance |
Non-Patent Citations (1)
Title |
---|
李振坤 等: "基于风光荷功率曲线的有源配电网动态孤岛划分方法", 《电力系统自动化》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112598159A (en) * | 2020-12-02 | 2021-04-02 | 广西大学 | Island fusion recovery method based on multi-source network reconstruction |
CN112598159B (en) * | 2020-12-02 | 2022-04-19 | 广西大学 | Island fusion recovery method based on multi-source network reconstruction |
CN113141023A (en) * | 2021-04-15 | 2021-07-20 | 国网天津市电力公司 | Photovoltaic island power supply range optimization method based on series synchronous machine form grid connection |
CN116780529A (en) * | 2023-06-30 | 2023-09-19 | 国网北京市电力公司 | Power distribution network fault recovery method, device, equipment and medium |
CN116780529B (en) * | 2023-06-30 | 2024-06-11 | 国网北京市电力公司 | Power distribution network fault recovery method, device, equipment and medium |
Also Published As
Publication number | Publication date |
---|---|
CN107451743B (en) | 2021-03-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107394775A (en) | A kind of active power distribution network sequential islet operation method of meter and load priority | |
CN108988322B (en) | Microgrid operation strategy optimization method considering system time-varying property | |
CN111478358B (en) | Robust recovery decision-making method for power distribution network considering uncertainty of distributed power supply | |
WO2019178919A1 (en) | Micro-grid distributed controller parameter determination method based on linear quadratic optimization | |
CN105119280B (en) | Alternating current-direct current mixed structure active power distribution network running optimizatin method based on cone optimization | |
CN105896537B (en) | A kind of power distribution network service restoration method based on intelligent Sofe Switch | |
CN103730908B (en) | Method for controlling energy storage converters in large-scale off-grid micro-grid | |
CN105186500B (en) | A kind of power distribution network power dissipation coordination optimizing method based on weighting acceleration Lagrangian again | |
CN104300538B (en) | Plant stand coordinates update method and the system of coordination constraint limit value in automatism voltage control | |
CN103401241B (en) | A kind of micro-capacitance sensor service restoration method based on distributed power source ad-hoc network strategy | |
Mathew et al. | A multilevel distributed hybrid control scheme for islanded DC microgrids | |
CN107341623A (en) | A kind of active power distribution network source storage lotus islet operation method of meter and network reconfiguration | |
Xiao et al. | Online supervisory voltage control for grid interface of utility-level PV plants | |
CN106549392A (en) | A kind of power distribution network control method for coordinating | |
CN107451743A (en) | A kind of active power distribution network islet operation method of consideration source lotus operation characteristic | |
CN105790255B (en) | Multi-microgrid power supply system and control method | |
Azeroual et al. | Intelligent energy management system of a smart microgrid using multiagent systems | |
Mathew et al. | A multi-level control and optimization scheme for islanded pv based microgrid: A control frame work | |
CN105244912A (en) | Method for active power distribution network island power supply recovery and black-start | |
Satish et al. | Control of microgrid—A review | |
Tekpeti et al. | Fault analysis of solar photovoltaic penetrated distribution systems including overcurrent relays in presence of fluctuations | |
CN107332277B (en) | Active power distribution network island operation method considering source load storage operation characteristics | |
CN108206540A (en) | Consider the active power distribution network isolated island division methods in important load continuous working period | |
CN104124700A (en) | Method and system for generating power distribution network black start scheme | |
CN112152256A (en) | Power grid recovery mixed integer planning method considering renewable energy uncertainty |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |