CN107436979A - Suitable for the creator of transmission line of electricity lightning protection calculation auto-building model - Google Patents

Suitable for the creator of transmission line of electricity lightning protection calculation auto-building model Download PDF

Info

Publication number
CN107436979A
CN107436979A CN201710618527.4A CN201710618527A CN107436979A CN 107436979 A CN107436979 A CN 107436979A CN 201710618527 A CN201710618527 A CN 201710618527A CN 107436979 A CN107436979 A CN 107436979A
Authority
CN
China
Prior art keywords
model
parameter
transmission line
shaft tower
lightning protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710618527.4A
Other languages
Chinese (zh)
Inventor
谢文炳
赵贤根
何俊佳
肖佩
傅智为
吴文斌
许军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huazhong University of Science and Technology
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Fujian Electric Power Co Ltd
State Grid Fujian Electric Power Co Ltd
Original Assignee
Huazhong University of Science and Technology
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Fujian Electric Power Co Ltd
State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huazhong University of Science and Technology, State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Fujian Electric Power Co Ltd, State Grid Fujian Electric Power Co Ltd filed Critical Huazhong University of Science and Technology
Priority to CN201710618527.4A priority Critical patent/CN107436979A/en
Publication of CN107436979A publication Critical patent/CN107436979A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/30Circuit design
    • G06F30/36Circuit design at the analogue level
    • G06F30/367Design verification, e.g. using simulation, simulation program with integrated circuit emphasis [SPICE], direct methods or relaxation methods

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The invention discloses a kind of creator suitable for transmission line of electricity lightning protection calculation auto-building model, user is only needed to input shaft tower physical dimension, insulator chain parameter, ground wire parameter, part of path parameter and lightning current source parameter, Tower Model and circuit segment model can be automatically generated, the automatic connection of electrical node is realized by related information, realizes automatically creating for transmission line of electricity lightning protection calculation model.The creator greatly reduces the workload of long distance transmission line lightning protection calculation model creation, improves the efficiency of transmission line of electricity Lightning Protection Analysis.The present invention's has advantages below:1)Workable, user only needs to carry out configuration to the engineering parameter of shaft tower and circuit that modeling work can be completed;2)Efficiency high, part of path mode input parameter needs not move through intermediate computations, but creator calculates acquisition automatically;3)It is easily managed, part of path associates with corresponding shaft tower, and shaft tower parameter changes, and part of path parameter associated with it changes automatically.

Description

Suitable for the creator of transmission line of electricity lightning protection calculation auto-building model
Technical field
The invention belongs to technical field of high voltage, and in particular to one kind is given birth to automatically suitable for transmission line of electricity lightning protection calculation model Into creator.
Background technology
Thunderbolt is the main reason for causing transmission line of electricity to trip, and accurate evaluation Methods of Lightning Protection Performance for Transmission Line simultaneously rationally enters The corresponding Lightning Transformation of row, the safe and stable operation to transmission line of electricity have great importance.
Super-pressure and UHV transmission line, especially DC power transmission line, transmission distance is remote, shaft tower quantity is more, causes Establish that the workload of transmission line of electricity lightning protection properties computation model is huge, and workload is concentrated mainly on circuit between Tower Model and shaft tower Model.Patent《The construction method and shaft tower modeling method of a kind of New Two Dimensional shaft tower editing machine》Propose the efficient of Tower Model Creation method, but the patent circuit model not being related between shaft tower, can not realize whole piece power transmission line only for Tower Model The lightning protection calculation model on road automatically creates.Model of power transmission system parameter is numerous, not only include with shaft tower size interrelated geometrical parameters, Electric parameter is also included, and the parameter of each section of circuit (between two shaft towers) is different, causes manual creation circuit model Workload it is big, efficiency is low, easy error.
The content of the invention
In view of this, the present invention provides a kind of creator suitable for transmission line of electricity lightning protection calculation auto-building model.
The present invention is realized using following technical scheme:A kind of wound suitable for transmission line of electricity lightning protection calculation auto-building model Build device, it is characterised in that:Comprise the following steps:S1:Shaft tower parameter is inputted, including physical dimension, ground wire hanging point position, leads ground Line electric parameter, insulator chain string length;S2:The automatic model for establishing shaft tower;S3:Input line section parameter, including connected bar Tower is numbered and its latitude and longitude coordinates, span, sag of conductor and ground wire, soil resistivity;S4:The geometric parameter provided based on S1 and S3, Calculate the geometric parameter that circuit model needs, including transverse and longitudinal coordinate of each phase ground wire at shaft tower and the transverse and longitudinal in span center Coordinate, the length of circuit, wire internal-and external diameter; S5:The electric parameter provided based on S1 and S3, obtain the electricity that circuit model needs Gas parameter, including the D.C. resistance of ground wire unit length, soil resistivity;S6:Based on the S4 and S5 geometry provided and electrically Parameter, generate the Jmarti circuit segment models for lightning protection calculation;S7:It is automatic raw according to part of path and the related information of shaft tower Each phase ground wire and the electrical connection of Tower Model electrical node into circuit segment model, include shaft tower and lead so as to automatically create The model of power transmission system of ground line model;S8:Input lightning current parameter, including thunderbolt type, lightning current waveform, amplitude, lightning current Channel impedance, add lightning current source model automatically in model of power transmission system.
In an embodiment of the present invention, the transmission line of electricity type includes DC power transmission line and AC power line simultaneously Road.
In an embodiment of the present invention, thunderbolt type includes thunderbolt and back flashover two types.
The present invention is on the basis of Tower Model automatically creates, and by parameter association, realizes the mould of part of path between shaft tower Type automatically creates, and the connection for realizing the electrical node of circuit segment model and Tower Model is automatic, significantly reduces transmission of electricity The establishment work of circuit Lightning performance computation model, while also improve the degree of accuracy of model creation.
The present invention's has advantages below:1)Workable, user only needs to enter the engineering parameter of shaft tower and circuit Row configuration can complete modeling work;2)Efficiency high, part of path mode input parameter needs not move through intermediate computations, but creates Device calculates acquisition automatically;3)It is easily managed, part of path associates with corresponding shaft tower, and shaft tower parameter changes, associated with it Part of path parameter changes automatically.
Brief description of the drawings
Fig. 1 is that transmission line of electricity lightning protection calculation model automatically creates flow;
Fig. 2 is power transmission line section parameter inputting interface;
Fig. 3 is the Methods of Lightning Protection Performance for Transmission Line computation model automatically generated.
Embodiment
Explanation is further explained to the present invention with specific embodiment below in conjunction with the accompanying drawings.
A kind of creator suitable for transmission line of electricity lightning protection calculation auto-building model, it is characterised in that:Including following step Suddenly:S1:Input shaft tower parameter, including physical dimension, ground wire hanging point position, ground wire electric parameter, insulator chain string length; S2:The automatic model for establishing shaft tower;S3:Input line section parameter, including connected shaft tower numbering and its latitude and longitude coordinates, shelves Away from, sag of conductor and ground wire, soil resistivity;S4:The geometric parameter provided based on S1 and S3, calculate the geometric parameters that circuit model needs Number, including transverse and longitudinal coordinate of each phase ground wire at shaft tower and inside and outside the transverse and longitudinal coordinate, the length of circuit, wire in span center Footpath; S5:The electric parameter provided based on S1 and S3, obtain the electric parameter that circuit model needs, including ground wire unit length D.C. resistance, soil resistivity;S6:The geometry and electric parameter provided based on S4 and S5, is generated for lightning protection calculation Jmarti circuit segment models;S7:According to part of path and the related information of shaft tower, each phase ground wire of circuit segment model is automatically generated With the electrical connection of Tower Model electrical node, so as to automatically create the model of power transmission system for including shaft tower and ground wire model; S8:Lightning current parameter, including thunderbolt type, lightning current waveform, amplitude, lightning current channel impedance are inputted, in model of power transmission system In automatic addition lightning current source model.The transmission line of electricity lightning protection calculation model of one embodiment of the invention automatically creates flow referring to figure 1。
In an embodiment of the present invention, the transmission line of electricity type includes DC power transmission line and AC power line simultaneously Road.
In an embodiment of the present invention, thunderbolt type includes thunderbolt and back flashover two types.
The creator suitable for transmission line of electricity lightning protection calculation auto-building model of the present invention, with mono- time of Fujian Province 500kV The line of transmission line of alternation current-water three-exemplified by, the circuit includes 245 base shaft towers, and its Lightning performance assessment models is created automatically Build.Comprise the following steps:
(1)Input shaft tower parameter
According to the shaft tower drawing of water three-wire line, by《A kind of construction method and shaft tower modeling of New Two Dimensional shaft tower editing machine Method》The visualization shaft tower editing machine of offer, inputs corresponding parameter, including the physical dimension of shaft tower, insulation sub-information, leads ground Line parameter, and the position that hangs of ground wire is set, ground wire hang node be 1G and 2G, wire hang node be 1A, 1B and 1C.The power transmission line section parameter inputting interface of one embodiment of the invention is referring to Fig. 2.
(2)Tower Model automatically creates
Tower Model can use in an embodiment of the present invention《A kind of construction method and shaft tower of New Two Dimensional shaft tower editing machine Modeling method》The visualization shaft tower editing machine of offer automatically creates the surge impedance model of shaft tower, and generates 5 electrical nodes, compiles Number be respectively 1G, 2G, 1A, 1B and 1C.
(3)Input line section parameter
The parameter in input line section, including be associated shaft tower numbering, soil resistivity, sag of conductor and ground wire, Fig. 2 gives this The part of path parameter inputting interface of the creator of patent of invention.
(4)Circuit model automatically creates
Numbered by the shaft tower of association, obtain shaft tower electrical node quantity, be herein 5, creator automatically generates left and right ends Part of path Jmarti models respectively with 5 electrical nodes, left node entitled 1G_L, 2G_L, 1A_L, 1B_L, 1C_L are right Mid-side node entitled 1G_R, 2G_R, 1A_R, 1B_R, 1C_R;
Ground wire length in Jmarti models, ground wire internal-and external diameter, ground wire hangs coordinate, span center ground wire is sat at shaft tower The geometric parameters such as mark, ground wire division number, division spacing are calculated automatically from by the geometric parameter of input in (1) and (3);
The data that soil resistivity parameter is inputted by (3) in Jmarti models determine.
(5)Circuit segment model is electrically connected with Tower Model
Creator agreement electrically saves the electric Tower Model associated with it in succession on the part of path Jmarti models left side accordingly Point is connected, as 1G_L is connected with the 1G nodes of Tower Model, by that analogy;The electrical node on the right and next base shaft tower model Respective nodes are connected, as shown in Figure 3.
(6)Lightning current source parameter setting
The parameter setting in lightning current source mainly includes parameter setting, the creators such as waveform, amplitude, lightning channel resistance and automatically generated Lightning current source model with 1 electrical node Node.
(7)Lightning current source model is electrically connected with circuit model
The thunderbolt type selected according to user, creator automatically generate lightning current source model electrical node and model of power transmission system electricity The connection of moral point.
If user's selection is that counterattack calculates, i.e. lightning stroke rate, then the electrical node Node in lightning current source and shaft tower mould 1G the or 2G nodes of type are connected;What if user selected is shielding A phases, the electrical node Node and Tower Model in lightning current source 1A nodes be connected.As shown in Figure 3.
Above is presently preferred embodiments of the present invention, all changes made according to technical solution of the present invention, caused function are made During with scope without departing from technical solution of the present invention, protection scope of the present invention is belonged to.

Claims (3)

  1. A kind of 1. creator suitable for transmission line of electricity lightning protection calculation auto-building model, it is characterised in that:Comprise the following steps:
    S1:Input shaft tower parameter, including physical dimension, ground wire hanging point position, ground wire electric parameter, insulator chain string length;
    S2:The automatic model for establishing shaft tower;
    S3:Input line section parameter, including connected shaft tower numbering and its latitude and longitude coordinates, span, sag of conductor and ground wire, soil electricity Resistance rate;
    S4:The geometric parameter provided based on S1 and S3, the geometric parameter that circuit model needs is calculated, including each phase ground wire is in bar Transverse and longitudinal coordinate at tower and the transverse and longitudinal coordinate, the length of circuit, wire internal-and external diameter in span center;
    S5:The electric parameter provided based on S1 and S3, obtain the electric parameter that circuit model needs, including ground wire unit length D.C. resistance, soil resistivity;
    S6:The geometry and electric parameter provided based on S4 and S5, generates the Jmarti circuit segment models for lightning protection calculation;
    S7:According to part of path and the related information of shaft tower, each phase ground wire and the Tower Model for automatically generating circuit segment model are electric The electrical connection of moral point, so as to automatically create the model of power transmission system for including shaft tower and ground wire model;
    S8:Lightning current parameter, including thunderbolt type, lightning current waveform, amplitude, lightning current channel impedance are inputted, in transmission line of electricity Automatically lightning current source model is added in model.
  2. 2. according to the creator for being applied to transmission line of electricity lightning protection calculation auto-building model, it is characterised in that:The transmission line of electricity Type includes DC power transmission line and transmission line of alternation current simultaneously.
  3. 3. according to the creator for being applied to transmission line of electricity lightning protection calculation auto-building model, it is characterised in that:Thunderbolt type includes Thunderbolt and back flashover two types.
CN201710618527.4A 2017-07-26 2017-07-26 Suitable for the creator of transmission line of electricity lightning protection calculation auto-building model Pending CN107436979A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710618527.4A CN107436979A (en) 2017-07-26 2017-07-26 Suitable for the creator of transmission line of electricity lightning protection calculation auto-building model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710618527.4A CN107436979A (en) 2017-07-26 2017-07-26 Suitable for the creator of transmission line of electricity lightning protection calculation auto-building model

Publications (1)

Publication Number Publication Date
CN107436979A true CN107436979A (en) 2017-12-05

Family

ID=60460174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710618527.4A Pending CN107436979A (en) 2017-07-26 2017-07-26 Suitable for the creator of transmission line of electricity lightning protection calculation auto-building model

Country Status (1)

Country Link
CN (1) CN107436979A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112084751A (en) * 2020-09-04 2020-12-15 南方电网科学研究院有限责任公司 Method, device and equipment for editing tower data file and storage medium
CN113688504A (en) * 2021-07-26 2021-11-23 南方电网科学研究院有限责任公司 Parameterized modeling method, system, medium and power terminal for line electromagnetic interference

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101694939A (en) * 2009-10-16 2010-04-14 南方电网技术研究中心 Converter station insulating co-operating design method of high-pressure direct-current power transmission system
CN102298105A (en) * 2011-05-09 2011-12-28 国网电力科学研究院 Method for checking lightning shielding failure performance of line
CN103995931A (en) * 2014-05-20 2014-08-20 国家电网公司 Establishing method of novel two-dimensional tower editor and tower modeling method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101694939A (en) * 2009-10-16 2010-04-14 南方电网技术研究中心 Converter station insulating co-operating design method of high-pressure direct-current power transmission system
CN102298105A (en) * 2011-05-09 2011-12-28 国网电力科学研究院 Method for checking lightning shielding failure performance of line
CN103995931A (en) * 2014-05-20 2014-08-20 国家电网公司 Establishing method of novel two-dimensional tower editor and tower modeling method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
J.MORALES等: "Induced over voltages produced by atmospheric discharges considering JMarti and Pi distribution lines models", 《IEEE XPLORE》 *
宋阳等: "500kV同塔双回输电线路雷电反击仿真模型的建立与分析", 《电气技术》 *
陶海英: "基于JMarti模型的500kV空载线路分闸过电压研究", 《江西电力职业技术学院学报》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112084751A (en) * 2020-09-04 2020-12-15 南方电网科学研究院有限责任公司 Method, device and equipment for editing tower data file and storage medium
CN113688504A (en) * 2021-07-26 2021-11-23 南方电网科学研究院有限责任公司 Parameterized modeling method, system, medium and power terminal for line electromagnetic interference
CN113688504B (en) * 2021-07-26 2024-03-22 南方电网科学研究院有限责任公司 Parameterized modeling method, system, medium and power terminal for line electromagnetic interference

Similar Documents

Publication Publication Date Title
CN103995931B (en) The construction method and shaft tower modeling method of a kind of two-dimentional shaft tower editing machine
CN103795057B (en) Based on the power distribution network topology numbering generation method of search in distribution power system load flow calculation
KR100734821B1 (en) Measurement Method of Grounding Resistance of Transmission Towers in an Energized Transmission Line System
CN110705088B (en) Permanent magnet motor modeling and electromagnetic performance calculating method based on magnetic network
CN103500245B (en) A kind of field road transient state-transient state coupling simulation method based on m ulti-loop m ethod
CN104573245B (en) The computational methods that ground wire is lost in a kind of UHV transmission line
CN104410066A (en) Incidence matrix-based automatic short-circuit calculation method of mine high-voltage power supply system
CN105656076B (en) The acquisition methods of marine wind electric field extra large cable wiring
CN103714239B (en) Method for computing lightning induced voltages of insulators of low-voltage lines when earth is struck by lightning
CN103969552A (en) Harmonic source positioning and analyzing method for distributed power generation system
CN107436979A (en) Suitable for the creator of transmission line of electricity lightning protection calculation auto-building model
CN109444665A (en) The unrelated Fault Locating Method of power distribution network multiple-limb overhead transmission line parameter and system
CN104834788B (en) A kind of 500kV shaft towers divide the real-time construction method of grounded-line threedimensional model more more times
CN105976551B (en) A kind of fire alarm system based on BIM
CN111541246A (en) All-pure embedded calculation method for alternating current and direct current power flow of electric power system
CN108445297A (en) The monitoring method and system of Resistance of Grounding Grids
CN112784516B (en) High-voltage direct-current transmission direct-current magnetic bias level calculation method based on unified loop construction
CN104868339A (en) Method for establishing grounding grid based on BIM (building information modeling)
CN109299564B (en) Correction method for temperature factor influence in transformer bias current simulation calculation process
CN104410508B (en) power line network topology perception method and device based on power line communication
CN104866726A (en) Power network topology analyzing method and on-line load flow calculating method for offshore oilfield group
CN106294966B (en) A kind of single telegram in reply cable core transient state temperature rise acquisition methods not depending on skin temperature
CN209961868U (en) Circuit shunting structure for reverse short-distance measurement of grounding grid
CN105631119A (en) Simulation modeling method for grounding grid
CN203217034U (en) Grounding fault positioning system for power distribution network

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171205