CN204282553U - A kind of assembly of thorough blocking-up building structural steel cold bridge - Google Patents
A kind of assembly of thorough blocking-up building structural steel cold bridge Download PDFInfo
- Publication number
- CN204282553U CN204282553U CN201420636874.1U CN201420636874U CN204282553U CN 204282553 U CN204282553 U CN 204282553U CN 201420636874 U CN201420636874 U CN 201420636874U CN 204282553 U CN204282553 U CN 204282553U
- Authority
- CN
- China
- Prior art keywords
- heat
- cold
- insulation
- cushion block
- adhesive tape
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000746 Structural steel Inorganic materials 0.000 title claims abstract description 15
- 238000009413 insulation Methods 0.000 claims abstract description 43
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 38
- 239000010959 steel Substances 0.000 claims abstract description 38
- 239000002390 adhesive tape Substances 0.000 claims abstract description 21
- 238000010079 rubber tapping Methods 0.000 claims abstract description 21
- 238000004321 preservation Methods 0.000 claims abstract description 19
- 239000011435 rock Substances 0.000 claims abstract description 17
- 230000004888 barrier function Effects 0.000 claims abstract description 16
- 239000012528 membrane Substances 0.000 claims abstract description 14
- 239000000463 material Substances 0.000 claims description 4
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 claims description 3
- 239000000741 silica gel Substances 0.000 claims description 3
- 229910002027 silica gel Inorganic materials 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 5
- 239000011490 mineral wool Substances 0.000 abstract 1
- 230000000694 effects Effects 0.000 description 5
- 230000007797 corrosion Effects 0.000 description 2
- 238000005260 corrosion Methods 0.000 description 2
- 229920000742 Cotton Polymers 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009432 framing Methods 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/24—Structural elements or technologies for improving thermal insulation
- Y02A30/244—Structural elements or technologies for improving thermal insulation using natural or recycled building materials, e.g. straw, wool, clay or used tires
Landscapes
- Building Environments (AREA)
Abstract
A kind of assembly of thorough blocking-up building structural steel cold bridge, relate to a kind of construction steel structure combination unit, this device includes bottom profiled sheet (1), steel work purlin (2), heat-insulating cushion block (3), cold-prevention bridge tapping screw (4), vapor barrier layer (5), heat preservation rock (6), waterproof ventilated membrane (7), fixed support (8), insulation outside plate (9), double faced adhesive tape (10); This device adopts bottom profiled sheet (1) and high-strength heat-insulation cushion block (3) to be fixed on steel work purlin (2) by high-performance double faced adhesive tape (10), and one vapor barrier layer (5) is set the inner side of insulation layer and one layer of heat preservation rock wool (6), heat preservation rock (6) is covered one deck waterproof ventilated membrane (7), by cold-prevention bridge tapping screw (4), fixed support (8), insulation outside plate (9) are fixed on high-strength heat-insulation cushion block (3), form an overall heat insulating device.The utility model can be applicable in the various steel buildings of insulation and cold insulation requirement.
Description
Technical field
The utility model relates to a kind of construction steel structure assembly device, particularly relates to a kind of assembly of thorough blocking-up building structural steel cold bridge.
Background technology
Steel work, because of its easy construction, short construction period, the plurality of advantages such as anti-seismic performance is good, overall economic efficiency is good, had been widely applied in all types of industries and civilian construction in recent years.In cold district, insulation, energy-conservationly more and more to come into one's own, the attemperator of steel work theoretically, the heat-insulating property of design can be reached, but the defect of the connecting structure node of enclosed structure local, the existence of the factor such as to expand with heat and contract with cold of material itself, cause the destruction of partial insulation isolation layer, lose heat-insulating property, form " cold bridge " phenomenon, cause the thermal loss of whole building, and the phenomenons such as corrosion failure can be there is because of the existence of condensed water in the position of cold bridge, make building not only there is potential safety hazard, but also affect result of use.
Existing solution steel work cold bridge method: the layering as heat-preservation cotton is laid, self threading pin place increases insulated rubber strip, node steel plate place fill plug seal glue etc., but still the difficult phenomenon thoroughly solving cold bridge.
The utility model thoroughly blocks the combining structure of steel work cold bridge, and there is not been reported.
Summary of the invention
Be the assembly that a kind of thorough blocking-up building structural steel cold bridge is provided order of the present utility model, this device makes full use of intensity and the heat-proof quality of cold-prevention bridge tapping screw and heat-insulating cushion block, the attemperator of steel work is linked together, form a kind of good integrity, the heat insulating device of good heat-insulation effect, the conduction of heat is thoroughly cut off in this device, thus solves the cold bridge problem of steel work.
Be achieved through the following technical solutions order of the present utility model:
An assembly for thorough blocking-up building structural steel cold bridge, this device includes bottom profiled sheet, steel work purlin, heat-insulating cushion block, cold-prevention bridge tapping screw, vapor barrier layer, heat preservation rock, waterproof ventilated membrane, fixed support, insulation outside plate, double faced adhesive tape; Described device adopts bottom profiled sheet and high-strength heat-insulation cushion block to be fixed on steel work purlin by high-performance double faced adhesive tape, and vapor barrier layer is set, the inner side of insulation layer is covered with heat preservation rock, heat preservation rock covers waterproof ventilated membrane, by cold-prevention bridge tapping screw, fixed support, insulation outside plate are fixed on high-strength heat-insulation cushion block, form integral heat insulation heat-proof device.
The assembly of described a kind of thorough blocking-up building structural steel cold bridge, on described bottom profiled sheet, the steel work purlin of shaped steel shape is fixed as one through screw, the top of steel work purlin sticks double faced adhesive tape for building, double faced adhesive tape is pasted the heat-insulating cushion block of silica gel heat-barrier material, the top of heat-insulating cushion block has sticked double faced adhesive tape again, and the pressing plate be connected with cold-prevention bridge tapping screw is pasted on the top of double faced adhesive tape.
The assembly of described a kind of thorough blocking-up building structural steel cold bridge, described in the pressing plate that is connected is shaped with the screw of cold-prevention bridge tapping screw, and to be attached thereto.
The assembly of described a kind of thorough blocking-up building structural steel cold bridge, heat preservation rock is wrapped between described vapor barrier layer and waterproof ventilated membrane, the heat preservation rock of wrapping up between vapor barrier layer and waterproof ventilated membrane is clamped between heat-insulating cushion block and fixed support up and down by cold-prevention bridge tapping screw, in distortion shape.
The assembly of described a kind of thorough blocking-up building structural steel cold bridge, the support bracket fastened one end of described steel plate system is fixed on insulation outside plate, and other end connection is fastened on heat-insulating cushion block.
Advantage of the present utility model and effect are:
1. the utility model is steel work cold-prevention bridge device, make full use of intensity and the heat-proof quality of cold-prevention bridge tapping screw and heat-insulating cushion block, both actings in conjunction, the attemperator of steel work is linked together, form a kind of good integrity, the heat insulating device of good heat-insulation effect, thoroughly solves the weak link of heat conduction, prevents the appearance of cold bridge phenomenon.
2. the utility model is steel work cold-prevention bridge device, effectively reduces the loss of heat, reaches energy-conservation effect.Save the rehabilitation expense of the corrosion that cold bridge produces, decrease economic loss.
Accompanying drawing explanation
The utility model Fig. 1 is steel work cold-prevention bridge device constructional drawing.
Detailed description of the invention
Below in conjunction with embodiment, the utility model is described in detail.
The utility model high-strength heat-insulation cushion block coefficient of heat conduction is similar to insulation layer, cushion block and steel work main framing adopt high-performance sticking double faced adhesive tape, ensure bonding strength, one vapor barrier layer is set in the inner side of insulation layer, by cold-prevention bridge tapping screw and fixed support, insulation outside plate and insulation layer are fixed on high-strength heat-insulation cushion block, form an overall heat insulating device, reach the effect preventing cold bridge from occurring.Fixed support, cold-prevention bridge tapping screw, high-strength heat-insulation cushion block, insulation layer, vapor barrier layer Connecting groups are combined and form cold-prevention bridge device by the utility model.
Embodiment:
Parts in figure: bottom profiled sheet 1, steel work purlin 2, double faced adhesive tape 3, cold-prevention bridge tapping screw 4, vapor barrier layer 5, heat preservation rock 6, waterproof ventilated membrane 7, fixed support 8, insulation outside plate 9, heat-insulating cushion block 10.
As shown in Figure 1, anatomical connectivity of the present utility model is combined as: on bottom profiled sheet 1, the steel work purlin 2 of shaped steel shape is fixed as one through screw, the top of steel work purlin 2 sticks double faced adhesive tape 3 for building, double faced adhesive tape 3 is pasted the heat-insulating cushion block 10 of silica gel heat-barrier material, the top of heat-insulating cushion block 10 has sticked double faced adhesive tape 3 again, and the pressing plate (nut of similar tapping screw) be connected with cold-prevention bridge tapping screw 4 is pasted on the top of double faced adhesive tape 3; Be wrapped in heat preservation rock 6 between the vapor barrier layer 5 of 1 millimeters thick thermal insulation film and waterproof ventilated membrane 7, the heat preservation rock 6 of wrapping up between vapor barrier layer 5 and waterproof ventilated membrane 7 is clamped between heat-insulating cushion block 10 and fixed support 8 by cold-prevention bridge tapping screw about 4, in distortion shape; One end of steel plate fixed support 8 is fixed on insulation outside plate 9, and other end connection is fastened on heat-insulating cushion block 10.Its steel plate fixed support 8 one end can level or vertical be fixed on insulation outside plate 9, and the other end can be fastened on heat-insulating cushion block 10 in level or vertical connection.That is, the utility model can horizontal connection combination, also can connect combination by vertical configuration, thoroughly block the structural relation of cold bridge between this bottom profiled sheet 1 and steel work purlin 2, and it connects direction, the position of combining and determines according to building structure position.
The utility model adopts the thick bottom profiled sheet 1 of 5mm and 50mm high-strength heat-insulation cushion block 10 to be fixed on C200x70x20x2.5 steel work purlin 2 by high-performance double faced adhesive tape 3, and one vapor barrier layer 5 is set in the inner side of insulation layer, and the thick heat preservation rock 6 of 50mm, heat preservation rock 6 is covered one deck waterproof ventilated membrane 7, by 5.5mm cold-prevention bridge tapping screw 4, fixed support 8, insulation outside plate 9 are fixed on high-strength heat-insulation cushion block 10, define an overall heat insulating device, reach and thoroughly prevent cold bridge from occurring.
The utility model can be applicable in the various steel buildings of insulation and cold insulation requirement.
Claims (5)
1. one kind thoroughly blocks the assembly of building structural steel cold bridge, it is characterized in that, this device includes bottom profiled sheet (1), steel work purlin (2), heat-insulating cushion block (3), cold-prevention bridge tapping screw (4), vapor barrier layer (5), heat preservation rock (6), waterproof ventilated membrane (7), fixed support (8), insulation outside plate (9), double faced adhesive tape (10); Described device adopts bottom profiled sheet (1) and high-strength heat-insulation cushion block (3) to be fixed on steel work purlin (2) by high-performance double faced adhesive tape (10), and vapor barrier layer (5) is set, the inner side of insulation layer is covered with heat preservation rock (6), heat preservation rock (6) is covered waterproof ventilated membrane (7), by cold-prevention bridge tapping screw (4), fixed support (8), insulation outside plate (9) are fixed on high-strength heat-insulation cushion block (3), form integral heat insulation heat-proof device.
2. the assembly of a kind of thorough blocking-up building structural steel cold bridge according to claim 1, it is characterized in that, the steel work purlin (2) of the upper shaped steel shape of described bottom profiled sheet (1) is fixed as one through screw, the top of steel work purlin (2) sticks double faced adhesive tape for building (3), the upper heat-insulating cushion block (10) pasting silica gel heat-barrier material of double faced adhesive tape (3), the top of heat-insulating cushion block (10) has sticked double faced adhesive tape (3) again, and the pressing plate be connected with cold-prevention bridge tapping screw (4) is pasted on the top of double faced adhesive tape (3).
3. the assembly of a kind of thorough blocking-up building structural steel cold bridge according to claim 2, is characterized in that, described in the pressing plate that is connected is shaped with the screw of cold-prevention bridge tapping screw (4), and to be attached thereto.
4. the assembly of a kind of thorough blocking-up building structural steel cold bridge according to claim 1, it is characterized in that, heat preservation rock (6) is wrapped between described vapor barrier layer (5) and waterproof ventilated membrane (7), the heat preservation rock (6) of wrapping up between vapor barrier layer (5) and waterproof ventilated membrane (7) is clamped between heat-insulating cushion block (10) and fixed support (8) by cold-prevention bridge tapping screw (4) up and down, in distortion shape.
5. the assembly of a kind of thorough blocking-up building structural steel cold bridge according to claim 4, is characterized in that, one end of described steel plate fixed support (8) is fixed in insulation outside plate (9), and other end connection is fastened on heat-insulating cushion block (10).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420636874.1U CN204282553U (en) | 2014-10-30 | 2014-10-30 | A kind of assembly of thorough blocking-up building structural steel cold bridge |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420636874.1U CN204282553U (en) | 2014-10-30 | 2014-10-30 | A kind of assembly of thorough blocking-up building structural steel cold bridge |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204282553U true CN204282553U (en) | 2015-04-22 |
Family
ID=52865731
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420636874.1U Expired - Fee Related CN204282553U (en) | 2014-10-30 | 2014-10-30 | A kind of assembly of thorough blocking-up building structural steel cold bridge |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204282553U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104372863A (en) * | 2014-10-30 | 2015-02-25 | 辽宁省石油化工规划设计院有限公司 | Combination body for completely blocking building structural steel cold bridge |
| CN105401665A (en) * | 2015-12-04 | 2016-03-16 | 沈阳中辰钢结构工程有限公司 | Anti-cold bridge node for window of steel structure industrial plant |
-
2014
- 2014-10-30 CN CN201420636874.1U patent/CN204282553U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104372863A (en) * | 2014-10-30 | 2015-02-25 | 辽宁省石油化工规划设计院有限公司 | Combination body for completely blocking building structural steel cold bridge |
| CN105401665A (en) * | 2015-12-04 | 2016-03-16 | 沈阳中辰钢结构工程有限公司 | Anti-cold bridge node for window of steel structure industrial plant |
| CN105401665B (en) * | 2015-12-04 | 2018-02-02 | 沈阳中辰钢结构工程有限公司 | A kind of structural steel industrial building window Anti-cold bridge node |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106368722A (en) | Freezing prevention, thermal insulation and fire prevention integrated facility for tunnel in cold region | |
| CN204282553U (en) | A kind of assembly of thorough blocking-up building structural steel cold bridge | |
| CN209053264U (en) | A kind of polyurethane heat-insulation cold storage plate | |
| CN202209015U (en) | Polyurethane edge-sealed metal heat-insulation sandwich roof board | |
| CN207776179U (en) | Assembled super low energy consumption aluminum alloy glass curtain wall | |
| CN204006572U (en) | A kind of composite ceramic insulation board without cold bridge air-conditioning box | |
| CN207260397U (en) | A kind of glass roof steel construction | |
| CN104372863A (en) | Combination body for completely blocking building structural steel cold bridge | |
| CN204899051U (en) | Thermal insulation core sandwich board anti cold bridge node | |
| CN210562579U (en) | Air conditioner board insulation construction | |
| CN206220981U (en) | A kind of tunnel in cold area anti-freezing and heat-insulating and the integrated facility of fire prevention | |
| CN206189621U (en) | Building keeps warm and structure integration compound incubation module | |
| CN205153244U (en) | Metal roof waterproof people pore structure | |
| CN205935431U (en) | Various steel roof waterproof insulation structure | |
| CN216109395U (en) | Polyurethane board roofing tip binding off connected node structure | |
| CN220249338U (en) | A cold thermal insulation pipe shoes for LNG pipeline centre gripping | |
| CN208009766U (en) | A kind of waterproof roof | |
| CN201189042Y (en) | Water and fire proof thermal insulation quilt | |
| CN203924488U (en) | Cold-prevention bridge building heat preservation post | |
| CN204826608U (en) | Permanent compound incubation exterior sheathing of cast in situ concrete | |
| CN223634286U (en) | An installation structure for EPS (expanded polystyrene) moldings on thermally insulated exterior walls | |
| CN102979192A (en) | U-shaped internally installed compound thermal insulation system | |
| CN217630555U (en) | Be used for green energy-conserving building floor movement joint connection structure | |
| CN221837768U (en) | Parapet and gable heat preservation cover plate structure | |
| CN205013965U (en) | A adiabatic overcoat that keeps warm for stove |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150422 Termination date: 20181030 |