CN107447877A - A kind of construction wall heat insulating construction method - Google Patents
A kind of construction wall heat insulating construction method Download PDFInfo
- Publication number
- CN107447877A CN107447877A CN201710666596.2A CN201710666596A CN107447877A CN 107447877 A CN107447877 A CN 107447877A CN 201710666596 A CN201710666596 A CN 201710666596A CN 107447877 A CN107447877 A CN 107447877A
- Authority
- CN
- China
- Prior art keywords
- heat
- transparent panel
- wall
- insulation
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 33
- 238000009413 insulation Methods 0.000 claims abstract description 72
- 239000000463 material Substances 0.000 claims abstract description 25
- 238000005187 foaming Methods 0.000 claims abstract description 7
- 238000009434 installation Methods 0.000 claims abstract description 3
- 229910000831 Steel Inorganic materials 0.000 claims description 20
- 239000010959 steel Substances 0.000 claims description 20
- 239000004570 mortar (masonry) Substances 0.000 claims description 8
- 239000011521 glass Substances 0.000 claims description 6
- 239000011324 bead Substances 0.000 claims description 3
- 229920006248 expandable polystyrene Polymers 0.000 claims description 3
- 239000004794 expanded polystyrene Substances 0.000 claims description 3
- 229920003023 plastic Polymers 0.000 claims description 3
- 239000002985 plastic film Substances 0.000 claims description 3
- -1 poly- phenolic aldehyde Chemical class 0.000 claims description 3
- 238000007493 shaping process Methods 0.000 claims description 3
- 238000003780 insertion Methods 0.000 claims description 2
- 230000037431 insertion Effects 0.000 claims description 2
- 239000007787 solid Substances 0.000 claims description 2
- 229920002635 polyurethane Polymers 0.000 claims 1
- 239000004814 polyurethane Substances 0.000 claims 1
- 238000012423 maintenance Methods 0.000 abstract description 3
- 238000000034 method Methods 0.000 abstract description 2
- 238000004140 cleaning Methods 0.000 abstract 1
- 238000010792 warming Methods 0.000 description 7
- 238000005516 engineering process Methods 0.000 description 3
- 238000004321 preservation Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 239000000853 adhesive Substances 0.000 description 2
- 230000001070 adhesive effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 239000004927 clay Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 239000012535 impurity Substances 0.000 description 1
- 230000009545 invasion Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
- E04B1/76—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
- E04B1/76—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
- E04B1/7604—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only fillings for cavity walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
- E04B1/76—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
- E04B1/762—Exterior insulation of exterior walls
- E04B1/7629—Details of the mechanical connection of the insulation to the wall
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
- Y02B30/90—Passive houses; Double facade technology
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Acoustics & Sound (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Building Environments (AREA)
Abstract
A kind of construction wall heat insulating construction method, including foundation wall cleaning, heat-insulation unit division, material selection, be incubated the installation of swollen bolt, transparent panel is fixed, be incubated base material squeezes into, be incubated formable layer and auxiliary material is dismantled.The present invention and traditional architecture wall body heat insulating construction method are comparatively speaking, its take by foundation wall be divided into multiple heat-insulation units and on foundation wall direct foaming method, heat-insulation layer and foundation wall bonding plane are bigger, bonding is more firm, it is more durable in actual use, reduce maintenance cost, and safety coefficient is higher when operating, directly squeezed into during construction with air compressor machine by base material is incubated by the through hole on transparent panel, it is convenient and swift, difficulty of construction is reduced, operation is safer.
Description
Technical field
The present invention relates to technical field of heat preservation of building wall bodies, specially a kind of construction wall heat insulating construction method.
Background technology
As everybody comfort level to living environment requires more and more higher, the insulation of building also increasingly obtains weight
Depending on existing building engineering wall is processed with floor using raw material such as the larger clay of thermal conductivity factor, stone, reinforcing bars
Form, be unfavorable for insulation, thus the side of direct sticking heat-preservation plate outside the larger wall of thermal conductivity factor is taken in some areas
Formula is incubated, but this mode easily causes be bonded insecure between warming plate and wall, and adhesive surface is not full, what is exposed to the sun and rain
Under invasion and attack, water and air etc. easily causes warming plate to ftracture after entering the bonding plane of warming plate and wall under the effect of expanding with heat and contract with cold
Or directly come off with wall, potential safety hazard is caused, adds later maintenance cost, while, it is necessary to be incubated in work progress
A large amount of adhesive mortars are brushed between plate and wall, operation extremely inconvenience increases material cost and applied while bringing potential safety hazard
Work cost.
The content of the invention
Technical problem solved by the invention is to provide a kind of construction wall heat insulating construction method, to solve above-mentioned background
The shortcomings that in technology.
Technical problem solved by the invention is realized using following technical scheme:
A kind of construction wall heat insulating construction method, it comprises the following steps:
1)Foundation wall removing surface is clean and be divided into the heat-insulation unit of multiple shapings to be onstructed, according to the number of heat-insulation unit
The thickness of amount and heat-insulation unit selection dimension and the expansion bolt of quantity, outer silk screw rod, clamp nut, insulation is swollen bolt,
Transparent panel, angle steel with through hole and insulation base material;
2)It is implanted into the swollen bolts of multiple insulations respectively in foundation wall, is incubated swollen bolt and exposes the length of foundation wall and be less than heat-insulation unit
Thickness;
3)Expansion bolt is squeezed into foundation wall, outer silk screw rod is connected with expansion bolt, operated since foundation wall bottom,
Transparent panel corresponding to each heat-insulation unit is arranged on expansion bolt, it is tentatively solid by angle steel progress at the top and bottom of transparent panel
Further fastened with clamp nut after fixed, transparent panel and foundation wall keeping parallelism simultaneously form and fill space;
4)The pipeline of air compressor machine is connected into the through hole on transparent panel with holes, insulation base material is squeezed between transparent panel and foundation wall
Gap is filled, the insulation base material for making to fill between transparent panel and foundation wall in each heat-insulation unit in space is evenly distributed;
5)It is fixed-type after heat-insulation layer, to dismantle transparent panel, angle steel after insulation base material, insulation layer surface is kept clean, smooth.
Further, each heat-insulation unit is corresponding at least installs four expansion bolts, and each expansion bolt includes section of foundation
And linkage section, linkage section and section of foundation are integrally formed, linkage section diameter is more than section of foundation diameter, and internal thread spiral shell is set on linkage section
Hole, linkage section are connected with outer silk screw flight, and clamp nut, step 3 are set on outer silk screw rod)Make base during middle expansion bolt installation
Inside plinth section insertion foundation wall, linkage section exposes outside foundation wall and makes to expose the length outside foundation wall less than heat-insulation layer
Thickness, after outer silk screw rod is threadedly coupled with linkage section, transparent panel and angle steel are carried out through outer silk screw rod and by clamp nut
It is fixed.
Further, the step 5)First clamp nut and outer silk screw rod are disassembled during middle dismounting, then dismantled transparent
Plate and angle steel.
Further, the transparent panel selection sets multiple through holes, multiple equally distributed transparent plastic sheets of through hole thereon
Or transparent inorganic glass plate, step 4)During operation, make air compressor machine pipeline be sequentially connected it is equally distributed more on transparent panel with holes
Individual different through hole so that insulation base material squeeze between transparent panel and foundation wall with being more uniformly distributed between filling space in.
Further, the insulation base material is polyurathamc, the poly- phenolic aldehyde of foaming, expanded polystyrene (EPS), glass bead hair
Steep one kind in mortar, foamed polystyrene mortar.
Beneficial effect:The present invention has following advantage compared with conventional vacuum wall construction method:
1)Construction wall is Nian Jie with heat-insulation layer more firm, and traditional wall thermal insulating is Nian Jie with wall by warming plate when constructing, and holds
Easily bonding loosely causes to come off, and the present invention passes through the method for the direct foaming on foundation wall, heat-insulation layer and foot wall
Body bonding plane is bigger, and bonding is more firm, while the swollen bolt of insulation that one end is fixed on inside wall is provided with heat-insulation layer, makes guarantor
Contacted between warm layer and wall more close;
2)Heat-preserving wall is more durable, easily due to expanding with heat and contract with cold, into sky between the warming plate and wall of traditional heat-preserving wall
The impurity such as gas and water and cause to come off or problems of crack, present invention, avoiding the generation of these phenomenons, in actual use
It is more durable, reduce maintenance cost;
3)Safety coefficient is higher during operation, is also needed to greatly in addition to warming plate when the warming plate of traditional heat-preserving wall is Nian Jie with wall
Measure bonding mortar, worker apply man-hour requirement by bulky hod hang toward aerial high-altitude construct, safety coefficient is low, difficulty of construction
Greatly, it is of the invention directly to be squeezed into insulation base material by the through hole on transparent panel with air compressor machine, it is convenient and swift, reduce and apply
Work difficulty, operation are safer.
Brief description of the drawings
Fig. 1 is the construction and erection drawing of present pre-ferred embodiments.
Wherein:1st, foundation wall;2nd, heat-insulation layer;3rd, transparent panel;4th, through hole;5th, it is incubated swollen bolt;6th, angle steel;7th, floor;8、
Clamp nut;9th, expansion bolt;10th, section of foundation;11st, linkage section;12nd, outer silk screw rod.
Embodiment
In order that the technical means, the inventive features, the objects and the advantages of the present invention are easy to understand, tie below
Conjunction is specifically illustrating, and the present invention is expanded on further.
A kind of construction wall heat insulating construction method, construction and erection drawing shown in Figure 1, it comprises the following steps:
1)The removing surface of foundation wall 1 is clean and be divided into the heat-insulation unit of multiple shapings to be onstructed, according to heat-insulation unit
The thickness of quantity and heat-insulation unit selection dimension and the expansion bolt 9 of quantity, outer silk screw rod 12, clamp nut 8, insulation
Swollen bolt 5, the transparent panel 3 with through hole, angle steel 6 and insulation base material;
2)It is implanted into multiple swollen bolts 5 of insulation respectively in foundation wall 1, is incubated swollen bolt 5 and exposes the length of foundation wall 1 less than insulation
Element thickness;
3)Expansion bolt 9 is squeezed into foundation wall 1, outer silk screw rod 12 is connected with expansion bolt 9, is opened from the bottom of foundation wall 1
Begin to operate, transparent panel 3 corresponding to each heat-insulation unit is arranged on expansion bolt 9, the top and bottom of transparent panel 3 pass through angle steel
6 carry out it is tentatively fixed after further fastened with clamp nut 8, transparent panel 3 and the keeping parallelism of foundation wall 1 simultaneously form filling
Space;
4)The pipeline of air compressor machine is connected into the through hole 4 on transparent panel 3 with holes, insulation base material is squeezed into transparent panel 3 and foundation wall 1
Between filling gap, the insulation base material for making in each heat-insulation unit to fill between transparent panel 3 and foundation wall 1 in space is evenly distributed;
5)After insulation base material it is fixed-type be heat-insulation layer 2 after, dismounting transparent panel 3, angle steel 6, make the surface of heat-insulation layer 2 keep it is clean,
It is smooth.
In the present embodiment, each heat-insulation unit is corresponding at least to install four expansion bolts 9, and each expansion bolt 9 includes base
Plinth section 10 and linkage section 11, linkage section 11 and section of foundation 10 are integrally formed, and the diameter of linkage section 11 is more than the diameter of section of foundation 10, connection
Internal thread screw is set in section 11, and linkage section 11 is threadedly coupled with outer silk screw rod 12, and clamp nut 9, step are set on outer silk screw rod 12
Rapid 3)Middle expansion bolt 9 makes section of foundation 10 be embedded in inside foundation wall when installing, linkage section 11 exposes outside foundation wall 1 and makes dew
The length gone out outside foundation wall 1 is less than the thickness of heat-insulation layer 2, after outer silk screw rod 12 is threadedly coupled with linkage section 11, transparent panel 3
It is fixed with angle steel 6 through outer silk screw rod 12 and by clamp nut 8;Step 5)First by clamp nut 8 and outer during middle dismounting
Silk screw rod 12 disassembles, then dismantles transparent panel 3 and angle steel 6, so as to not influence the overall appearance of heat-insulation layer 2.
During practice of construction, in order to facilitate the linking between heat-insulation unit, the angle steel 6 of heat-insulation unit bottom can be with foot wall
Body 1 is fixed in opposite directions, is blocked beneficial to by the insulation glided under gravity base material, and the angle steel 6 at top then can be with foundation wall 1
It is reversely fixed, as shown in figure 1, so as to which upper and lower two heat-insulation unit joining places only need the swollen bolt 9 of one group of insulation, actual behaviour
During work, the angle steel 6 at top can also be replaced with band iron or square steel.
In the present embodiment, transparent panel 3 selects to set multiple through holes 4 thereon, multiple 4 equally distributed transparent plastic sheets of through hole
Or transparent inorganic glass plate, step 4)During operation, make air compressor machine pipeline be sequentially connected it is equally distributed more on transparent panel 3 with holes
Individual different through hole 4 is more rapidly and evenly squeezed into the filling space between transparent panel 3 and foundation wall so that being incubated base material,
When duration is tighter also can multiple air compressor machines connect different through holes 4 simultaneously, so as to improve operating efficiency, save the engineering time.
In the present embodiment, insulation base material is polyurathamc, the poly- phenolic aldehyde of foaming, expanded polystyrene (EPS), glass bead foaming
One kind in mortar, foamed polystyrene mortar, and heat-insulation layer 2 makes to tie between heat-insulation layer 2 and foundation wall 1 by being incubated swollen bolt 5
Close more firm.The technical scheme is similarly applied to floor 7 and is incubated so as to obtain heat preservation floor slab.
General principle, principal character and the advantages of the present invention of the present invention has been shown and described above.The technology of the industry
Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the simply explanation described in above-described embodiment and specification is originally
The principle of invention, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these changes
Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its
Equivalent thereof.
Claims (5)
1. a kind of construction wall heat insulating construction method, it is characterised in that comprise the following steps:
1)Foundation wall removing surface is clean and be divided into the heat-insulation unit of multiple shapings to be onstructed, according to the number of heat-insulation unit
The thickness of amount and heat-insulation unit selection dimension and the expansion bolt of quantity, outer silk screw rod, clamp nut, insulation is swollen bolt,
Transparent panel, angle steel with through hole and insulation base material;
2)It is implanted into the swollen bolts of multiple insulations respectively in foundation wall, is incubated swollen bolt and exposes the length of foundation wall and be less than heat-insulation unit
Thickness;
3)Expansion bolt is squeezed into foundation wall, outer silk screw rod is connected with expansion bolt, operated since foundation wall bottom,
Transparent panel corresponding to each heat-insulation unit is arranged on expansion bolt, it is tentatively solid by angle steel progress at the top and bottom of transparent panel
Further fastened with clamp nut after fixed, transparent panel and foundation wall keeping parallelism simultaneously form and fill space;
4)The pipeline of air compressor machine is connected into the through hole on transparent panel with holes, insulation base material is squeezed between transparent panel and foundation wall
Gap is filled, the insulation base material for making to fill between transparent panel and foundation wall in each heat-insulation unit in space is evenly distributed;
5)It is fixed-type after heat-insulation layer, to dismantle transparent panel, angle steel after insulation base material, insulation layer surface is kept clean, smooth.
2. a kind of construction wall heat insulating construction method according to claim 1, it is characterised in that each heat-insulation unit is corresponding
Four expansion bolts are at least installed, each expansion bolt includes section of foundation and linkage section, and linkage section and section of foundation are integrally formed, even
Connect section diameter and be more than section of foundation diameter, internal thread screw is set on linkage section, linkage section is connected with outer silk screw flight, outer silk screw rod
Upper setting clamp nut, step 3)Make during middle expansion bolt installation inside section of foundation insertion foundation wall, linkage section exposes basis
Wall is outer and makes to expose the thickness that the length outside foundation wall is less than heat-insulation layer, after outer silk screw rod is threadedly coupled with linkage section,
Transparent panel and angle steel are fixed through outer silk screw rod and by clamp nut.
A kind of 3. construction wall heat insulating construction method according to claim 2, it is characterised in that the step 5)Middle dismounting
When first clamp nut and outer silk screw rod are disassembled, then dismantle transparent panel and angle steel.
4. a kind of construction wall heat insulating construction method according to claim 1, it is characterised in that the transparent panel selects it
It is upper that multiple through holes are set, the equally distributed transparent plastic sheet of multiple through holes or transparent inorganic glass plate, step 4)During operation, make sky
The pipeline of press is sequentially connected equally distributed multiple different through holes on transparent panel with holes so that insulation base material is more uniformly distributed
Ground squeeze between transparent panel and foundation wall between filling space in.
5. a kind of construction wall heat insulating construction method according to claim 1, it is characterised in that the insulation base material is hair
Steep one kind in polyurethane, the poly- phenolic aldehyde of foaming, expanded polystyrene (EPS), glass bead foaming mortar, foamed polystyrene mortar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710666596.2A CN107447877B (en) | 2017-08-07 | 2017-08-07 | Building wall heat-insulation construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710666596.2A CN107447877B (en) | 2017-08-07 | 2017-08-07 | Building wall heat-insulation construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107447877A true CN107447877A (en) | 2017-12-08 |
CN107447877B CN107447877B (en) | 2023-04-11 |
Family
ID=60489587
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710666596.2A Active CN107447877B (en) | 2017-08-07 | 2017-08-07 | Building wall heat-insulation construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107447877B (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205206060U (en) * | 2015-11-30 | 2016-05-04 | 张功利 | Scene is filled to keep warm and is decorated integration external thermal insulation system |
CN106592811A (en) * | 2016-12-09 | 2017-04-26 | 安徽省根源光大节能建材有限公司 | Construction method for heat preservation wall |
-
2017
- 2017-08-07 CN CN201710666596.2A patent/CN107447877B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205206060U (en) * | 2015-11-30 | 2016-05-04 | 张功利 | Scene is filled to keep warm and is decorated integration external thermal insulation system |
CN106592811A (en) * | 2016-12-09 | 2017-04-26 | 安徽省根源光大节能建材有限公司 | Construction method for heat preservation wall |
Also Published As
Publication number | Publication date |
---|---|
CN107447877B (en) | 2023-04-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201826468U (en) | Thermal decorating plate | |
CN107268818A (en) | PC lightweight composite sandwich heat-insulating integral wallboards | |
CN206368439U (en) | Integrated prefabricated heat-insulation wall plate construction and wallboard connecting component | |
CN107700697A (en) | A kind of exterior wall prefabricated construction | |
CN104863305B (en) | The preparation method of green assembled architecture wallboard | |
CN107165303B (en) | External heat preservation type cross-shaped composite wall with lead pipe-coarse sand energy dissipation and shock absorption keys and manufacturing method | |
CN101100895A (en) | Composite thermal insulation energy-saving board | |
CN107447877A (en) | A kind of construction wall heat insulating construction method | |
CN114960995B (en) | Aluminum plate heat-insulation integrated plate structure at deformation joint and construction method | |
CN208039610U (en) | Assembled integrated heat-insulation wall plate | |
CN206346312U (en) | A kind of steel-structure box room | |
CN207211424U (en) | A kind of heat-preserving wall | |
JPS5947784B2 (en) | Structure of external walls in concrete buildings | |
CN108396905A (en) | A kind of insulated compound trabs and its manufacturing method of prefabricated band ceramic tile layer | |
CN210917815U (en) | Low-energy-consumption assembled heat-insulation wallboard | |
CN206971400U (en) | Light-duty bridge cut-off assembles board connecting structure | |
CN207048093U (en) | PC lightweight composite sandwich heat-insulating integral wallboards | |
CN204282553U (en) | A kind of assembly of thorough blocking-up building structural steel cold bridge | |
CN203320751U (en) | Formwork thermal insulation integrated wall body | |
CN201649331U (en) | Hollow interlayer insulated wall plate | |
CN206769072U (en) | Novel energy-saving environment-friendly heat-insulation system building materials | |
CN206769190U (en) | External heat insulation board device of civil construction project | |
CN201962815U (en) | Tight splicing structure for heat-insulating compound plates of building wall body | |
KR20160027360A (en) | Construction method for outside insulating concrete structure | |
CN204510609U (en) | Light body floor modules |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
OL01 | Intention to license declared | ||
OL01 | Intention to license declared |