CN107447971A - Suitable for the adjustable scaffold of fitting-out work - Google Patents

Suitable for the adjustable scaffold of fitting-out work Download PDF

Info

Publication number
CN107447971A
CN107447971A CN201610371417.8A CN201610371417A CN107447971A CN 107447971 A CN107447971 A CN 107447971A CN 201610371417 A CN201610371417 A CN 201610371417A CN 107447971 A CN107447971 A CN 107447971A
Authority
CN
China
Prior art keywords
connecting rod
leading screw
mating groove
fixing hole
fitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610371417.8A
Other languages
Chinese (zh)
Inventor
郭晓广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changge Weimei Decoration Shop
Original Assignee
Changge Weimei Decoration Shop
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changge Weimei Decoration Shop filed Critical Changge Weimei Decoration Shop
Priority to CN201610371417.8A priority Critical patent/CN107447971A/en
Publication of CN107447971A publication Critical patent/CN107447971A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Ladders (AREA)

Abstract

The present invention relates to fitting-out work field, more specifically apply to the adjustable scaffold of fitting-out work, including connecting rod, connector and standing platform, the middle part of connecting rod is made up of leading screw and screw rod, during actual installation, flexible modulation can be carried out according to landform and actual conditions, ensure the bonding strength of scaffold.Connecting rod includes connection end, leading screw and screw rod, leading screw fixing hole and connecting rod fixing hole are provided with connection end, leading screw has two, one end of two leading screws is fixedly connected in leading screw fixing hole, the other end is both connected in screw rod between the two, vertical connecting cylinder is provided with connector, vertical mating groove, vertical lever attachment hole, horizontal connection cylinder, horizontal mating groove and horizontal lever attachment hole, the both ends of connecting rod can be with vertical mating groove by connecting rod fixing hole, horizontal mating groove, which coordinates, to be fixedly connected, connector is connected between multiple connecting rods, standing platform is fixedly connected between two connecting rods.

Description

Suitable for the adjustable scaffold of fitting-out work
Technical field
The present invention relates to fitting-out work field, the adjustable foot hand of fitting-out work is more specifically applied to Frame.
Background technology
Scaffold refers to job site as operation and solves vertically and horizontally to transport the various branch set up Frame.The generic term of architecture field, refer on construction site be used in exterior wall, inside fitting or floor height is higher can not The place directly constructed.Mainly for workmen up and down work or perimeter security net go along with sb. to guard him and high-altitude installation Component etc., some engineerings also with scaffold when template use, in addition advertising, municipal administration, traffic road and bridge, The departments such as mine are also used extensively.
Also there are many defects in existing scaffold, frame structure is complicated, using single fixed structure, It can not be adjusted, very unstable situation occur in the bad location of landform, therefore, it is necessary to pin It is further to the structure of existing building scaffold to be improved.
The content of the invention
The present invention solves the technical problem of the adjustable scaffold provided suitable for fitting-out work, connects The middle part of extension bar is made up of leading screw and screw rod, can be according to landform and reality during actual installation Situation carries out flexible modulation, ensures the bonding strength of scaffold.
In order to solve the above technical problems, the present invention relates to fitting-out work field, more specifically apply to The adjustable scaffold of fitting-out work, including connecting rod, connector and standing platform, the centre of connecting rod Position is made up of leading screw and screw rod, during actual installation, can carry out spirit according to landform and actual conditions Regulation living, ensure the bonding strength of scaffold.
Connecting rod includes connection end, leading screw and screw rod, is provided with leading screw fixing hole on connection end and connecting rod is consolidated Determine hole.Leading screw has two, and one end of two leading screws is fixedly connected in leading screw fixing hole, and the other end connects It is connected in screw rod between the two.
Be provided with connector vertical connecting cylinder, vertical mating groove, vertical lever attachment hole, horizontal connection cylinder, Horizontal mating groove and horizontal lever attachment hole.
The both ends of connecting rod can be coordinated by connecting rod fixing hole with vertical mating groove, horizontal mating groove to be fixed Connection.Connector is connected between multiple connecting rods.Standing platform is fixedly connected between two connecting rods.
As the further optimization of the technical program, the present invention is applied to the adjustable scaffold of fitting-out work It is bolted between described connecting rod fixing hole and vertical mating groove, horizontal mating groove.
As the further optimization of the technical program, the present invention is applied to the adjustable scaffold of fitting-out work It is fixedly connected between described leading screw and connection end.
As the further optimization of the technical program, the present invention is applied to the adjustable scaffold of fitting-out work It is connected through a screw thread between described leading screw and screw rod.
The present invention is applied to having the beneficial effect that for the adjustable scaffold of fitting-out work:
The present invention is applied to the adjustable scaffold of fitting-out work, and the middle part of connecting rod is by leading screw and spiral shell Bar forms, and during actual installation, can carry out flexible modulation according to landform and actual conditions, ensure pin The bonding strength of hand cradle.
Brief description of the drawings
The present invention will be further described in detail with specific implementation method below in conjunction with the accompanying drawings.
Fig. 1 is the structural representation of the present invention.
Fig. 2 is the structural representation of the connection status of connecting rod 1 of the present invention.
Fig. 3 is the connection end 1-1 of present invention structural representation.
Fig. 4 is the structural representation of the connector 2 of the present invention.
In figure:Connecting rod 1;Connection end 1-1;Leading screw fixing hole 1-1-1;Connecting rod fixing hole 1-1-2; Leading screw 1-2;Screw rod 1-3;Connector 2;Vertical connecting cylinder 2-1;Vertical mating groove 2-2;Vertical bar Connecting hole 2-3;Horizontal connection cylinder 2-4;Horizontal mating groove 2-5;Horizontal lever attachment hole 2-6;Stand flat Platform 3.
Embodiment
Embodiment one:
Illustrate present embodiment with reference to Fig. 1-4, the present invention relates to fitting-out work field, more specifically Say the adjustable scaffold for applying to fitting-out work, including connecting rod 1, connector 2 and standing platform 3, the middle part of connecting rod is made up of leading screw and screw rod, can be according to landform during actual installation Flexible modulation is carried out with actual conditions, ensures the bonding strength of scaffold.
Connecting rod 1 includes connection end 1-1, leading screw 1-2 and screw rod 1-3, is provided with the 1-1 of connection end Leading screw fixing hole 1-1-1 and connecting rod fixing hole 1-1-2.Leading screw 1-2 has two, two leading screw 1-2's One end is fixedly connected in leading screw fixing hole 1-1-1, and the other end is both connected to screw rod 1-3 between the two It is interior.
Be provided with connector 2 vertical connecting cylinder 2-1, vertical mating groove 2-2, vertical lever attachment hole 2-3, Horizontal connection cylinder 2-4, horizontal mating groove 2-5 and horizontal lever attachment hole 2-6.
It can be matched somebody with somebody by connecting rod fixing hole 1-1-2 with vertical mating groove 2-2, level at the both ends of connecting rod 1 Groove 2-5 cooperations are closed to be fixedly connected.Connector 2 is connected between multiple connecting rods 1.Standing platform 3 is solid Surely it is connected between two connecting rods 1.
Embodiment two:
Illustrate present embodiment with reference to Fig. 1-4, present embodiment is made furtherly to embodiment one It is bright, pass through between described connecting rod fixing hole 1-1-2 and vertical mating groove 2-2, horizontal mating groove 2-5 Bolt connection.
Embodiment three:
Illustrate present embodiment with reference to Fig. 1-4, present embodiment is made furtherly to embodiment one It is bright, it is fixedly connected between described leading screw 1-2 and connection end 1-1.
Embodiment four:
Illustrate present embodiment with reference to Fig. 1-4, present embodiment is made furtherly to embodiment one It is bright, it is connected through a screw thread between described leading screw 1-2 and screw rod 1-3.
Certain described above is not limitation of the present invention, and the present invention is also not limited to the example above, this skill The those of ordinary skill in art field the present invention essential scope in made change, remodeling, addition or Replace, fall within protection scope of the present invention.

Claims (4)

1. suitable for the adjustable scaffold of fitting-out work, including connecting rod (1), connector (2) and standing platform (3), it is characterised in that:Connecting rod (1) includes connection end (1-1), leading screw (1-2) and screw rod (1-3), Leading screw fixing hole (1-1-1) and connecting rod fixing hole (1-1-2) are provided with connection end (1-1);Leading screw (1-2) There are two, one end of two leading screws (1-2) is fixedly connected in leading screw fixing hole (1-1-1), the other end It is both connected in screw rod (1-3) between the two;
Vertical connecting cylinder (2-1), vertical mating groove (2-2), vertical bar connection are provided with connector (2) Hole (2-3), horizontal connection cylinder (2-4), horizontal mating groove (2-5) and horizontal lever attachment hole (2-6);
The both ends of connecting rod (1) by connecting rod fixing hole (1-1-2) can with vertical mating groove (2-2), Horizontal mating groove (2-5), which coordinates, to be fixedly connected;Connector (2) is connected between multiple connecting rods (1); Standing platform (3) is fixedly connected between two connecting rods (1).
2. the adjustable scaffold according to claim 1 suitable for fitting-out work, it is characterised in that:It is described Connecting rod fixing hole (1-1-2) and vertical mating groove (2-2), horizontal mating groove (2-5) between pass through spiral shell Tether and connect.
3. the adjustable scaffold according to claim 1 suitable for fitting-out work, it is characterised in that:It is described Leading screw (1-2) and connection end (1-1) between be fixedly connected.
4. the adjustable scaffold according to claim 1 suitable for fitting-out work, it is characterised in that:It is described Leading screw (1-2) and screw rod (1-3) between be connected through a screw thread.
CN201610371417.8A 2016-05-30 2016-05-30 Suitable for the adjustable scaffold of fitting-out work Pending CN107447971A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610371417.8A CN107447971A (en) 2016-05-30 2016-05-30 Suitable for the adjustable scaffold of fitting-out work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610371417.8A CN107447971A (en) 2016-05-30 2016-05-30 Suitable for the adjustable scaffold of fitting-out work

Publications (1)

Publication Number Publication Date
CN107447971A true CN107447971A (en) 2017-12-08

Family

ID=60484919

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610371417.8A Pending CN107447971A (en) 2016-05-30 2016-05-30 Suitable for the adjustable scaffold of fitting-out work

Country Status (1)

Country Link
CN (1) CN107447971A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1447042A (en) * 1972-11-10 1976-08-25 Stirey Engs Ltd Thos Adjustable height prefabricated tower
CN202248820U (en) * 2011-10-24 2012-05-30 上海浦东程达五金有限公司 Combined overhanging scaffold
CN104481129A (en) * 2014-12-11 2015-04-01 韩翼 Decoration scaffold convenient to accommodate
CN204940831U (en) * 2015-09-16 2016-01-06 朱新伟 A kind of leading screw cross lock fastener and use the scaffold jacking assembly of this fastener
CN105421734A (en) * 2015-11-27 2016-03-23 苏州鑫远同装饰工程有限公司 Scaffold

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1447042A (en) * 1972-11-10 1976-08-25 Stirey Engs Ltd Thos Adjustable height prefabricated tower
CN202248820U (en) * 2011-10-24 2012-05-30 上海浦东程达五金有限公司 Combined overhanging scaffold
CN104481129A (en) * 2014-12-11 2015-04-01 韩翼 Decoration scaffold convenient to accommodate
CN204940831U (en) * 2015-09-16 2016-01-06 朱新伟 A kind of leading screw cross lock fastener and use the scaffold jacking assembly of this fastener
CN105421734A (en) * 2015-11-27 2016-03-23 苏州鑫远同装饰工程有限公司 Scaffold

Similar Documents

Publication Publication Date Title
CN105443871B (en) A kind of new suspension and support and construction technology for the connection of horizontal multi-pipeline counterpart
CN103206074B (en) Elevator shaft template construction method, platform and support
CN105952133A (en) Suspended large-span reinforced concrete structure construction steel platform and construction method
CN105781100A (en) Template component for sidewall of subway station
CN104420640B (en) Abnormity chimney construction platform
CN102296828A (en) Construction method of boom before building ceiling or pipelining
CN104372923B (en) Scaffolding
CN207191310U (en) One kind is used for ship plank construction portable unit
CN206762086U (en) A kind of fire detecting and fire-fighting unmanned plane
CN206418751U (en) One kind can freely lift flexible assembled hoistway operation platform
CN103628692B (en) A kind of floor beam mounting bracket and use it to install the method for floor beam
CN206318599U (en) A kind of power supply for construction stair shaft mouthful protective door device
CN108505539A (en) A kind of beam outrigger platform and its erection method
CN106351441B (en) Chimney climbing formwork for construction device and construction method
CN211689948U (en) Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge
CN205558247U (en) Scaffold puts up connecting device for civil engineering
CN107447971A (en) Suitable for the adjustable scaffold of fitting-out work
CN204662501U (en) A kind of pass in and out immersed tube vertical occasional passage
CN105113415B (en) Hydraulic pressure sliding sash climbing frame
CN105910508B (en) It is a kind of to tilt the service of connection devices for installing warhead
CN207110442U (en) The connector that a kind of scaffold uses
CN107447970A (en) Suitable for the scaffold of construction and decoration construction
CN204174915U (en) Scaffold
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN107642049A (en) A kind of device and its installation method changed for main rope of suspension bridge cord clip

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171208

WD01 Invention patent application deemed withdrawn after publication