CN107451677A - 一种考虑激励机制电量电价弹性矩阵的耗电量估测方法 - Google Patents
一种考虑激励机制电量电价弹性矩阵的耗电量估测方法 Download PDFInfo
- Publication number
- CN107451677A CN107451677A CN201710502069.8A CN201710502069A CN107451677A CN 107451677 A CN107451677 A CN 107451677A CN 201710502069 A CN201710502069 A CN 201710502069A CN 107451677 A CN107451677 A CN 107451677A
- Authority
- CN
- China
- Prior art keywords
- mtd
- msub
- mrow
- price
- period
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000007246 mechanism Effects 0.000 title claims abstract description 81
- 239000011159 matrix material Substances 0.000 title claims abstract description 33
- 238000000034 method Methods 0.000 title claims abstract description 13
- 230000005611 electricity Effects 0.000 claims abstract description 59
- 230000005284 excitation Effects 0.000 claims abstract description 7
- 238000009472 formulation Methods 0.000 abstract description 5
- 239000000203 mixture Substances 0.000 abstract description 5
- 238000005516 engineering process Methods 0.000 description 2
- 240000002853 Nelumbo nucifera Species 0.000 description 1
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 1
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 1
- 238000004378 air conditioning Methods 0.000 description 1
- 238000000205 computational method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- 238000005303 weighing Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Health & Medical Sciences (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Public Health (AREA)
- Primary Health Care (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Educational Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明公开了一种考虑激励机制电量电价弹性矩阵的耗电量估测方法。执行同时包括价格机制和激励机制的电力需求响应,用户的用电量受价格机制和激励机制影响,构建用电量电价弹性矩阵和用电量激励弹性矩阵,并利用两个矩阵计算获得执行两个需求响应机制后的耗电量。本发明将需求响应中的价格机制和激励机制同时用于电量电价弹性矩阵中,便于指导电力系统中需求响应的价格机制和激励机制的制定。
Description
技术领域
本发明涉及一种电网用户耗电量的计算方法,特别是涉及了一种考虑激励机制电量电价弹性矩阵的耗电量估测方法。
背景技术
我国电力峰谷差在持续增长,导致峰谷差持续增长的一个重要原因是夏季空调负荷的急剧增长。此外,恶劣天气的增多,气温的反复无常,也加剧了电力峰谷差对系统的影响。为应对持续增长的电力峰谷差,保证用户的安全可靠用电,电力系统需要具备充足的备用容量,尤其是具有快速调节能力的发电机组。然而,发电机组的启停和高频率的调节带来了很高的能耗,提高了供电成本。
需求响应是通过负荷侧的调控,在不影响用户用电和舒适度的同时,协助系统平衡,降低系统峰谷差。与仅仅通过发电侧维护电力系统平衡的方法相比,需求响应可以提高系统的经济性,正被我国广泛推广。实现需求响应的主要手段包括价格机制。价格机制是通过一套电价体系实现电力用户与电力公司之间的友好互动,价格机制从根本上都是对参与需求响应的用户的经济补偿。
发明内容
针对上述背景技术中的问题,本发明提供了一种考虑激励机制电量电价弹性矩阵的耗电量估测方法,可以将需求响应中的价格机制和激励机制同时考虑到电量电价弹性矩阵中,便于指导电力系统中需求响应的价格机制和激励机制的制定:
本发明采用的技术方案是:
首先执行同时包括价格机制和激励机制的电力需求响应,用户的用电量受价格机制和激励机制影响,构建用电量电价弹性矩阵Ep和用电量激励弹性矩阵Eh,并利用两个矩阵计算获得执行两个需求响应机制后的耗电量,获得综合考虑价格机制和激励机制的耗电量。
所述的价格机制是指将一天时间划分为n个时间段,用户在各个时间段的用电电价不同,每个时间段的用电电价表示为Pi。
所述的激励机制是指将一天时间划分为n个时间段,用户各个时间段中会被断电,断电后会以补偿电价返回给用户,每个时间段断电后的补偿电价表示为Hi。
所述的方法在执行同时包括价格机制和激励机制的需求响应下具体为:
1)计算价格机制的自弹性系数和互弹性系数,再构建用电量电价弹性矩阵Ep:
本时间段的用电电价变化会影响本时间段的用电量,采用以下公式计算每个时间段的价格机制需求响应的自弹性系数εii:
式中,△Qi表示第i时间段用电量相比执行需求响应之前的变化,△Pi表示第i时间段的用电电价相比执行需求响应之前的变化,Qi表示执行需求响应之前第i时间段用户的用电量,Pi表示执行需求响应之前第i时间段的用电电价,i表示时间段的序号;
本时间段的用电电价变化也会影响其他时间段的用电量,采用以下公式计算每两个时间段的价格机制需求响应之间的互弹性系数ε:
式中,△Pj表示第j时间段的用电电价相比执行需求响应之前的变化,Pj表示执行需求响应之前第j时间段的用电电价;
采用以下公式计算电量变化与价格机制之间的关系作为用电量电价弹性矩阵Ep:
2)计算激励机制的自弹性系数和互弹性系数,再构建用电量激励弹性矩阵Eh:
本时间段的补偿电价变化会影响本时间段的用电量,采用以下公式计算每个时间段的激励机制需求响应的自弹性系数ρii:
式中,△Qi表示第i时间段用电量相比执行需求响应之前的变化,△Hi表示第i时间段的补偿电价相比执行需求响应之前的变化,Qi表示执行需求响应之前第i时间段用户的用电量,Hi表示执行需求响应之前第i时间段的补偿电价,i表示时间段的序号;
本时间段的补偿电价变化也会影响其他时间段的用电量,采用以下公式计算每个时间段的激励机制需求响应的互弹性系数ρij:
式中,△Hj表示第j时间段的补偿电价相比执行需求响应之前的变化,Hj表示执行需求响应之前第j时间段的补偿电价;
采用以下公式计算电量变化与激励机制之间的关系作为用电量激励弹性矩阵Eh:
3)采用以下公式计算获得执行需求响应后的耗电量:
其中,Q’i表示执行需求响应的价格机制和激励机制后时间段i的用电量,i=1~n。
本发明在耗电量估测中引入了激励机制进行需求响应,激励机制是通过补偿电价实现电力用户与电力公司之间的关联对接,激励机制从根本上是对参与需求响应的用户的电量补偿反馈。
现有技术中仅仅通过价格机制的电量电价弹性矩阵可以反应用户在执行需求响应后耗电量随电价的变化情况。但是不能反应用户在执行激励机制的需求响应后,耗电量随激励合同的变化情况,不利于需求响应的制定。
本发明在价格机制中引入了激励机制,使得用户用电在使用过程中进行调配,来提高电量利用率,提高稳定性。
本发明具有以下有益效果:
本发明将需求响应中的价格机制和激励机制同时考虑到电量电价弹性矩阵中,提高需求响应下耗电量估测的精确度,用于提高电网的稳定性和经济性,有利于指导电力系统中需求响应工作的开展,为价格机制和激励机制的制定提供依据。
附图说明
图1是考虑价格机制和激励机制的电量电价弹性矩阵示意图。
具体实施方式
以下结合实施例及其附图作进一步说明。
本发明的实施例如下:
具体实施将一天时间划分为3个时间段,执行需求响应前1天的电价恒定为激励机制为耗电量为
执行需求响应后,每个时间段的电价为激励机制为
因此,计算得
通过实施仿真统计获得用户的电量电价弹性矩阵Ep为电量激励弹性矩阵Eh为
综合考虑电价机制和激励机制的电量电价弹性矩阵可以求得执行需求响应后的耗电量为:
由此可见,本发明通过考虑价格机制和激励机制的电量电价弹性矩阵,有效计算出了执行需求响应后的耗电量。便于指导电力系统中需求响应工作的开展,为价格机制和激励机制的制定提供依据,实现了其技术效果。
Claims (4)
1.一种考虑激励机制电量电价弹性矩阵的耗电量估测方法,其特征在于:
执行同时包括价格机制和激励机制的电力需求响应,用户的用电量受价格机制和激励机制影响,构建用电量电价弹性矩阵Ep和用电量激励弹性矩阵Eh,并利用两个矩阵计算获得执行两个需求响应机制后的耗电量。
2.根据权利要求1所述的一种考虑激励机制电量电价弹性矩阵的耗电量估测方法,其特征在于:所述的价格机制是指将一天时间划分为n个时间段,用户在各个时间段的用电电价不同,每个时间段的用电电价表示为Pi。
3.根据权利要求1所述的一种考虑激励机制电量电价弹性矩阵的耗电量估测方法,其特征在于:所述的激励机制是指将一天时间划分为n个时间段,用户各个时间段中会被断电,断电后会以补偿电价返回给用户,每个时间段断电后的补偿电价表示为Hi。
4.根据权利要求1所述的一种考虑激励机制电量电价弹性矩阵的耗电量估测方法,其特征在于:所述的方法在执行同时包括价格机制和激励机制的需求响应下具体为:
1)计算价格机制的自弹性系数和互弹性系数,再构建用电量电价弹性矩阵Ep:
采用以下公式计算每个时间段的价格机制需求响应的自弹性系数εii:
<mrow>
<msub>
<mi>&epsiv;</mi>
<mrow>
<mi>i</mi>
<mi>i</mi>
</mrow>
</msub>
<mo>=</mo>
<mfrac>
<mrow>
<msub>
<mi>&Delta;Q</mi>
<mi>i</mi>
</msub>
<mo>/</mo>
<msub>
<mi>Q</mi>
<mi>i</mi>
</msub>
</mrow>
<mrow>
<msub>
<mi>&Delta;P</mi>
<mi>i</mi>
</msub>
<mo>/</mo>
<msub>
<mi>P</mi>
<mi>i</mi>
</msub>
</mrow>
</mfrac>
<mo>,</mo>
<mi>i</mi>
<mo>&Element;</mo>
<mo>&lsqb;</mo>
<mn>1</mn>
<mo>,</mo>
<mi>n</mi>
<mo>&rsqb;</mo>
</mrow>
式中,△Qi表示第i时间段用电量相比执行需求响应之前的变化,△Pi表示第i时间段的用电电价相比执行需求响应之前的变化,Qi表示执行需求响应之前第i时间段用户的用电量,Pi表示执行需求响应之前第i时间段的用电电价,i表示时间段的序号;
采用以下公式计算每两个时间段的价格机制需求响应之间的互弹性系数εij:
<mrow>
<msub>
<mi>&epsiv;</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>=</mo>
<mfrac>
<mrow>
<msub>
<mi>&Delta;Q</mi>
<mi>i</mi>
</msub>
<mo>/</mo>
<msub>
<mi>Q</mi>
<mi>i</mi>
</msub>
</mrow>
<mrow>
<msub>
<mi>&Delta;P</mi>
<mi>j</mi>
</msub>
<mo>/</mo>
<msub>
<mi>P</mi>
<mi>j</mi>
</msub>
</mrow>
</mfrac>
<mo>,</mo>
<mi>i</mi>
<mo>&Element;</mo>
<mo>&lsqb;</mo>
<mn>1</mn>
<mo>,</mo>
<mi>n</mi>
<mo>&rsqb;</mo>
<mo>,</mo>
<mi>j</mi>
<mo>&Element;</mo>
<mo>&lsqb;</mo>
<mn>1</mn>
<mo>,</mo>
<mi>n</mi>
<mo>&rsqb;</mo>
<mo>,</mo>
<mi>i</mi>
<mo>&NotEqual;</mo>
<mi>j</mi>
</mrow>
式中,△Pj表示第j时间段的用电电价相比执行需求响应之前的变化,Pj表示执行需求响应之前第j时间段的用电电价;
采用以下公式计算电量变化与价格机制之间的关系作为用电量电价弹性矩阵Ep:
<mrow>
<msub>
<mi>E</mi>
<mi>p</mi>
</msub>
<mo>=</mo>
<mfenced open = "[" close = "]">
<mtable>
<mtr>
<mtd>
<msub>
<mi>&epsiv;</mi>
<mn>11</mn>
</msub>
</mtd>
<mtd>
<msub>
<mi>&epsiv;</mi>
<mn>12</mn>
</msub>
</mtd>
<mtd>
<mn>...</mn>
</mtd>
<mtd>
<msub>
<mi>&epsiv;</mi>
<mrow>
<mn>1</mn>
<mi>n</mi>
</mrow>
</msub>
</mtd>
</mtr>
<mtr>
<mtd>
<msub>
<mi>&epsiv;</mi>
<mn>21</mn>
</msub>
</mtd>
<mtd>
<msub>
<mi>&epsiv;</mi>
<mn>22</mn>
</msub>
</mtd>
<mtd>
<mn>...</mn>
</mtd>
<mtd>
<msub>
<mi>&epsiv;</mi>
<mrow>
<mn>2</mn>
<mi>n</mi>
</mrow>
</msub>
</mtd>
</mtr>
<mtr>
<mtd>
<mo>.</mo>
</mtd>
<mtd>
<mo>.</mo>
</mtd>
<mtd>
<mrow></mrow>
</mtd>
<mtd>
<mo>.</mo>
</mtd>
</mtr>
<mtr>
<mtd>
<mo>.</mo>
</mtd>
<mtd>
<mo>.</mo>
</mtd>
<mtd>
<mrow></mrow>
</mtd>
<mtd>
<mo>.</mo>
</mtd>
</mtr>
<mtr>
<mtd>
<mo>.</mo>
</mtd>
<mtd>
<mo>.</mo>
</mtd>
<mtd>
<mrow></mrow>
</mtd>
<mtd>
<mo>.</mo>
</mtd>
</mtr>
<mtr>
<mtd>
<msub>
<mi>&epsiv;</mi>
<mrow>
<mi>n</mi>
<mn>1</mn>
</mrow>
</msub>
</mtd>
<mtd>
<msub>
<mi>&epsiv;</mi>
<mrow>
<mi>n</mi>
<mn>2</mn>
</mrow>
</msub>
</mtd>
<mtd>
<mn>...</mn>
</mtd>
<mtd>
<msub>
<mi>&epsiv;</mi>
<mrow>
<mi>n</mi>
<mi>n</mi>
</mrow>
</msub>
</mtd>
</mtr>
</mtable>
</mfenced>
</mrow>
2)计算激励机制的自弹性系数和互弹性系数,再构建用电量激励弹性矩阵Eh:
采用以下公式计算每个时间段的激励机制需求响应的自弹性系数ρii:
<mrow>
<msub>
<mi>&rho;</mi>
<mrow>
<mi>i</mi>
<mi>i</mi>
</mrow>
</msub>
<mo>=</mo>
<mfrac>
<mrow>
<msub>
<mi>&Delta;Q</mi>
<mi>i</mi>
</msub>
<mo>/</mo>
<msub>
<mi>Q</mi>
<mi>i</mi>
</msub>
</mrow>
<mrow>
<msub>
<mi>&Delta;H</mi>
<mi>i</mi>
</msub>
<mo>/</mo>
<msub>
<mi>H</mi>
<mi>i</mi>
</msub>
</mrow>
</mfrac>
<mo>,</mo>
<mi>i</mi>
<mo>&Element;</mo>
<mo>&lsqb;</mo>
<mn>1</mn>
<mo>,</mo>
<mi>n</mi>
<mo>&rsqb;</mo>
</mrow>
式中,△Qi表示第i时间段用电量相比执行需求响应之前的变化,△Hi表示第i时间段的补偿电价相比执行需求响应之前的变化,Qi表示执行需求响应之前第i时间段用户的用电量,Hi表示执行需求响应之前第i时间段的补偿电价,i表示时间段的序号;
采用以下公式计算每个时间段的激励机制需求响应的互弹性系数ρij:
<mrow>
<msub>
<mi>&rho;</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>=</mo>
<mfrac>
<mrow>
<msub>
<mi>&Delta;Q</mi>
<mi>i</mi>
</msub>
<mo>/</mo>
<msub>
<mi>Q</mi>
<mi>i</mi>
</msub>
</mrow>
<mrow>
<msub>
<mi>&Delta;H</mi>
<mi>j</mi>
</msub>
<mo>/</mo>
<msub>
<mi>H</mi>
<mi>j</mi>
</msub>
</mrow>
</mfrac>
<mo>,</mo>
<mi>i</mi>
<mo>&Element;</mo>
<mo>&lsqb;</mo>
<mn>1</mn>
<mo>,</mo>
<mi>n</mi>
<mo>&rsqb;</mo>
<mo>,</mo>
<mi>j</mi>
<mo>&Element;</mo>
<mo>&lsqb;</mo>
<mn>1</mn>
<mo>,</mo>
<mi>n</mi>
<mo>&rsqb;</mo>
<mo>,</mo>
<mi>i</mi>
<mo>&NotEqual;</mo>
<mi>j</mi>
</mrow>
式中,ΔHj表示第j时间段的补偿电价相比执行需求响应之前的变化,Hj表示执行需求响应之前第j时间段的补偿电价;
采用以下公式计算电量变化与激励机制之间的关系作为用电量激励弹性矩阵Eh:
<mrow>
<msub>
<mi>E</mi>
<mi>h</mi>
</msub>
<mo>=</mo>
<mfenced open = "[" close = "]">
<mtable>
<mtr>
<mtd>
<msub>
<mi>&rho;</mi>
<mn>11</mn>
</msub>
</mtd>
<mtd>
<msub>
<mi>&rho;</mi>
<mn>12</mn>
</msub>
</mtd>
<mtd>
<mn>...</mn>
</mtd>
<mtd>
<msub>
<mi>&rho;</mi>
<mrow>
<mn>1</mn>
<mi>n</mi>
</mrow>
</msub>
</mtd>
</mtr>
<mtr>
<mtd>
<msub>
<mi>&rho;</mi>
<mn>21</mn>
</msub>
</mtd>
<mtd>
<msub>
<mi>&rho;</mi>
<mn>22</mn>
</msub>
</mtd>
<mtd>
<mn>...</mn>
</mtd>
<mtd>
<msub>
<mi>&rho;</mi>
<mrow>
<mn>2</mn>
<mi>n</mi>
</mrow>
</msub>
</mtd>
</mtr>
<mtr>
<mtd>
<mo>.</mo>
</mtd>
<mtd>
<mo>.</mo>
</mtd>
<mtd>
<mrow></mrow>
</mtd>
<mtd>
<mo>.</mo>
</mtd>
</mtr>
<mtr>
<mtd>
<mo>.</mo>
</mtd>
<mtd>
<mo>.</mo>
</mtd>
<mtd>
<mrow></mrow>
</mtd>
<mtd>
<mo>.</mo>
</mtd>
</mtr>
<mtr>
<mtd>
<mo>.</mo>
</mtd>
<mtd>
<mo>.</mo>
</mtd>
<mtd>
<mrow></mrow>
</mtd>
<mtd>
<mo>.</mo>
</mtd>
</mtr>
<mtr>
<mtd>
<msub>
<mi>&rho;</mi>
<mrow>
<mi>n</mi>
<mn>1</mn>
</mrow>
</msub>
</mtd>
<mtd>
<msub>
<mi>&rho;</mi>
<mrow>
<mi>n</mi>
<mn>2</mn>
</mrow>
</msub>
</mtd>
<mtd>
<mn>...</mn>
</mtd>
<mtd>
<msub>
<mi>&rho;</mi>
<mrow>
<mi>n</mi>
<mi>n</mi>
</mrow>
</msub>
</mtd>
</mtr>
</mtable>
</mfenced>
</mrow>
3)采用以下公式计算获得执行需求响应后的耗电量:
其中,Q’i表示执行需求响应的价格机制和激励机制后时间段i的用电量,i=1~n。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710502069.8A CN107451677A (zh) | 2017-06-27 | 2017-06-27 | 一种考虑激励机制电量电价弹性矩阵的耗电量估测方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710502069.8A CN107451677A (zh) | 2017-06-27 | 2017-06-27 | 一种考虑激励机制电量电价弹性矩阵的耗电量估测方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107451677A true CN107451677A (zh) | 2017-12-08 |
Family
ID=60487189
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710502069.8A Pending CN107451677A (zh) | 2017-06-27 | 2017-06-27 | 一种考虑激励机制电量电价弹性矩阵的耗电量估测方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107451677A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111391709A (zh) * | 2020-04-23 | 2020-07-10 | 燕山大学 | 一种电动汽车换电站调度方法及系统 |
WO2024056051A1 (zh) * | 2022-09-16 | 2024-03-21 | 清华大学 | 非侵入式柔性负荷聚合特性辨识与优化方法、装置及设备 |
-
2017
- 2017-06-27 CN CN201710502069.8A patent/CN107451677A/zh active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111391709A (zh) * | 2020-04-23 | 2020-07-10 | 燕山大学 | 一种电动汽车换电站调度方法及系统 |
WO2024056051A1 (zh) * | 2022-09-16 | 2024-03-21 | 清华大学 | 非侵入式柔性负荷聚合特性辨识与优化方法、装置及设备 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Wang et al. | Dynamic control strategy for the electrolyte flow rate of vanadium redox flow batteries | |
Ju et al. | Multi-objective electro-thermal coupling scheduling model for a hybrid energy system comprising wind power plant, conventional gas turbine, and regenerative electric boiler, considering uncertainty and demand response | |
CN110276489B (zh) | 基于㶲损最低的多能量枢纽分布式优化调度方法及系统 | |
CN109799851A (zh) | 一种基于负荷簇温度调控的用户侧负荷响应方法 | |
CN105162113A (zh) | 一种基于灵敏度分析的微电网与配电网互动成本计算方法 | |
CN104008432A (zh) | 基于emd-kelm-ekf的微网短期负荷预测方法 | |
CN107451677A (zh) | 一种考虑激励机制电量电价弹性矩阵的耗电量估测方法 | |
CN102903185A (zh) | 一种电力用户响应系统和方法 | |
CN102593833A (zh) | 一种独立微网频率控制器设计方法 | |
CN105159085A (zh) | 空调所属建筑物二阶等效热参数模型的实时参数辨识方法 | |
CN104408663A (zh) | 智能电网用户需求响应调度系统及方法 | |
CN108536917A (zh) | 一种输配电网全局电压稳定控制的分布式计算方法 | |
CN108460547A (zh) | 热电联供系统热电联合状态估计方法及系统 | |
CN107632522A (zh) | 一种质子交换膜燃料电池非线性状态空间模型辨识方法 | |
Mu et al. | Input-output table of electricity demand and its application | |
CN106786536A (zh) | 考虑外网扩展Ward等值的状态估计方法 | |
CN103365319B (zh) | 一种发热假人模型集群系统 | |
CN117010625A (zh) | 一种需求响应与预测误差的虚拟电厂优化调度方法及系统 | |
CN204008846U (zh) | 一种变电站子母表最大需量同步计量装置 | |
CN114336607B (zh) | 计及源荷双侧不确定性的电网经济运行域生成方法及系统 | |
Chen et al. | Learning-based sparse spatiotemporal modeling for distributed thermal processes of Lithium-ion batteries | |
CN115375091A (zh) | 一种基于价格弹性系数的负荷可调节能力量化方法 | |
Chen et al. | Multiple energies retailing based on Stackelberg game model | |
CN104300536A (zh) | 一种基于网络分解的配电网状态估计方法 | |
Hao et al. | A Novel Stochastic Economic Dispatch Method Considering Renewable Energy Correlation and Demand Response |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171208 |
|
RJ01 | Rejection of invention patent application after publication |