CN107447876A - The heat-insulation system and construction method of a kind of construction wall - Google Patents
The heat-insulation system and construction method of a kind of construction wall Download PDFInfo
- Publication number
- CN107447876A CN107447876A CN201710528303.4A CN201710528303A CN107447876A CN 107447876 A CN107447876 A CN 107447876A CN 201710528303 A CN201710528303 A CN 201710528303A CN 107447876 A CN107447876 A CN 107447876A
- Authority
- CN
- China
- Prior art keywords
- wall
- construction
- concrete
- stones
- cement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 61
- 238000009413 insulation Methods 0.000 title claims abstract description 29
- 239000004568 cement Substances 0.000 claims abstract description 44
- 239000004567 concrete Substances 0.000 claims abstract description 41
- 238000005336 cracking Methods 0.000 claims abstract description 38
- 239000000463 material Substances 0.000 claims abstract description 23
- 239000011449 brick Substances 0.000 claims abstract description 20
- 239000000853 adhesive Substances 0.000 claims abstract description 12
- 230000001070 adhesive effect Effects 0.000 claims abstract description 12
- 239000006260 foam Substances 0.000 claims abstract description 11
- 239000004570 mortar (masonry) Substances 0.000 claims description 26
- 239000003973 paint Substances 0.000 claims description 8
- 239000004925 Acrylic resin Substances 0.000 claims description 4
- 239000006004 Quartz sand Substances 0.000 claims description 4
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 claims description 4
- 229910052799 carbon Inorganic materials 0.000 claims description 4
- 239000011083 cement mortar Substances 0.000 claims description 4
- 231100000252 nontoxic Toxicity 0.000 claims description 4
- 230000003000 nontoxic effect Effects 0.000 claims description 4
- 239000002994 raw material Substances 0.000 claims description 4
- 238000007493 shaping process Methods 0.000 claims description 4
- 238000003756 stirring Methods 0.000 claims description 4
- 238000004381 surface treatment Methods 0.000 claims description 4
- 238000005187 foaming Methods 0.000 claims 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 13
- 238000004140 cleaning Methods 0.000 abstract 1
- 238000001035 drying Methods 0.000 abstract 1
- 238000002474 experimental method Methods 0.000 abstract 1
- 238000002360 preparation method Methods 0.000 abstract 1
- 230000009286 beneficial effect Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000011464 hollow brick Substances 0.000 description 1
- 239000011810 insulating material Substances 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 238000005245 sintering Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
- E04B1/76—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
- E04B1/762—Exterior insulation of exterior walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/92—Protection against other undesired influences or dangers
- E04B1/94—Protection against other undesired influences or dangers against fire
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Acoustics & Sound (AREA)
- Building Environments (AREA)
Abstract
A kind of heat-insulation system of construction wall, including concrete wall layer, it is characterized in that, adhesive linkage has been built by laying bricks or stones on the left of the concrete wall layer, foam cement flaggy is built on the left of the adhesive linkage by laying bricks or stones, anti-permeation cracking-resistant screed has been built by laying bricks or stones on the left of the foam cement flaggy, wall face decorating layer has been built by laying bricks or stones on the left of the anti-permeation cracking-resistant screed, the structure of the requirement of wall and design is analyzed according to the requirement of construction preparation, designed obtained data are fabricated to model according to the contrast of reality or test body, for the model that various different materials and material are made, the experiment of thermal insulation and heat conduction etc. is carried out to it.The heat-insulation system and construction method of the construction wall, by the levelling of concrete wall and the cleaning of metope is kept with keeping its surfacing after cement board drying, form of construction work on the whole and execution conditions etc., it can ensure that wall heat insulation effect in the finished on the whole and anti-permeation cracking-resistant effect are better.
Description
Technical field
The present invention relates to construction engineering technical field, the heat-insulation system and construction method of specially a kind of construction wall.
Background technology
Building is the general name of building and structures, be people in order to meet social life needs, utilize grasped thing
Matter technological means, and the artificial environment created with certain scientific law, geomantic omen theory and aesthetic principle, wall is building
Important component, its effect is load-bearing, go along with sb. to guard him and the compartment, wall are divided into load-bearing by wall stressing conditions and material
Wall and non-load bearing wall, it is divided into solid wall, sintering hollow brick wall, rowlock wall and composite wall etc. by wall structure mode, insulated wall cares for
Name Si Yi necessarily plays insulation and maintains the stable effect of indoor temperature, refers to using certain fixed form bonding, machinery
Anchoring, stickup, mechanical anchor, spraying and cast etc., thermal conductivity factor is relatively low(I.e. heat insulating effect is preferable)Heat-insulating material
It is fixed as one with building masonry wall, increases the evenly heat resistance of wall, is done so as to reach a kind of engineering of insulation or effect of heat insulation
Method.
Existing construction wall heat-insulation system occurs that long construction period and construction process are numerous and diverse in the market, and wall
Heat insulation effect and ineffective anti-permeation cracking-resistant the problem of, so propose a kind of construction wall heat-insulation system and construction method come
Solve the problems, such as above-mentioned propose.
The content of the invention
(One)The technical problem of solution
In view of the shortcomings of the prior art, the invention provides a kind of heat-insulation system of construction wall and construction method, possesses wall
The advantages that high insulating effect and anti-permeation cracking-resistant, solve existing construction wall heat-insulation system and long construction period and construction occurs
Flow is numerous and diverse, and the problem of the heat insulation effect and ineffective anti-permeation cracking-resistant of wall.
(Two)Technical scheme
To realize above-mentioned purpose easy for construction, the present invention provides following technical scheme:A kind of heat-insulation system of construction wall, including
Concrete wall layer, it is characterised in that built adhesive linkage on the left of the concrete wall layer by laying bricks or stones, the left side of the adhesive linkage is built
Foam cement flaggy has been built, has built anti-permeation cracking-resistant screed, the anti-permeation cracking-resistant mortar on the left of the foam cement flaggy by laying bricks or stones
Wall face decorating layer is built by laying bricks or stones in the left side of layer.
Another technical problem to be solved by the present invention is that a kind of construction method of the heat-insulation system of construction wall, its feature exist
In comprising the following steps:
1)The position both sides that are poured during construction required for wall set up that two block sizes are identical and template in the same horizontal line,
Teeming line is internally placed after template erection is completed, the corresponding one side of template is fastened on by bolt draw bar to fix
Together, then work is protected to carry out the support of template by support frame;
2)Cement and sandstone are put into concrete mixer by five to five or five to four proportions, add concrete material
Mutually appropriate three to five times of moisture is sufficiently stirred, and the concrete material finally obtained is poured into template, is then used
Vibrating spear to the concrete in template vibrate levelling, then treats that wall is molded;
3)After the shaping of wall basic unit, concrete wall repair using cement mortar levelling, then treat that wall is molded;
4)Wall it is levelling and be molded after the completion of, using cement, quartz sand, hydrophober and polyacrylate resin according to 5-5-1-1
Or 4-4-1-1 ratio, respectively take corresponding component then to be put into mixer and be stirred, finally by resulting thing
Material by putty knife be uniformly applied to it is levelling after metope on, before the material on metope is not completely dried, will foam
Cement plate is conformed on metope, and cement board is made up of inorganic incombustible material, and nontoxic, environmentally friendly and low-carbon, its fire line
A1 levels can be reached, and its thermal conductivity factor is 0.045, firm with concrete bonding, the coefficient of expansion is consistent, service life and building
Unanimously, cement plate to be foamed is dried with metope contact site;
5)It is first that the surface treatment of cement board is levelling after cement board is dried with concrete wall surface contact site, make
Its holding is smooth and clean, then stirs anti-permeation cracking-resistant mortar raw material, the construction of anti-permeation cracking-resistant mortar and storage temperature requirement
Between 5 DEG C -30 DEG C, anti-permeation cracking-resistant mortar is uniformly applied in cement board by putty knife, then treated impervious anti-
Mortar is split to be completely dried;
6)After anti-permeation cracking-resistant mortar is completely dried, decorative paint layer is uniformly applied to by anti-permeation cracking-resistant mortar by cylinder brush
On, after dry paint layer to be decorated, construction wall integral construction is completed.
(Three)Beneficial effect
Compared with prior art, the invention provides a kind of heat-insulation system of construction wall and construction method, possess following beneficial
Effect:
1. the heat-insulation system of the construction wall, pass through concrete wall layer, adhesive linkage, foam cement flaggy, anti-permeation cracking-resistant mortar
Layer wall face decorating layer between structure connection, and connection between mode repairing with levelling, building can be effectively ensured
The overall better heat preservation of wall.
2. the construction method of the construction wall, by making each form of construction work built by laying bricks or stones between layer get on more in construction
Fine repairing and levelling, and form of construction work on the whole and execution conditions etc., can ensure wall in the finished on the whole
Heat insulation effect and anti-permeation cracking-resistant effect it is better.
Brief description of the drawings
Fig. 1 is a kind of heat-insulation system structural representation of construction wall proposed by the present invention.
In figure:1 concrete wall layer, 2 adhesive linkages, 3 foam cement flaggies, 4 anti-permeation cracking-resistant screeds, 5 wall face decorating layers.
Embodiment
Below in conjunction with embodiments of the invention, the technical scheme in the embodiment of the present invention is clearly and completely retouched
State, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.
Based on the embodiment in the present invention, those of ordinary skill in the art are obtained under the premise of creative work is not made
The every other embodiment obtained, belongs to the scope of protection of the invention.
Embodiment one:
The problem to be solved in the present invention is a kind of heat-insulation system of construction wall, including concrete wall layer 1, the concrete walls
Adhesive linkage 2 has been built in the left side of body layer 1 by laying bricks or stones, and the left side of the adhesive linkage 2 has built foam cement flaggy 3, the cement board by laying bricks or stones
Anti-permeation cracking-resistant screed 4 has been built in the left side of layer 3 by laying bricks or stones, and wall face decorating layer 5 has been built in the left side of the anti-permeation cracking-resistant screed 4 by laying bricks or stones.
Another technical problem to be solved by the present invention is that a kind of construction method of the heat-insulation system of construction wall, including it is following
Step:
1)The position both sides that are poured during construction required for wall set up that two block sizes are identical and template in the same horizontal line,
Teeming line is internally placed after template erection is completed, the corresponding one side of template is fastened on by bolt draw bar to fix
Together, then work is protected to carry out the support of template by support frame;
2)Cement and sandstone are put into concrete mixer by five to five proportions, add concrete material mutually appropriate three
Moisture again is sufficiently stirred, and the concrete material finally obtained is poured into template, then using vibrating spear to template
Interior concrete vibrate levelling, then treats that wall is molded;
3)After the shaping of wall basic unit, concrete wall repair using cement mortar levelling, then treat that wall is molded;
4)Wall it is levelling and be molded after the completion of, using cement, quartz sand, hydrophober and polyacrylate resin according to 5-5-1-1
Ratio, respectively take corresponding component and then put into mixer to be stirred, resulting material finally passed through into oil
Grey knife be uniformly applied to it is levelling after metope on, before the material on metope is not completely dried, cement board is pasted
It is bonded on metope, cement board is made up of inorganic incombustible material, and nontoxic, environmentally friendly and low-carbon, and its fire protecting performance reaches A1
Level, and its thermal conductivity factor is 0.045, firm with concrete bonding, the coefficient of expansion is consistent, and service life is consistent with building, treats
Cement board is dried with metope contact site;
5)It is first that the surface treatment of cement board is levelling after cement board is dried with concrete wall surface contact site, make
Its holding is smooth and clean, then stirs anti-permeation cracking-resistant mortar raw material, the construction of anti-permeation cracking-resistant mortar and storage temperature requirement
Between 5 DEG C -15 DEG C, anti-permeation cracking-resistant mortar is uniformly applied in cement board by putty knife, then treated impervious anti-
Mortar is split to be completely dried;
6)After anti-permeation cracking-resistant mortar is completely dried, decorative paint layer is uniformly applied to by anti-permeation cracking-resistant mortar by cylinder brush
On, after dry paint layer to be decorated, construction wall integral construction is completed.
Embodiment two:
The problem to be solved in the present invention is a kind of heat-insulation system of construction wall, including concrete wall layer 1, the concrete walls
Adhesive linkage 2 has been built in the left side of body layer 1 by laying bricks or stones, and the left side of the adhesive linkage 2 has built foam cement flaggy 3, the cement board by laying bricks or stones
Anti-permeation cracking-resistant screed 4 has been built in the left side of layer 3 by laying bricks or stones, and wall face decorating layer 5 has been built in the left side of the anti-permeation cracking-resistant screed 4 by laying bricks or stones.
Another technical problem to be solved by the present invention is that a kind of construction method of the heat-insulation system of construction wall, including it is following
Step:
1)The position both sides that are poured during construction required for wall set up that two block sizes are identical and template in the same horizontal line,
Teeming line is internally placed after template erection is completed, the corresponding one side of template is fastened on by bolt draw bar to fix
Together, then work is protected to carry out the support of template by support frame;
2)Cement and sandstone are put into concrete mixer by five to four proportions, add concrete material mutually appropriate five
Moisture again is sufficiently stirred, and the concrete material finally obtained is poured into template, then using vibrating spear to template
Interior concrete vibrate levelling, then treats that wall is molded;
3)After the shaping of wall basic unit, concrete wall repair using cement mortar levelling, then treat that wall is molded;
4)Wall it is levelling and be molded after the completion of, using cement, quartz sand, hydrophober and polyacrylate resin according to 4-4-1-1
Ratio, respectively take corresponding component and then put into mixer to be stirred, resulting material finally passed through into oil
Grey knife be uniformly applied to it is levelling after metope on, before the material on metope is not completely dried, cement board is pasted
It is bonded on metope, cement board is made up of inorganic incombustible material, and nontoxic, environmentally friendly and low-carbon, and its fire protecting performance reaches A1
Level, and its thermal conductivity factor is 0.045, firm with concrete bonding, the coefficient of expansion is consistent, and service life is consistent with building, treats
Cement board is dried with metope contact site;
5)It is first that the surface treatment of cement board is levelling after cement board is dried with concrete wall surface contact site, make
Its holding is smooth and clean, then stirs anti-permeation cracking-resistant mortar raw material, the construction of anti-permeation cracking-resistant mortar and storage temperature requirement
Between 15 DEG C -30 DEG C, anti-permeation cracking-resistant mortar is uniformly applied in cement board by putty knife, then treated impervious anti-
Mortar is split to be completely dried;
6)After anti-permeation cracking-resistant mortar is completely dried, decorative paint layer is uniformly applied to by anti-permeation cracking-resistant mortar by cylinder brush
On, after dry paint layer to be decorated, construction wall integral construction is completed.
The beneficial effects of the invention are as follows:Form of construction work on the whole and execution conditions etc., can ensure that wall is completing
Heat insulation effect and anti-permeation cracking-resistant effect afterwards on the whole is better.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (2)
1. a kind of heat-insulation system of construction wall, including concrete wall layer(1), it is characterised in that the concrete wall layer
(1)Left side built adhesive linkage by laying bricks or stones(2), the adhesive linkage(2)Left side built foam cement flaggy by laying bricks or stones(3), the foaming water
Mud plate layer(3)Left side built anti-permeation cracking-resistant screed by laying bricks or stones(4), the anti-permeation cracking-resistant screed(4)Left side built metope by laying bricks or stones
Decorative layer(5).
2. a kind of construction method of the heat-insulation system of construction wall, it is characterised in that comprise the following steps:
1)The position both sides that are poured during construction required for wall set up that two block sizes are identical and template in the same horizontal line,
Teeming line is internally placed after template erection is completed, the corresponding one side of template is fastened on by bolt draw bar to fix
Together, then work is protected to carry out the support of template by support frame;
2)Cement and sandstone are put into concrete mixer by five to five or five to four proportions, add concrete material
Mutually appropriate three to five times of moisture is sufficiently stirred, and the concrete material finally obtained is poured into template, is then used
Vibrating spear to the concrete in template vibrate levelling, then treats that wall is molded;
3)After the shaping of wall basic unit, concrete wall repair using cement mortar levelling, then treat that wall is molded;
4)Wall it is levelling and be molded after the completion of, using cement, quartz sand, hydrophober and polyacrylate resin according to 5-5-1-1
Or 4-4-1-1 ratio, respectively take corresponding component then to be put into mixer and be stirred, finally by resulting thing
Material by putty knife be uniformly applied to it is levelling after metope on, before the material on metope is not completely dried, will foam
Cement plate is conformed on metope, and cement board is made up of inorganic incombustible material, and nontoxic, environmentally friendly and low-carbon, its fire line
A1 levels can be reached, and its thermal conductivity factor is 0.045, firm with concrete bonding, the coefficient of expansion is consistent, service life and building
Unanimously, cement plate to be foamed is dried with metope contact site;
5)It is first that the surface treatment of cement board is levelling after cement board is dried with concrete wall surface contact site, make
Its holding is smooth and clean, then stirs anti-permeation cracking-resistant mortar raw material, the construction of anti-permeation cracking-resistant mortar and storage temperature requirement
Between 5 DEG C -30 DEG C, anti-permeation cracking-resistant mortar is uniformly applied in cement board by putty knife, then treated impervious anti-
Mortar is split to be completely dried;
6)After anti-permeation cracking-resistant mortar is completely dried, decorative paint layer is uniformly applied to by anti-permeation cracking-resistant mortar by cylinder brush
On, after dry paint layer to be decorated, construction wall integral construction is completed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710528303.4A CN107447876A (en) | 2017-07-01 | 2017-07-01 | The heat-insulation system and construction method of a kind of construction wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710528303.4A CN107447876A (en) | 2017-07-01 | 2017-07-01 | The heat-insulation system and construction method of a kind of construction wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107447876A true CN107447876A (en) | 2017-12-08 |
Family
ID=60488566
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710528303.4A Pending CN107447876A (en) | 2017-07-01 | 2017-07-01 | The heat-insulation system and construction method of a kind of construction wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107447876A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101177967A (en) * | 2007-11-22 | 2008-05-14 | 北京中远汇丽精细化工有限公司 | Phase-change thermal energy storage three-in-one exterior wall outer insulation system and construction method thereof |
CN103147524A (en) * | 2013-03-06 | 2013-06-12 | 肇东市华奥中天建材科技有限公司 | Heat-insulating wall |
CN103225349A (en) * | 2013-05-06 | 2013-07-31 | 无锡奕扬保温材料科技有限公司 | Internal insulation system for exterior wall of building |
CN103233522A (en) * | 2013-05-06 | 2013-08-07 | 无锡奕扬保温材料科技有限公司 | Outer heat-insulating system of outer wall of building |
CN103306385A (en) * | 2013-06-18 | 2013-09-18 | 上海宝冶工程技术有限公司 | Inorganic fireproof building heat preservation system and construction method thereof |
CN104612257A (en) * | 2014-12-13 | 2015-05-13 | 广西科技大学 | Composite foamed cement board external insulation system |
CN105625588A (en) * | 2016-01-27 | 2016-06-01 | 中国十七冶集团有限公司 | Construction method for heat preservation external wall of building |
-
2017
- 2017-07-01 CN CN201710528303.4A patent/CN107447876A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101177967A (en) * | 2007-11-22 | 2008-05-14 | 北京中远汇丽精细化工有限公司 | Phase-change thermal energy storage three-in-one exterior wall outer insulation system and construction method thereof |
CN103147524A (en) * | 2013-03-06 | 2013-06-12 | 肇东市华奥中天建材科技有限公司 | Heat-insulating wall |
CN103225349A (en) * | 2013-05-06 | 2013-07-31 | 无锡奕扬保温材料科技有限公司 | Internal insulation system for exterior wall of building |
CN103233522A (en) * | 2013-05-06 | 2013-08-07 | 无锡奕扬保温材料科技有限公司 | Outer heat-insulating system of outer wall of building |
CN103306385A (en) * | 2013-06-18 | 2013-09-18 | 上海宝冶工程技术有限公司 | Inorganic fireproof building heat preservation system and construction method thereof |
CN104612257A (en) * | 2014-12-13 | 2015-05-13 | 广西科技大学 | Composite foamed cement board external insulation system |
CN105625588A (en) * | 2016-01-27 | 2016-06-01 | 中国十七冶集团有限公司 | Construction method for heat preservation external wall of building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103015574B (en) | Form-removal-free cast-in-place light-weight insulated wall and construction method thereof | |
CN103643754B (en) | The waterproof treatment structure of building wall body interface seam crossing and processing method | |
CN104674987A (en) | Self heat insulation laminated shear wall structure and construction process | |
CN102701648B (en) | Foam concrete doped with lightweight foam and production method of foam concrete | |
RU2473761C2 (en) | Method to manufacture heat insulation panel and heat insulation panel | |
CN103206032B (en) | Heat-insulation wall with low temperature difference | |
CN107806250B (en) | Dry-hanging type external wall repairing and reinforcing method | |
CN204266529U (en) | Assembly type building wall pasting board component | |
CN203947668U (en) | A kind of compound new-type thermal insulation thermal insulation board | |
CN201459966U (en) | Self-insulation wall structure for building | |
CN204456534U (en) | A kind of self-heat conserving overlapped shear wall structure | |
CN204040459U (en) | A kind of cast-in-situ concrete fireproof heat insulating non-dismantling formwork | |
CN107447876A (en) | The heat-insulation system and construction method of a kind of construction wall | |
CN206477479U (en) | A kind of compound heat preservation die plate wall body structure | |
CN202990145U (en) | Novel sound insulation and thermal insulation building material | |
CN201826403U (en) | Building exterior wall insulation structure | |
CN209780017U (en) | Effectual portland cement wallboard gives sound insulation | |
CN104453153B (en) | Assembled building wall pasting board component | |
CN111285641A (en) | Novel floor heat-insulating sound-insulating material and application thereof | |
CN202809977U (en) | I-shaped self-heat preservation block | |
CN205822648U (en) | A kind of heat insulation formwork integrated board and external thermal insulation system | |
CN208251511U (en) | A kind of superthin stone heat insulation decoration integrated plate structure | |
CN206173232U (en) | Building thistle board strip for partition wall | |
CN211714253U (en) | Heat-insulating wall | |
CN205475769U (en) | Net strengthening rib external wall insulation board is rolled over to metal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: Room 12A02, Building A, Hongding Building, Xuanlongqiao Road, Wenzhou City, Zhejiang Province, 325000 Applicant after: Wenzhou Huahong Construction Co., Ltd. Address before: Room 12A02, Building A, Hongding Building, Xuanlongqiao Road, Wenzhou City, Zhejiang Province, 325000 Applicant before: Grand municipal garden engineering Construction Company Limited of China of Wenzhou City |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171208 |